About this file

This is Amendment No. 1 to a grant agreement between the Florida Department of Environmental Protection (FDEP) and Citrus County for the Sugarmill Woods Golf Course Reuse Project. The project, located in the City of Homosassa within Citrus County, involves the construction of approximately 22,000 feet of transmission mains, a 1.0 million gallon storage tank, a 1.0 million gallons per day pump station, a 0.5 million gallons per day booster station, and associated electrical and control systems to supply reclaimed water from Citrus County's Southwest Regional Water Reclamation Facility to the Sugarmill Woods and Citrus National golf courses. The amendment extends the original agreement expiration date from the initial term to December 31, 2026, to provide additional time for project completion. The project encompasses four primary tasks: Preconstruction Activities (design, permitting, surveys, and engineering evaluations), Bidding and Contractor Selection (bid package preparation and contractor solicitation), Project Management (field engineering, construction observation, and coordination), and Construction (installation of all infrastructure components). The Grantee may submit payment requests no more frequently than monthly for most tasks, with final documentation including design copies, permits, bid packages, and engineer certifications required by the respective task end dates.

The total project funding is $4,918,000, consisting of $3,918,000 from State funds under Line Item 1650B of the 2022-2023 General Appropriations Act (allocated to the Statewide Water Quality Restoration Projects program, Appropriation Category 149946) and $1,000,000 in additional state funding from Line Item 1705A of the 2023-2024 General Appropriations Act (Appropriation Category 140047), with a reimbursement period beginning July 1, 2023. The budget allocates $186,050 for Preconstruction Activities, $10,000 for Bidding and Contractor Selection, $60,000 for Project Management, and $4,661,950 for Construction. All tasks have a start date of July 1, 2022, and end date of June 30, 2026. The agreement includes special audit requirements under both federal (2 CFR Part 200, Subpart F) and state (Section 215.97, Florida Statutes) regulations, with recipients expending $750,000 or more in federal or state awards in a fiscal year required to obtain single or program-specific audits. Additionally, if Citrus County qualifies as a nonprofit organization, documentation regarding state fund allocation for board member and officer remuneration must be provided to FDEP and posted on the County's website. Record retention requirements mandate that the Grantee maintain supporting documentation for five years from the audit report date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP Agreement No. LPQ0030, Amendment No. 1, Page 1 of 3

AMENDMENT NO. 1

TO AGREEMENT NO. LPQ0030

BETWEEN

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

AND

CITRUS COUNTY

This Amendment to Agreement No. LPQ0030 (Agreement) is made by and between the Department of Environmental Protection (Department), an agency of the State of Florida, and the Citrus County (Grantee), on the date last signed below.

WHEREAS, the Department entered into the Agreement with the Grantee for Sugarmill Woods Golf Course Reuse Project (Project), effective May 29, 2023; and, WHEREAS, $1,000,000 in additional funding for this Project is provided under Line Item 1705A of the 2023-2024 General Appropriations Act; and the total funding for this Agreement is now $4,918,000; and, WHEREAS, the reimbursement period for the additional funding provided under Line Item 1705A of the 2023-2024 General Appropriations Act begins on July 1, 2023; and, WHEREAS, the Grantee has requested to add new tasks to the Grant Work Plan; and, WHEREAS, an extension to the Agreement is needed to provide additional time to complete the Project; and, WHEREAS, the parties have agreed to amend the Agreement as set forth herein.

NOW THEREFORE, the parties agree as follows:

1. Section 3. of the Standard Grant Agreement is hereby revised to change the Date of Expiration to

December 31, 2026. The Department and the Grantee shall continue to perform their respective duties during this extension period pursuant to the same terms and conditions provided in the Agreement.

