DRAFT PWS - PA-TAC VI .docx
DOCX document 543 KB Posted
- Attached to
- Request for Information - FEMA Public-Assistance Technical Assistance (PA-TAC) VI Contract
- Solicitation number
- Not on record
About this file
This is a Performance Work Statement (PWS) for an Indefinite Delivery/Indefinite Quantity (IDIQ) Advisory and Assistance Services contract to support FEMA's Public Assistance (PA) program in response to major disasters and emergencies. The contract will award up to ten IDIQ contracts (up to two per zone) across five geographic zones: Atlantic (Regions 1-2), East (Regions 3-4), Central (Regions 5-8), West (Regions 7, 9-10), and Headquarters & CRC. The base period runs from October 1, 2026 to September 30, 2027, with four optional one-year renewal periods through September 30, 2031. The contractor must maintain a roster of 125 qualified personnel across specified labor categories including Civil Engineers (25), Construction Managers (16), Construction/Building Inspectors (16), Project Managers (21), and various specialists. Primary services include Site Inspection support, field technical support, Program Delivery Manager support, equipment rate development, Community Disaster Loan Program support, appeals and audits support, and cost estimating assistance.
The contract employs a hybrid pricing structure with Firm Fixed Price (FFP), Labor Hour (LH), and Time & Materials (T&M) contract line items. Contractors must propose fixed hourly rates for all labor categories under CLIN 0001, a Project Management Office rate not to exceed 4% of CLIN 0001 costs under CLIN 0002, reimbursable travel and miscellaneous costs under CLINs 0003 and 0004, and a minimum guaranteed payment under CLIN 0005. Key Personnel include a Program Manager (minimum 15 years program management experience, bachelor's degree) and Deputy Program Manager (minimum 10 years experience) available 24/7. All contractor personnel require background investigations commensurate with risk levels, completion of DHS security training within 30 days of award, and E-Verify employment eligibility verification. The contractor must submit 50% of required personnel names within 30 days of award and the remaining 50% within 90 days, and maintain comprehensive management, quality control, and training plans. Task orders will be issued competitively among zone awardees with specific requirements for deployment, reporting, invoicing through Technical Monitor certification, and quality assurance surveillance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT PWS - PA-TAC VI (as of 8-6-2026).docx | DOCX document | |
| RFI Questions - PA-TAC VI - updated 6-1-26.docx | DOCX document | |
| Answer Template updated 6-1-26.xlsx | XLSX spreadsheet | |
| Answer Temple v2 (RFI PA-TAC VI).xlsx | XLSX spreadsheet | |
| RFI Questions - PA-TAC VI RFI v2.docx | DOCX document | |
| DRAFT PWS - PA-TAC VI UPDATED 5.14.26.docx | DOCX document | |
| Answers Temple (RFI - PA-TAC VI).xlsx | XLSX spreadsheet | |
| Request for Information (RFI) - PA-TAC VI.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
ADVISORY and ASSISTANCE SERVICES CONTRACT
PUBLIC ASSISTANCE-TECHNICAL ASSISTANCE CONTRACT (PA-TAC) VI
Federal Emergency Management Agency
PERFORMANCE WORK STATEMENT (PWS) FOR:
Public Assistance – Technical Assistance Contract VI
Erich Ducote, Contracting Officer
PROCUREMENT SENSITIVE INFORMATION
This document contains non-public information intended for use on a need-to-know basis within FEMA only.
Please protect this document as procurement sensitive and handle accordingly.
DEPARTMENT OF HOMELAND SECURITY (DHS)
Table of Contents
| General Information | 3 |
| Background | 3 |
| Scope | 3 |
| Objective | 4 |
| Applicable Documents & Resources | 5 |
| Specific Requirements/Tasks | 6 |
| Qualified Personnel | 6 |
| Contractor Furnished Items | 6 |
| Labor Categories | 5 |
| Quality Standards | 5 |
| Use of Local Firms | 5 |
| Contractor Personnel | 10 |
| Key Personnel | 10 |
| Code of Conduct | 10 |
| Other Applicable Conditions | 11 |
| Period of Performance | 11 |
| Place of Performance | 12 |
| Non-Personal Services | 12 |
| Reporting | 12 |
| Management Plan | 12 |
| Quality Control Plan (QCP) | 13 |
| Quality Assurance Surveillance Plan (QASP) | 13 |
| Training Plan | 13 |
| Security Startup Roster | 14 |
| Final Voucher and Closeout Tracker | 14 |
| Annual and Final Report | 14 |
| Base Contract Kick Off /Post Award Conference/Periodic Partnering Meetings | 15 |
| Overtime | 15 |
| Recognized Holidays | 15 |
| Hours of Operation | 16 |
| Contractor Travel | 16 |
| Health & Safety | 17 |
| Organizational Conflict of Interest | 17 |
| Government Furnished Equipment (GFE) | 18 |
| Contractor Furnished Equipment (CFE) | 18 |
| Technical Monitor Certification (TMC) | 19 |
| Invoicing | 19 |
| Task Order Process | 20 |
| Kickoff Meeting | 22 |
| Deployment of Contractor Staff | 22 |
| Reports | 22 |
| Definitions and Acronyms | 23 |
| Background Investigations | 26 |
| Facility Access | 29 |
| Separation From Contract | 29 |
| Records Management Obligations | 30 |
| 508 Information Technology Clause | 31 |
| DHS – FEMA Enterprise Architecture Compliance | 33 |
| Safeguarding Of Controlled Unclassified Information | 34 |
| Information Technology Security Awareness Training | 43 |
| Privacy Training 52.224-3 | 44 |
| For Official Use Only (FOUO) Information | 45 |
| Employment Eligibility Verification | 46 |
| Contractor Employee Access (HSAR) 48 CFR 3052.204–71 | 46 |
| Federal Records Act Compliance | 50 |
| Notification and Credit Monitoring Requirements for PII Incidents | 52 |
| Artificial Intelligence (AI) Clause | 55 |
| DHS Geospatial Information System Compliance | 56 |
1. General Information
1.1. Background
FEMA’s mission is helping people before, during, and after disasters. FEMA’s goal is to ensure that as a nation we work together to build, sustain and improve our capability to prepare for, protect against, respond to, recover from and mitigate all hazards. Within FEMA, the Office of Response and Recovery (ORR) provides guidance, leadership and oversight to build, sustain, and improve the coordination and delivery of support to citizens and State, local, Tribal and Territorial governments to save lives, reduce suffering, protect property and recover from all hazards. As part of ORR, the Recovery Directorate provides assistance to communities overwhelmed by acts of terrorism, natural disasters, or other emergencies.
