This Invitation to Bid (ITB) #26-03 is issued by Walton County, Florida's Board of County Commissioners for the Old Town of Santa Rosa Foreman Property Nellie Drive Extension project. The project consists of constructing approximately one mile of roadway extension for Nellie Drive from Chat Holley Road to US Highway 98, adjacent to 2038 US Highway 98 in Walton County, Florida, within Sections 25 and 26, Township 2S, Range 20. Work includes stormwater conveyance systems, stormwater management facilities, box culvert construction, gravity and retaining walls, a multi-use path, landscaping, and erosion control measures compliant with FDOT, Army Corps of Engineers, and Northwest Florida Water Management District requirements. The project utilizes a three-lane typical section with two travel lanes and a center turn lane. Sealed bids are due by 10:00 am on January 20, 2026, with public opening immediately following at the Office of Central Purchasing in DeFuniak Springs or via teleconference. A non-mandatory pre-bid conference is scheduled for November 19, 2025, at 8:30 am. The question submission deadline is December 10, 2025, at 12:00 pm. Contract duration is 365 calendar days to substantial completion, with an additional 30 calendar days for punch list completion. All bids must be submitted electronically through the County's e-Procurement Portal at https://procurement.opengov.com/portal/waltoncountyfl/projects/208290.
The bid schedule is structured as a unit price bid covering mobilization, maintenance of traffic, sediment barriers, clearing and grubbing, excavation, embankment, base materials, asphalt paving, concrete work, pipe culverts, box culverts, retaining walls, and other infrastructure items. Bidders must include sales tax and all applicable taxes and fees in pricing. Bid security of 5 percent of the base bid price is required in the form of a certified check or bond issued by a surety with at least an "A-" policyholder's rating and Class VII financial rating, listed on the U.S. Treasury Department's T-list. The successful bidder must furnish performance and payment bonds and certificates of insurance within specified timeframes. Bidders must be FDOT prequalified in work classes 7, 10, 11, 12, 28, 38, and 40 with proof submitted at bid. Liquidated damages of $3,813.00 per calendar day apply for failure to achieve substantial or final completion within designated timeframes. The County reserves the right to reject any or all bids and may value engineer the scope if the low bid exceeds budget, in which case the three lowest responsive and responsible bids will be reviewed for award selection. Award will be made to the lowest responsive and responsible bidder within thirty days of bid opening. A bid protest bond equal to 1 percent of the protestor's bid (minimum $500) is required for any protest filed within specified timeframes.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/waltoncountyfl
Walton County
INVITATION TO BID
26-03
OLD TOWN OF SANTA ROSA FOREMAN PROPERTY NELLIE DRIVE
EXTENSION
RELEASE DATE: November 12, 2025
RESPONSE DEADLINE: January 20, 2026, 10:00 am
Please refer to the project timeline in this document for all important deadlines.
Invitation To Bid #26-03 Title: Old Town of Santa Rosa Foreman Property Nellie Drive Extension
Table of Contents
1. Invitation to Bid
2. Instruction to Bidders
3. Scope of Work
4. Bid Schedule
5. Vendor Submissions
6. Attachments
Attachments:
A - Contract No. 26-03
B - Public_Construction_Bond (25)
C - FDOT Grant No. G2C01, Ext to 3.31.27
D - 1394776 NWFWMD Permit
E - FDOT Grant Agreement No. G2C01
F - 43371.001 Nellie Drive Extension
G - Final CRAS Old Town Santa Rosa Reg SMF_Walton
H - P22-0685 Geotechnical Report - Nellie Drive Old Town Santa Rosa - Signed 6.13.23
I - 2025.04.17-SP-Permit-Form-Final-202401041
J - P22-0685 Final Geotechnical Report - Nellie Drive Old Town Santa Rosa - Signed 7.31.23
K - C-BASE-CORR-43371.001_3lanes
L - C-BASE-GRAD-43371.001
1. Invitation to Bid
BOARD OF COUNTY COMMISSIONERS,
WALTON COUNTY, FLORIDA
Old Town of Santa Rosa Foreman Property Nellie Drive Extension
26-03
Sealed bids for the Old Town of Santa Rosa Foreman Property Nellie Drive Extension Project will be received by the Walton County Board of County Commissioners, hereinafter referred to as "County" until 10:00 am
LOCAL TIME on Tuesday, January 20, 2026, for furnishing labor and materials and performing all work set forth in the Bidding Documents prepared by Walton County. IMMEDIATELY FOLLOWING the scheduled closing time for the reception of bids, all bids which have been submitted in accordance with the conditions of the Bidding
Documents issued in relation to this Project will be publicly opened and read aloud.
Bidder is responsible for the submission of its bid.
Bids received after the specified day and time will not be opened.
The proposed project, hereinafter referred to as the “Project” consists of the construction of a roadway extension for Nellie Drive, located adjacent to 2038 US Highway 98 in Walton County, Florida, within Sections
25 and 26, Township 2S, Range 20. The Project involves extending the existing Nellie Drive approximately one mile from Chat Holley Road to US Highway 98
Contract Time: The contract duration is THREE HUNDRED SIXTY-FIVE (365) days to substantial completion with an additional THIRTY (30) days for punch list completion.
Advertisement Date: November 12, 2025
Pre-Bid Meeting (Non-Mandatory): November 19, 2025, 8:30am
Office of Central Purchasing 176 Montgomery Circle DeFuniak Springs, Florida 32435
OR
Bidders may also attend the pre-bid meeting via teleconference by dialing 850-
635-0655 EXT 261217
Question Submission Deadline: December 10, 2025, 12:00pm
Bid Closing Deadline: January 20, 2026, 10:00am
In-Person Bid Opening:
Office of Central Purchasing 176 Montgomery Circle DeFuniak Springs, Florida 32435
OR
Bidders may also attend the bid closing meeting via teleconference by dialing 850-
635-0655 EXT 261217
All responses must be submitted electronically via the County e-Procurement Portal:
https://procurement.opengov.com/portal/waltoncountyfl/projects/208290.
Through the e-Procurement Portal, responses will be securely locked and digitally encrypted until the submission deadline passes.
Should you encounter any technical difficulties or require assistance with the e-Procurement Portal, please reach out to our technical support team via the blue chat bubble on the bottom right or via email at procurement-support@opengov.com
All subcontractors and suppliers shall be declared on the prescribed Subcontractors and Suppliers Declaration form.
