This is an Environmental Resource Permit issued by the Florida Department of Environmental Protection (FDEP) Northwest District for the Oriole Beach Boat Ramp Improvements project in Santa Rosa County, Florida. The permit authorizes Santa Rosa County to construct a new boat ramp within an existing footprint, install sheet pile bulkhead to raise existing grade, construct a paved parking area and associated stormwater management system including one exfiltration trench, and construct and remove temporary sheet pile during dewatering. The project is located at 3165 Linden Avenue in Gulf Breeze, Florida on an approximately 0.96-acre site within Santa Rosa Sound, a Class II Florida Waterbody. The permit was issued on August 23, 2024, with a construction phase expiration date of August 23, 2029. The permittee is Santa Rosa County, with Michael Schmidt designated as the contact at 6051 Old Bagdad Highway, Suite 301, Milton, Florida 32583, and authorized agent Amelia Fontaine of Coastal Technology Corporation.

The permit grants both an Environmental Resource Permit and State-owned Submerged Lands Authorization, though a separate U.S. Army Corps of Engineers authorization is required. The project involves extensive construction conditions addressing erosion control, turbidity management, manatee protection, stormwater management operations and maintenance, and compliance with water quality standards and endangered species protections. The permit specifies that dredging activities are limited to daylight hours, depth indicators and permanent signage must be installed and maintained to identify navigational access, and monofilament recycling bins with educational signage must be installed within 60 days of construction commencement. Operation and maintenance of all stormwater structures must continue for the life of the facility, with inspections required on the first anniversary of conversion to operational phase and every two years thereafter, with quarterly inspections of sediment control sumps mandatory. The permit conditions are binding and enforceable, with failure to comply subject to permit revocation and enforcement action.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLORIDA DEPARTMENT OF

Environmental Protection

Northwest District

160 W. Government Street, Suite 308 Pensacola, Florida 32502-5740

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Permittee/Authorized Entity:

Santa Rosa County Attn: Michael Schmidt

6051 Old Bagdad Highway, Suite 301 Milton, Florida 32583 michaels@santarosa.fl.gov

Oriole Beach Boat Ramp

Authorized Agent:

Amelia Fontaine

2302 Cortez Avenue Vero Beach, Florida 32960 afontaine@coastaltechcorp.com

Environmental Resource Permit State-owned Submerged Lands Authorization – Granted

U.S. Army Corps of Engineers Authorization – Separate Corps Authorization

Required

Santa Rosa County Permit No.: 0374762-003-EI/57

Permit Issuance Date: August 23, 2024

Permit Construction Phase Expiration Date: August 23, 2029 mailto:michaels@santarosa.fl.gov mailto:afontaine@coastaltechcorp.com

Permittee: Santa Rosa County c/o Michael Schmidt Permit Expiration: August 23, 2029 Permit No: 0374762-003-EI/57

Consolidated Environmental Resource Permit and Sovereignty Submerged Lands Authorization

Permittee/Grantee: Santa Rosa County

PROJECT LOCATION

The activities authorized by this permit and sovereignty submerged lands authorization are located at 3165 Linden Avenue in Gulf Breeze, Florida 32563 on an approximately 0.96-acre site and is part of a larger planned development. Parcel ID 31-2S-28-2980-00000-Park and 31-2S- 28-2980-00100-0010 in Section 31, Township 2 South, Range 28 West in Santa Rosa County, at 30° 22′ 35.32″ North Latitude, 87° 5′ 30.92″ West Longitude.

PROJECT DESCRIPTION

The application and plans for this project have been reviewed and the project qualifies for an ERP pursuant to Chapter 62-330, Florida Administrative Code. The permittee is authorized to construct a new boat ramp within the existing footprint, construct and remove a temporary sheet pile during dewatering, install a sheet pile bulkhead to raise the existing grade, construct a paved parking area and drive with an associated stormwater management system. The stormwater management system will include one (1) exfiltration trench. The project is located within Santa Rosa Sound, a Class II Florida Waterbody, Unclassified Shellfish Harvesting Area. Authorized activities are depicted on the attached exhibits.

AUTHORIZATIONS

Oriole Beach Boat Ramp Environmental Resource Permit The Department has determined that the activity qualifies for an Environmental Resource Permit.

Therefore, the Environmental Resource Permit is hereby granted, pursuant to Part IV of Chapter 373, Florida Statutes (F.S.), and Chapter 62-330, Florida Administrative Code (F.A.C.).

Sovereignty Submerged Lands Authorization As staff to the Board of Trustees of the Internal Improvement Trust Fund (Board of Trustees), the Department has determined the activity is not on submerged lands owned by the State of Florida. Therefore, your project is not subject to the requirements of Chapter 253, F.S., or Rule 18-21, F.A.C.

As staff to the Board of Trustees of the Internal Improvement Trust Fund (Board of Trustees) under Sections 253.002, F.S., the Department has determined that the activity qualifies for and requires a Letter of Consent, as long as the work performed is located within the boundaries as described and is consistent with the terms and conditions herein.

During the term of this Letter of Consent you shall maintain satisfactory evidence of sufficient upland interest as required by paragraph 18-21.004(3)(b), F.A.C. If such interest is terminated or the Board of Trustees determines that such interest did not exist on the date of issuance of this Letter of Consent, this Letter of Consent may be terminated by the Board of Trustees at its sole option. If the Board of Trustees terminates this Letter of Consent, you agree not to assert a claim or defense against the Board of Trustees arising out of this Letter of Consent.