The Recovery Directorate’s Public Assistance (PA) Division has the specific mission of providing assistance to applicants (i.e., State, Tribal and local governments) and certain types of Private Nonprofit (PNP) organizations so that communities can quickly respond to and recover from major disasters or emergencies declared by the President. In support of PA’s mission, as well as other FEMA missions under both Stafford Act and non-Stafford Act authorities, in response to major disasters and emergencies, the contractor shall provide qualified personnel to support FEMA services.
1.2. Scope
The government will award up to ten (10) Indefinite Delivery/Indefinite Quantity (IDIQ) contracts (up to two (2) per zone) that can successfully and expeditiously supplement PA activities following Presidentially declared disasters. Task orders will be awarded based on competition among the awardees of each zone. The government seeks vendors who are adaptive, flexible, and can provide innovative solutions to ensure long-term contract success in response to emergent conditions.
In support of PA’s mission, the contractor shall provide qualified technical personnel to assist FEMA with delivering the PA Program in a timely, efficient, effective, and consistent manner.
The primary contractor support services required is anticipated to be:
· Site Inspection (SI) support
· Field Technical support
· Program Delivery Manager (PDMG) support
· Technical support in the development/updating of equipment rates
· Technical support for the PA Community Disaster Loan (CDL) Program
· PA appeals, audits and arbitration support
· PA program analysis and support
· Cost Estimating Format (CEF) support
· Consolidated Resource Center (CRC) support
· Additional technical support service areas as identified at the Task Order level.
There may be several labor categories that may be requested to support these positions. FEMA may update Position Assists throughout the life of the contract. If updates conflict with the terms and conditions of the contract, the contractor may be required to provide an updated technical and cost proposal.
FEMA Headquarters (HQ) requires technical assistance for national-level mission support tasks, such as training, planning, project management, updating equipment rates, and providing services that involve or relate to analyses, feasibility studies, and strategy options to be used by FEMA personnel. They also require technical assistance to support the Consolidated Resource Centers (CRC). This includes validating PA claims, developing cost estimates for eligible work, providing technical support, verifying insurance compliance, and conducting quality assurance reviews support scoping and costing, document validation, and project review for disasters nationwide.
1.3. Objective
FEMA is seeking the procurement of Advisory and Assistance Services (A&AS) Contracts for professional and non-professional services as a follow-on to the Public Assistance – Technical Assistance Contract (PA-TAC) V. The government has established five (5) zones and seeks to award on a competitive basis two (2) IDIQ contracts for each respective zone. The purpose of this contract is to obtain qualified contractor personnel with the technical expertise needed to support FEMA's Public Assistance (PA) activities, as well as other FEMA missions under both Stafford Act and non-Stafford Act authorities, in response to major disasters and emergencies.
The zones are as follows:
| Zone |
| FEMA Regions |
| Atlantic |
| FEMA Regions 1 and 2 |
| East |
| FEMA Regions 3 and 4 |
| Central |
| FEMA Regions 5, 6, and 8 |
| West |
| FEMA Regions 7, 9, and 10 |
| HQ & CRC |
| FEMA HQ & CRC |
1.4. Applicable Documents & Resources
The contractor must abide by all applicable and current regulations, publications, manuals, and local policies and procedures, including, but not limited to the following:
· Robert T. Stafford Disaster Relief and Emergency Assistance Act, 42 U.S.C. §5121-5207
· Code of Federal Regulations (CFR) Part 200 – Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards
· CFR – Domestic Security
· CFR Part 200- Uniform Administrative Requirements For Federal Grants
· 29 CFR Part 1910 – Occupational Safety and Health Administration Standards
· 36 CFR—Parks, Forests, and Public Property
· 40 CFR Parts 1500-1508—Protection of Environment
· 41 CFR Part 301—Public Contracts and Property Management
· 44 CFR—Emergency Management and Assistance
· 48 CFR—Federal Acquisition Regulations System
· 50 CFR Part 402, Wildlife and Fisheries
· Public Assistance Program and Policy Guide
· Public Assistance Alternative Procedures Guides and Standard Operating Procedures
· Public Assistance Program and Policy Guide (PAPPG), version 5
· All associated Position Assists and Job Aids
· PA’s Grants Portal – Grants Manager YouTube Channel (FEMA PA Grants Portal - Grants Manager Channel - YouTube)
· Other official PA-related resources and job assists as specified by the Program Office
2. Specific Requirements/Tasks
The contractor shall perform to the standards in the contract. All deliverables must comply with the standards listed in the documents and resources listed in the Applicable Documents & Resources section.