Each Bidder’s submittal shall include all the items listed in the Vendor Submissions section.
The Successful Bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the Contract, as prescribed in the Contract Documents.
All bid bonds, payment and performance bond(s), insurance contracts, and certificates of insurance shall be executed by a licensed agent of the surety or insurance company authorized to do business in the State of
Florida and meet the requirements set forth in the Bid Security section.
The bid may be withdrawn without penalty prior to the date and time of bid opening. Bids shall remain open and subject to acceptance for a period of thirty (30) calendar days after the date of bid opening, but the
County at its sole discretion may release any bid and bid security. No Bidder may withdraw its bid for a period of thirty (30) calendar days after the date of bid opening.
In order to perform work on public contracts, the successful Bidder shall have all licenses and permits required by federal, state, and local statutes, regulations, and ordinances.
The County will award the bid to the lowest, most Responsible and Responsive Bidder that is most qualified to perform the job according to the specifications and qualifications listed in the Invitation to Bid. Bidders shall provide documentation that they can perform the required services and provide documentation of past and https://procurement.opengov.com/portal/waltoncountyfl/projects/208290 mailto:procurement-support@opengov.com present projects of this same nature, along with references. Failure to provide said documentation will result in a bid being found non-responsive.
Before a contract will be awarded for the Project contemplated herein, the County will conduct such investigations as is necessary to determine the performance record and ability of the apparent low Bidder to perform the size and type of project specified under the Contract. The County reserves the right to reject bids from Bidders whose Dun & Bradstreet Comprehensive Report, or past work performance with the County and other governmental agencies, including timeliness of completion of projects and history of payment to subcontractors or materialmen are deemed by the County to be unsatisfactory. The Bidder shall submit with its bid detailed written evidence of experience and current commitments necessary to allow the County to evaluate the bidder's qualifications. Failure to do so will result in bid being found non-responsive.
In the event the apparent low bid submitted by a Responsible and Responsive Bidder exceeds the County's budget for the Project, the County reserves the right to value engineer the published scope of work in order to effect deductive cost changes. In light of the modified scope of work, the County shall review the three lowest bids submitted by Responsible and Responsive Bidders in order to select one Bidder to whom to award the
Contract.
The County reserves the right to reject any or all bid(s), and may postpone the award of the Contract for a period of time which shall not extend beyond thirty (30) calendar days from the bid opening date.
A person or an affiliate who has been placed on the convicted vendor list following a conviction for public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, Florida
Statutes, for CATEGORY TWO for a period of thirty-six (36) months from the date of being placed on the convicted vendors list.
Walton County, as a political subdivision of the State of Florida, shall comply with Executive Order Number 11-
02, dated January 4, 2011, and shall require that contractors utilize the U.S. Department of Homeland
Security’s E-Verify system to verify the employment eligibility of: (a) all persons employed during the contract term by the contractor to perform employment duties within Florida; and (b) all persons (including subcontractors) assigned by the contractor to perform work pursuant to the Contract with the County.
Pursuant to §287.05701, Florida Statutes, the County may not request documentation of or consider a contractor's social, political, or ideological interests when determining if the contractor is a responsible contractor. Further, the County may not give preference to a contractor based on the vendor's social, political, or ideological interests.
2. Instruction to Bidders
2.1 DEFINED TERMS
The term "Bidder" shall mean one who submits a bid directly to the County, as distinct from a sub-bidder, who submits a bid to a Bidder. The term "Responsible and Responsive Bidder" means a person or entity who has submitted a bid which conforms in all material respects to the requirements set forth in the Bidding
Documents and has the capability, in all respects, to perform fully the contract requirements, and the tenacity, perseverance, experience, integrity, reliability, capacity, facilities, equipment, and credit which will assure good faith performance. The term “Successful Bidder” means the most Responsible and Responsive Bidder with the lowest bid who has been selected for award of the Contract. The term “Contract” shall mean the agreement between the Successful Bidder and the County resulting from this ITB. The term “Contract
Documents” includes the Construction Contract, Construction Plans prepared by Halff , dated October 17, 2025, consisting of information provided in Scope of Work and Attachments sections. The term "Bidding
Documents" includes the Invitation to Bid, Instruction to Bidders, Contract Documents and the Bid Form
(including all addenda issued prior to receipt of bids). The term “Notice of Award” shall mean the form issued by the Purchasing Department awarding the Contract to the Successful Bidder. The term “Notice to Proceed” shall mean the letter issued by the Purchasing Department notifying Successful Bidder to commence work on the Project.
2.2 COPIES OF BIDDING DOCUMENTS
A. Complete sets of Bidding Documents must be used in preparing bids; neither the County nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of
Bidding Documents.
B. The County and Engineer in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining bids on the Project and do not confer a license or grant for any other use.
2.3 QUALIFICATIONS OF BIDDERS
To demonstrate qualifications to perform the Project, each Bidder shall submit with their bid detailed written evidence of experience completing projects of the nature and scope similar to the project described in this
Invitation to Bid, documentation of current commitments, a copy of all applicable occupational and state contractor licenses, and such information as is required in the Vendor Submissions section. Each Bidder must also be prepared to submit within five (5) business days of the County's request, written evidence, such as licenses, financial data, previous experience, present commitments, and other such data as may be requested by the County. Each bid must contain evidence of Bidder's qualification to do business in the State of Florida.
Specifically, the Bidder shall have all licenses and permits required by federal, state, and local statutes, regulations, and ordinances.
BIDDERS MUST BE FDOT PREQUALIFIED
https://procurement.opengov.com/portal/waltoncountyfl/projects/208290/document?section=1948754 https://procurement.opengov.com/portal/waltoncountyfl/projects/208290/document?section=1948756 https://procurement.opengov.com/portal/waltoncountyfl/projects/208290/document?section=1948750
The contractor(s) performing the work on Project (whether the prime contractor or a subcontractor) must be FDOT prequalified in the following work classes if performing work in that specific work class:
WORK CLASS NO. WORK CLASS NAME
7 Drainage
10 Flexible Paving
11 Grading
12 Grassing, Seeding, and Sodding
28 Pavement Marking
38 Roadway Signage
40 Sidewalk
Proof of FDOT prequalification in the above work classes must be submitted with the bid.