Federal Authorization Your proposed activity as outlined on your application and attached drawings does not qualify for Federal authorization pursuant to the State Programmatic General Permit and a SEPARATE permit or authorization shall be required from the Corps. You must apply separately to the Corps using the Application for Department of the Army Permit (ENG 4345) or alternative as allowed by Corps regulations. More information on Corps permitting may be found online in the Jacksonville District Regulatory Division Sourcebook:

(https://www.saj.usace.army.mil/Missions/Regulatory/Source-Book/).

Authority for review - an agreement with the USACOE entitled “Coordination Agreement Between the U. S. Army Corps of Engineers (Jacksonville District) and the Florida Department of Environmental Protection (or Duly Authorized Designee), State Programmatic General Permit”, Section 10 of the Rivers and Harbor Act of 1899, and Section 404 of the Clean Water Act.

Coastal Zone Management Issuance of this authorization also constitutes a finding of consistency with Florida’s Coastal Zone Management Program, as required by Section 307 of the Coastal Zone Management Act.

Water Quality Certification Granted This permit also constitutes a grant of water quality certification under Section 401 of the Clean Water Act, 33 U.S.C. Section 1341. Pursuant to Rule 62-330.062, F.A.C. issuance of the individual or conceptual approval permit under this chapter shall constitute certification of compliance with water quality standards.

Other Authorizations You are advised that authorizations or permits for this activity may be required by other federal, state, regional, or local entities including but not limited to local governments or municipalities.

This permit does not relieve you from the requirements to obtain all other required permits or authorizations.

The activity described may be conducted only in accordance with the terms, conditions and attachments contained in this document. Issuance and granting of the permit and authorizations herein do not infer, nor guarantee, nor imply that future permits, authorizations, or modifications will be granted by the Department.

PERMIT / SOVEREIGNTY SUBMERGED LANDS CONDITIONS

The activities described must be conducted in accordance with:

• The Specific Conditions

• The General Conditions

• The Special Consent Conditions

• The General Conditions for Sovereignty Submerged Lands Authorization

• The limits, conditions and locations of work shown in the attached drawings

• The term limits of this authorization

You are advised to read and understand these conditions and drawings prior to beginning the authorized activities, and to ensure the work is conducted in conformance with all the terms, https://www.saj.usace.army.mil/Missions/Regulatory/Source-Book/ conditions, and drawings herein. If you are using a contractor, the contractor also should read and understand these conditions and drawings prior to beginning any activity. Failure to comply with these conditions, including any mitigation requirements, shall be grounds for the Department to revoke the permit and authorization and to take appropriate enforcement action.

Operation of the facility is not authorized except when determined to be in conformance with all applicable rules and this permit and sovereignty submerged lands authorization, as described.

SPECIFIC CONDITIONS – ADMINISTRATIVE/EMERGENCIES

1. The permittee shall be responsible for keeping records documenting that relevant permit conditions are met. This documentation shall include, at a minimum, the date of each inspection, the name and qualifications of the inspector, any maintenance actions taken, and a determination by the inspector as to whether the system is operating as intended. Inspection documentation must be readily available and shall be provided at the Department's request. Submittal of the inspection documentation to the Department is not required.

2. Within 30 days of any failure of a stormwater management system or deviation from the permit, a report shall be submitted to the Department on Form 62-330.311(1), Operation and Maintenance Inspection Certification, describing the remedial actions taken to resolve the failure of deviation. This report shall be signed and sealed by a registered professional.

3. For emergencies involving a serious threat to the public health, safety, welfare, or environment, the emergency telephone contact number is (800) 320-0519 (State Warning Point).

The Department telephone number for reporting nonthreatening problems or system malfunctions is (850) 595-0663, day or night.

4. The mailing address for submittal of forms for the “Construction Commencement Notice”, “As-Built Certification …”, “Request for Conversion of Stormwater Management Permit Construction Phase to Operation and Maintenance Phase”, or other correspondence is FDEP, SLERP, 160 W. Government Street, Pensacola, Florida 32502.

SPECIFIC CONDITIONS – PRIOR TO ANY CONSTRUCTION

5. This permit does not authorize the construction of any additional structures not illustrated on the permit drawings.

6. Best management practices for erosion control shall be implemented prior to construction activities and maintained at all times during construction to prevent siltation and turbid discharges into adjacent wetlands. Methods shall include but are not limited to the use of staked hay bales, staked filter cloth, sodding, seeding, and mulching; staged construction; and the installation of turbidity screens around the immediate project site. Erosion control methods shall be implemented as described and shown in the attached permit drawings. The permittee shall be responsible for ensuring that erosion control devices/procedures are inspected and maintained daily during all stages of construction authorized by this permit until all areas that were disturbed during construction are sufficiently stabilized to prevent erosion, siltation, and turbid discharges.

7. Dredging shall be limited to day light; no dredging (or dewatering) activities are authorized to be conducted at night.

SPECIFIC CONDITIONS – CONSTRUCTION ACTIVITIES

8. The construction phase expires at 11:59 p.m. on the date indicated on the cover page of this permit, unless an application for extension is received and approved pursuant to Rule 62- 330.320, F.A.C. If construction of the stormwater management system authorized by this environmental resource permit has not been completed and continued use of the system formally transferred to the operating phase before the expiration date of the permit, or an authorized extension, then at least 60 days before such expiration date, the permittee shall apply for another individual stormwater permit, using the forms and accompanied by the fee required by rules in effect at that time.

9. Erosion controls shall remain in place until the filled area has sufficient vegetative coverage to ensure stability and prevent erosion into the surrounding wetlands or surface waters. Grass seed and mulch or sod shall be installed and maintained on all exposed slopes and disturbed soil areas within 48 hours of completing final grade, and at any other time as necessary, to prevent erosion, sedimentation, or turbid discharges into adjacent wetlands. A vegetative cover that stabilizes and prevents erosion of the fill material shall be established within 60 days of sodding or seeding. Upon establishment of a substantial vegetative cover, all erosion control devices shall be removed.