2. Section 5. of the Standard Grant Agreement is hereby revised to the following:

Total Amount of Funding:

$4,918,000

Funding Source? Award #s or Line Item Appropriations: Amount per Source(s):

State Federal Spr Cst WQ, GAA LI 1650B, FY 22-23, LATF $3,918,000 State Federal LP, GAA LI 1705A, FY 23-24, GR $1,000,000 Grantee Match

Total Amount of Funding + Grantee Match, if any: $4,918,000

3. The following is hereby added to Attachment 1 as Section 8.k.:

State Funds Documentation. Pursuant to section 216.1366, F.S., if Contractor meets the definition of a non-profit organization under section 215.97(2)(m), F.S., Contractor must provide the Department with documentation that indicates the amount of state funds:

i. Allocated to be used during the full term of the contract or agreement for remuneration to any member of the board of directors or an officer of Contractor.

ii. Allocated under each payment by the public agency to be used for remuneration of any member of the board of directors or an officer of the Contractor.

The documentation must indicate the amounts and recipients of the remuneration. Such information must be posted on the State’s contract tracking system and maintained pursuant to section 215.985, F.S., and must be posted on the Contractor’s website, if Contractor maintains a website.

DEP Agreement No. LPQ0030, Amendment No. 1, Page 2 of 3

4. Attachment 3, Grant Work Plan, is hereby deleted in its entirety and replaced with Attachment 3-1, Revised Grant Work Plan, as attached to this Amendment and hereby incorporated into the Agreement. All references in the Agreement to Attachment 3 shall hereinafter refer to Attachment 3-1, Revised Grant Work Plan.

5. Attachment 5, Special Audit Requirements, is hereby deleted in its entirety and replaced with Attachment

5-1, Revised Special Audit Requirements, attached hereto and made a part of the Agreement. All references in the Agreement to Attachment 5, shall hereinafter refer to Attachment 5-1, Revised Special Audit Requirements.

6. All other terms and conditions of the Agreement remain in effect. If and to the extent that any inconsistency may appear between the Agreement and this Amendment, the provisions of this Amendment shall control.

THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK

Victoria Boyd Digitally signed by Victoria Boyd Date: 2023.10.02 11:32:09 -04'00'

Nathan Jagoda

Digitally signed by Nathan Jagoda Date: 2023.10.02 11:49:49 -04'00'

DEP Agreement No. LPQ0030, Attachment 3-1, Page 1 of 3

ATTACHMENT 3-1

REVISED GRANT WORK PLAN

PROJECT TITLE: Sugarmill Woods Golf Course Reuse Project

PROJECT LOCATION: The Project will be located in the City of Homosassa within Citrus County;

Lat/Long (28.7184, -82.5136).

PROJECT BACKGROUND: The project will provide necessary facilities to make reclaimed water available for beneficial reuse for irrigation at the Sugarmill Woods and Citrus National golf courses. The high-quality reclaimed water will offset groundwater withdrawals from the Homosassa and Chassahowitzka springshed.

PROJECT DESCRIPTION: The Grantee will construct approximately 22,000 feet of transmission mains, a 1.0 million gallon storage tank, a 1.0 million gallons per day (mgd) pump station, a 0.5 mgd booster station, and other necessary appurtenances to supply reclaimed water from Citrus County’s Southwest Regional Water Reclamation Facility to the Sugarmill Woods and Citrus National golf courses.

TASKS: All documentation should be submitted electronically unless otherwise indicated.

Task 1: Preconstruction Activities

Deliverables: The Grantee will complete the design of the underground piping, reclaimed water ground storage tank, high service pumping and booster stations and associated electrical and control systems, and obtain all necessary permits for construction of the project. The Grantee will also conduct a topographic survey, geotechnical investigation, structural engineering evaluation, hydraulic analysis of the pump and piping system, and pipeline design.

Documentation: The Grantee will submit: 1) a signed acceptance of the completed work to date, as provided in the Grantee’s Certification of Payment Request; and 2) a summary of activities to date, indicating the percentage of design completion for the time period covered in the payment request. For the final documentation, the Grantee will also submit a copy of the design, topographic survey, geotechnical investigation, structural engineering evaluation, and hydraulic analysis completed with the funding provided for this task and a list of all required permits identifying issue dates and issuing authorities.