2.4 EXAMINATION OF CONTRACT DOCUMENTS AND SITE
A. It is the responsibility of each Bidder before submitting a bid, to (a) examine the Contract Documents thoroughly, (b) visit the Project site to become familiar with local conditions that may affect cost, progress, performance, or completion of the Project, including the time and cost in obtaining any necessary fee or permit, (c) consider federal, state, and local laws and regulations that may affect cost, progress, performance, or completion of the Project, (d) study and carefully correlate Bidder's observations with the Contract Documents, (e) notify the County of any conflicts, errors, or discrepancies in the Contract Documents, and (f) attend any mandatory pre-bid meeting. The County does not assume responsibility for the accuracy or completeness of the Contract Documents or for any additional reports, drawings, and specifications that may be made available for viewing by the County to any Bidder on request.
B. Before submitting a bid, each Bidder will, at the Bidder's own expense, make or obtain any additional information and data which pertain to the physical conditions (surface, subsurface, underground facilities) at or contiguous to the site which may affect cost, progress, performance, or completion of the Project and which Bidder deems necessary to determine its bid for performing and completing the
Project in accordance with the time, price, and other terms and conditions of the Contract Documents.
C. Upon request, in advance, the County will provide each Bidder access to the Project site to conduct such explorations and tests as each Bidder deems necessary for submission of a bid. Bidder shall fill all holes, clean up, and restore the site to its former condition upon completion of such explorations.
D. Temporary construction facilities and storage of materials and equipment will be provided by Bidder.
E. The submission of a bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of these Instructions to Bidders including visiting the Project site to become familiar with local conditions that may affect the cost, progress, performance, or completion of the Project; that without exception the bid is premised upon performing and furnishing of the labor, services, equipment, and materials required by the Contract Documents in accordance with such means, methods, techniques, sequences, or procedures of construction as may be indicated in or required by the Contract Documents; and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and completion of the Project.
2.5 NON-MANDATORY PRE-BID CONFERENCE
A non-mandatory pre-bid conference will be held at 8:30 am on Wednesday, November 19, 2025 at
Office of Central Purchasing 176 Montgomery Circle DeFuniak Springs, Florida 32435 OR Bidders may also attend the pre-bid meeting via teleconference by dialing 850-635-0655 EXT 261217.
Bidders attending via teleconference are strongly encouraged to join the teleconference at least 10 minutes before the designated start time. If unable to join the teleconference at the number above, please call 850-
892-8176 and ask to be included in the Old Town of Santa Rosa Foreman Property Nellie Drive Extension pre-bid teleconference.
2.6 INTERPRETATIONS AND ADDENDA
A. All questions about the meaning or intent of the Contract Documents are to be posted on the County's e-Procurement portal accessible via the following link;
https://procurement.opengov.com/portal/waltoncountyfl.
B. Addenda may be issued to modify the Bidding Documents as deemed appropriate by the County.
DIRECTING QUESTIONS TO ANY OTHER COUNTY COMMISSIONER, COUNTY EMPLOYEE, PROJECT ENGINEER, OR ANY OTHER PERSON IS PROHIBITED AND WILL RESULT IN A BID BEING DISQUALIFIED. QUESTIONS MUST
BE SUBMITTED ON THE COUNTY'S E-PROCUREMENT PORTAL AT
https://procurement.opengov.com/portal/waltoncountyfl NO LATER THAN 10:00 am ON Tuesday, January
20, 2026. Interpretations or clarifications considered necessary by the County in response to such questions will be issued by Addenda on the County’s e-Procurement portal. Only questions answered by formal written
Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
2.7 BLACKOUT PERIOD
The period between the beginning of the advertisement for the Invitation to Bid, and the contract award, or any resulting bid protest is resolved, or the solicitation is otherwise canceled is referred to as the blackout period. During the blackout period any communication regarding the aforementioned solicitations is prohibited between the Bidder (or its agents or representatives) and any other entity with the potential for a financial interest in the award (or their respective agents or representatives) regarding such competitive solicitation, and any County Commissioner or County employee, selection committee member, or other https://procurement.opengov.com/portal/waltoncountyfl athttps://procurement.opengov.com/portal/waltoncountyfl athttps://procurement.opengov.com/portal/waltoncountyfl persons authorized to act on behalf of the County including the County’s architect, engineer, or their sub consultants, or anyone designated to provide a recommendation to award a particular contract, other than
Purchasing Division staff. Each competitive solicitation shall provide notice of the blackout period.
Exceptions to the Blackout Period. The blackout period shall not apply to:
A. Communications at any public proceeding or meeting, including pre-bid conferences, selection committee presentations, or pre-award meetings.
B. Communications during contract negotiations between designated County employees and the contract awardee.
C. Communication with a vendor initiated by a Purchasing Division employee following the bid opening to clarify the vendor’s bid or intended scope of services.
D. Communication following the filing of a protest between the protesting party and the Purchasing
Division, County Administrator’s Office, and the County Attorney’s Office, during the dispute resolution process.
E. Purchases exempt from competitive selection, sole source procurements, single source procurements, and emergency procurements, as defined in Walton County Board of County Commissioners
Purchasing Policy and Procedure Manual.
F. Communications with existing vendors in the performance of existing contracts.
2.8 BID SECURITY
A. Each bid must be accompanied by bid security in an amount of five percent (5%) of the Bidder's base bid price made payable to Walton County Board of County Commissioners and in the form of a certified bank check or a bid bond on the form attached, issued by a surety duly authorized and qualified to conduct business in the State of Florida. Further, the surety or insurance company shall have at least an “A-" policyholder’s rating and a financial rating of at least Class VII and shall be listed on the United States Treasury Department's T-list as acceptable to issue bonds for the applicable dollar amount. Applicable bond documents may be uploaded, but physical checks must be delivered to the
Office of Central Purchasing prior to the bid opening. It is the Bidder’s responsibility to ensure that its bid bond check is delivered at the proper time and place.
B. The bid security of the Successful Bidder will be retained until such Bidder has executed the Contract, and has furnished the required Performance and Payment Bond(s) and Certificates of Insurance. If the
Successful Bidder fails to execute and deliver the Contract, or furnish the required Certificates of
Insurance, within TEN (10) business days after the Notice of Award and the required certified copies of the recorded Performance and Payment bond(s) within THREE (3) business days of receipt of the executed contract, the County may annul the Notice of Award and the bid security of that Bidder will be forfeited. The bid security of other Bidders may be retained by the County until TEN (10) business days after the Notice of Award, whereupon bid security furnished by such Bidders will be returned.