10. All material used as fill shall be clean sand/fill dirt/shell material and shall not be contaminated with vegetation, garbage, trash, tires, hazardous waste, and deleterious materials.

11. The permittee shall be responsible for ensuring that erosion control devices/procedures are inspected and maintained daily during all phases of construction authorized by this permit until all areas that were disturbed during construction are sufficiently stabilized to prevent erosion, siltation, and turbid discharges.

12. If any construction de-watering is required which results in an offsite discharge of groundwater, the permittee and/or the contractor shall ensure that the requirements of pertinent portions of Chapter 62-621, F.A.C. are met. Please contact the FDEP Wastewater Department at 850-595-8300, for more information.

13. Construction equipment shall not be repaired or refueled in wetlands or elsewhere within waters of the state.

14. Any damage to wetlands outside of the authorized impact areas as a result of construction shall be immediately reported to the Department at (850)595-8300 and repaired by reestablishing the pre-construction elevations and replanting vegetation of the same species, size, and density as that in the adjacent areas. The restoration shall be completed within 30 days of completion of construction, and the Department shall be notified of its completion within that same 30-day period.

15. The following measures shall be taken immediately by the permittee when turbidity levels within waters of the State surrounding the project site exceed 29 NTUs above background:

a. Immediately cease work contributing to the water quality violation.

b. Stabilize exposed soils contributing to the violation. Modify the work procedures responsible for the violation, install additional turbidity containment devices and repair non-functioning turbidity containment devices.

c. Notify the Department of Environmental Protection, Submerged Lands & Environmental Resources Program, Compliance and Enforcement Section, Northwest District Office, 160 W Government Street, Pensacola, Florida 32502- 5794, in writing or by telephone at (850)595-8300 within 24 hours of the time the violation is first detected.

16. The seawall shall be fully constructed prior to the placement of any backfill material.

17. All material used as backfill for construction of the of the seawall shall be clean material and shall not be contaminated with vegetation, garbage, trash, tires, hazardous, toxic waste or other materials that are not suitable construction within waters of the State as so determined by the department.

18. All cleared vegetation, excess lumber, scrap wood, trash, garbage and any other type of debris shall be removed from wetlands/waters of the state within 14 days of completion of the work authorized in this permit.

19. Dredging within waters of the State for the purpose of providing backfill is prohibited.

20. Depth indicators shall be installed and maintained for the life of the facility, to identify the controlling depths of the navigational access. Use of the ramp is prohibited if the depth indicator shows a navigational access below 2 feet mean low water.

21. Permanent signs shall be installed and maintained at each boat ramp lane, in a clearly visible location, stating that “Launching at the ramp is prohibited when water depth is less than 2 feet.”

22. No portion of the dredge pipeline, nor any related equipment, shall be stored, anchored on, or laid on or over seagrass beds without prior Department approval. Anchoring done to secure the dredge or equipment shall be done within the navigation channel or in areas where seagrass beds are not present during dredging and related activities.

23. Areas to be dredged shall be dredged in accordance with the attached permit drawings and shall not exceed the areas and depths indicated on those drawings. The dredged material shall be placed in a self-contained, upland disposal site, as depicted on Sheet 4 of 23. The dewatering/disposal area shall be constructed in a manner which shall prevent the escape of dredged material and associated effluent into wetlands and surface waters. Discharge of water or dredged material to waters of the State shall not be allowed during disposal or transport.

SPECIFIC CONDITIONS – MANATEE

24. The Standard Manatee Conditions for In-water Work (2011) shall be followed for all in-water activity.

https://secure-web.cisco.com/1jCWPTahRYpQK67sIv08JJL3UTCExarfWoEjEn7j_3ARxs59g1lzm7LyD7VS0a46ViF0O-NHWbqynyOB4NCs8w58wct3nKfEx3f8w7fVG9w5fwR3G6VMoPERL6sqiEuvXtd_6VMDxeDab4bf0TaVKIsrz_6uuf4uLajg4j_kyyLB75YhNluGezBv0oUnmeZIdSYCdwXh4cOdX5aFHxCSAGi4rCx4trfvoFDlTEw0HjndVfx_t0pqlE_KqFpEI01jVfIoP5Vqfh5dYAYvmOspeBz1Lrt3vA6Av2_jS8BjJc321AKe0oXLNdMMwxDh6JRAJ/https%3A%2F%2Fmyfwc.com%2Fmedia%2F7246%2Fmanatee_stdcondin_waterwork.pdf

25. While performing backfilling between the bulkheads, it is important to ensure that manatees or sea turtles do not become entrapped during sheet pile installation or gain access after the sheet pile has been installed and before filling work has been completed. If a manatee or sea turtle becomes entrapped, the area shall be opened to allow the manatee or turtle to leave of its own volition. It shall not be herded or harassed into leaving the area.

26. To reduce the risk of entrapment and drowning of manatees, manatee exclusion devices (such as grating) shall be installed and maintained over any existing or proposed pipes or culverts greater than 8 inches, but smaller than 8 feet in diameter that are submerged or partially submerged and reasonably accessible to manatees. If horizontal or vertical bars are used, no more than 8-inch gaps on center shall be allowed. Grates shall be in place at the accessible end(s) during all phases of the construction process and as a final design element to restrict manatee access.

27. The Permittee shall install bins for the disposal or recycling of monofilament line or other used fishing gear, which shall be maintained for the life of the facility, no later than 60 days after construction commencement. Educational signs encouraging the use of these bins shall be posted. A proposal for the location of the bin and the sign shall be submitted to ImperiledSpecies@MyFWC.com. Signs shall be replaced in accordance with FWC guidance by the Permittee if outdated, damaged or faded.

