PWS - Att 2 - Performance Requirements Summary (PA-TAC VI).pdf
PDF 221 KB Posted
- Attached to
- Request for Information - FEMA Public-Assistance Technical Assistance (PA-TAC) VI Contract
- Solicitation number
- Not on record
About this file
This document is a Performance Requirements Summary (PRS) Matrix that outlines contractor performance obligations and surveillance methods for a federal emergency management services contract, likely supporting the Federal Emergency Management Agency (FEMA) with Explosive Ordnance Disposal (EOD) operations.
The PRS matrix is organized into three sections: Start-up Mobilization Tasks, Base Contract Reports, and Order Level Deliverables. Start-up requirements include staffing a minimum roster of qualified labor categories with 50 percent of personnel submitted within 30 days of contract award and the remaining 50 percent within 90 days, along with completion of security and privacy training within specified timelines. Base Contract Reports require weekly security reports identifying all security-related information for rostered employees, submission of a Quality Assurance and Surveillance Plan within 30 days of award, annual and final reports 15 calendar days after each contract period ends, and a final voucher and closeout package within 90 days following the Period of Performance end date. Order Level Deliverables include kickoff meeting minutes within one business day, a Quality Control Plan within ten calendar days, daily accountability reports by 9:00 AM each workday, Technical Monitor Certification reports prior to invoicing with a ten business-day review period, Daily Activity Reports tied to specific Public Assistance projects, weekly progress reports, Site Inspection Metrics Reports by close of business each Monday, monthly order status reports by the 15th of each month, and a monthly order status report summarizing overall order status and resource hours. All deliverables are subject to 100 percent compliance thresholds and 100 percent inspection by the Contracting Officer's Representative (COR) and Technical Monitor for completeness and accuracy.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS - Att 3 - Security and Badging (PA-TAC VI).pdf | ||
| PWS - Att 1 - Labor Category Qualifications (PA-TAC VI).pdf | ||
| DRAFT PWS - PA-TAC VI (as of 8-6-2026).docx | DOCX document | |
| RFI Questions - PA-TAC VI - updated 6-1-26.docx | DOCX document | |
| Answer Template updated 6-1-26.xlsx | XLSX spreadsheet | |
| Answer Temple v2 (RFI PA-TAC VI).xlsx | XLSX spreadsheet | |
| RFI Questions - PA-TAC VI RFI v2.docx | DOCX document | |
| DRAFT PWS - PA-TAC VI UPDATED 5.14.26.docx | DOCX document | |
| Request for Information (RFI) - PA-TAC VI.docx | DOCX document | |
| DRAFT PWS - PA-TAC VI .docx | DOCX document | |
| Answers Temple (RFI - PA-TAC VI).xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Requirements Summary (PRS) Matrix – Attachment 2
PRS # Performance Tasks Requirements Threshold Method of Surveillance
1 Start-up Mobilization Tasks
1.1 Personnel Roster Roster the minimum number of qualified, skilled Labor Categories (LCAT) in the quantities identified in the PWS. The contractor shall submit their staff names as follows:
• 50% of staff submitted within 30 days of contract award
• 50% of staff submitted within 90 days of contract award
Maintain roster of active EOD staff for the duration of the contract.
100% Compliance 100% Inspection – COR/TM will review for completeness and accuracy.
1.2 Security & Privacy Training Contractor Key Personnel and staff supporting Startup Tasks shall complete required Security and Privacy training within the timelines specified in the contract and record each completion in the Weekly Security Report (employee name, course title, and completion date). The COR may request any training certificate at any time, and the Contractor shall provide the requested certificate(s) within 24 hours.
100% Compliance 100% inspection – COR will review for completeness and accuracy
2 Base Contract Reports
2.1 Weekly Security Report The contractor shall submit a weekly Security Report identifying all security-related information for rostered employees. Information shall include, but is not limited to, name, job title, date e-QIP was initiated, EOD, and other pertinent information identified by the COR. The report shall be submitted on a specific day of the week determined by the COR after base contract award. Should disaster needs dictate, delivery frequency may change over the course of the agreement, as directed by the COR with oversight by the FEMA Contract Security Group.
100% Compliance 100% Inspection – COR/TM and FEMA Contract Security Group will review for completeness and accuracy.
2.2 Quality Assurance and Surveillance
Plan
The contractor shall develop and maintain the Quality Assurance and Surveillance Plan (QASP) based on this PWS and the requirements set forth by the CMB. The QASP shall identify what is going to be inspected, the inspection process, and who will do the inspecting. The results of those inspections will then be used to document contractor performance. The QASP is a “living” document and shall be reviewed as performance warrants. The contractor shall submit within 30 calendar days after award and shall update it on a continual basis as needed.