C. Failure to submit an appropriate bid security shall result in the bid being declared unresponsive.
2.9 SUBSTITUTE OR "OR-EQUAL" ITEMS
The use of brand names is for the purpose of describing the standard of quality, performance, and characteristics desired and is not intended to limit or restrict competition. Equipment or materials determined by the County to be substantially equivalent to that equipment or materials specified by brand name will be considered for award.
2.10 CONTRACT TIME AND LIQUIDATED DAMAGES
Contractor shall begin working on the Project within TEN (10) business days of issuance of the Notice to
Proceed and substantially complete the Project within THREE HUNDRED SIXTY-FIVE (365) calendar days of issuance of the Notice to Proceed. Final completion of the project shall be accomplished within THIRTY (30) calendar days from the date a punch list of the remaining items to be completed is issued by the County.
Failure to achieve substantial completion within the designated time may result in the County imposing liquidated damages in the amount of THREE THOUSAND, EIGHT HUNDRED THIRTEEN AND 00/100THS
DOLLARS ($3,813.00) per day. Failure to achieve final completion within the designated time may result in the imposition of liquidated damages in the amount of THREE THOUSAND, EIGHT HUNDRED THIRTEEN AND
00/100THS DOLLARS ($3,813.00) per calendar day and shall accrue until an application for final payment has been approved by the County. These liquidated damages represent a reasonable estimate of the County’s extra expenses and losses for denied use of the facility, financing costs, additional extended overhead, and any lost revenues and do not constitute a penalty or forfeiture.
2.11 BID FORM
A. The Bidder shall use the Bid Form included with the Bidding Documents. Failure to use the Bid Form shall result in the bid being declared un-responsive. All blanks on the Bid Form must be completed in ink by hand or typewritten.
B. Bids by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign), and the corporate seal must be affixed and attested. The corporate address and state of incorporation must be shown below the signature.
C. Bids by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature, and the official address of the partnership must be shown below the signature.
D. All bids shall be notarized and names must be typed or printed below the signature. The bid shall contain an acknowledgement of receipt of all addenda via County’s e-Procurement Portal. The contact person's name, address, and telephone number for communications regarding the bid must be provided.
E. Each Bidder’s submittal shall include all the items listed in the Vendor Submissions section.
2.12 SUBMISSION OF BIDS
All bids submitted on e-Procurement Portal will be securely locked and digitally encrypted until the submission deadline passes. Please note that all bids must be submitted prior to 10:00 am on Tuesday, January 20, 2026.
Ensure that all required documents and information are complete and accurately provided before submission.
Upon successful submission through the e-Procurement Portal, you will receive a confirmation email acknowledging receipt of your bid.
Bids received after the specified deadline will not be considered.
Thank you for your attention to these submission instructions. Should you have any questions regarding the bidding process or requirements, feel free to contact the Purchasing Department at purchasing@co.walton.fl.us or call 850.892.8176.
2.13 MODIFICATION AND WITHDRAWAL OF BIDS
A. Bids may be modified or withdrawn by the Bidder by clicking on “Unsubmit Proposal” via County’s e-
Procurement Portal. Bids can be re-submitted at any time prior to the opening of bids.
B. Bids may not be withdrawn for a period of thirty (30) calendar days after the date of bid opening.
2.14 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE
All bids shall remain open and subject to acceptance for a period of sixty (60) calendar days after the date of bid opening, but the County at its sole discretion may release any bid and return the bid security prior to that date.
2.15 AWARD OF CONTRACT
A. The County reserves the right to reject any and all bids for any reason or for no reason as may be deemed necessary by the County to be in its best interest, including but not limited to bids from any contractor who has failed to successfully complete a previous project to the satisfaction of the County.
The County further reserves the right to waive any and all informalities, and reserves the right to reject all nonconforming, unresponsive, unbalanced, or conditional bids. PLEASE NOTE: ANY TERMS, CONDITIONS, OR EXCEPTIONS SUBMITTED WITH A BID SHALL BE DISREGARDED AND HAVE NO
EFFECT UPON THE CONTRACT RESULTING FROM THIS SOLICITATION. The County reserves the right to reject the bid of any Bidder if the County believes that it would not be in the best interest of the
Project to make an award to that Bidder, because the bid is not responsive or responsible, or the mailto:purchasing@co.walton.fl.us
Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the County. The County also reserves the right to enter into contract negotiations with a Responsible and Responsive Bidder who submits the lowest bid. If the County and the low Bidder cannot negotiate a successful contract the County may terminate such negotiations and begin negotiations with a Responsible and Responsive Bidder who submits the next lowest bid. No
Bidder shall have any rights against the County arising from such negotiations. Discrepancies in the multiplication of units of work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Where numeric data is given both in Arabic numerals and in written language, and where there exists a discrepancy between an Arabic numeral and written language, the written language shall be presumed to be correct and the Arabic numeral presumed incorrect.
B. In the event the apparent low bid submitted by a Responsible and Responsive Bidder exceeds the
County's budget for the Project, the County reserves the right to value engineer the published scope of work in order to effect deductive cost changes. In light of the modified scope of work, the County shall review the three lowest bids submitted by Responsible and Responsive Bidders in order to select one
Bidder to whom to award the contract.
C. The County reserves the right to delete any bid items and the total bid shall be determined as the sum of the bid items awarded. In evaluating bids, the County will consider the qualifications of the Bidders, whether or not the bids comply with the prescribed requirements, time of completion and other data, as may be requested in the Bid Form or prior to the Notice of Award. The County may conduct such investigations as the County deems necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, and other persons and organizations to perform and complete the Project in accordance with the Contract
Documents to the County's satisfaction within the prescribed time. The County may consider the operating costs, maintenance requirements, performance data, and guarantees of major items of materials and equipment proposed for incorporation in the Project when such data is required to be submitted prior to Notice of Award.
If the contract is to be awarded, it will be awarded to the Responsible and Responsive Bidder submitting the lowest bid whose evaluation by the County indicates to the County that the award will be in the best interest of the Project. The County will give the Successful Bidder a Notice of Award within thirty (30) days after the day of the bid opening.
2.16 BID PROTEST
Any person or entity whose bid is rejected, in whole or in part, or who submits a bid but is not awarded the contract, may protest such decision. Written notice of intent to file a bid protest must be submitted with the
Purchasing Department or Chief Financial Officer within twenty-four (24) hours after the Board’s declaration of its intention with regard to an award. Written protest must be submitted to Purchasing Director or Chief
Financial Officer within ten (10) calendar days after filing written notice of intent.