28. The Permittee shall install permanent manatee educational signs, which shall be maintained for the life of the facility, no later than 60 days after construction commencement. The number and types of signs, as well as the on-site locations shall be approved by FWC staff prior to installation. A proposal for FWC sign approval shall be submitted to ImperiledSpecies@MyFWC.com in accordance with information provided at https://myfwc.com/wildlifehabitats/wildlife/manatee/education-for-marinas/. Signs shall be replaced in accordance with FWC guidance by the Permittee if outdated, damaged, or faded.

SPECIFIC CONDITIONS – OTHER LISTED SPECIES

29. This permit does not authorize the permittee to cause any adverse impact to or “take” of state listed species and other regulated species of fish and wildlife. Compliance with state laws regulating the take of fish and wildlife is the responsibility of the owner or permittee associated with this project. Please refer to Chapter 68A-27 of the Florida Administrative Code for definitions of “take” and a list of fish and wildlife species. If listed species are observed onsite, Florida Fish and Wildlife Conservation Commission (FWC) staff are available to provide decision support information or assist in obtaining the appropriate FWC permits. Most marine endangered and threatened species are statutorily protected and a “take” permit cannot be issued. Requests for further information or review can be sent to ConservationPlanningServices@MyFWC.com.

30. If new information (e.g. listing of new species, new critical habitat, etc.) shows that the magnitude of impacts to federally listed species has the potential for adverse effects, the U.S.

Fish and Wildlife Service (USFWS) will notify the Department. The Department will initiate coordination with the permittee and with the USFWS to determine what adverse impacts are likely and if additional minimization measures, reporting, or monitoring are required in order to be consistent with the Endangered Species Act, as deemed necessary by USFWS.

mailto:ImperiledSpecies@myfwc.com mailto:ImperiledSpecies@myfwc.com https://secure-web.cisco.com/1bzOfqJiS1j6BR1s79Fd-A_UFyOCQGwIqChyjT6P9HVxdkwLDyy_rbvt9_FESoX6fbJJCJQdw8NnBTOp6D7sw51kIcwGBAnLtzMJtPLvDY5J7wQp2IrYLkrCHasAebRa_VsNya7YPzJxPKCPcYks3iaOQksD25TJcS7MJ5VmZlM4rW8aSXtK-Q-s92LYX_MFs4qwFvby2Nq5Wsk102i0wv-YiunZ0xuYgHtrUmdy8tRGthg9jMGhT5TTlOr8_rY89y-zaidhYE76Ewl3K-_-_q55zNvxkwITFvd5Z7gpirnXXn1BklV3CMU5SkbkI00cr/https%3A%2F%2Fmyfwc.com%2Fwildlifehabitats%2Fwildlife%2Fmanatee%2Feducation-for-marinas%2F mailto:ConservationPlanningServices@MyFWC.com

31. The Permittee shall report any injured, sick, or dead federally or state listed animal(s) discovered onsite to the Florida Fish and Wildlife Conservation Commission Wildlife Alert number at 888-404-FWCC (3922).

SPECIFIC CONDITIONS – OPERATION AND MAINTENANCE ACTIVITIES

32. The authorized stormwater management system shall be completed prior to or simultaneously with associated upland development.

33. Once project construction has been deemed complete, including the re-stabilization of all side slopes, embankments, and other disturbed areas, and before the transfer to the Operation and Maintenance phase, all obsolete erosion control materials shall be removed.

34. The permittee shall be responsible for keeping records documenting that relevant permit conditions are met. This documentation shall include, at a minimum, the date of each inspection, the name and qualifications of the inspector, any maintenance actions taken, and a determination by the inspector as to whether the system is operating as intended. Inspection documentation must be readily available and shall be provided at the Department’s request.

35. In addition to these conditions, the Permittee shall comply with all maintenance and inspection requirements prescribed in the Maintenance and Operation Plan developed by the registered professional who designed the system.

36. All structures authorized by this permit shall remain in operable condition and shall not be allowed to deteriorate or otherwise contribute to a water quality violation for the life of the facility. All stormwater structures identified by this permit shall be maintained in proper working order for the life of the facility.

37. The permittee shall be responsible for keeping records documenting that relevant permit conditions are met. This documentation shall include, at a minimum, the date of each inspection, the name and qualifications of the inspector, any maintenance actions taken, and a determination by the inspector as to whether the system is operating as intended. Inspection documentation must be readily available and shall be provided at the Department’s request.

38. On a quarterly frequency, each sediment control sump (or equivalent) and each clean-out shall be inspected on at least a quarterly basis. Permittee shall remove any deposited sediment or debris within the sump. Any clean-out that is damaged shall be repaired. If applicable, permittee shall verify that any grate on each sediment sump is in place. If applicable, inspect each overflow weir and baffle and confirm that it is free-flowing and clear of debris.

39. The stormwater management system shall be inspected by a registered professional to evaluate whether the system is functioning as designed and permitted. Percolation performance should specifically be addressed. The registered professional may record his inspection on Form No 62-330.311(1), Operation and Maintenance Inspection Certification or may provide his evaluation in any other format; however any report must be signed and sealed by the registered professional. Submittal of the inspection report to the Department is not required; but the report shall be made available to the Department upon request. Inspections shall be made by the registered professional in accordance with this schedule:

a. On the first anniversary of the date of conversion to Operation and Maintenance Phase.

b. Every second year on the anniversary of conversion to Operation and Maintenance phase, after the first year of successful operation.

40. Within 30 days of any failure of a stormwater management system or deviation from the permit, a report shall be submitted to the Department on Form 62-330.311(1), Operation and Maintenance Inspection Certification, describing the remedial actions taken to resolve the failure or deviation. This report shall be signed and sealed by a registered professional.

