FETC_resurface_landscape.pdf
PDF 988 KB Posted
- Attached to
- Dust Suppression Services - Southern Nevada
- Solicitation number
- 43ADG-S1644
- Issued by
- Clark County, Fish Springs CDP, Nevada
About this file
The provided document is a project map detailing the proposed resurfacing areas for the Nevada Army National Guard's Floyd Edsall Training Center (FETC). The total surface area to be resurfaced is 3,139,000 square feet or 350,000 square yards, encompassing earthen roads, single-lane gravel roads, gravel parking areas, an engineer training area and access roads, a staging area and gravel roads, a vehicle test track, and a running track.
The related state and local contract opportunity is for Dust Suppression Services in Southern Nevada, specifically involving the jurisdictions of Carson City. The contract details, such as response dates, award dates, contract term, and renewal options, are not provided in the given information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 43ADG-S1644 Dust Suppression Southern NV.docx | DOCX document | |
| FETC Minor Soure Permit _01157_July 13 2026.pdf | ||
| FETC-cultSurv-NAID MAP.pdf | ||
| Fugitive Dust - Amended 01-21-2020_.pdf | ||
| SECOND Q.docx | DOCX document | |
| ATTACHMENT D - Insurance Schedule~2.docx | DOCX document | |
| ATTACHMENT H -Certification Regarding Lobbying.docx | DOCX document | |
| ATTACHMENT B - Vendor Certifications .docx | DOCX document | |
| ATTACHMENT A - Confidentiality and Certification of Indemnification .docx | DOCX document | |
| ATTACHMENT I - Federal Laws and Authorities .docx | DOCX document | |
| ATTACHMENT J - Environmental Policy.pdf | ||
| ATTACHMENT J - Personal Security Questionnaire.docx | DOCX document | |
| Quote Instructions.pdf | ||
| Standard Contract Form.docx | DOCX document | |
| Reference Questionnaire - 01-24-20~4.doc | DOC document | |
| Amendment 1 Walk Time and Date.docx | DOCX document | |
| LetterOfIntent~2.pdf | ||
| ATTACHMENT G - Cost Schedule.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nevada Army National Guard Flyod Edsall Training Center (FETC)
Proposed Resurfacing Areas
Date Drawn Drawn By
JJP
Areas to be Resurfaced ARNG-Owned Parcel Boundaries
FETC
8/3/2021
3,139,000 square feet3,139,000 square feet 350,000 square yards350,000 square yards
0 1,000 2,000 3,000 4,000500 Feet $
Imagery date: 3/2021 (Google) Projection: NAD 83 UTM Zone 11
Tota l Sur face AreaTota l Sur face Area
Earthen Road Single Lane
Gravel Road Single Lane
Hall Rd. (gravel) Width Varies
Gravel Parking Areas
Gravel Parking Areas
Engineer Training Area and Access Rds (gravel)
Staging Area and Gravel Rds (width varies)
Gravel Road Single Lane
Vehicle Test Track
Running Track (gravel)
Staging Areas (gravel)
File details come from the government source that posted it. Updated .