Each written protest must be accompanied by a bid protest bond in the form of a certified check, cashier’s check, or money order made payable to the Walton County Board of County Commissioners, in an amount equal to 1% of the protestor’s bid received by the County, but in no case less than $500.00.
The condition of the protest bond shall be that, should the protest be determined to be without merit and non-valid, the bond shall be forfeited to the County in its entirety.
2.17 PUBLIC ENTITY CRIMES
A person or an affiliate who has been placed on the convicted vendor list following a conviction for public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, Florida
Statutes, for CATEGORY TWO for a period of thirty-six (36) months from the date of being placed on the convicted vendors list.
3. Scope of Work
3.1 Old Town of Santa Rosa Foreman Property Nellie Drive Extension
The Old Town of Santa Rosa Foreman Property Nellie Drive Extension Project is located adjacent to 2038 US
Highway 98, Walton County, Florida in Sections 25 and 26, Township 2S, Range 20. The project will extend the existing Nellie Drive approximately 1 mile from Chat Holley Road to US highway 98.
Plans provided for the project include provisions for the extension of Nellie Drive, construction of a stormwater conveyance system for the road, stormwater management facilities to provide treatment for the road, reconstruction of the existing driveway connections located near US Highway 98, construction of a box culvert to maintain connections for the existing drainage ditch crossing the proposed extension, construction of a gravity wall, construction of a retaining wall to connect to the box culverts, construction of a multi-use path, and landscaping to provide stabilization for all disturbed areas. The proposed road will utilize a 3-lane typical section (two lanes to provide travel in both directions and a single turn lane located between the two lanes).
The project will include impacts to the surrounding wetlands and will require special attention to not impact areas outside of the Right of Way for the project. Erosion control measures will need to be provided as shown in the approved plans and permit documents from Northwest Florida Water Management District and the
Army Corps of Engineers.
Contractor will be responsible for obtaining a National Pollutant Discharge Elimination System (NPDES) permit.
Project shall be constructed in accordance with the referenced construction standards on the coversheet and notes of the approved plans.
NOTE: All Construction activities shall be performed in accordance with FDOT procedures, County standards, and the requirements of FDOT Grant No. G2C01.
4. Bid Schedule
BIDS shall include sales tax and all other applicable taxes and fees.
This is a unit price bid. The following Bid Schedule is intended as a general recap of the work involved. It is
NOT an all-inclusive detail of everything required to do this job. It is the contractor’s responsibility to carefully review the Bidding Documents to determine what is needed to do the whole job, and to reflect this in the unit price bid. This basis of award will be the total base bid for the project. IF DURING THE BID PROCESS, THE
CONTRACTOR NOTICES A DISCREPANCY BETWEEN THE WORK REQUIRED AND THIS BID SCHEDULE HE MUST
BRING IT TO THE PURCHASING DIRECTOR'S ATTENTION BEFORE THE BID CLOSING DATE.
NOTE: The unit prices listed below will be used as the basis for computing the value of any change orders either additive or deductive. THE OWNER RESERVES THE RIGHT TO REJECT ANY OR ALL BIDS.
Line Item Specification
No.
Description Quantity Unit of
Measure Unit Cost Total
1 0101-1 MOBILIZATION (3%) 1 LS
2 0102-1 MAINTENANCE OF
TRAFFIC
1 LS
3 0104-10-3 SEDIMENT BARRIER 20,140 LF
4 0104-12 STAKED TURBIDITY
BARRIER- NYLON
REINFORCED PVC
262 LF
5 0104-15 SOIL TRACKING
PREVENTION DEVICE
2 EA
6 0104-18 INLET PROTECTION
SYSTEM
30 EA
7 0110-1-1 CLEARING &
GRUBBING
14.6 AC
8 0120-1 REGULAR EXCAVATION 44,756 CY
9 0120-2 SUBSOIL EXCAVATION 45,542 CY
10 0120-6 EMBANKMENT 72,389 CY
11 0285-738 OPTIONAL BASE -
GRADED AGGREGATE,
5" (Black Base)
1,370 SY
Line Item Specification
No.
Description Quantity Unit of
Measure Unit Cost Total
12 0285-706 OPTIONAL BASE
GROUP 6
20,606 SY
13 0160-4 TYPE B STABILIZATION 21,976 SY
14 327-70-4 MILLING EXISTING
ASPHALT PAVEMENT,
3" AVG DEPTH
1,466 SY
15 0334-1-52 SUPERPAVE ASPHALTIC
CONC, TRAFFIC B,
PG76-22
2,296 TN
16 0337-7-81 ASPHALT CONRETE
FRICTION COURSE,
TRAFFIC B, FC-12.5, PG
76-22
1,148 TN
17 0520-1-10 CONCRETE CURB &
GUTTER, TYPE F
10,542 LF
18 0522-1 CONCRETE SIDEWALK
AND DRIVEWAYS, 4"
THICK
4,151 SY
19 0430-175-
PIPE CULVERT,
OPTIONAL MATERIAL,
ROUND, 18" S/CD
525 LF
20 0430-175-
PIPE CULVERT,
OPTIONAL MATERIAL,
ROUND, 24" S/CD
5,154 LF
21 0430-175-
PIPE CULVERT,
OPTIONAL MATERIAL,
ROUND, 30" S/CD
212 LF
22 0403-175-
PIPE CULVERT,
OPTIONAL MATERIAL,
ROUND, 42" S/CD
95 LF
23 0430-175-
PIPE CULVERT,
OPTIONAL MATERIAL,
OTHER SHAPE-
ELLIP/ARCH, 30" S/CD
165 LF
Description Quantity Unit of
Measure Unit Cost Total
24 BOX CULVERT 1 LS
25 RETAINING WALL FOR
BOX CULVERT
2 EA
26 DENITRIFICATION
WALL
1 LS
27 400-0-11 CONCRETE CLASS NS,
GRAVITY WALL INDEX
400-011, SCHEME 2
1,011 CY
28 0430-982-
18" MITERED END
SECTION
1 EA
29 0430-982-
24" MITERED END
SECTION
7 EA
30 0430-982-
30" MITERED END
SECTION