Performance Standard: The Department’s Grant Manager will review the documentation to verify that the deliverables have been completed as described above. Upon review and written acceptance by the Department’s Grant Manager, the Grantee may proceed with payment request submittal.

Payment Request Schedule: The Grantee may submit a payment request for cost reimbursement no more frequently than monthly.

Task 2: Bidding and Contractor Selection

Deliverables: The Grantee will prepare a bid package, publish a public notice, solicit bids, conduct pre-bid meetings, and respond to bid questions in accordance with the Grantee’s procurement process, to select one or more qualified and licensed contractors to complete the construction of the underground piping, reclaimed water ground storage tank, high service pumping and booster stations and associated electrical and control systems.

DEP Agreement No. LPQ0030, Attachment 3-1, Page 2 of 3

Documentation: The Grantee will submit: 1) the public notice of advertisement for the bid; 2) the bid package; and 3) a written notice of selected contractor(s).

Performance Standard: The Department’s Grant Manager will review the documentation to verify that the deliverables have been completed as described above. Upon review and written acceptance by the Department’s Grant Manager, the Grantee may proceed with payment request submittal.

Payment Request Schedule: The Grantee may submit a payment request for cost reimbursement following the conclusion of the task.

Task 3: Project Management

Deliverables: The Grantee will perform project management, to include field engineering services, construction observation, site meetings with construction contractor(s) and design professionals, and overall project coordination and supervision.

Documentation: The Grantee will submit interim progress status summaries including summary of inspection(s), meeting minutes and field notes, as applicable.

Performance Standard: The Department’s Grant Manager will review the documentation to verify that the deliverables have been completed as described above. Upon review and written acceptance by the Department’s Grant Manager, the Grantee may proceed with payment request submittal.

Payment Request Schedule: The Grantee may submit a payment request for cost reimbursement no more frequently than monthly.

Task 4: Construction

Deliverables: The Grantee will construct the underground piping, reclaimed water ground storage tank, high service pumping and booster stations and associated electrical and control systems in accordance with the construction contract documents.

Documentation: The Grantee will submit: 1) a copy of the final design; 2) a signed acceptance of the completed work to date, as provided in the Grantee’s Certification of Payment Request; and 3) a signed Engineer’s Certification of Payment Request.

Performance Standard: The Department’s Grant Manager will review the documentation to verify that the deliverables have been completed as described above. Upon review and written acceptance by the Department’s Grant Manager, the Grantee may proceed with payment request submittal.

Payment Request Schedule: The Grantee may submit a payment request for cost reimbursement no more frequently than monthly.

THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK

DEP Agreement No. LPQ0030, Attachment 3-1, Page 3 of 3

PROJECT TIMELINE & BUDGET DETAIL: The tasks must be completed by, and all documentation received by, the corresponding task end date. Cost reimbursable grant funding must not exceed the budget amounts as indicated below.

Task No. Task Title Budget

Category Grant

Amount Task

Start Date Task

End Date

1 Preconstruction Activities Contractual Services $186,050 07/01/2022 6/30/2026

2 Bidding and Contractor Selection

Contractual Services $10,000 07/01/2022 6/30/2026

3 Project Management Contractual Services $60,000 07/01/2022 6/30/2026

4 Construction Contractual Services $4,661,950 07/01/2022 6/30/2026

$4,918,000

Note that, per Section 8.h. of Attachment 1 in the Agreement, authorization for continuation and completion of work and any associated payments may be rescinded, with proper notice, at the discretion of the Department if the Legislature reduces or eliminates appropriations. Extending the contract end date carries the risk that funds for this project may become unavailable in the future. This should be a consideration for the Grantee with this and future requests for extension.

Figure 1 – Location Map

Attachment 5-1

BGS-DEP 55-215 revised 11/8/2022

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Revised Special Audit Requirements (State and Federal Financial Assistance)

The administration of resources awarded by the Department of Environmental Protection (which may be referred to as the "Department", "DEP", "FDEP" or "Grantor", or other name in the agreement) to the recipient (which may be referred to as the "Recipient", "Grantee" or other name in the agreement) may be subject to audits and/or monitoring by the Department of Environmental Protection, as described in this attachment.