100% Compliance 100% Inspection – COR/TM will review for completeness and accuracy.
2.2 Annual and Final Report The contractor shall submit a report 15 calendar days at the end of each contract period. The report shall document and summarize the results of the entire contractual effort to date, including key issues and resolutions, recommendations, and conclusions. The report shall include tables, graphs, and other visual aids to comprehensively explain the results achieved under the contract.
2.3 Final Voucher and Closeout
Package
The contractor shall submit a final voucher tracker and closeout package no later than 90 days following the order’s Period of Performance end date.
3 Order Level Deliverables*
3.1 Kickoff Meeting Notes The contractor shall submit a copy of the Kickoff Meeting Minutes no later than 1 business day following the conclusion of the kickoff meeting.
100% Compliance 100% inspection – COR will review for completeness and accuracy
3.2 Quality Control Plan The Quality Control Plan (QCP) must be submitted to the government within ten (10) calendar days after award. At a minimum, the QCP must include the task, performance objective, performance standard, primary method of surveillance, the acceptable quality level, and the evaluation method.
3.3 Daily Accountability Report The contractor shall submit a Daily Accountability Report and shall be sent daily in Excel format. The report shall identify the daily status (e.g., deployed, remote support, sick leave, rotation, etc.) of each employee billing under the order. The contractor shall submit the report no later than 9:00 AM each workday, or as otherwise specified in the order proposal request.
3.4 Security & Privacy Training Only Contractor personnel performing under an order are required to complete Security and Privacy training.
Such personnel shall complete the required training within the timelines in the Base Contract following order award and record each completion in the Weekly Security Report (employee name, course title, and completion date). The COR may request any training certificate at any time, and the Contractor shall provide the requested certificate(s) within 24 hours.
3.5 Technical Monitor Certification
(TMC) Report
The contractor shall submit a TMC report to the designated Technical Monitor for review prior to submitting an invoice. The TMC shall contain all charges associated with the invoice to include all Labor Hour charges and ODC-related costs. The Technical Monitor will review and, if approved, sign and return the TMC to the contractor to submit as part of invoice. The frequency of TMC submissions will be established at the order level. The TMC review period is generally limited to ten (10) business days. If a TMC is not reviewed within 10 business days, on the 11th business day an invoice may be submitted.
3.6 Daily Activity Report The contractor shall submit a Daily Activity Report (DAR) for the prior work day covering the activities of each employee assigned under the order. For every employee, work shall be tied to specific Public Assistance work, including the relevant project #, Applicant, site inspection #, or other COR-directed PA activity and documented with sufficient specificity to demonstrate relationship between hours charged and work performed. The report shall be maintained in a consolidated, cumulative, and electronically searchable format that incorporates all prior daily reports to enable efficient analysis of work trends, productivity, and backlog, and to support forecasting of future work and resource needs under this order.
3.7 Weekly Progress Report The contractor will develop a weekly progress report to provide to the TM, COR and/or FEMA Field Leadership. Must contain detailed information on individual staff assignments and associated SOW tasks and deliverables.
100% Compliance 100% inspection – COR will review for completeness and accuracy
3.8 Site Inspection Metrics Reporting The contractor shall submit a comprehensive Site Inspections Metrics Report to the COR no later than close of business each Monday, covering the prior reporting week. The report shall address only those projects and site inspections to which contractor personnel are assigned, and shall provide both weekly and cumulative statistical data on all related site inspection activities, including at a minimum:
• Counts of site inspection work orders and sites inspected (completed, pending, and cancelled), with backlog volumes and aging;
• Timeliness metrics, including counts and percentages of inspections:
o Completed within 48 hours, o Completed within 7 calendar days, and o Aging over 30 days from confirmed inspection request;
• Quality metrics, including the number and percentage of DDDs returned for rework and primary reasons for rework;
The report shall also include trend indicators and any additional metrics as requested by the COR.
100% compliance 100% inspection – COR will review for
3.9 Monthly Order Status Report The contractor shall submit a report that reflects a summary of the overall order status, including the current and cumulative hours worked by labor category. The report must also provide the total number of personnel working on assignments, the start date(s) for the period; and the hours expended for the current month. The Contractor shall provide a summary of deliverables submitted, planned activities for the next month and problems and proposed corrective actions. The contractor shall submit the report by the 15th of each month unless otherwise specified in the order proposal.
*Order Deliverables will be determined at the order level and detailed in the scope of each order, the above list provides examples of regularly required deliverables.