2.1 Qualified Personnel - The contractor shall provide qualified personnel with the requisite qualifications necessary to fulfil the requirements of this contract. Requisite qualifications (Attachment 1 – Labor Category Qualifications) include the demonstrated experience and skills necessary for the contractor personnel to perform all PA-related tasks, including competences in ancillary writing and technology-related skills (e.g., grammar and spelling skills, FEMA Grants Manager (GM) training, inspection photography, etc.). The contractor shall also maintain a roster of qualified, available personnel ready to support PA Program’s missions. The specific labor categories and minimum anticipated Full-Time-Equivalent (FTE) yearly quantities are listed below (Table 2 – Labor Categories). The contractor shall ensure all personnel are licensed (if applicable).
2.2 Contractor Furnished Items - The contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items as necessary to perform the services as defined in the PWS at no cost to the government.
2.3 Labor Categories - The contractor shall roster at least the minimum quantity of labor categories listed in Table 2 – Labor Categories throughout the period of performance of the contract. The contractor shall submit the names of 50% of each of the required Labor Category quantities within 30 calendar days after contract award, and the remaining 50% within 90 calendar days. To account for attrition and unavailability of personnel, the government will allow contractor to exceed the minimum roster quantity by no more than 40% for a given year.
The government may not process FEMA-issued background checks in excess of the established ceiling. The government reserves the right to increase this amount based on zone disaster activity and operational needs and will attempt to provide advance notice in the event additional resources may be required beyond the established ceiling. This will be included at the time of the Task Order Proposal Request (TOPR).
The contractor shall submit the names and corresponding labor categories to the Contracting Officer Representative (COR) or designated recipient. All submitted resumes shall include the minimum qualifications and skills as specified in Attachment 1 – Labor Category Qualifications.
Labor categories not identified in this contract in Table 1 – Labor Categories that are otherwise required by the government may be requested. In such instances, the contractor may agree to the request and propose the labor category and corresponding fixed hourly labor rate for consideration. Upon review and acceptance, the government will modify the contract to incorporate the new labor category and corresponding fixed hourly labor rate.
Table 1 – Labor Categories
| Labor Category |
| Quantity |
| Accountant |
| 1 |
| Administrative Support Specialist |
| 5 |
| Appraiser * |
| 0 |
| Archaeologist |
| 1 |
| Architect |
| 2 |
| Architectural Historian |
| 1 |
| Biologist * |
| 0 |
| Certified Floodplain Manager * |
| 0 |
| Certified Public Accountant * |
| 0 |
| Civil Engineer |
| 25 |
| Coastal Engineer * |
| 0 |
| Commercial Property Insurance Professional |
| 3 |
| Construction Manager |
| 16 |
| Construction or Building Inspector |
| 16 |
| Ecologist * |
| 0 |
| Electrical Engineer |
| 5 |
| Environmental Engineer * |
| 0 |
| Environmental Planner |
| 6 |
| Estimator |
| 5 |
| Financial Analyst |
| 1 |
| General Planner |
| 3 |
| Geologist * |
| 0 |
| Graphic Artist * |
| 0 |
| Health Scientist * |
| 0 |
| Historic Architect * |
| 0 |
| Horticulturalist * |
| 0 |
| Hydraulic Engineer * |
| 0 |
| Hydrologist * |
| 0 |
| Industrial Hygienist * |
| 0 |
| Management Analyst (Program Strategist) |
| 2 |
| Mechanical Engineer |
| 3 |
| Project Manager |
| 21 |
| Quality Assurance Analyst |
| 2 |
| Reports and Communication Specialist |
| 2 |
| Sanitary Engineer * |
| 0 |
| Soil/Geotechnical Engineer * |
| 0 |
| Structural Engineer |
| 3 |
| Technical Writer |
| 1 |
| Trainer |
| 1 |
| Water Quality Specialist * |
| 0 |
| Wetlands Specialist * |
| 0 |
| TOTAL |
| 125 |
*These labor categories are not required be rostered at the time of award but may be requested at the task order level.
The government will award a hybrid IDIQ contract with Firm Fixed Price (FFP), Labor Hour (LH), and Time & Materials (T&M) type contract line-item numbers (CLINs). The government anticipates that many of the Task Orders will include CLINs 0001, 0002, 0003, 0004, and 0005.
This contract does not provide for Readiness, Startup or Closeout costs.
Table 2 – CLIN Structure
| CLIN # |
| CLIN Description |
| CLIN TYPE |
| 0001 |
| Task Order Labor Categories |
| T&M/LH |
| 0002 |
| Task Order Project Management Office (PMO) Rate |
| FFP |
| 0003 |
| Travel |
| T&M |
| 0004 |
| Miscellaneous and Other Direct Costs (ODC) |
| T&M |
| 0005 |
| Minimum Guarantee |
| FFP |
a. CLIN 0001: Task Order Labor Categories – The contractor shall propose a fixed hourly rate for all personnel (Table 1 – Labor Categories).
b. CLIN 0002: Task Order Project Management Office (PMO) Rate – The contractor shall propose Task Order Project Management Office Rate, not to exceed 4% of CLIN 0001 labor hour costs for each period of performance. The PMO fixed costs will be based on actual hours of CLIN 0001 costs billed at the end of each monthly invoice period, not to exceed the proposed PMO percentage. Project Management Office Rate will cover all costs associated with contract administration and project oversight as defined at the Task Order level.
c. CLIN 0003 and CLIN 0004: Travel and Miscellaneous and Other Direct Costs (ODC). All allowable Travel and Miscellaneous costs shall be prescribed in the TOPR and will only be reimbursable provided the expense is explicitly identified as reimbursable on the TOPR or contract modification, or if the COR provides specific direction allowing expense. The government will allow travel booking fees not to exceed $25.00, unless otherwise prescribed in the TOPR.