MONITORING

In addition to reviews of audits conducted in accordance with 2 CFR Part 200, Subpart F-Audit Requirements, and Section 215.97, F.S., as revised (see “AUDITS” below), monitoring procedures may include, but not be limited to, on-site visits by DEP Department staff, limited scope audits as defined by 2 CFR 200.425, or other procedures. By entering into this Agreement, the recipient agrees to comply and cooperate with any monitoring procedures/processes deemed appropriate by the Department of Environmental Protection. In the event the Department of Environmental Protection determines that a limited scope audit of the recipient is appropriate, the recipient agrees to comply with any additional instructions provided by the Department to the recipient regarding such audit. The recipient further agrees to comply and cooperate with any inspections, reviews, investigations, or audits deemed necessary by the Chief Financial Officer (CFO) or Auditor General.

AUDITS

PART I: FEDERALLY FUNDED

This part is applicable if the recipient is a State or local government or a non-profit organization as defined in 2 CFR §200.330

1. A recipient that expends $750,000 or more in Federal awards in its fiscal year, must have a single or program-specific audit conducted in accordance with the provisions of 2 CFR Part 200, Subpart F. EXHIBIT 1 to this Attachment indicates Federal funds awarded through the Department of Environmental Protection by this Agreement. In determining the federal awards expended in its fiscal year, the recipient shall consider all sources of federal awards, including federal resources received from the Department of Environmental Protection. The determination of amounts of federal awards expended should be in accordance with the guidelines established in 2 CFR 200.502-503. An audit of the recipient conducted by the Auditor General in accordance with the provisions of 2 CFR Part 200.514 will meet the requirements of this part.

2. For the audit requirements addressed in Part I, paragraph 1, the recipient shall fulfill the requirements relative to auditee responsibilities as provided in 2 CFR 200.508-512.

3. A recipient that expends less than $750,000 in federal awards in its fiscal year is not required to have an audit conducted in accordance with the provisions of 2 CFR Part 200, Subpart F-Audit Requirements. If the recipient expends less than $750,000 in federal awards in its fiscal year and elects to have an audit conducted in accordance with the provisions of 2 CFR 200, Subpart F-Audit Requirements, the cost of the audit must be paid from non-federal resources (i.e., the cost of such an audit must be paid from recipient resources obtained from other federal entities.

4. The recipient may access information regarding the Catalog of Federal Domestic Assistance (CFDA) via the internet at https://sam.gov/content/assistance-listings.

BGS-DEP 55-215 revised 11/8/2022

PART II: STATE FUNDED

This part is applicable if the recipient is a nonstate entity as defined by Section 215.97(2), Florida Statutes.

1. In the event that the recipient expends a total amount of state financial assistance equal to or in excess of

$750,000 in any fiscal year of such recipient (for fiscal years ending June 30, 2017, and thereafter), the recipient must have a State single or project-specific audit for such fiscal year in accordance with Section 215.97, F.S.; Rule Chapter 69I-5, F.A.C., State Financial Assistance; and Chapters 10.550 (local governmental entities) or 10.650 (nonprofit and for-profit organizations), Rules of the Auditor General.

EXHIBIT 1 to this form lists the state financial assistance awarded through the Department of Environmental Protection by this agreement. In determining the state financial assistance expended in its fiscal year, the recipient shall consider all sources of state financial assistance, including state financial assistance received from the Department of Environmental Protection, other state agencies, and other nonstate entities. State financial assistance does not include federal direct or pass-through awards and resources received by a nonstate entity for Federal program matching requirements.

2. In connection with the audit requirements addressed in Part II, paragraph 1; the recipient shall ensure that the audit complies with the requirements of Section 215.97(8), Florida Statutes. This includes submission of a financial reporting package as defined by Section 215.97(2), Florida Statutes, and Chapters 10.550 (local governmental entities) or 10.650 (nonprofit and for-profit organizations), Rules of the Auditor General.