GENERAL CONDITIONS FOR INDIVIDUAL PERMITS

The following general conditions are binding on all individual permits issued under chapter 62- 330, F.A.C., except where the conditions are not applicable to the authorized activity, or where the conditions must be modified to accommodate project-specific conditions.

1. All activities shall be implemented following the plans, specifications and performance criteria approved by this permit. Any deviations must be authorized in a permit modification in accordance with Rule 62-330.315, F.A.C. Any deviations that are not so authorized may subject the permittee to enforcement action and revocation of the permit under Chapter 373, F.S.

2. A complete copy of this permit shall be kept at the work site of the permitted activity during the construction phase, and shall be available for review at the work site upon request by the Agency staff. The permittee shall require the contractor to review the complete permit prior to beginning construction.

3. Activities shall be conducted in a manner that does not cause or contribute to violations of state water quality standards. Performance-based erosion and sediment control best management practices shall be installed immediately prior to, and be maintained during and after construction as needed, to prevent adverse impacts to the water resources and adjacent lands. Such practices shall be in accordance with the State of Florida Erosion and Sediment Control Designer and Reviewer Manual (Florida Department of Environmental Protection and Florida Department of Transportation June 2007), and the Florida Stormwater Erosion and Sedimentation Control Inspector’s Manual (Florida Department of Environmental Protection, Nonpoint Source Management Section, Tallahassee, Florida, July 2008), which are both incorporated by reference in subparagraph 62-330.050(9)(b)5., F.A.C., unless a project-specific erosion and sediment control plan is approved or other water quality control measures are required as part of the permit.

4. At least 48 hours prior to beginning the authorized activities, the permittee shall submit to the Agency a fully executed Form 62-330.350(1), “Construction Commencement Notice,” [October 1, 2013], which is incorporated by reference in paragraph 62-330.350(1)(d), F.A.C., indicating the expected start and completion dates. A copy of this form may be obtained from the Agency, as described in subsection 62-330.010(5), F.A.C. If available, an Agency website that fulfills this notification requirement may be used in lieu of the form.

5. Unless the permit is transferred under Rule 62-330.340, F.A.C., or transferred to an operating entity under Rule 62-330.310, F.A.C., the permittee is liable to comply with the plans, terms and conditions of the permit for the life of the project or activity.

6. Within 30 days after completing construction of the entire project, or any independent portion of the project, the permittee shall provide the following to the Agency, as applicable:

a. For an individual, private single-family residential dwelling unit, duplex, triplex, or quadruplex ‒ “Construction Completion and Inspection Certification for Activities Associated With a Private Single-Family Dwelling Unit” [Form 62-330.310(3)]; or

b. For all other activities ‒ “As-Built Certification and Request for Conversion to Operational Phase” [Form 62-330.310(1)].

c. If available, an Agency website that fulfills this certification requirement may be used in lieu of the form.

7. If the final operation and maintenance entity is a third party:

a. Prior to sales of any lot or unit served by the activity and within one year of permit issuance, or within 30 days of as- built certification, whichever comes first, the permittee shall submit, as applicable, a copy of the operation and maintenance documents (see sections 12.3 thru

12.3.3 of Volume I) as filed with the Department of State, Division of Corporations and a copy of any easement, plat, or deed restriction needed to operate or maintain the project, as recorded with the Clerk of the Court in the County in which the activity is located.

b. Within 30 days of submittal of the as- built certification, the permittee shall submit “Request for Transfer of Environmental Resource Permit to the Perpetual Operation Entity” [Form 62-330.310(2)] to transfer the permit to the operation and maintenance entity, along with the documentation requested in the form. If available, an Agency website that fulfills this transfer requirement may be used in lieu of the form.

8. The permittee shall notify the Agency in writing of changes required by any other regulatory agency that require changes to the permitted activity, and any required modification of this permit must be obtained prior to implementing the changes.

9. This permit does not:

a. Convey to the permittee any property rights or privileges, or any other rights or privileges other than those specified herein or in Chapter 62-330, F.A.C.;

b. Convey to the permittee or create in the permittee any interest in real property;

c. Relieve the permittee from the need to obtain and comply with any other required federal, state, and local authorization, law, rule, or ordinance; or

d. Authorize any entrance upon or work on property that is not owned, held in easement, or controlled by the permittee.

10. Prior to conducting any activities on state-owned submerged lands or other lands of the state, title to which is vested in the Board of Trustees of the Internal Improvement Trust Fund, the permittee must receive all necessary approvals and authorizations under Chapters 253 and 258, F.S.

Written authorization that requires formal execution by the Board of Trustees of the Internal Improvement Trust Fund shall not be considered received until it has been fully executed.

11. The permittee shall hold and save the Agency harmless from any and all damages, claims, or liabilities that may arise by reason of the construction, alteration, operation, maintenance, removal, abandonment or use of any project authorized by the permit.

12. The permittee shall notify the Agency in writing:

a. Immediately if any previously submitted information is discovered to be inaccurate; and

b. Within 30 days of any conveyance or division of ownership or control of the property or the system, other than conveyance via a long-term lease, and the new owner shall request transfer of the permit in accordance with Rule 62-330.340, F.A.C. This does not apply to the sale of lots or units in residential or commercial subdivisions or condominiums where the stormwater management system has been completed and converted to the operation phase.

13. Upon reasonable notice to the permittee, Agency staff with proper identification shall have permission to enter, inspect, sample and test the project or activities to ensure conformity with the plans and specifications authorized in the permit.

14. If any prehistoric or historic artifacts, such as pottery or ceramics, stone tools or metal implements, dugout canoes, or any other physical remains that could be associated with Native American cultures, or early colonial or American settlement are encountered at any time within the project site area, work involving subsurface disturbance in the immediate vicinity of such discoveries shall cease. The permittee or other designee shall contact the Florida Department of State, Division of Historical Resources, Compliance and Review Section, at (850) 245-6333 or

(800) 847-7278, as well as the appropriate permitting agency office. Such subsurface work shall not resume without verbal or written authorization from the Division of Historical Resources. If unmarked human remains are encountered, all work shall stop immediately and notification shall be provided in accordance with Section 872.05, F.S.

15. Any delineation of the extent of a wetland or other surface water submitted as part of the permit application, including plans or other supporting documentation, shall not be considered binding unless a specific condition of this permit or a formal determination under Rule 62- 330.201, F.A.C., provides otherwise.

16. The permittee shall provide routine maintenance of all components of the stormwater management system to remove trapped sediments and debris. Removed materials shall be disposed of in a landfill or other uplands in a manner that does not require a permit under Chapter 62-330, F.A.C., or cause violations of state water quality standards.

17. This permit is issued based on the applicant’s submitted information that reasonably demonstrates that adverse water resource-related impacts will not be caused by the completed permit activity. If any adverse impacts result, the Agency will require the permittee to eliminate the cause, obtain any necessary permit modification, and take any necessary corrective actions to resolve the adverse impacts.

18. A Recorded Notice of Environmental Resource Permit may be recorded in the county public records in accordance with subsection 62-330.090(7), F.A.C. Such notice is not an encumbrance upon the property.

19. In addition to those general conditions in subsection (1), above, the Agency shall impose any additional project-specific special conditions necessary to assure the permitted activities will not be harmful to the water resources, as set forth in rules 62-330.301 and 62-330.302, F.A.C., Volumes I and II, as applicable, and the rules incorporated by reference in this chapter.

SPECIAL CONSENT CONDITIONS

1. The applicant agrees to indemnify, defend and hold harmless the Board of Trustees and the State of Florida from all claims, actions, lawsuits and demands in any form arising out of the authorization to use sovereignty submerged lands or the applicant’s use and construction of structures on sovereignty submerged lands. This duty to indemnify and hold harmless will include any and all liabilities that are associated with the structure or activity including special assessments or taxes that are now or in the future assessed against the structure or activity during the period of the authorization.

2. Failure by the Board of Trustees to enforce any violation of a provision of the authorization or waiver by the Board of Trustees of any provision of the authorization will not invalidate the provision not enforced or waived, nor will the failure to enforce or a waiver prevent the Board of Trustees from enforcing the unenforced or waived provision in the event of a violation of that provision.

3. Applicant binds itself and its successors and assigns to abide by the provisions and conditions set forth in the authorization. If the applicant or its successors or assigns fails or refuses to comply with the provisions and conditions of the authorization, the authorization may be terminated by the Board of Trustees after written notice to the applicant or its successors or assigns. Upon receipt of such notice, the applicant or its successors or assigns will have thirty

(30) days in which to correct the violations. Failure to correct the violations within this period will result in the automatic revocation of this authorization.

4. All costs incurred by the Board of Trustees in enforcing the terms and conditions of the authorization will be paid by the applicant. Any notice required by law will be made by certified mail at the address shown on page one of the authorization. The applicant will notify the Board of Trustees in writing of any change of address at least ten days before the change becomes effective.

5. This authorization does not allow any activity prohibited in a conservation easement or restrictive covenant that prohibits the activity.

GENERAL CONDITIONS FOR SOVEREIGNTY SUBMERGED LANDS

AUTHORIZATION

Any use of sovereignty submerged lands is subject to the following general conditions, which are binding upon the applicant and are enforceable under Chapter 253, F.S.

1. Sovereignty submerged lands may be used only for the specified activity or use. Any unauthorized deviation from the specified activity or use and the conditions for undertaking that activity or use will constitute a violation. Violation of the authorization will result in suspension or revocation of the applicant’s use of the sovereignty submerged lands unless cured to the satisfaction of the Board of Trustees.

2. Authorization under Rule 18-21.005, F.A.C., conveys no title to sovereignty submerged lands or water column, nor does it constitute recognition or acknowledgment of any other person’s title to such land or water.

3. Authorizations under Rule 18-21.005, F.A.C., may be modified, suspended or revoked in accordance with its terms or the remedies provided in Sections 253.04, F.S. and Chapter 18-14, F.A.C.

4. Structures or activities will be constructed and used to avoid or minimize adverse impacts to resources.

5. Construction, use, or operation of the structure or activity will not adversely affect any species which is endangered, threatened or of special concern, as listed in Rules 68A-27.003, 68A-27.004, and 68A-27.005, F.A.C.

6. Structures or activities will not unreasonably interfere with riparian rights. When a court of competent jurisdiction determines that riparian rights have been unlawfully affected, the structure or activity will be modified in accordance with the court’s decision.

7. Structures or activities will not create a navigational hazard.

8. Structures will be maintained in a functional condition and will be repaired or removed if they become dilapidated to such an extent that they are no longer functional.

9. Structures or activities will be constructed, operated, and maintained solely for water dependent purposes.

10. The applicant agrees to indemnify, defend and hold harmless the Board of Trustees and the State of Florida from all claims, actions, lawsuits and demands in any form arising out of the authorization to use sovereignty submerged lands or the applicant’s use and construction of structures on sovereignty submerged lands. This duty to indemnify and hold harmless will include any and all liabilities that are associated with the structure or activity including special assessments or taxes that are now or in the future assessed against the structure or activity during the period of the authorization.

11. Failure by the Board of Trustees to enforce any violation of a provision of the authorization or waiver by the Board of Trustees of any provision of the authorization will not invalidate the provision not enforced or waived, nor will the failure to enforce or a waiver prevent the Board of Trustees from enforcing the unenforced or waived provision in the event of a violation of that provision.

12. Applicant binds itself and its successors and assigns to abide by the provisions and conditions set forth in the authorization. If the applicant or its successors or assigns fails or refuses to comply with the provisions and conditions of the authorization, the authorization may be terminated by the Board of Trustees after written notice to the applicant or its successors or assigns. Upon receipt of such notice, the applicant or its successors or assigns will have thirty

(30) days in which to correct the violations. Failure to correct the violations within this period will result in the automatic revocation of this authorization.

13. All costs incurred by the Board of Trustees in enforcing the terms and conditions of the authorization will be paid by the applicant. Any notice required by law will be made by certified mail at the address shown on page one of the authorization. The applicant will notify the Board of Trustees in writing of any change of address at least ten days before the change becomes effective.

14. This authorization does not allow any activity prohibited in a conservation easement or restrictive covenant that prohibits the activity.

NOTICE OF RIGHTS

This action is final and effective on the date filed with the Clerk of the Department unless a petition for an administrative hearing is timely filed under Sections 120.569 and 120.57, F.S., before the deadline for filing a petition. On the filing of a timely and sufficient petition, this action will not be final and effective until a subsequent order of the Department. Because the administrative hearing process is designed to formulate final agency action, the subsequent order may modify or take a different position than this action.

Petition for Administrative Hearing A person whose substantial interests are affected by the Department’s action may petition for an administrative proceeding (hearing) under Sections 120.569 and 120.57, F.S. Pursuant to Rules 28-106.201 and 28-106.301, F.A.C., a petition for an administrative hearing must contain the following information:

(a) The name and address of each agency affected and each agency’s file or identification number, if known;

(b) The name, address, and telephone number of the petitioner; the name, address, and telephone number of the petitioner’s representative, if any, which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner’s substantial interests are or will be affected by the agency determination;

(c) A statement of when and how the petitioner received notice of the agency decision;

(d) A statement of all disputed issues of material fact. If there are none, the petition must so indicate;

(e) A concise statement of the ultimate facts alleged, including the specific facts that the petitioner contends warrant reversal or modification of the agency’s proposed action;

(f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency’s proposed action, including an explanation of how the alleged facts relate to the specific rules or statutes; and

(g) A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wishes the agency to take with respect to the agency’s proposed action.

The petition must be filed (received by the Clerk) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399- 3000, or via electronic correspondence at Agency_Clerk@FloridaDEP.gov. Also, a copy of the petition shall be mailed to the applicant at the address indicated above at the time of filing.

Time Period for Filing a Petition In accordance with Rule 62-110.106(3), F.A.C., petitions for an administrative hearing by the applicant and persons entitled to written notice under Section 120.60(3), F.S., must be filed within 14 days of receipt of this written notice. Petitions filed by any persons other than the applicant, and other than those entitled to written notice under Section 120.60(3), F.S., must be filed within 14 days of publication of the notice or within 14 days of receipt of the written notice, whichever occurs first. You cannot justifiably rely on the finality of this decision unless notice of this decision and the right of substantially affected persons to challenge this decision has been duly published or otherwise provided to all persons substantially affected by the decision. While you are not required to publish notice of this action, you may elect to do so pursuant to Rule 62- 110.106(10)(a).

The failure to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing) under Sections 120.569 and 120.57, F.S., or to intervene in this proceeding and participate as a party to it. Any subsequent intervention (in a proceeding initiated by another party) will be only at the discretion of the presiding officer upon the filing of a motion in compliance with Rule 28-106.205, F.A.C. If you do not publish notice of this action, this waiver will not apply to persons who have not received written notice of this action.

Extension of Time Under Rule 62-110.106(4), F.A.C., a person whose substantial interests are affected by the Department’s action may also request an extension of time to file a petition for an administrative hearing. The Department may, for good cause shown, grant the request for an extension of time.

Requests for extension of time must be filed with the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399- 3000, or via electronic correspondence at Agency_Clerk@FloridaDEP.gov, before the deadline for filing a petition for an administrative hearing. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon.

Mediation Mediation is not available in this proceeding.

FLAWAC Review The applicant, or any party within the meaning of Section 373.114(1)(a) or 373.4275, F.S., may also seek appellate review of this order before the Land and Water Adjudicatory Commission under Section 373.114(1) or 373.4275, F.S. Requests for review before the Land and Water Adjudicatory Commission must be filed with the Secretary of the Commission and served on the Department within 20 days from the date when this order is filed with the Clerk of the Department.

Judicial Review Once this decision becomes final, any party to this action has the right to seek judicial review pursuant to Section 120.68, F.S. by filing a Notice of Appeal pursuant to Florida Rules of Appellate Procedure 9.110 and 9.190 with the Clerk of the Department in the Office of General Counsel (Station #35, 3900 Commonwealth Boulevard, Tallahassee, Florida 32399-3000) and by filing a copy of the Notice of Appeal accompanied by the applicable filing fees with the appropriate district court of appeal. The notice must be filed within 30 days from the date this action is filed with the Clerk of the Department.

http://web2.westlaw.com/find/default.wl?ordoc=I0C7293C0912311DB8F8F8100D79B57CF&rp=%2ffind%2fdefault.wl&DB=1000006&DocName=FLSTS120%2E569&FindType=L&AP=&rs=WLW9.08&ifm=NotSet&fn=_top&sv=Split&mt=Florida&utid=4&vr=2.0&pbc=38B33E51

Thank you for applying to the Submerged Lands and Environmental Resource Permit Program.

If you have any questions regarding this matter, please contact Leah Wilkins or Savannah Cowen at the letterhead address, at (850)595-0559 or (850)595-0640, or at Leah.Wilkins@FloridaDEP.gov or Savannah.Cowen@FloridaDEP.gov

EXECUTION AND CLERKING

Executed in Pensacola, Florida.

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Kimberly R. Allen Permitting Program Administrator

KRA:sc

Attachments:

Exhibit 1, Project Drawings and Design Specs., 23 pages Exhibit 2, Operation and Maintenance Plan, 3 pages

Copies of 62-330 forms may be obtained at: https://floridadep.gov/water/submerged-lands-environmental-resources-coordination/content/forms-environmental-resource

CERTIFICATE OF SERVICE

The undersigned duly designated deputy clerk hereby certifies that this document and all attachments were sent on the filing date below to the following listed persons:

Kimberly R. Allen, FDEP, Kim.Allen@FloridaDEP.gov Blake Chapman, FDEP, Blake.A.Chapman@FloridaDEP.gov Russell Sullivan, FDEP, Russell.Sullivan@FloridaDEP.gov Leah Wilkins, FDEP, Leah.Wilkins@FloridaDEP.gov Savannah Cowen, FDEP, Savannah.Cowen@FloridaDEP.gov Michael Schmidt, SRC, michaels@santarosa.fl.gov Amelia Fontaine, Coastal Technology Corporation, afontaine@coastaltechcorp.com Santa Rosa County, PlanningNotifications@santarosa.fl.gov, cindym@santarosa.fl.gov, maureenk@santarosa.fl.gov, info@srcpa.org, pburt@srcpa.gov, bsouthers@srcpa.org

FILING AND ACKNOWLEDGMENT

FILED, on this date, pursuant to Section 120.52, F.S., with the designated Department Clerk, receipt of which is hereby acknowledged.

___________ August 23, 2024 Clerk Date mailto:Leah.Wilkins@FloridaDEP.gov mailto:Savannah.Cowen@FloridaDEP.gov https://floridadep.gov/water/submerged-lands-environmental-resources-coordination/content/forms-environmental-resource https://floridadep.gov/water/submerged-lands-environmental-resources-coordination/content/forms-environmental-resource mailto:Kim.Allen@FloridaDEP.gov mailto:Blake.A.Chapman@FloridaDEP.gov mailto:Russell.Sullivan@FloridaDEP.gov mailto:Leah.Vickery@FloridaDEP.gov mailto:Savannah.Cowen@FloridaDEP.gov mailto:michaels@santarosa.fl.gov mailto:afontaine@coastaltechcorp.com mailto:PlanningNotifications@santarosa.fl.gov mailto:cindym@santarosa.fl.gov mailto:maureenk@santarosa.fl.gov mailto:info@srcpa.org mailto:pburt@srcpa.gov mailto:bsouthers@srcpa.org welch_p Signature

PROJECT SITE

ORIOLE BEACH

BOAT RAMP

N508907.15'

E1151240.35'

LAT N030° 22' 25.70"

LONG W087° 05' 30.63"

3187 LINDEN AVENUE

GULF BREEZE, FL 32570

SANTA ROSA SOUND

ORIOLE BEACH

BOAT RAMP

PROJECT

SITE

PROJECT SITE

O R

IO

L E

B E

A C

H B

O A

T R

A M

P

IM

P R

O V

E M

E N

T S

F O

R S

A N

T A

R O

S A

C O

U N

T Y

T H

S T R

E E

T V

E R

O B

E A

C H

F

L

-8

C E

R T

IF

IC

A

T E

O F

A U

T H

O R

IZ

A

T

IO

N N

U M

B E

R

C O

A S

T A

L

E

N V

IR

O

N M

E N

T A

L

C

IV

IL

E N

G

IN

E E

R

IN

G A

N D

P L A

N N

IN

G

R E

V

D A

T E

N

O T E

S

D R

A F

T E

R

A Q

N

C H

E C

K E

D B

Y : M

P W

P R

O

JE

C T N

O

.0

D A

T E

D R

A W

N

/2

/2

C H

A R

L E

S T

F

O N

T A

IN

E

II

I, P .E

D

T E

F L O

R

ID

A P

.E

L

IC

E N

S E

N U

M B

E R

C O

A S

T A

L T

E C

HORIOLE BEACH BOAT RAMP IMPROVEMENTS

FOR

SANTA ROSA COUNTY, FLORIDA

LOCATION MAP

SHEET LIST TABLE

SHEET

NUMBER

SHEET TITLE

C1.0 COVER SHEET

C1.1 NOTES

C2.0 EXISTING CONDITIONS

C3.0 EROSION CONTROL PLAN

C3.1 EROSION CONTROL PLAN DETAILS

C4.0 DEMOLITION PLAN

C5.0 SITE PLAN

C6.0 PAVING, GRADING, & DRAINAGE PLAN

C6.1 PROFILE & CROSS-SECTION

C6.2 PAVING, GRADING, & DRAINAGE DETAILS

C6.3 PAVING, GRADING, & DRAINAGE DETAILS

C6.4 PAVING, GRADING, & DRAINAGE DETAILS

C6.5 PAVING, GRADING, & DRAINAGE DETAILS

C6.6 PAVING, GRADING, & DRAINAGE DETAILS

C6.7 CONTRACTION JOINT LAYOUT DETAILS

C6.8 PAVEMENT MARKING DETAILS

C7.0 SOIL BORING PLANVIEW

C7.1 SOIL BORING CROSS-SECTIONS

C8.0 EXISTING CONDITIONS DRAINAGE MAP

C8.1 PROPOSED CONDITIONS DRAINAGE MAP

C9.0 RAMP & SEAWALL DETAILS

C10.0 DOCK DETAILS

C11.0 LANDSCAPE PLAN