The government will not reimburse for DBA insurance or other insurance and/or other taxes for OCONUS assignments e.g., Business to Business tax, tax equalization, Gross Receipt Tax (GRT). The government will also not reimburse General & Administration (G&A) Indirect Costs on travel and ODCs.
d. CLIN 0005: The government will provide a minimum guaranteed payment if no task orders are issued.
2.1.
2.2.
2.3.
2.1.
2.2.
2.3.
2.4. Quality Standards –The contractor shall provide the skilled personnel, supervision, and quality control oversight necessary to ensure compliance. The contractor shall provide a management structure that ensures the highest quality standards are achieved in conformance with this PWS, including the guidance identified in Applicable Documents & Resources section.
2.5. Use of Local Firms –The contractor, to the extent feasible and practicable, utilize local firms. The contractor will prepare a tracker that shows the labor mix on the task order level. It will illustrate, at a minimum, the labor category, number of personnel, monetary value, and local versus non-local firms and any other labor and/or staffing related trend as identified by the COR or Contracting Officer (CO). In addition, upon request, the contractor will provide an addendum to their personnel report that shows how it intends to maximize to the highest extent practicable the use of local firms to supplement its labor pool in support of this contract. The contractor will be required to meet goals as set by the CO regarding local versus non-local firms.
3. Contractor Personnel
3.1 Key Personnel - The contractor shall designate a Program Manager (PM) and Deputy Program Manager (DPM) as Key Personnel. The PM and DPM shall be the contractor’s primary Points-of-Contact (POC) when interfacing with FEMA on all contract-related issues. The Key Personnel shall be available to FEMA on a 24-hour/7-day basis. Key Personnel must be committed for a minimum of six (6) months after contract award. Key Personnel shall also be available for any meetings, including weekly or quarterly assessment meetings.
Program Manager (PM): The PM is accountable for the overall cost, schedule, and performance of a program. The PM ensures that all work is being completed correctly and in a timely manner; monitors how projects are progressing; and reports the details to the government. The PM:
· Must have a minimum of a bachelor’s degree in business or a related technical field.
· Must also have a minimum of 15 years of experience performing program management functions to include experience previous experience as a Project Manager on multiple projects.
· Should have disaster operational experience
· Must have high-level management and leadership skills
· Ability to both lead and function as a member of a team.
· Should have excellent written and oral communication skills
· Must have attention to detail, great organizational skills, as well as the ability to multi-task and work well under pressure.
· Must have conflict resolution and problem-solving skills to include risk management
· Must have cost control and budgeting skills
· Must have teamwork and motivational skills
Deputy Program Manager (DPM): The DPM is accountable for the overall cost, schedule, and performance of a program. The DPM ensures that all work is being completed correctly and in a timely manner; monitors how projects are progressing; and reports the details to the government. In the event the PM is unable to perform and/or support, the DPM will act in their absence. The DPM:
· Must have a minimum of a bachelor’s degree in business or a related technical field.
· Must also have a minimum of 10 years of experience performing program management functions to include experience previous experience as a Project Manager on multiple projects.
· Should have disaster operational experience
· Must have high-level management and leadership skills
· Ability to both lead and function as a member of a team.
· Should have excellent written and oral communication skills
· Must have attention to detail, great organizational skills, as well as the ability to multi-task and work well under pressure.
· Must have conflict resolution and problem-solving skills to include risk management
· Must have cost control and budgeting skills
· Must have teamwork and motivational skills
3.1
3.2 Code of Conduct - The contractor shall ensure that all personnel performing work under this contract adhere to its code of conduct, which at a minimum must comply with FEMA Directive: Personnel Standards of Conduct (FEMA Directive 123-0-2-1) and DHS Management Directive 0480.1 Ethics/Standards of Conduct (issued on March 1, 2003). The contractor shall submit their Code of Conduct and remediation plans as part of their Management Plan. The government reserves the right to request the removal of any contractor employee from a Task Order for any reason.
If a request for removal is made by the COR, the contractor shall have forty-eight (48) hours to propose a replacement with similar qualifications. Upon review and acceptance by the COR, the contractor shall have forty-eight (48) hours, or a timeframe specified by the COR, to arrive at designated TDY.
4. Other Applicable Conditions
4.1 Period of Performance - The PA-TAC contract will have a base period of performance, with four (4) option periods. Each individual task order requirement will determine the period of performance.
The Period of Performance for the contract reads as follows:
| · Base Year: | 1 Oct 2026 to 30 Sep 2027 | |
| · Option Year I: | 1 Oct 2027 to 30 Sep 2028 | |
| · Option Year II: | 1 Oct 2028 to 30 Sep 2029 | |
| · Option Year III: | 1 Oct 2029 to 30 Sep 2030 | |
| · Option Year IV: | 1 Oct 2030 to 30 Sep 2031 |
4.2 Place of Performance - The government will specify Place of Performance at the TOPR Phase. The Place of Performance may include contractor’s headquarters, area field offices, FEMA offices or other remote locations as designated. These may be located within the United States, its Commonwealths, Territories, and Minor Outlying Islands. Personnel are anticipated to support virtually and/or in person.