3. If the recipient expends less than $750,000 in state financial assistance in its fiscal year (for fiscal year ending

June 30, 2017, and thereafter), an audit conducted in accordance with the provisions of Section 215.97, Florida Statutes, is not required. In the event that the recipient expends less than $750,000 in state financial assistance in its fiscal year, and elects to have an audit conducted in accordance with the provisions of Section 215.97, Florida Statutes, the cost of the audit must be paid from the non-state entity’s resources (i.e., the cost of such an audit must be paid from the recipient’s resources obtained from other than State entities).

4. For information regarding the Florida Catalog of State Financial Assistance (CSFA), a recipient should access the Florida Single Audit Act website located at https://apps.fldfs.com/fsaa for assistance. In addition to the above websites, the following websites may be accessed for information: Legislature's Website at http://www.leg.state.fl.us/Welcome/index.cfm, State of Florida’s website at http://www.myflorida.com/, Department of Financial Services’ Website at http://www.fldfs.com/and the Auditor General's Website at http://www.myflorida.com/audgen/.

PART III: OTHER AUDIT REQUIREMENTS

(NOTE: This part would be used to specify any additional audit requirements imposed by the State awarding entity that are solely a matter of that State awarding entity’s policy (i.e., the audit is not required by Federal or State laws and is not in conflict with other Federal or State audit requirements). Pursuant to Section 215.97(8), Florida Statutes, State agencies may conduct or arrange for audits of State financial assistance that are in addition to audits conducted in accordance with Section 215.97, Florida Statutes. In such an event, the State awarding agency must arrange for funding the full cost of such additional audits.)

PART IV: REPORT SUBMISSION

1. Copies of reporting packages for audits conducted in accordance with 2 CFR Part 200, Subpart F-Audit

Requirements, and required by PART I of this form shall be submitted, when required by 2 CFR 200.512, by or on behalf of the recipient directly to the Federal Audit Clearinghouse (FAC) as provided in 2 CFR 200.36 and 200.512

A. The Federal Audit Clearinghouse designated in 2 CFR §200.501(a) (the number of copies required by

2 CFR §200.501(a) should be submitted to the Federal Audit Clearinghouse), at the following address:

BGS-DEP 55-215 revised 11/8/2022

By Mail:

Federal Audit Clearinghouse Bureau of the Census 1201 East 10th Street Jeffersonville, IN 47132

Submissions of the Single Audit reporting package for fiscal periods ending on or after January 1, 2008, must be submitted using the Federal Clearinghouse’s Internet Data Entry System which can be found at http://harvester.census.gov/facweb/

2. Copies of financial reporting packages required by PART II of this Attachment shall be submitted by or on behalf of the recipient directly to each of the following:

A. The Department of Environmental Protection at one of the following addresses:

By Mail:

Audit Director Florida Department of Environmental Protection Office of Inspector General, MS 40 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Electronically:

FDEPSingleAudit@dep.state.fl.us

B. The Auditor General’s Office at the following address:

Auditor General Local Government Audits/342 Claude Pepper Building, Room 401 111 West Madison Street Tallahassee, Florida 32399-1450

The Auditor General’s website (http://flauditor.gov/) provides instructions for filing an electronic copy of a financial reporting package.

3. Copies of reports or management letters required by PART III of this Attachment shall be submitted by or on behalf of the recipient directly to the Department of Environmental Protection at one of the following addresses:

By Mail:

Audit Director Florida Department of Environmental Protection Office of Inspector General, MS 40 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Electronically:

FDEPSingleAudit@dep.state.fl.us

4. Any reports, management letters, or other information required to be submitted to the Department of

Environmental Protection pursuant to this Agreement shall be submitted timely in accordance with 2 CFR 200.512, section 215.97, F.S., and Chapters 10.550 (local governmental entities) or 10.650 (nonprofit and for-profit organizations), Rules of the Auditor General, as applicable.

BGS-DEP 55-215 revised 11/8/2022

5. Recipients, when submitting financial reporting packages to the Department of Environmental Protection for audits done in accordance with 2 CFR 200, Subpart F-Audit Requirements, or Chapters 10.550 (local governmental entities) and 10.650 (non and for-profit organizations), Rules of the Auditor General, should indicate the date and the reporting package was delivered to the recipient correspondence accompanying the reporting package.

