FDOT_Grant_No._G2C01,_Ext_to_3.31.27.pdf

PDF 343 KB Posted

Attached to
Old Town of Santa Rosa Foreman Property Nellie Drive Extension
Solicitation number
26-03
Issued by
Walton County, Florida

About this file

This is a grant documentation file related to the Florida Department of Transportation (FDOT) Grant No. G2C01, extending through March 31, 2027, for a roadway extension project in Walton County, Florida. The project involves the construction of a one-mile extension of Nellie Drive from Chat Holley Road to US Highway 98, located adjacent to 2038 US Highway 98 within Sections 25 and 26, Township 2S, Range 20. The contract duration is 365 days to substantial completion with an additional 30 days allocated for punch list completion. The project falls under the Old Town of Santa Rosa Foreman Property initiative and represents a significant infrastructure improvement to extend existing roadway connectivity in the designated area.

The FDOT grant funding mechanism provides the financial basis for this roadway extension project, with the grant extending through the specified termination date. The project is structured to facilitate competitive sealed bidding procedures, with submissions required through the appropriate procurement portal. The extension of the grant period to March 31, 2027, indicates continued funding availability and commitment to project completion, allowing adequate time for construction phases and final project closeout activities within the established timeframe.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files