FETC Minor Soure Permit _01157_July 13 2026.pdf

PDF 473 KB Posted

Attached to
Dust Suppression Services - Southern Nevada
Solicitation number
43ADG-S1644
Issued by
Clark County, Fish Springs CDP, Nevada

About this file

This document is a Minor Source Permit issued by the Clark County Department of Environment and Sustainability/Division of Air Quality for the Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center. The permit covers natural gas boilers, emergency generators, and a surface coating operation at the facility, classifying it as a minor source of regulated air pollutants. The permit outlines equipment, controls, emissions limitations, compliance monitoring and testing requirements, recordkeeping, and reporting for the facility.

The permit limits operation of the emergency generators to 100 hours per year for testing and maintenance, with an additional 50 hours allowed for non-emergency use. It also limits the annual consumption of VOC-containing coatings and solvents to 1,100 gallons. The facility must comply with federal requirements for stationary reciprocating internal combustion engines and conduct visible emissions checks quarterly. Recordkeeping, reporting, and notification requirements are also detailed in the permit.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MINOR SOURCE PERMIT

SOURCE ID: 1157

Nevada Army National Guard

North Las Vegas Readiness Center and

Floyd Edsall Training Center

6600 Range Road

Las Vegas, Nevada 89139

ISSUED ON: July 14, 2021 EXPIRES ON: July 13, 2026

Current action: Renewal

Issued to: Responsible Official:

Nevada Army National Guard Nathan Stromberg

2460 Fairview Drive Environmental Protection Specialist

Carson City, Nevada 89701 PHONE: (702) 694-4484

EMAIL: nathan.b.stromberg.civ@mail.mil

Issued by the Clark County Department of Environment and Sustainability/Division of Air

Quality in accordance with Section 12.1 of the Clark County Air Quality Regulations.

Theodore A. Lendis, Permitting Manager

Minor Source Permit

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center Source ID: 1157

EXECUTIVE SUMMARY

The source is the main headquarters of the Nevada National Guard in Southern Nevada, located in the Hydrographic Area of 212 – Las Vegas Valley. As the main headquarters of the Nevada

National Guard, the source is classified under SIC 9711: National Security and NAICS 928110:

National Security. The source consists of natural gas boilers, emergency generators, and a surface coating operation. Combined, these emission units establish the Nevada National Guard North

Las Vegas Readiness Center and Floyd Edsall Training Center as a minor source of all regulated air pollutants, enforced by the Clark County Division of Air Quality.

In addition, the source is subject to the federal requirements of 40 CFR Part 60 Subpart IIII and 40

CFR Part 63 Subpart ZZZZ. However, the source will meet all of the federal requirements of 40

CFR Part 63 Subpart ZZZZ, by adhering to the federal requirements of 40 CFR Part 60 Subpart

IIII.

SOURCE-WIDE PTE SUMMARY

The facility is a minor source of PM10, PM2.5, NOx, CO, SO2, and VOC.

Table 1. Potential to Emit (tons per year)

Pollutant PM10 PM2.5 NOx CO SO2 VOC H2S Pb

Total 0.29 0.29 8.96 4.44 0.04 1.46 0 0

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

TABLE OF CONTENTS

1.0 EQUIPMENT

1.1 Emission Units

1.2 Insignificant Activities

1.3 Nonroad Engines

2.0 CONTROLS

2.1 Control Devices

2.2 Control Requirements

3.0 LIMITATIONS

3.1 Operational Limits

3.2 Emission Limits

4.0 COMPLIANCE DEMONSTRATION REQUIREMENTS

4.1 Monitoring

4.2 Testing

4.3 Recordkeeping Requirements

4.4 Reporting and Notification

5.0 ADMINISTRATIVE REQUIREMENTS

5.1 General

5.2 Renewals and Revisions

LIST OF TABLES

Table 1-1. Summary of Emission Units

Table 1-2. List of Insignificant Activities

Table 3-1. Potential to Emit (tons per year)

Table 3-2. Source-Wide Emission Unit PTE Summary (tons per year)

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

COMMON ACRONYMS AND ABBREVIATIONS

(These terms may be seen in the permit)

AQR Clark County Air Quality Regulation

CARB California Air Resources Board

CFR Code of Federal Regulations

CO carbon monoxide

DAQ Division of Air Quality

DOM date of manufacture

EF emission factor

EPA U.S. Environmental Protection Agency

EU emission unit

GDO gasoline dispensing operation

HP horsepower

H2S hydrogen sulfide kW kilowatt

MMBtu British thermal units (in millions)

NAICS North American Industry Classification System

NOx nitrogen oxide

O2 oxygen

Pb lead

PM2.5 particulate matter less than 2.5 microns in aerodynamic diameter

PM10 particulate matter less than 10 microns in aerodynamic diameter ppm parts per million

PSD Prevention of Significant Deterioration

PTE potential to emit

RACT reasonably available control technology

RICE reciprocating internal combustion engine

SCC Source Classification Codes

SIC Standard Industrial Classification

SO2 sulfur dioxide

TDS total dissolved solids

TSD Technical Support Document

VOC volatile organic compound

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

1.0 EQUIPMENT

1.1 EMISSION UNITS

The stationary source consists of the emission units (EU) listed in Table 1-1. [AQR 12.1.4.1(b)]

Table 1-1. Summary of Emission Units

EU Rating Type Make MN SN

Power Generation

A02

450 kW Emergency Generator Cummins DFEJ7255415 J080214246

755 hp Diesel Engine DOM 2008 Cummins QSX15G9 U052201101

A03

1,250 kW Emergency Generator Cummins DQGAA8169823C J110259883

2,220 hp Diesel Engine DOM 2012 Cummins QSK50G4 25369266

Surface Coating Operation

B02 Spray Paint Booth Modine HFG250SMLLN20A1 09170943144975

Boilers

C06 1.50 MMBtu/hr Natural Gas Boiler Lochinvar FBN1501 1633103317658

C07 1.50 MMBtu/hr Natural Gas Boiler Lochinvar FBN1501 1633103317659

1.2 INSIGNIFICANT ACTIVITIES

The following units/activities are insignificant emission sources under AQR 12.1.2(c). When added to the source PTE, emissions from these units will not subject the source to major-source requirements for any pollutant. Pursuant to AQR 12.1.2(a), all exempt and insignificant units and activities shall remain subject to any other applicable requirements.

Table 1-2. List of Insignificant Activities

Rating Type

0.500 MMBtu/hr Natural Gas Boiler

0.500 MMBtu/hr Natural Gas Boiler

0.500 MMBtu/hr Natural Gas Boiler

0.500 MMBtu/hr Natural Gas Boiler

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

0.300 MMBtu/hr Natural Gas Boiler

0.300 MMBtu/hr Natural Gas Boiler

0.199 MMBtu/hr Natural Gas Boiler

0.150 MMBtu/hr Natural Gas Boiler

0.100 MMBtu/hr Natural Gas Boiler

0.100 MMBtu/hr Natural Gas Boiler

0.100 MMBtu/hr Natural Gas Boiler

0.076 MMBtu/hr Natural Gas Boiler

0.075 MMBtu/hr Natural Gas Boiler

0.075 MMBtu/hr Natural Gas Boiler

0.075 MMBtu/hr Natural Gas Boiler

0.075 MMBtu/hr Natural Gas Boiler

0.125 MMBtu/hr Natural Gas Spray Booth Dryer

433 gpm Cooling Tower

282 gpm Cooling Tower

1.3 NONROAD ENGINES

Pursuant to Title 40, Part 1068.30 of the Code of Federal Regulations (40 CFR Part 1068.30), nonroad engines that are portable or transportable (i.e., not used on self-propelled equipment) shall not remain at a location for more than 12 consecutive months; otherwise, the engine(s) will constitute a stationary reciprocating internal combustion engine (RICE) and be subject to the applicable requirements of 40 CFR Part 63, Subpart ZZZZ; 40 CFR Part 60, Subpart IIII; and/or

40 CFR Part 60, Subpart JJJJ. Stationary RICE shall be permitted as emission units upon commencing operation at this stationary source. Records of location changes for portable or transportable nonroad engines shall be maintained, and shall be made available to the Control

Officer upon request. These records are not required for engines owned and operated by a contractor for maintenance and construction activities as long as records are maintained demonstrating that such work took place at the stationary source for periods of less than 12 consecutive months.

Nonroad engines used on self-propelled equipment do not have this 12-month limitation or the associated recordkeeping requirements.

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

2.0 CONTROLS

2.1 CONTROL DEVICES

No add-on control devices have been identified.

2.2 CONTROL REQUIREMENTS

Generators / Engines [AQR 12.1.4.1(c)&(f)]

1. The permittee shall operate each emergency generator (EU: A02-A03) with a turbocharger and an aftercooler.

2. The permittee shall operate and maintain the emergency generators (EU: A02-A03) in accordance with the manufacturer’s O&M manual for emissions-related components.

Boilers / Water Heaters / Fuel Burning Equipment [AQR 12.1.4.1(c)&(f)]

3. The permittee shall combust only natural gas in each boiler (EU: C06-C07).

4. The permittee shall operate and maintain each boiler (EU: C06-C07) in accordance with the manufacturer’s operations and maintenance (O&M) manual for emissions-related components and good combustion practices.

Particulates and Overspray [AQR 12.1.4.1(c)&(f)]

5. The permittee shall perform all spray-applied coating in the spray booth.

6. The permittee shall have a fully enclosed spray booth, or preparation stations with a full roof and either four complete walls or complete side curtains. The enclosure must be ventilated at negative pressure. If the spray booth or preparation station is sealed and has an automatic pressure balancing system, it may be operated at up to, but not more than, 0.05 inches water gauge positive pressure.

7. The permittee shall operate spray booths with exhaust filters that are rated or demonstrated to achieve at least 98 percent capture of overspray. Filter media must cover all exhaust openings in the spray booth.

8. The permittee shall follow the manufacturer’s operation and maintenance (O&M) manual for use and operation of filtration systems. Filters should be replaced when the pressure drop exceeds 0.25 inches (6.35 millimeters) of water unless the manufacturer’s specifications indicate a different pressure drop value.

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

9. The permittee shall apply all spray-applied coatings with a high volume, low pressure spray gun, electrostatic application, airless spray gun, air-assisted spray gun, or equivalent technology that the spray gun manufacturer has demonstrated achieves a transfer efficiency comparable to one of the spray gun technologies listed previously for a comparable operation, and for which the permittee has obtained written approval from the Control

Officer.

10. The permittee shall clean all surface coating application equipment in a manner that does not create an atomized mist of spray gun cleaning solvent and paint residue outside of a container that collects used gun cleaning solvent. Spray gun cleaning may be done with, for example, hand cleaning of parts of the disassembled gun in a container of solvent by flushing solvent through the gun without atomizing the solvent and paint residue, or by using a fully enclosed spray gun washer. A combination of nonatomizing methods may also be used.

Vapors [AQR 12.1.4.1(c)&(f)]

11. The permittee shall not allow open containers to be used for storage or disposal of VOC-containing cloth or other materials (excluding masking tape and masking paper) used for surface preparation and cleanup.

12. The permittee shall clean all surface coating application equipment in a manner that minimizes volatilization of VOCs into the ambient air.

13. The permittee shall ensure all containers with VOC-containing products remain securely closed except during product transfer. Containers shall be inspected regularly for leakage, and the contents of any leaking container shall be immediately transferred to an appropriately labeled container that has been specifically designed for storage of the compound.

Other [AQR 12.1.4.1(c)&(f)]

14. The permittee shall not cause, suffer, or allow any source to discharge air contaminants (or other materials) in quantities that will cause a nuisance, including excessive odors. [AQR 40

& AQR 43]

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

Source ID: 1157

3.0 LIMITATIONS

3.1 OPERATIONAL LIMITS

1. The permittee shall limit the operation of each emergency generator (EU: A02-A03) for testing and maintenance to 100 hours per year. The permittee may operate the emergency generators up to 50 hours per year for nonemergency situations, but those hours count towards the 100 hours provided for testing and maintenance. The emergency generators cannot be used for peak shavings or demand response. [40 CFR Part 60 Subpart IIII]

2. The permittee shall limit the consumption of VOC-containing paint strippers, paints, basecoats, primers, reducers, thinners, solvents, etc., to 1,100 gallons per year, based on a weighted average VOC content of 1.92 pounds per gallon. In order to allow operational flexibility, sources may alter usage in gallons and average VOC content as long as the PTE is not exceeded. [AQR 12.1.4.1(c)&(f)]

3.2 EMISSION LIMITS

1. The permittee shall not allow the actual emissions from the stationary source to exceed the

PTE listed per year in Table 3-1, except for emission units intended only for use in emergencies and as provided in AQR 12.1.6(b). [AQR 12.1.4.1(c)]

Table 3-1. Potential to Emit (tons per year)

Pollutant PM10 PM2.5 NOx CO SO2 VOC H2S Pb

Total 0.29 0.29 8.96 4.44 0.04 1.46 0 0

2. The permittee shall not allow the actual emissions from the following individual emission units to exceed the PTE listed per year in Table 3-2, except for emission units intended only for use in emergencies and as provided in AQR 12.1.6(b). [AQR 12.1.4.1(c)]

Table 3-2. Source-Wide Emission Unit PTE Summary (tons per year)

EU Condition 1 PM10 PM2.5 NOX CO SO2 VOC

A02 500 hours 0.01 0.01 2.14 0.17 0.01 0.03

A03 500 hours 0.18 0.18 5.54 3.19 0.01 0.29

B02 1,100 gallons 0 0 0 0 0 1.06

C06 8,760 hours 0.05 0.05 0.64 0.54 0.01 0.04

C07 8,760 hours 0.05 0.05 0.64 0.54 0.01 0.04

1 The quantities in this column are not intended as enforceable permit limits unless stated otherwise in this permit.

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

3. The permittee shall not discharge into the atmosphere, from any emission unit, any air contaminant in excess of an average of 20 percent opacity for more than six consecutive minutes. [AQR 26.1]

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

4.0 COMPLIANCE DEMONSTRATION REQUIREMENTS

4.1 MONITORING

Visible Emissions [AQR 12.1.4.1(d)]

1. The responsible official shall sign and adhere to the Visible Emissions Check Guidebook and keep a copy of the signed guide on-site at all times.

2. The permittee shall conduct a visual emissions check at least quarterly on the emergency generators (EU: A02 and A03) while the emission unit is in operation.

3. If no plume appears to exceed the opacity standard during the visible emissions check, the date, location, and results shall be recorded, along with the viewer’s name.

4. If a plume appears to exceed the opacity standard, the permittee shall do one of the following:

a. Immediately correct the perceived exceedance, then record the first and last name of the person who performed the emissions check, the date the check was performed, the unit(s) observed, and the results of the observation; or

b. Call a certified Visible Emissions Evaluation (VEE) reader to perform a U.S.

Environmental Protection Agency (EPA) Method 9 evaluation.

i. For sources required to have a certified reader on-site, the reader shall start

Method 9 observations within 15 minutes of the initial observation. For all other sources, the reader shall start Method 9 observations within 30 minutes of the initial observation.

ii. If no opacity exceedance is observed, the certified VEE reader shall record the first and last name of the person who performed the VEE, the date the VEE was performed, the unit(s) evaluated, and the results. A Method 9 VEE form shall be completed for each emission unit that was initially perceived to have exceeded the opacity limit, and the record shall also indicate:

(1) The cause of the perceived exceedance;

(2) The color of the emissions; and

(3) Whether the emissions were light or heavy.

iii. If an opacity exceedance is observed, the certified VEE reader shall take immediate action to correct the exceedance. The reader shall then record the first and last name of the person performing the VEE, the date the VEE was performed, the unit(s) evaluated, and the results. A Method 9 VEE form shall be completed for each reading identified, and the record shall also indicate:

(1) The cause of the exceedance;

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

(2) The color of the emissions;

(3) Whether the emissions were light or heavy;

(4) The duration of the emissions; and

(5) The corrective actions taken to resolve the exceedance.

5. Any scenario of visible emissions noncompliance can and may lead to enforcement action.

Generators / Engines [AQR 12.1.4.1(d)]

6. The permittee shall operate the emergency generators (EU: A02 and A03) with a nonresettable hour meter and monitor the emission unit during testing, maintenance, and nonemergency operation. If the engine is used for an emergency, the permittee shall monitor its operation and document the nature of the emergency.

Surface Coating Equipment [AQR 12.1.4.1(d)]

7. The permittee shall employ a manometer (or equivalent) and monitor the pressure drop across the spray booth exhaust filters each day of operation.

8. The permittee shall inspect the spray booth and all ancillary equipment for filter bypass, malfunctions, proper gauge operation, pressure drops, etc., each day the booth operates.

9. The permittee shall monitor, each month of operation, the consumption of each individual

VOC-containing compound (e.g., paint strippers, paints, basecoats, primers, reducers, thinners, solvents, etc.) in gallons.

4.2 TESTING

No performance testing requirements have been identified.

4.3 RECORDKEEPING REQUIREMENTS

1. The permittee shall create and maintain the following records, all of which must be producible on-site to the Control Officer’s authorized representative upon request and without prior notice during the permittee’s hours of operation: [AQR 12.1.4.1(d)(2) & AQR

12.1.4.1(s)]

Opacity

a. Dates and times when visible emissions checks and observations are made, and the corrective steps taken to bring opacity into compliance;

Inspections/Maintenance/General

b. Equipment inspections, maintenance, replacement, and/or repair;

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

c. Manufacturer’s O&M manual for emission units (if available);

Emergency Generators

d. Date and duration of operation of the emergency generators (EU: A02 and A03) for testing, maintenance, and nonemergency use;

e. Date and duration of operation of the emergency generators (EU: A02 and A03) for emergency use, including documentation justifying use during the emergency;

Nonroad Engines

f. Records of location changes for nonroad engines, if applicable;

Surface Coating Operation

g. Safety data sheets and/or other records demonstrating the VOC and HAP content for each compound;

h. Spray booth pressure drop readings;

i. Total monthly consumption (in gallons) of each individual VOC-containing compound

(paint strippers, paints, basecoats, primers, reducers, thinners, solvents, etc.);

Emissions

j. Deviations from permit requirements that result in excess emissions (reported as required in Section 4.4 of this permit);

k. Deviations from permit requirements that do not result in excess emissions (reported annually); and

l. Calculation of annual emissions for each emission unit and for the entire source

(reported annually).

2. The permittee shall include in each record above, where applicable, the date and time the monitoring or measurement was taken, the person performing the monitoring or measurement, and the emission unit or location where the monitoring or measurement was performed. Each record must also contain the action taken to correct any deficiencies, when applicable. [AQR 12.1.4.1(d)(2)(A)]

3. The permittee shall maintain all records for a period of at least five years from their creation.

[AQR 12.1.4.1(d)(2)(B)]

4.4 REPORTING AND NOTIFICATION

1. The permittee is responsible for all applicable notification and reporting requirements contained in 40 CFR Parts 60 and 63.

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

2. If the construction or modification of a source differs from what was authorized in a new permit or significant permit revision, the source shall provide a written notice to the Control

Officer that includes a list of the differences, and complete descriptions of each one, at least

30 days before commencing operations. [AQR 12.1.4.1(n)]

3. The permittee shall submit an annual report to the Control Officer in accordance with the following requirements. [AQR 12.1.4.1(d)(3)]

a. Each annual report shall be: [AQR 12.9]

i. Based on the preceding calendar year;

ii. Submitted on or before March 31 of each year, even if there was no activity (if

March 31 falls on a Saturday or Sunday, or on a state or federal holiday, the submittal shall be due on the next regularly scheduled business day); and

iii. Addressed to the attention of the Control Officer.

b. Each annual report shall contain, at a minimum:

i. As the first page of text, a signed certification containing the sentence: “I certify that, based on information and belief formed after reasonable inquiry, the statements contained in this document are true, accurate, and complete.” This statement shall be signed and dated by a responsible official of the company (a sample form is available from DAQ); [AQR 12.9(g)]

ii. The calculated actual annual emissions from each emission unit, even if there was no activity, and the total calculated actual annual emissions for the source based on the emissions calculation methodology used to establish the PTE in the permit or an equivalent method approved by the Control Officer prior to submittal. [AQR

12.9(c)(2)]

4. The permittee shall report to the Control Officer any upset, breakdown, malfunction, emergency, or deviation that causes emissions of regulated air pollutants in excess of any limits set by regulation or by this permit. The report shall be in two parts, as specified below:

[AQR 25.6.1 & AQR 12.1.4.1(d)(3)(B)]

a. Within 24 hours of the time the permittee learns of the event, the permittee shall notify

DAQ by phone at (702) 455-5942, by fax at (702) 383-9994, or by email at

AQCompliance@ClarkCountyNV.gov.

b. Within 72 hours of the required notification, the permittee shall submit a detailed written report to DAQ containing the information required by AQR 25.6.3.

5. The permittee shall report deviations from permit requirements that do not result in excess emissions, including those attributable to upset conditions as defined in the permit, with the annual report. Such reports shall include the probable cause of such deviations, as well as any corrective actions or preventive measures taken. [AQR 12.1.4.1(d)(3)(B)] mailto:AQCompliance@ClarkCountyNV.gov

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

6. Any report and/or compliance certification submitted pursuant to this section or the AQR shall contain certification by a responsible official of truth, accuracy, and completeness. This certification, and any other certification required under this section, shall state that, based on information and belief formed after reasonable inquiry, the statements and information in the document are true, accurate, and complete. [AQR 12.1.4.1(d)(3)(C)]

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

5.0 ADMINISTRATIVE REQUIREMENTS

5.1 GENERAL

1. The permittee must comply with all permit conditions. Noncompliance with any condition is a violation of the AQRs and grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or for denial of a renewal application. [AQR

12.1.4.1(r)]

2. If any term or condition of this permit becomes invalid as a result of a challenge to a portion of this permit, the other terms and conditions of this permit shall be unaffected and remain valid. [AQR 12.1.4.1(i)]

3. The terms and conditions of this permit apply to any part or activity of the stationary source that emits, or has the potential to emit, any regulated air pollutant for which operating authority has been granted, and includes all third parties (such as lessees or contractors) conducting such activities. [AQR 12.1.4.1(c) & AQR 12.1.4.1(aa)]

4. Any application, report, or compliance certification submitted to the Control Officer pursuant to this permit or the AQRs shall contain a certification of truth, accuracy, and completeness with a responsible official’s original signature. [AQR 12.1.3.6(a), AQR 12.1.4.1(d)(3), &

40 CFR Part 3]

5. As a condition of the issuance of the permit, the owner or operator agrees to allow inspection of the premises to which the permit relates, including the location where records must be kept under the conditions of the permit, by any authorized representative of the Control

Officer at any time during the permittee’s hours of operation without prior notice to perform the following: [AQR 12.1.4.1(s)]

a. Access and copy any records that must be kept under the conditions of the permit;

b. Inspect any facilities, equipment (including monitoring and air pollution control equipment), practices, or operations regulated or required under the permit;

c. Sample or monitor substances or parameters for the purpose of assuring compliance with the permit or applicable requirements; and

d. Document alleged violations using such devices as cameras or video equipment.

6. The permittee shall pay fees to the Control Officer consistent with the approved fee schedule in AQR 18. [AQR 12.1.4.1(k)]

7. This permit does not convey property rights of any sort, or any exclusive privilege. [AQR

12.1.4.1(t)]

8. Anyone issued a permit under AQR 12 shall post the permit in compliance with AQR 12.13.

[AQR 12.1.4.1(v)]

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

9. This permit shall not waive, or make less stringent, any limitations or requirements contained in or issued under the Nevada State Implementation Plan, or that are otherwise federally enforceable. [AQR 12.1.4.1(w)]

10. Except as provided in AQR 12.1.6, no person shall commence construction of, operate, or make a modification to a minor source except in compliance with a minor source permit that authorizes such construction, operation, or modification. [AQR 12.1.3.1(a)]

11. The permittee’s commencement of operations constitutes an acknowledgment that the permittee assumes the responsibility of ensuring the source’s emission units and emission control equipment have been constructed and will be operated in compliance with all applicable requirements. [AQR 12.1.4.2]

12. It shall not be a defense for the permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity to maintain compliance with the conditions of the permit. [AQR 12.1.4.1(o)]

5.2 RENEWALS AND REVISIONS

1. This permit may be modified, revoked, reopened and reissued, or terminated for cause by the Control Officer. The filing of a request by the permittee for a permit modification, for termination, or of a notification of planned changes or anticipated noncompliance does not stay any permit condition. [AQR 12.1.4.1(p)]

2. The permittee shall furnish to the Control Officer, in writing and within a reasonable time, any information that the Control Officer may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the permit, or to determine compliance with the permit. Upon request, the permittee shall also furnish to the Control Officer copies of records that the permit requires keeping. The permittee may furnish records deemed confidential to the Control Officer with a claim of confidentiality, pursuant to AQR 12.6.

[AQR 12.1.4.1(u)]

3. Any revision of an emission limitation, monitoring, testing, reporting, or recordkeeping requirement shall be made consistent with the permit revision requirements in AQR 12.1.6.

[AQR 12.1.4.1(e)]

4. A permit may be reopened and revised under any of the following circumstances: [AQR

12.1.4.1(q)]

a. Additional requirements (including excess emissions requirements) become applicable to an affected source under the acid rain program. Upon approval by the Control

Officer, excess emissions offset plans shall be deemed to be incorporated into the permit.

b. The Control Officer determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or other terms or conditions of the permit.

Source Name: Nevada Army National Guard North Las Vegas Readiness Center and Floyd Edsall Training Center

c. The Control Officer determines that the permit must be revised or revoked to assure compliance with applicable requirements.

d. Proceedings to reopen and issue a permit shall follow the same procedures that apply to initial permit issuance, and shall affect only those parts of the permit for which cause to reopen exists. Such reopening shall be made as expeditiously as practicable.

5. For the renewal of an existing minor source permit, a timely application shall be submitted to the Control Officer. An application for renewal shall be deemed to be timely if it is submitted at least 120 days, but no more than 270 days, before the date of permit expiration.

[AQR 12.1.3.1(b)]

6. To be deemed complete, an application must contain all information required under AQR

12.1.3.6, and must be accompanied by payment of the applicable fee(s) established in AQR

18. If, while processing an application deemed complete, the Control Officer determines that additional information is needed to evaluate or take final action on the application, he or she may request such information in writing and set a reasonable deadline for its submission.

Failure to provide the additional information required by the Control Officer by the deadline could result in denial of the application. [AQR 12.1.3.3]

7. If an existing minor source submits a timely and complete application for renewal of a minor source permit, the source’s continued operation after permit expiration and before issuance of the renewed permit is not a violation of the AQRs. This application shield shall cease to apply if, after a completeness determination, the applicant fails to submit any additional information identified as necessary to process the application by a deadline the Control

Officer has specified in writing, or if the renewed permit is denied for any other reason. [AQR

12.1.3.4]

8. If the submittal of an application for renewal of an existing minor source permit is not timely, there is no permit application shield as provided in AQR 12.1.3.4, and the source loses its authority to operate upon permit expiration until the renewal permit is issued. [AQR

12.1.3.1(c)]

9. If an application for renewal of an existing minor source permit is submitted within six months after permit expiration, the source loses its authority to operate upon permit expiration until the renewal permit is issued. [AQR 12.1.3.1(d)]

10. If an application for the renewal of an existing minor source permit is submitted six months or more after permit expiration, the source loses its authority to operate upon permit expiration; the source will be treated as a new minor source, and the application will be subject to all the requirements of AQR 12.1.3.6. [AQR 12.1.3.1(e)]

File details come from the government source that posted it. Updated .