PART V: RECORD RETENTION

The recipient shall retain sufficient records demonstrating its compliance with the terms of the award and this Agreement for a period of five (5) years from the date the audit report is issued, and shall allow the Department of Environmental Protection, or its designee, Chief Financial Officer, or Auditor General access to such records upon request. The recipient shall ensure that audit working papers are made available to the Department of Environmental Protection, or its designee, Chief Financial Officer, or Auditor General upon request for a period of three (3) years from the date the audit report is issued, unless extended in writing by the Department of Environmental Protection.

A tt ac hm en t 5

-1 , E xh ib it of

B G

S- D

EP

5-

R ev is ed

/2

E X

H

IB

IT

FU

N

D S

A W

A R

D

ED

T O

T H

E R

EC

IP

IE

N

T

PU

R

SU

A N

T

TO

T H

IS

A

G R

EE

M

EN

T

CO

N

SI

ST

O F

TH

E

FO

LL

O W

IN

G

N ot e:

If th e re so ur ce s a w ar de d to th e re ci pi en t r ep re se nt m or e th an o ne fe de ra l p ro gr am

, p ro vi de th e sa m e in fo rm at io n sh ow n be lo w fo r e ac h fe de ra l p ro gr am an d sh ow to ta l f ed er al re so ur ce s a wa rd ed

Fe de ra l R es ou rc es

A w ar de d to th e

R ec ip ie nt P ur su an t t o th is A gr ee m en t C on si st o f t he F ol lo w in g:

ra l

Pr og ra m ra l A ge nc y

C

FD

um be r

A

T itl e

Fu nd in g A m ou nt

St at e A pp ro pr ia tio n

C at e g or ra l Pr og ra l A ge be r

A

T in g A m e A pp ro pr ia tio n

C at eg ot e:

O f t he re so ur ce s a w ar de d to th e re ci pi en t r ep re se nt m or e th an o ne fe de ra l p ro gr am

, l is t a pp lic ab le c om pl ia nc e re qu ir em en ts fo r e ac h fe de ra l p ro gr th sa m e m an ne r a s s ho wn b el ow

Fe de ra l

Pr og

Fi rs t C om pl ia nc e re qu ire m en t:

i.e

(w ha t s er vi ce s o f p ur po se s r es ou rc es m us t b e us ed fo r)

Se co nd

C om pl ia nc e re qu ire m en t:

i.e el ig ib ili ty re qu ire m en t f or re ci pi en ts o f t he re so ur ce s)

Et c.

ra l Pr og

Fi rs t C om pl ia nc e re qu ire m en t:

i.e

(w ha t s er vi ce s o f p ur po se s r es ou rc es m us t b e us ed fo r)

Se co nd

C om pl ia nc e re qu ire m en t:

i.e

(e lig ib ili ty re qu ire m en t f or re ci pi en ts o f t he re so ur ce s) tt ac hm en t 5

-1 , E xh ib it of

G

S- D

EP

5-

R ev is ed

/2

N ot e:

If th e re so ur ce s a w ar de d to th e re ci pi en t f or m at ch in g re pr es en t m or e th an o ne fe de ra l p ro gr am , p ro vi de th e sa m e in fo rm at io n sh ow n be lo w fo r e ac h fe de ra l p ro gr am a nd sh ow to ta l s ta te re so ur ce s a wa rd ed fo r m at ch g.

e

R es ou rc es A w ar de d to th e R ec ip ie nt

P ur su an t t o th is

A gr ee m en t C on si st o f t he

F ol lo w in g

M at ch in g R es ou rc es fo r

Fe de ra l P ro gr s:

ra l Pr og ra l A ge

A

T in g A m e A pp ro pr ia tio n

C at eg ra l Pr og ra l A ge

A

T in g A m e A pp ro pr ia tio n

C at e g e:

If th e re so ur ce s a w ar de d to th e re ci pi en t r ep re se nt m or e th an o ne st at e pr oj ec t, pr ov id e th e sa m e in fo rm at io n sh ow n be lo w fo r e ac h st at e pr oj ec t a nd sh ow to ta l s ta te fi na nc ia l a ss is ta nc e aw ar de d th at is su bj ec t t o se ct io n

5.

, F .S

St at e

R es ou rc es A w ar de d to th e R ec ip ie nt

P ur su an t t o th is

A gr ee m en t C on si st o f t he

F ol lo w in g

R es ou rc es S ub je ct to

S ec tio n

5.

, F

.S

St at e Pr og e

A w ar di n g A ge e

Fi sc al Y ea r1

SF

be r

C

SF

A T itl in g

So ur ce D es cr ip tio n in g A m e A pp ro pr ia tio n

C at e g or y O rig al gr ee m en t

D ep ar tm en t o f En vi ro nm en ta l P ro te ct io n

-2

.0 ew id e W at er

Q ua lit y

R es to ra tio n

Pr o j ec ts

LI

0B

$3 ,9

,0

.0 en dm en t 1

D ep ar tm en t o f

En vi ro nm en ta l P ro te ct io n

-2 ew id e

W at er Q ua lit y R es to ra tio n Pr o j ec ts

LI

5A

$1

,0

,0

.0 e Pr og e

A w ar di n g A ge e

Fi sc al Y ea r2

SF

be r

C

SF

A T itl in g

So ur ce D es cr ip tio n in g A m e A pp ro pr ia tio n

C at eg

To ta l A w ar d $4

,9

,0 e:

L is t a pp lic ab le c om pl ia nc e re qu ir em en t i n th e sa m e m an ne r as il lu st ra te d ab ov e fo r fe de ra l r es ou rc es . F or m at ch in g re so ur ce s pr ov id ed b y th e D ep ar tm en t fo r D

EP

f or f ed er al p ro gr am s, th e re qu ir em en ts m ig ht b e sim ila r to t he r eq ui re m en ts f or t he a pp lic ab le f ed er al p ro gr am s.

Al so to t he e xt en t th at d iff er en t re qu ir em en ts p er ta in to d iff er en t a m ou nt fo r t he n on -fe de ra l r es ou rc es , t he re m ay b e m or e th an o ne g ro up in g

(i.

e.

, 2

, 3 , e tc lis te d un de r t hi s c at eg y.

Fo r e ac h pr og ra m id en tif ie d ab ov e, th e re ci pi en t s ha ll co m pl y w ith th e pr og ra m re qu ire m en ts d es cr ib ed in th e

C at al og o f F ed er al D om es tic A ss is ta nc e (C

FD

A

[h ttp s:

//s am

.g ov

/c on te nt

/a ss is ta nc e-lis tin gs ] a nd /o r t he

F lo rid a

C at al og o f S ta te

F in an ci al A ss is ta nc e (C

SF

A ht tp s:

//a pp s.f ld fs .c om /fs aa /s ea rc hC at al og

.a sp x] , a e Pr oj ec ts C om pl ia nc e Su pp le m en t (P ar t

Fo ur

St at e

Pr oj ec ts

C om pl ia nc e

Su pp le m en t

[h ttp s:/ /a pp s.f ld fs

.c om

/fs aa

/s ta te _p ro je ct _c om pl ia nc e.

as px

Th e se rv ic es

/p ur po se s f or w hi ch th e fu nd s a re to b e us ed a re in cl ud ed in th e A gr ee m en t’s G ra nt

W or k Pl an

A ny m at ch re qu ire d by th e

R ec ip ie nt is c le ar ly in di ca te d in th e

A gr ee m en t.

1 S ub je ct to c ha ng e by C ha ng e O rd er

2 S ub je ct to c ha ng e by C ha ng e O rd er

FDEP Grant_ LPQ0030 Agreement Executed.pdf
FDEP Grant_LPQ0030 Amendment 1 Executed.pdf

File details come from the government source that posted it. Updated .