2 EA
31 0430-524-
STRAIGHT CONCRETE
ENDWALLS, 24",
SINGLE, 0 DEGREES,
ROUND
7 EA
32 0430-524-
STRAIGHT CONCRETE
ENDWALLS, 24",
DOUBLE, 0 DEGREES,
ROUND
1 EA
33 0430-524-
STRAIGHT CONCRETE
ENDWALLS, 24",
TRIPLE, 0 DEGREES,
ROUND
1 EA
34 0430-040-24 WINGED CONCRETE
ENDWALLS, U-TYPE
INDEX 430-040, 24",
DOUBLE
1 EA
35 0430-040-24 WINGED CONCRETE
ENDWALLS, U-TYPE
INDEX 430-040, 24",
TRIPLE
1 EA
Description Quantity Unit of
Measure Unit Cost Total
36 0430-040-30 WINGED CONCRETE
ENDWALLS, U-TYPE
INDEX 430-040, 30",
TRIPLE, ELLIPTICAL
2 EA
37 0430-542-
STRAIGHT CONCRETE
ENDWALLS, 42",
SINGLE, 0 DEGREES,
ROUND
1 EA
38 0425-1361 INLETS, CURB, TYPE P-
6, <10'
10 EA
39 0425-1351 INLETS, CURB, TYPE P-
5, <10'
15 EA
40 0425-1541 INLETS, DT BOT, TYPE
D, <10'
1 EA
41 0425-1551 INLETS, DT BOT, TYPE
E, <10'
3 EA
42 0425-1581 INELTS, DT BOT, TYPE
H, <10'
1 EA
43 0425-2-41 MANHOLES, P-7, <10' 5 EA
44 515-23-11 PEDESTRIAN/BICYCLE
RAILING, ALUMINUM
ONLY 42" TYPE 1
2,741 LF
45 0527-2 DETECTABLE
WARNINGS
100 SF
46 0530-3-4 RIPRAP, RUBBLE, F&I,
DITCH LINING
364 TN
47 0570-1-1 TEMPORARY SEEDING
(PERFORMANCE TURF)
10,196 SY
48 0570-1-1 PERFORMANCE TURF 10,196 SY
49 0570-1-2 PERFORMANCE TURF,
SOD
22,488 SY
Description Quantity Unit of
Measure Unit Cost Total
50 0700-1-11 SINGLE POST SIGN, F&I
GROUND MOUNT, UP
TO 12 SF
8 EA
51 0700-1-112 SINGLE POST, F&I
FROUND MOUNT,
12.0-20.0 SF
1 EA
52 0700-2-111 MULTI COLUMN
GROUND SIGN
ASSEMBLY, F&I GROUN
MOUNT, LESS THAN 12
SF
3 EA
53 0705-10-1 OBJECT MARKER, TYPE
9 EA
54 0711-11123 THERMOPLASTIC,
STANDARD, WHITE,
SOLID, 12" FOR
CROSSWALK AND
ROUNDABOUT
210 LF
55 0711-11125 THERMOPLASTIC,
STANDARD, WHITE,
SOLID, 24" FOR STOP
LINE AND CROSSWALK
192 LF
56 0711-11170 THERMOPLASTIC,
STANDARD, WHITE,
ARROW
34 EA
57 0711-11224 THERMOPLASTIC,
STANDARD, YELLOW,
SOLID, 18" FOR
DIAGONAL OR
CHEVRON
2,708 LF
58 0711-15101 THERMOPLASTIC,
STANDARD-OPEN
GRADED ASPHALT
SURFACES WHITE,
SOLID, 6"
2.373 GM
Description Quantity Unit of
Measure Unit Cost Total
59 0711-15201 THERMOPLASTIC,
STANDARD-OPEN
GRADED ASPHALT
SURFACES, YELLOW,
SOLID, 6"
3.185 GM
60 0706-1-3 RASIED PAVEMENT
MARKER, TYPE B
230 EA
TOTAL
5. Vendor Submissions
All subsections in this section require a response.
Important: Bidders are responsible for reviewing all required forms and documentation listed in this solicitation. If any forms require notarization—such as the Public Entity Crimes Statement or the Unauthorized Alien Affidavit—they must be properly executed and uploaded with your submission. Failure to include completed and notarized documents, where applicable, may result in your bid being deemed non-responsive.
5.1 BIDDER'S DECLARATION AND UNDERSTANDING *
The undersigned, herein defined as the "Bidder," declares that the only persons or parties interested in this bid are those named herein, that this bid is, in all respects, fair and without fraud, that it is made without collusion with any employee or official of the County, and that the bid is made without any connection or collusion with any person submitting another bid on this Project.
The Bidder further declares that it has visited the Project site, inspected the plans and specifications, examined all the Contract Documents, and has satisfied itself to the quantities involved, including materials and equipment and the conditions of work involved, including the fact that the description of work and materials, as included herein, is brief and is intended only to indicate the general nature of the Project and to identify the said quantities with the detailed requirements of the Contract Documents, and this bid is made according to the provisions and under the terms of the Contract Documents which are made a part of this bid.
☐ Please confirm
*Response required
5.2 CONTRACT EXECUTION, CERTIFICATES OF INSURANCE AND BONDS*
The Successful Bidder agrees to acknowledge the terms and conditions of the Contract and return a signed
Contract with any Certificates of Insurance (COI) to the County, within TEN (10) business days after Notice of
Award. Upon receipt of the signed Contract and COI, the County will execute the Contract and send the executed contract to the Successful Bidder to acquire the Performance and Payment Bond(s) within THREE (3) business days. The Successful Bidder must provide certified copies of the recorded Performance and Payment
Bond(s) prior to the issuance of the Notice to Proceed. Failure to either return a signed Contract with COI to the County within TEN (10) business days after Notice of Award is sent or provide certified copies of the recorded Performance and Payment Bond(s) within THREE (3) business days after receipt of the executed contract will result in loss of surety.
☐ Please confirm
*Response required
5.3 START OF CONSTRUCTION AND CONTRACT COMPLETION TIME*
The Successful Bidder further agrees to begin work on the Project within TEN (10) business days after the date of issuance of the Notice to Proceed, to substantially complete the Project within THREE HUNDRED AND SIXY
FIVE (365) calendar days of issuance of the date of the Notice to Proceed, and to finally complete the Project within THIRTY (30) calendar days from the date a punch list of remaining items is issued by the County. The
Contractor shall comply with all specific completion dates and sequences indicated elsewhere in the Contract
Documents.
☐ Please confirm
*Response required
5.4 SALES AND USE TAXES*
The Bidder agrees that any and all applicable federal, state and local sales and use taxes that are incurred by the Bidder are included in the stated bid price for the Project. The County is tax exempt from federal excise and state sales tax.
☐ Please confirm
*Response required
5.5 Acknowledgment of Bid Schedule*
By confirming, if awarded the contract, the Bidder agrees to accept as full payment for the work proposed under this Project, as specified in the Bidding Documents prepared by Walton County, and based upon their own estimate of the quantities and costs, including the cost of any necessary fee or permit provided as part of their bid.
☐ Please confirm
*Response required
5.6 BID FORM*
Please download the below documents, complete, and upload.
• BID_FORM_(14).docx
*Response required
5.7 Trench Safety Compliance*
Please download the below documents, complete, and upload.
• TRENCH_SAFETY_COMPLIANCE_(6...
*Response required
5.8 BID BOND*
https://government-project.s3.us-west-2.amazonaws.com/88564/132b3318-2d92-4ca8-82dc-b8dcc3728e2a_BID_FORM_%2814%29.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4CC7YHWFZ%2F20260114%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260114T213146Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEFwaCXVzLXdlc3QtMiJIMEYCIQDCB8RkuXOTAFedsU4ug8Z3H3vdsu36Htmn%2FKqNi5QvAwIhAJBBdnib0rwlk7Z60xO2Xb9Tij9VZda928CEzkRkRbeKKowFCCUQAhoMODkyMzY0Njg3NjcyIgyaPtgFd1VjVBmc7aEq6QRHs552owfZEML6UuDGjUV1hmuyyW%2FRrXjiPbowHhAZ1ZxZVBFxYG5rRtce4UR63Xm4JGLDv3vVX04t4jJ1HKFP0VbP7V64lp5FMMNyp4YOAg1Ral0Vx2%2Bs28t4rfpuUQFXJHM9QqWuDoOfB4cmJ6Is5n%2Bn%2BpAzEa6ghEXW5sDAd6726ZNktL79UCwI7ZiS9GDmlW6gX50wSyy6%2BSn60iTnbCCmVxyUA2t2%2FECDSR7JpSnj54QrDW%2FpNRWY1iT33hZf27Km1trHTFHXoSXvQVBAqUijlstLedgWsI5iR92mCgwrF%2Fir%2FXnFMmRCbc6Nl%2F2My7qHtsARFnaSf981FBwCuWnnm8E4elYVswzFJ9i2w%2Fxtyd%2FS0P%2BsIBYrGLMUWiSunF80wDKn2swHBAAn33KcxwTTgujzbKJQ3aupM5H69gdDa8fnAHVgYFwLM7itTrBHbwdgqGMmHZugwp3h%2BMSM2e63WGK5irHbodfyJbOCFDCVGEtZosSGtfiVx9aepyf7n91M0vnFaEPMQiWHoHFKkiIc%2Fdpz3bXapQ5eY9YnVZ20H3FqobbBlivEGB9NIUdfbNXGFSf3x1IzLaxlhtOLRJsnKLqe1i0uMClwDdItLOpzaOoGKF8sz0ndGdH8QPHWBHZR8VMFrzGfCHfxkJF%2Fhvools92UyCDrLunaNU%2FHGxNHSwy7R047hlyJhnihWxqGHN3jMLGfsVBPfQyXh9RoIC4HvGtgX%2FrIHeQ5nVOFl7%2FOVgQt1vcq%2BgEh1we7TS%2B%2BuO826g0xx9Q0nLk55Z4yl9nrLtC3Cjt8mWqncikNGaplNxH8p%2FWwTCZ6J%2FLBjqYAagyDHUJ6InJIpu7F7ksxTuxQ6cxJad%2FRq%2BXSC8YL9s20Xdb2f1OQUp%2BiNfJL1jUOgXWIMH84nFcK0fYnmj2mmjicxkjR3X5VtD5qF3WAhDwF9OB9upqzUpLLOSuhGDBpy0WSn89z%2FZFRlkY2Sz3R12hiqiQ55u1eOB3so5afnwwWL%2FioVR0kvrIICJCKBql7PWQWMNzHKqz&X-Amz-Signature=eb19d3744e4bdf9c221c0ccbe740460d1985db1e5a11842485dbab877b3db2de&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22BID_FORM_%2814%29.docx%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/88564/7b510b92-28f5-4224-804c-6e0a0fb1d185_TRENCH_SAFETY_COMPLIANCE_%286%29.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4CC7YHWFZ%2F20260114%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260114T213146Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEFwaCXVzLXdlc3QtMiJIMEYCIQDCB8RkuXOTAFedsU4ug8Z3H3vdsu36Htmn%2FKqNi5QvAwIhAJBBdnib0rwlk7Z60xO2Xb9Tij9VZda928CEzkRkRbeKKowFCCUQAhoMODkyMzY0Njg3NjcyIgyaPtgFd1VjVBmc7aEq6QRHs552owfZEML6UuDGjUV1hmuyyW%2FRrXjiPbowHhAZ1ZxZVBFxYG5rRtce4UR63Xm4JGLDv3vVX04t4jJ1HKFP0VbP7V64lp5FMMNyp4YOAg1Ral0Vx2%2Bs28t4rfpuUQFXJHM9QqWuDoOfB4cmJ6Is5n%2Bn%2BpAzEa6ghEXW5sDAd6726ZNktL79UCwI7ZiS9GDmlW6gX50wSyy6%2BSn60iTnbCCmVxyUA2t2%2FECDSR7JpSnj54QrDW%2FpNRWY1iT33hZf27Km1trHTFHXoSXvQVBAqUijlstLedgWsI5iR92mCgwrF%2Fir%2FXnFMmRCbc6Nl%2F2My7qHtsARFnaSf981FBwCuWnnm8E4elYVswzFJ9i2w%2Fxtyd%2FS0P%2BsIBYrGLMUWiSunF80wDKn2swHBAAn33KcxwTTgujzbKJQ3aupM5H69gdDa8fnAHVgYFwLM7itTrBHbwdgqGMmHZugwp3h%2BMSM2e63WGK5irHbodfyJbOCFDCVGEtZosSGtfiVx9aepyf7n91M0vnFaEPMQiWHoHFKkiIc%2Fdpz3bXapQ5eY9YnVZ20H3FqobbBlivEGB9NIUdfbNXGFSf3x1IzLaxlhtOLRJsnKLqe1i0uMClwDdItLOpzaOoGKF8sz0ndGdH8QPHWBHZR8VMFrzGfCHfxkJF%2Fhvools92UyCDrLunaNU%2FHGxNHSwy7R047hlyJhnihWxqGHN3jMLGfsVBPfQyXh9RoIC4HvGtgX%2FrIHeQ5nVOFl7%2FOVgQt1vcq%2BgEh1we7TS%2B%2BuO826g0xx9Q0nLk55Z4yl9nrLtC3Cjt8mWqncikNGaplNxH8p%2FWwTCZ6J%2FLBjqYAagyDHUJ6InJIpu7F7ksxTuxQ6cxJad%2FRq%2BXSC8YL9s20Xdb2f1OQUp%2BiNfJL1jUOgXWIMH84nFcK0fYnmj2mmjicxkjR3X5VtD5qF3WAhDwF9OB9upqzUpLLOSuhGDBpy0WSn89z%2FZFRlkY2Sz3R12hiqiQ55u1eOB3so5afnwwWL%2FioVR0kvrIICJCKBql7PWQWMNzHKqz&X-Amz-Signature=1b4e50b332d421e46c2911504ecce8cb2d57f7c1641fed353b78a4ca6debe676&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22TRENCH_SAFETY_COMPLIANCE_%286%29.docx%22&x-id=GetObject
Will you be utilizing Surety 2000 for submitting your Bid Bond?
