FHPS-Structured Cabling RFP-APP B-Collins (1).pdf

PDF 1 MB Posted

Attached to
Request for Structured Cabling System
Solicitation number
RFP FHP 210000000025 2
Issued by
Kent County, Grand Rapids City, Michigan

About this file

This document is an architectural/technical specification document for a Structured Cabling RFP (Request for Proposal) for FHPS (appears to be a school district facility). The document provides detailed technical specifications and floor plans for structured cabling installation across multiple classroom or institutional spaces. The scope of work includes installation of horizontal cabling pathways, cable tray systems, grounding infrastructure, electrical receptacles, conduit systems, and supporting infrastructure to accommodate data, A/V, and wireless connectivity throughout the designated spaces. The specifications call for 12"x4" cable trays, four 4" conduits for horizontal pathways from hallways, grounding busbars mounted at 80" above finished floor (AFF), and 3/4" A/C fire-treated plywood backboards measuring 8 feet high mounted with the bottom at 6" AFF. Multiple locations require new A/V setup installations, and the document identifies specific technology placement requirements across various rooms with teacher stations, televisions, wireless access points, and existing A/V pathways designated for future use.

Environmental and infrastructure requirements include maintaining room temperatures between 64°F and 75°F with relative humidity between 37% and 55% non-condensing, with each space requiring a dedicated air conditioning unit. Electrical specifications require 5-20R, 120V receptacles mounted on diverse circuits at 80" AFF or inside provided technology cabinets. Suspended ceilings are explicitly not required or desired. All grounding infrastructure must be connected to the main building ground. Backboards must be painted with two coats of fire-retardant white paint. The specifications reference existing V4000 raceways to be utilized for data and A/V cabling, indicating integration with current building infrastructure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Legend

General Data

A/V Location

Wireless AP

Teacher StationT

M

TVTV

TVTV

TVTV

TVTV

T

T

T

T ex

TG

B

12"x4" Cable Tray

4" Slv

4" Slv

General Notes:

1. Suspended ceilings are not required or desired.

2. The space should be environmentally controlled to maintain a room temperature range of 64F to 75F (18°C to 24°C) with a relative humidity level between 37% to 55% non-condensing.

Space should have a dedicated A/C unit.

3. Grounding busbars shall be provided and grounded to the main building ground. Mount and secure to backboard at 80" AFF.

Detailed Notes:

1. 5-20R, 120V. Receptacles should on diverse circuits and be mounted 80" AFF to align with technology cabinet placement.

2. Four 4" conduits should be provided for horizontal pathway from the hallway.

3. 12"x4" cable tray should be provided to support cabling from sleeve locations to provided equipment rack location.

4. 3/4" A/C fire treated plywood backboards to be installed, 8’ high, mounted so the bottom is 6" AFF, painted with two coats of fire retardant white paint.

x

Existing V4000 raceway to be used for data and A/V cabling

A/V Location

Wireless AP

Teacher StationT

TVTV

TVTV

TVTV

TVTV

TVTV TVTV

TVTV

TVTV

TVTV

TVTV

T T

T

T T

T

T

T

T

T ex ex ex ex ex ex ex ex ex

Two at Floor Level

One at Projector

Existing A/V

Pathway for future use

Pathway for future use

A/V Location

Wireless AP

Teacher StationT

I

TVTV

TVTV

TVTV

TVTV

TVTV

T

T T

T

T ex ex

TGB 12"x4" Cable Tray 4" Slv

General Notes:

1. Suspended ceilings are not required or desired.

2. The space should be environmentally controlled to maintain a room temperature range of 64F to 75F (18°C to 24°C) with a relative humidity level between 37% to 55% non-condensing.

Space should have a dedicated A/C unit.

3. Grounding busbars shall be provided and grounded to the main building ground. Mount and secure to backboard at 80" AFF.

Detailed Notes:

1. 5-20R, 120V. Receptacles should be mounted inside of the technology cabinet provided by others.

2. Four 4" conduits should be provided for horizontal pathway from the hallway.

3. 12"x4" cable tray should be provided to support cabling from sleeve locations to provided equipment rack location.

4. 3/4" A/C fire treated plywood backboards to be installed, 8’ high, mounted so the bottom is 6" AFF, painted with two coats of fire retardant white paint.

x

A/V Location

Wireless AP

Teacher StationT

TVTV

TVTV

TVTV

TVTV

TVTV

TV

TVTV

TVTVT

T

T

T

T

T ex ex ex ex ex ex

Requires new A/V Setup

Requires new A/V Setup

File details come from the government source that posted it. Updated .