4.3 Non-Personal Services – In accordance with FAR 37.104 Personal Services Contracts, the PA-TAC VI is a non-personal services contract. The Government will not be engaged in continuous supervision and control of contractor personnel while administering this contract. Contractor personnel assigned to task order shall take direction only from designated direct lead or supervisor, e.g., TOM, who shall be contractor personnel. Contractor lead(s) or designated supervisor(s) shall take instruction only from appointed COR or TM. At no point shall the contractor take or give direction from or to another contractor assisting in PA recovery efforts without authorization or validation from a COR or TM.
4.4 Reporting – The contractor shall provide the following reports to the COR and TM in accordance with Attachment 2 – Performance Requirements Summary Matrix. The contractor shall provide templates of the reports identified in the PRS to the COR within (15) calendar days after contract award date. The templates will be reviewed and any requests for modifications will be communicated by the COR.
The government will provide the minimum reporting elements, and the contractor may propose additional items. The final template(s) will be provided to the contractor within (30) calendar days of contract award. All required reports shall be subject to modification at the request of the COR at any time during the performance of this contract.
FEMA may periodically issue written guidance to clarify contract requirements, applicable Agency policies, bulletins, and procedural expectations to support contract execution.
Management Plan – The contractor shall submit a management plan that at a minimum:
· Identifies the management structure and critical processes necessary to successfully manage the contract and its requirements.
· The management plan shall demonstrate the contractor’s detailed knowledge of the overall PA Program as identified in this PWS, including the applicable documents in Applicable Documents & Resources section.
· The plan shall also delineate efficient methods and effective cost controls and describe in detail how the contractor will respond to and manage all contractor personnel for each task during multiple and/or concurrent disasters.
· The plan shall also demonstrate the contractor’s procedures and capability to increase their pool of personnel in the event FEMA requests additional personnel based on task order level requirements. These resources must be vetted, badged, qualified and trained. The plan will include how they will vet and have their staff successfully pass a FEMA security background investigation (BI) to obtain a FEMA badge at an authorized facility as described in Attachment 3 of the PWS. The Contractor’s Key Personnel performing work under this contract must also have a Moderate Risk Background Investigation and must maintain the level of security for the life of the contract. All other contractor staff supporting work under this contract must have a Moderate Risk background investigation prior to commencing work. The management plan shall be a living document that is flexible enough to adapt to changing requirements under a broader scope.
4.4.2 Quality Control Plan (QCP) – The contractor shall develop and maintain an effective quality control program that at a minimum ensures services are performed in accordance with this PWS. The contractor’s quality control program is the inspection methodology by which the contractor assures itself that work complies with the requirement of the contract.
· The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.
· The contractor will include a corrective action plan within the QCP to address items of non-compliance. The QCP shall list specific instances where anticipated quality control inspections will take place during the life cycle of the process.
· The contractor shall ensure its quality control-related inspections are documented and saved for verification.
The QCP shall also be a living document that is updated when submitted at the Task Order level and be specific to the Task Order requirements.
The contractor shall develop a QCP and submit the document (30) calendar days after contract award.
4.4.3 Quality Assurance Surveillance Plan (QASP) – The government shall at a minimum evaluate the contractor’s performance under this contract in accordance with the QASP. This plan is primarily focused on what the government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, the minimum acceptable defect rate(s), and all correction and follow-up actions on issues that merit such approach. The contractor shall submit a QASP in accordance with the Performance Requirements Summary (PRS).
4.4.4 Training Plan - As part of its contract proposal, the contractor shall at a minimum develop and submit a comprehensive training plan incorporating applicable PA related materials as specified in this contract.
· The Training Plan should outline the contractor’s efforts to equip its personnel with the requisite knowledge and skills to perform under this contract as outlined in Attachment 1 – Labor Category Qualifications.
· The contractor shall develop and provide training for the positions identified by the government in the TOPR. The contractor may provide training only to its designated staff following receipt of TOPR. For some positions, the contractor developed training may be required prior to kickoff. This training requirement will be included in the TOPR. The training shall be a reduced version of the full FEMA-provided training for position certification. The contractor shall provide these training courses in a manner that the staff will be familiar with the duties and tasks for certain positions and gain knowledge in PA policy and systems. Additional training may be provided by FEMA staff, on a case-by-case basis, in an on-the-job training (OJT) or just-in-time training (JIT) as time and FEMA resources can accommodate during awarded disasters Task Orders. The government will provide the training materials to the contractor to train their staff and develop the Training Plan. Train-the-Trainer will not be provided.
If proposed staff are no longer available, all replacement candidates must be trained within five (5) calendar days of authorization to commence work.
4.4.5 Security Startup Roster – The contractor shall submit a weekly Security Roster identifying all security-related information for rostered employees. Information shall include, but is not limited to, name, job title, date e-QIP was initiated, EOD, and other pertinent information identified by the COR. Upon award, the government will provide a template for the contractor to submit required information.
4.4.6 Final Voucher and Closeout Tracker – The contractor shall submit a final voucher tracker and closeout package no later than 90 days following the Task Order’s Period of Performance end date. At a minimum, the final voucher tracker should include the Task Order number, description, Task Order status, Period of Performance start and end dates, total obligated value, total expenditures, remaining balance, final invoice number and final invoice amount. The report shall be cumulative and include all previously awarded Task Orders. The closeout package shall contain a final public voucher; payment history; draft request for final modification; list of classified materials retained; certification regarding U.S. Government property; contractor’s assignment of refunds, rebates or credits; contractor’s release of claims; and continuation sheets, if necessary. If additional time is needed, the zone contractor shall submit a written request for a time extension that explains the extenuating circumstances.
4.4.7 Annual and Final Report – The contractor shall submit a report (15) calendar days after the end of each contract period. The report shall document and summarize the results of the entire contractual effort to date, including key issues and resolutions, recommendations, and conclusions. The report shall include tables, graphs, and other visual aids to comprehensively explain the results achieved under the contract.
4.4.8 Other operational reports as identified at the Task Order level, e.g. Site Inspection Report, etc.
4.1 4.2 4.3 4.4
4.5 Base Contract Kick Off /Post Award Conference/Periodic Partnering Meetings - The contractor shall participate in a kickoff meeting with the government no later than five (5) business days after contract award. The contractor shall provide key personnel with authority to make decisions and take responsibility of any actionable items because of the meeting. The contractor shall submit the kickoff meeting notes no later than five (5) calendar days following the conclusion of the meeting. The contractor agrees to attend any post award meetings convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The CO, COR, and other government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the government of problems, if any. Partnering meetings may be held at the government’s discretion. Types of partnering meetings include Senior Partnering, Operational Partnering, and Individual Partnering. As part of these partnering meetings, the contractor may be asked to present briefings to the COR and other interested FEMA personnel on the status of tasking under the contract. Partnering meetings may be held virtually or a designated location as determined and/or the contractor.
4.6 Overtime – All projected overtime needs and OT request approval process (i.e., weekly workweek exceeding 40 hours) will be specified on the Task Order Proposal Request (TOPR). Overtime hours are not allowable unless the contractor receives written preauthorization from the COR or designated TM. The contractor shall only bill actual hours worked, and the COR or TM may verify using backup documentation to determine whether actual work hours were completed. For bidding purposes, the contractor should include regular and overtime rates for all labor categories to include base and all options.
4.7 Recognized Holidays – The TOPR will specify whether contractors are expected to work on federal holidays. The government recognizes the following holidays:
| New Year’s Day |
| Labor Day |
| Martin Luther King’s Birthday |
| Columbus Day |
| Washington’s Birthday |
| Veterans’ Day |
| Memorial Day |
| Thanksgiving Day |
| Juneteenth Day |
| Christmas Day |
Independence Day
4.8 Hours of Operation – The government will specify Hours of Operation, including all estimated overtime hour requirements, at the TOPR Phase. The core working hours are 9:30 am local time to 3:30 pm local time of requesting requirement office. The contractor is responsible for conducting business based upon the hours of operation specified in each task order except Federal holidays. When the government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings, FEMA employees have directed work locations. The contractor must receive approval from the CO and/or COR to work from an alternate location. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this contract when the government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.
Additionally, the contractor must provide the COR/TM with a list of all holidays observed by the contractor. This information will be provided at the Task Order Kickoff Meeting. In the event there is a holiday that is observed by DHS FEMA, but not by the contractor, the contractor must arrange with the COR and/or TM, a plan for how to ensure that the full weekly work commitment is met (e.g., work 4/10 hour days, work from Alternate Work Station (AWS), or at a Contractor facility, etc.) The COR and/or TM will review and in coordination with the program/field, will make the determination regarding the schedule.
4.9 Contractor Travel – Costs for transportation, lodging, meals and incidental expenses incurred by contractor personnel on official company business in support of this contract are allowable in accordance with FAR 31.205-46, Travel Costs. Travel costs will be considered reasonable and allowable only to the extent that they conform to FEMA’s Travel Policy Manual 122-1-1, which supersedes the previous FEMA Travel Manual 6200.1 from May 1989 and any other directive-level travel guidance by the agency will be used as guidance in coordination with FAR 31.205-46. The contractor will be authorized only those travel expenses specifically prescribed in the TOPR and consistent with the substantive provisions of the FEMA Travel Manual and the limitation of funds specified in the contract.
For lodging:
· Contractors should seek the lowest available lodging rate and avoid using nonconventional lodging to maximize personal convenience at the expense of other cost considerations, including increased travel time, fuel costs, etc.
· Lodging at properties owned by family or friends is not permitted for reimbursement purposes.
· Lodging at property the traveler or family member owns outright or have any ownership interest in (such as through a Limited Liability Corporation or lease-to-own arrangement) is not reimbursable.
· Lodging selected must not fall under the category of luxury accommodations. Luxury accommodations are defined as properties that offer high-end amenities and services typically found in high-end hotels and resorts.
· Charges for utilities, resort fees, maintenance, service, rental insurance, cleaning fees, deposits, etc. will not be charged - only the standard nightly government, plus tax rate are eligible for reimbursement.
· For Non-Conventional Lodging, the contractor will be required to provide a daily itemized invoice/payment receipt that includes name of company, address, EIN/Tax ID number, dates rented, and zero balance.
· Any additional costs/fees outside of the standard government rate and taxes are not reimbursable.
· If lodging at a rental property, include a copy of the signed rental agreement that includes the printed name and signature of the landlord/lessor.
· Contractor employees approved for non-conventional lodging will not be allowed to sublet rooms or any portion of the property to others unless lodging sharing is disclosed and approved by the contractor and the CO and/or TM.