☐ Yes
☐ No
When equals "Yes"
6. 8.1. Surety 2000 Electronic Bid Bond*
Please enter your Bid Bond information from Surety2000 below.
If you would like to use your preferred surety, please select "No" to the above question.
*Response required
When equals "No"
Bid Bond*
Please download the below documents, complete, and upload.
• 3.0_Walton_County_Florida_B...
*Response required
6.1 PREVIOUS EXPERIENCE AND CURRENT COMMITMENTS*
Please download the below documents, complete, and upload.
• PREVIOUS_EXPERIENCE_AND_CUR...
*Response required
6.2 SUBCONTRACTORS AND SUPPLIERS DECLARATION*
Please download the below documents, complete, and upload.
• SUBCONTRACTORS_AND_SUPPLIER...
*Response required
6.3 PUBLIC ENTITY CRIMES*
Please download the below documents, complete and have notarized. An online notarization option will be provided for you when responding.
• PUBLIC_ENTITY_CRIMES_(13).pdf
*Response required
6.4 DRUG FREE WORK PLACE CERTIFICATION*
Identical tie bids: preference shall be given to businesses with drug-free workplace programs. Whenever two or more bids which are equal with respect price, quality, and service are received by the state or by any political subdivision for the procurement of commodities or contractual services, a bid received from a business that certified that it has implemented a drug-free work place program shall be given preference in the award process. Established procedures for processing tie bids will be followed in none of the tied
Consultants have a drug-free workplace program. In order to have a drug-free workplace program, a business shall:
https://government-project.s3.us-west-2.amazonaws.com/88564/0a36e9aa-78ff-44a3-aa6a-f4a1a116e837_3.0_Walton_County_Florida_Bid_Bond_V1.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4CC7YHWFZ%2F20260114%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260114T213146Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEFwaCXVzLXdlc3QtMiJIMEYCIQDCB8RkuXOTAFedsU4ug8Z3H3vdsu36Htmn%2FKqNi5QvAwIhAJBBdnib0rwlk7Z60xO2Xb9Tij9VZda928CEzkRkRbeKKowFCCUQAhoMODkyMzY0Njg3NjcyIgyaPtgFd1VjVBmc7aEq6QRHs552owfZEML6UuDGjUV1hmuyyW%2FRrXjiPbowHhAZ1ZxZVBFxYG5rRtce4UR63Xm4JGLDv3vVX04t4jJ1HKFP0VbP7V64lp5FMMNyp4YOAg1Ral0Vx2%2Bs28t4rfpuUQFXJHM9QqWuDoOfB4cmJ6Is5n%2Bn%2BpAzEa6ghEXW5sDAd6726ZNktL79UCwI7ZiS9GDmlW6gX50wSyy6%2BSn60iTnbCCmVxyUA2t2%2FECDSR7JpSnj54QrDW%2FpNRWY1iT33hZf27Km1trHTFHXoSXvQVBAqUijlstLedgWsI5iR92mCgwrF%2Fir%2FXnFMmRCbc6Nl%2F2My7qHtsARFnaSf981FBwCuWnnm8E4elYVswzFJ9i2w%2Fxtyd%2FS0P%2BsIBYrGLMUWiSunF80wDKn2swHBAAn33KcxwTTgujzbKJQ3aupM5H69gdDa8fnAHVgYFwLM7itTrBHbwdgqGMmHZugwp3h%2BMSM2e63WGK5irHbodfyJbOCFDCVGEtZosSGtfiVx9aepyf7n91M0vnFaEPMQiWHoHFKkiIc%2Fdpz3bXapQ5eY9YnVZ20H3FqobbBlivEGB9NIUdfbNXGFSf3x1IzLaxlhtOLRJsnKLqe1i0uMClwDdItLOpzaOoGKF8sz0ndGdH8QPHWBHZR8VMFrzGfCHfxkJF%2Fhvools92UyCDrLunaNU%2FHGxNHSwy7R047hlyJhnihWxqGHN3jMLGfsVBPfQyXh9RoIC4HvGtgX%2FrIHeQ5nVOFl7%2FOVgQt1vcq%2BgEh1we7TS%2B%2BuO826g0xx9Q0nLk55Z4yl9nrLtC3Cjt8mWqncikNGaplNxH8p%2FWwTCZ6J%2FLBjqYAagyDHUJ6InJIpu7F7ksxTuxQ6cxJad%2FRq%2BXSC8YL9s20Xdb2f1OQUp%2BiNfJL1jUOgXWIMH84nFcK0fYnmj2mmjicxkjR3X5VtD5qF3WAhDwF9OB9upqzUpLLOSuhGDBpy0WSn89z%2FZFRlkY2Sz3R12hiqiQ55u1eOB3so5afnwwWL%2FioVR0kvrIICJCKBql7PWQWMNzHKqz&X-Amz-Signature=a838205add2cf30589aef06ee02fb37b582f10c29d2ecbe3e9f2f325c42272fb&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%223.0_Walton_County_Florida_Bid_Bond_V1.pdf%22&x-id=GetObject…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .