This document is a bid tabulation spreadsheet for the St. Pete-Clearwater International Airport's Air Operations Area (AOA) Fence Replacement project, prepared by RS&H, Inc. on May 3, 2024. The project involves replacing existing fencing with a new security system, including removing 4,250 linear feet of chain-link fence and installing 3,770 linear feet of Econo Mesh Fence with topping, a 12' double leaf swing gate, fence signage, and grounding rods. The bid includes a base bid and two alternates, with each section covering project survey, mobilization, maintenance of traffic, fence removal, and installation of new fencing components.
The total project cost is $119,000, which includes owner's contingencies of $100,000 for the base bid, $7,000 for Alternate 1, and $12,000 for Alternate 2. The contingency costs suggest the project anticipates potential additional expenses or unforeseen challenges. The bid tabulation shows zero dollar amounts for most line items, indicating that actual pricing will be provided by the bidding contractors. The project aims to enhance airport security by replacing vulnerable fence sections with a more robust, non-scalable fencing system that includes wildlife deterrent features and additional security measures.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Quantities
| ST PETE-CLEARWATER INTERNATIONAL AIRPORT |
| AIR OPERATIONS AREA (AOA) FENCE REPLACEMENT |
BID PRICE FORM
| Prepared By: RS&H, Inc. |
| Date Prepared: May 3, 2024 |
| LINE ITEM | DESCRIPTION | QUANTITY | UNIT OF MEASURE | UNIT COST | TOTAL |
| BASE BID | |||||
| GENERAL CONDITIONS | |||||
| C-104-1 | Project Survey and Stakeout | 1 | LS | $0.00 | |
| C-105-1 | Mobilization | 1 | LS | $0.00 | |
| C-106-1 | Maintenance of Traffic and Temporary Construction Items | 1 | LS | $0.00 | |
| SUBTOTAL - GENERAL CONDITIONS | $0.00 | ||||
| CIVIL | |||||
| FL-110-3 | Chain-Link Fence Removal | 4,250 | LF | $0.00 | |
| F-161-5.1 | Econo Mesh Fence with Topping (Includes Installation) | 3,770 | LF | $0.00 | |
| F-163-5.1 | Wildlife Fence Fabric | 15,080 | SF | $0.00 | |
| F-161-5.2a | 12' Double Leaf Swing Gate | 1 | EA | $0.00 | |
| F-161-5.3 | Fence Signage | 1.00 | LS | $0.00 | |
| FL-110-1 | Tree Clearing | 370 | LF | $0.00 | |
| FL-110-2 | Tree Removal | 1 | EA | $0.00 | |
| FL-120-1 | Rock Removal (Remove Rock at Bottom of Fence) | 4,250 | LF | $0.00 | |
| F-161-5.4 | 10' Grounding Rod (1 every 500 feet) | 8 | EA | $0.00 | |
| SUBTOTAL - CIVIL | $0.00 | ||||
| 999-0000-1 | Base Bid Owner's Contingency | 1 | EA | $100,000.00 | $100,000.00 |
| Total Construction Cost (Base Bid) | $100,000.00 | ||||
| BID ALTERNATE 1 | |||||
| GENERAL CONDITIONS | |||||
| C-104-1 | Project Survey and Stakeout | 1 | LS | $0.00 | |
| C-105-1 | Mobilization | 1 | LS | $0.00 | |
| C-106-1 | Maintenance of Traffic and Temporary Construction Items | 1 | LS | $0.00 | |
| SUBTOTAL - GENERAL CONDITIONS | $0.00 | ||||
| CIVIL | |||||
| FL-110-3 | Chain-Link Fence Removal | 260 | LF | $0.00 | |
| F-161-5.1 | Econo Mesh Fence with Topping (Includes Installation) | 260 | LF | $0.00 | |
| F-161-5.3 | Fence Signage | 1.00 | LS | $0.00 | |
| F-161-5.4 | 10' Grounding Rod (1 every 500 feet) | 1 | EA | $0.00 | |
| SUBTOTAL - CIVIL | $0.00 | ||||
| 999-0000-2 | Bid Alt 1 Owner's Contingency | 1 | EA | $7,000.00 | $7,000.00 |
| Total Construction Cost (Bid Alternate 1) | $7,000.00 | ||||
| BID ALTERNATE 2 | |||||
| GENERAL CONDITIONS | |||||
| C-104-1 | Project Survey and Stakeout | 1 | LS | $0.00 | |
| C-105-1 | Mobilization | 1 | LS | $0.00 | |
| C-106-1 | Maintenance of Traffic and Temporary Construction Items | 1 | LS | $0.00 | |
| SUBTOTAL - GENERAL CONDITIONS | $0.00 | ||||
| CIVIL | |||||
| FL-110-3 | Chain-Link Fence and Gate Removal | 240 | LF | $0.00 | |
| F-161-5.1 | Econo Mesh Fence (Includes Installation) | 220 | LF | $0.00 | |
| F-161-5.2b | 20' Sliding Gate With New Motor and related appurtenances installed | 1 | EA | $0.00 | |
| F-161-5.3 | Fence Signage | 1.00 | LS | $0.00 | |
| F-161-5.4 | 10' Grounding Rod (1 every 500 feet) | 1 | EA | $0.00 | |
| SUBTOTAL - CIVIL | $0.00 | ||||
| 999-0000-3 | Bid Alt 2 Owner's Contingency | 1 | EA | $12,000.00 | $12,000.00 |
| Total Construction Cost (Bid Alternate 2) | $12,000.00 | ||||
| TOTAL COSTS | |||||
| TOTAL CONSTRUCTION COST (BASE BID, ALT 1, ALT 2) | $0.00 | ||||
| TOTAL CONTINGENCY (BASE BID, ALT 1, ALT 2) | $119,000.00 | ||||
| TOTAL PROJECT COST (BASE BID, ALT 1, ALT 2) | $119,000.00 |