All travel requires government approval/authorization and notification to the COR or TM. In the event there is a conflict in the travel regulation, the contractor shall seek guidance and approval from FEMA. The government will reimburse up to eight (8) hours per day for contractor travel time, to include OCONUS travel. Labor hours for travel will be accounted for under CLIN 0002 and CLIN 0003 at the Task Order Level. The government will not reimburse for non-rotational travel time.
4.10 Health & Safety – The contractor shall ensure that all applicable health and safety requirements for infectious and communicable diseases are followed in accordance with federal regulations. All costs associated with providing contractor personnel with regulatory mandated Personal Protective Equipment (PPE) and testing will be the responsibility of the contractor.
4.11 Organizational Conflict of Interest – Contractor and subcontractor personnel performing work under this contract may have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The contractor shall notify the CO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the CO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the CO and in the event the CO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the CO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
4.12 Government Furnished Equipment (GFE) – As part of its base contract proposal, the contractor shall assume that no GFE will be provided on any task order. The government will specify at TOPR if government-issued laptops are required to be furnished to the contractor. In such instances, the government will provide for all shipping and/or travel-related costs to acquire equipment. The contractor is responsible for all equipment until FEMA acknowledges receipt of returned equipment. If equipment is damaged or stolen, the contractor is liable and shall reimburse the government for the cost of the equipment. This is referenced on the last page of the Statement of responsibility section of the FEMA Personal Property Custody/Hand Receipt Report provided with each piece of government equipment.
In accordance with the Rehabilitation Act of 1973, as amended Section 504 (Programs, Services and Activities) and Section 508 (Electronic and Information Technology), FEMA will provide applicable accessible information technology systems to specialists covered under the Rehabilitation Act of 1973. Based on the contractor’s specific need, FEMA will provide accessibility related software or peripheral devices to use systems that comply with Section 508.
The contractor/Provider shall comply fully with Section 504 of the Rehabilitation Act of 1973, as amended, and incorporate this language in any sub-contracts related to the provision of FEMA public-facing program or activity.
If GFE is required, the contractor shall ensure it has a property management system in accordance with FAR 45.104. Contractor personnel shall not conduct any work under this contract from overseas locations unless otherwise approved in writing by the COR. Overseas use of GFE is strictly prohibited and may result in immediate removal from the contract.
GFE must be returned within 15 business days following completion of the assignment. The COR may authorize the contractor to retain equipment beyond the established timeframe.
4.13 Contractor Furnished Equipment (CFE) – The contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items as necessary to perform the services as defined in the Performance Work Statement (PWS) within the contractor's proposed firm fixed rates and at no additional cost to the government, unless the contract identifies such cost as reimbursable. All contractor personnel working under this contract are required to have a working cell phone and laptop for communication purposes, including on OCONUS deployments. The government will not reimburse the contractor for any cell phone-related costs, including but not limited to purchase of item, network plans, minute plans, roaming charges, wi-fi hotspots, and international calls.
If government-issued laptops are not furnished to the contractor at TOPR, the contractor shall be responsible for all laptop-related costs. The contractor shall be prepared to furnish all laptops with software applications required by FEMA, to include Microsoft Suite and a contractor issued business email address. If there are other software applications required by FEMA, it will be included at the time of TOPR.
4.14 Technical Monitor Certification (TMC) – The contractor shall submit a TM Certification report to the designated TM and/or COR for review prior to submitting an invoice. The TMC shall contain all charges associated with the invoice to include all Labor Hour charges and ODC-related costs. The Technical Monitor will review and, if approved, sign and return the TMC to the contractor to submit as part of invoice. The contractor shall submit a monthly TMC by the 15th day after all expenses have been incurred in the prior 30 days. An alternate frequency of TMC submissions may be established at the Task Order level. The TMC review period is generally limited to ten (10) business days. The contractor shall submit corrected TMCs within five (5) business days after receipt of feedback from TM. The contractor shall not submit any additional TMCs under the same task order during the TM's ten (10) business day review period. If a TMC is not reviewed within ten (10) business days, on the 11th business day an invoice may be submitted.
4.15 Invoicing – The contractor shall submit all invoices no later than the last day of the subsequent month following delivery and acceptance of services. Invoices shall include all expenses (e.g., field & management labor hours, travel, etc.) incurred by the contractor, including all Subcontractor costs, within the invoice’s Period of Performance, which shall not exceed the calendar month. Preliminary reviews will be conducted through the TMC procedure in section 4.14, before invoices are submitted.
5. Task Order Process
Task orders will be awarded based on competition among the awardees of each zone.
The CO will issue a Task Order Proposal Request (TOPR) to the contractors. The TOPR will identify:
· Period of Performance
· Area(s) of Operations
· Labor Category and quantities
· Place of Performance
· Tasks and Deliverables
· Other task order-relevant information (e.g., travel, additional training requirements, etc.).
While FEMA experience is not a requirement for the base contract, it may be a requested preference on task orders.
The CO will notify contractors of task order award. Any changes in personnel from contractor proposal to award shall be immediately communicated to the COR. The contractor shall have from the TOPR notification to a Task Order award to train their staff in the respective positions as prescribed in the training plan. When proposed, that contractor shall notify FEMA that their staff will be trained (or is already trained) and are ready for assignment and deployment upon Task Order kickoff meeting and award.
The contractor shall mobilize staff to support multiple, simultaneous task orders within a given year.
As part of TOPR proposal, the contractor shall identify a Task Order Manager (TOM) and/or a designated Lead, to manage all task order Labor Category personnel. The TOM and/or a designated Lead shall coordinate with the COR and TM on any travel-, performance-, and other contract related issues, and shall be available at any time to address issues identified by the COR and/or TM for the entire Period of Performance of the Task Order. The designated lead is also an operational staff member under CLIN 0001. The TOM is billable under CLIN 0002.
The TOM is responsible for the successful performance of the assigned work. Depending on the size and complexity of the assignment, the TOM may be on site or located remotely. The TOM will be in frequent contact with the TM and/or COR and have sufficient authority and experience to address any issues. Specific responsibilities include:
· Serves as the TAC primary point of contact with the TM and COR.
· Responsible for overall management and execution of the assignment from inception to completion; ensures assigned tasks are within the approved SOW.
· Performs quality monitoring to ensure implementation of the TAC’s quality control plan; coordinates preparation and/or review and approval of contract deliverables for completeness, technical accuracy, timeliness, and conformance with other Task Order requirements.
· Periodically visits the project site to meet with the TM and/or COR and TAC staff; frequency and duration of visits are dependent on the size and complexity of the operation and will be pre-approved by the TM and/or COR.
· Provides oversight of the TAC Team Leader’s and TAC Coordinator’s activities, or, if deployed, performs TAC Team Leader duties.
Utilized primarily on large scale events, the designated Lead is a staff member responsible for managing the day-to-day performance of the field staff and is readily available to support needs of the TM, the TOM and the technical staff to implement the task. Specific Lead responsibilities include:
· Serves as the primary interface with the TM and the TOM.
· Provides oversight and coordinates with the TOM, all productivity, quality, health and safety, behavioral and welfare issues associated with staff.
· Performs continuous quality assurance review of work products, and reports issues to the assigned TOM and the TM and/or COR.
· Represents TAC Management at FEMA meetings.
· Works with the TM and/or COR to address any performance issues, staff reassignments, quality of work products or productivity, and demobilizations.
FEMA will consider the use of a TAC Coordinator position to perform administrative Task Order duties. The TAC Coordinator may deploy on site/mobilize on short durations to aid in contractor staff/field personnel deployments, demobilizations, system/facility access, logistics/equipment coordination, and other administrative or coordination efforts. During TOPRs, the contractor shall propose a suitable field labor category, i.e., administrative support specialist, to perform the TAC Coordinator functions. The TAC Coordinator is an operational staff member under CLIN 0002.
The total staff with allowable hours for the TAC Coordinator position are noted below. Multiple TAC Coordinators are allowed for every (30) staff:
0-4 staff: no TAC coordinator 5-6 staff: up to 5 hours per week 6-10 staff: up to 10 hours per week 11-15 staff: up to 20 hours per week 16-20 staff: up to 30 hours per week 21-30 staff: up to 40 hours per week
5.1 Kickoff Meeting – The contractor shall participate in all Task Order-related kickoff meetings no later than five (5) business days following task order award, or as otherwise specified in the TOPR. The contractor shall introduce the designated Lead(s) and other staff if applicable. The contractor shall take notes and provide a digital copy to the COR and TM no later than three (3) business days following the conclusion of the kickoff meeting.
5.2 Deployment of Contractor Staff – Contractor staff and designated lead shall have a minimum of 24-48 hours to arrive at designated TDY location upon COR notification. Task Orders with OCONUS TDY shall specify time of arrival. Contractors supporting virtually from designated Residences of Record (RORs) shall be available within 24 hours following Task Order Award to receive work under the task order.
All personnel proposed on a task order are expected to be committed to the disaster for the duration of the assignment, including base and any option period(s). If staff cannot commit for the entire duration, the information shall be disclosed in the technical proposal, along with the expected duration the staff is committed to. If the proposed personnel are no longer available to support the task order by the time the award is made, it must be brought to the attention of the CO, COR, and TM. Any changes to proposed Labor Category personnel must be submitted to the COR prior to demobilization and/or removal.
Rotational travel schedules must be coordinated with the TM and/or COR at least fourteen (14) days prior to departure. Rotations shall be for a minimum of seven (7) days. The maximum duration shall be fourteen (14) days as long it is operationally permissible. No accrual of days shall be permitted. To ensure adequate coverage during authorized rotations, rotation schedules may be adjusted; the contactor shall coordinate with the TM and/or COR to avoid depleting the field of contractors at any given period. Other travel schedule requirements, including intervals, notification and approval process, shall be identified in the TOPR.
5.3 Reports - Reports may be requested at the task order level to include but not limited to Daily Accountability Report, Task Order Status Report (TOSR) and Labor/OT Report.
6. Definitions and Acronyms
6.1 Definitions
4.1 Contractor – A supplier or vendor awarded a contract to provide specific supplies or services to the government. The term used in this contract refers to the prime.
Contracting Administration Office – An office that performs assigned post-award functions related to the administration of contracts in conformance with FAR 42.302.
Contracting Officer (CO) – The CO has authority to enter, administer, or terminate contracts and make related determinations and findings. COs may bind the government only to the extent of the authority delegated to them. COs are responsible for ensuring performance of all necessary actions for effective contracting, ensuring compliance with the terms of the contract, and safeguarding the interests of the United States Federal Government in its contractual relationships. COs ensure that contract requirements have been met, and that sufficient funds are available for obligation; and ensure that contractors receive impartial, fair, and equitable treatment. In addition, the CO is the only person legally authorized to approve changes to any of the requirements under this contract.
Contracting Officer’s Representative (COR) – The COR will be identified by a separate appointment letter by the CO. The COR monitors all technical aspects of the contract and assists in contract administration.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .