FD2020-24-50083_DD1423Pkg_2024Aug29-Signed.pdf
PDF 1 MB Posted
- Attached to
- BBU-48A/B Impulse Cartridge Federal contract opportunity
- Solicitation number
- FA8213-25-R-B001
About this file
This is a Contract Data Requirements List (CDRL) package containing 26 individual CDRLs (A001-A026) for contract FD2020-24-50083 related to the BBU-48A/B Impulse Cartridge (NSN 1377-01-640-7205) program managed by the Air Force Life Cycle Management Center at Hill AFB (AFLCMC/EBHCC).
The CDRLs specify various required deliverables including Government Furnished Material reports, ammunition data cards, performance oriented packaging test reports, engineering change proposals, quality assurance plans, acceptance test plans, counterfeit prevention plans, technical data package reviews, and program status reports. Key requirements include monthly contractor progress reports, 30-day reporting of GFM consumption, lot acceptance test reports within 30 days of testing, and various technical documentation requiring government review/approval within specified timeframes. Most deliverables must be submitted electronically via Wide Area Work Flow (WAWF) or email in Microsoft Office/PDF format. The package includes detailed distribution requirements and export control restrictions for each deliverable, with most items designated as Distribution Statement D (DoD and DoD contractors only).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA821325RB0010002.pdf | ||
| RFIs - FA8213-25-R-B001.docx | DOCX document | |
| Solicitation Amendment FA821325RB0010001 SF 30.pdf | ||
| Solicitation - FA821325RB001.pdf | ||
| Air Spec BBU-48 FD2020-24-50083.docx | DOCX document | |
| BBU-48 Pricing Table.xlsx | XLSX spreadsheet | |
| REPSHIP.pdf | ||
| ATTACHMENT 8 - FAT (Contractor Testing).docx | DOCX document | |
| Attachment 3 ES7035 Description Sheets.docx | DOCX document | |
| Section L Instructions. Conditions. & Notices to Offerors.pdf | ||
| Section M Evaluation Factors for Award.pdf | ||
| JQR BBU-48 May 2019 signed.pdf | ||
| Attachment 4 - ES6200 (End Item Component ADC) BBU 48.docx | DOCX document | |
| BBU-48 Pricing Table Example.xlsx | XLSX spreadsheet | |
| GFPFA821325RB001_1.pdf | ||
| Attachment 9 ES6925 MSE BBU 48.pdf | ||
| Attachment 5 - ES7034 (Rework Repair).docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Government Furnished Material (GFM) Consumption Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80438B
5. CONTRACT REFERENCE
Airmunition Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
BLK 4: Following format and content requirements as stated in the Data Item Description.
BLK 7: The Letter of Transmittal shall be annotated to reflect if additional submittals are to be furnished or if this is the final submittal. The Letter of Transmittal shall be used only for this data item; do not combine other data item submittals with this requirement.
BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.438
BLK 10, 12, 13: Reporting to commence upon receipt of GFM and then every 30 days thereafter until end of contract.
BLK 14: Submit report electronically via e-mail in Microsoft Office software or PDF format to the email recipient(s) listed below. Refer to contract for e-mail address of the Government Contracting Officer(EBHKC).
juan.gutierrez.23.ctr@us.af.mil (AFLCMC/EBHCC)
FOB DESTNATION
EBH 23-341-001
AFLCMC/Terry McCurdy/EBHEC, 586-0535
Contr. Officer 1 1 0
AFLCMC/EBHCC 1 1 0
DCMA/QAR 1 1 0
DCMA/ACO 1 1 0
15. TOTAL 4 4 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Ammunition Data Card (ADC)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80043B
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
SD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
BLK 7: The electronic receiving report shall be annotated with Lot Number, National Stock Number and Nomenclature. The electronic receiving report shall also be annotated to reflect if additional submittals are to be furnished or if this is the final submittal of data. The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at: https://wawf.eb.mil.
BLK 8: Within 30 calendar days of receipt, Government Engineer thru WAWF notice of notice of approval/disapproval. If disapproved, Government Engineer response thru WAWF will include instruction for remediation.
BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology)(Date of Contract Award). Other requests for this document shall be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 10, 12, 13: Submit after successful Lot Acceptance Test and prior to delivery of each production lot. Submit within 30 calendar days after completion of each Lot Acceptance Test.
BLK 14: A sample ADC or "draft" will be generated and submitted using the Worldwide Ammunition-data Repository Program (WARP) system to ensure general format and content is acceptable. For the final submittals, one hard copy of ADCs shall be generated from the WARP and submitted with the electronic receiving report via WAWF to AFLCMC/EBHCC. The final ammo data card shall be uploaded in WAWF under DoDAAC FA8213.
FOB DESTINATION
EBH 23-341-001
Terry McCurdy/AFLCMC/EBHEC/586-0535
WAWF 0 1 0
DoDAAC FA8213
Sample ADC via
WARP sys only 0 1 0
15. TOTAL 0 2 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER PACK
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Performance Oriented Packaging (POP) Test Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-PACK-81059C
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
SD
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
BLK 4: Follow format and submission of the Performance Oriented Packaging Test Report in accordance with requirements stated in the Data Item Description.
BLK 7: Acceptance/Rejection of final report will be within 7 days from date of receipt. Electronic receiving report required via internet Wide Area Work Flow (WAWF, DoDAAC FA8213) at https://wawf.eb.mil. The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement.
BLK 9: DISTRIBUTION STATEMEN B. Distribution authorized to U.S.
Government agencies (Critical Technology) (Date of Contract Award).
Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 11, 12 & 13: Test report due 30 days prior to shipment. For Multi-year contracts, the contractor shall re-perform the POP testing at a U.S Government approved Performance-Oriented Packaging (POP) test laboratory IAW CFR 49 if:
(a) The initial POP test report expires before the end of the contract (single pack certification is valid for a period of 1 year;
combination pack POP certification is valid for a period of 2 years).
(b) There is a change in container manufacturer, design, or manufacturing processes of the container.
EXCEPTION TO POP MARKINGS: If the container is manufactured outside the USA, the contractor/container manufacturer shall be responsible to perform the POP certification tests IAW the United Nations Recommendations on the Transport of Dangerous Goods and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.
FOB DESTINATION
EBH 23-341-001
Terry McCurdy, AFLCMC/EBHEC, 586-0535
WAWF 0 1 0
DoDAAC, FA8213
15. TOTAL 0 1 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80639E
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
BLK 4: Data delivery description for content of Engineering Change Proposal via applicable DD Form 1692 shall be in accordance with para. 3.3.2.(1) of EIA-649-1A and the principles of EIA-649-C.
BLK 7: The Letter of Transmittal shall be annotated to reflect if additional submittals are to be furnished or if this is the final submittal of data. The Letter of Transmittal shall be used only for this data item; do not combine other data item submittals with this requirement.
BLK 8: Within 30 days of receipt, the Government Engineer thru the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response thru the Government Contracting Officer will include instruction for remediation. Notification of approval of the proposed engineering change shall be by signed contract modification.
BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C) Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 14: Submit reports electronically via e-mail in Microsoft Office or PDF format to the following e-mail recipients listed below. Refer to contract for e-mail address of the Government Contracting Officer
(AFLCMC/EBHKC).
robert.morgan.27@us.af.mil (AFLCMC/EBHEC)
Terry McCurdy, AFLCMC/EBHEC, 586-0535
AFLCMC/EBHCC 1 1 0
AFLCMC/EBHEC 1 1 0
AFLCMC/EBHKC 1 1 0
DCMA/QAR 1 1 0
DCMA/ACO 1 1 0
15. TOTAL 5 5 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Notice of Revision (NOR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80642E
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
BLK 4: Follow format requirements listed under paragraph 2 of Data Item Description. Data deliverable contents of Notice of Revision shall contain all information required by DD Form 1695.
BLK 8: Within 30 days of receipt, the Government Engineer thru the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response thru the Government Contracting Officer will include instruction for remediation. Notification of approval of the proposed notice of revision shall be by signed contract modification (AFLCMC/EBHKC).
BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 14: Submit reports electronically via email in Microsoft Office or PDF format to the e-mail recipients listed below. Refer to contract for email address of the Government Contracting Officer
(AFLCMC/EBHKC).
robert.morgan.27@us.af.mil (AFLCMC/EBHEC)
Terry McCurdy, AFLCMC/EBHEC, 586-0535
AFLCMC/EBHCC 1 1 0
AFLCMC/EBHEC 1 1 0
AFLCMC/EBHKC 1 1 0
DCMA/QAR 1 1 0
DCMA/ACO 1 1 0
15. TOTAL 5 5 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Request for Variance (RFV)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80640E
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
BLK 4: Follow format requirements listed under paragraph 2 of Data Item Description. Data deliverable contents of Request for Variance (RFV) shall contain all information required by DD Form 1694.
BLK 7: Government engineer will perform review of the RFV.
Notification of approval shall be signed RFV (AFLCMC/EBHKC).
BLK 8: Within 30 days of receipt, the Government Engineer thru the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response thru the Government Contracting Officer will include instruction for remediation.
BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C) Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 14: Submit reports electronically via e-mail in Microsoft Office or PDF format to the following e-mail recipient(s) listed below.
Refer to contract for e-mail address of the Government Contracting Officer (AFLCMC/EBHKC).
robert.morgan.27@us.af.mil (AFLCMC/EBHEC)
FOB DESTINATION
EBH 23-341-001
Terry McCurdy, AFLCMC/EBHEC, 586-0535
AFLCMC/EBHCC 1 1 0
AFLCMC/EBHEC 1 1 0
DCMA/QAR 1 1 0
DCMA/ACO 1 1 0
15. TOTAL 4 4 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Supplier's Configuration Management Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80858D
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
BLK 4: : Supplier's Configuration Management plan shall be prepared in Supplier format. Follow content as stated in paragraph 3.
BLK 7: Electronic receiving report required via internet Wide Area Work Flow (WAWF) at: https://wawf.eb.mil under DoDAAC, FA8213. The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement.
BLK 8: Government Comments/Approval/Disapproval will be submitted within 30 working days of receipt, by the Government Engineer.
Failure to comment/approve/disapprove within 30 calendar days does not constitute full/final acceptance by the Government.
BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 14: Submit the report electronically in Microsoft Office software or PDF format. Submit report via e-mail to the addressee listed below:
blake.bradford.1@us.af.mil (AFLCMC/EBHCC)
Terry McCurdy, AFLCMC/EBHEC, 586-0535
WAWF 0 1 0
DoDAAC, FA8213
AFLCMC/EBHCC 1 1 0
15. TOTAL 1 2 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER QCIC
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Acceptance Test Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-80553A
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
BLK 4: Contractor format is acceptable. Follow content preparation instructions as specified in the Data Item Description.
BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:
https://wawf.eb.mil. The electronic receiving report shall be used only for this data item, do not combine other data item submittals with this requirement.
BLK 8: Comments/approval/disapproval will be submitted within 30 working days of receipt by AFLCMC/EBHCC.
BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 10,11, 12, 13: The contractor shall provide a Acceptance Test Plan after contract award and at least 90 days prior to Lot Acceptance Testing allowing for 30 day approval time. No changes to previously approved government Acceptance Test Plans shall be made without prior notification of AFLCMC/EBHCC Engineering approval in accordance with Airmunitions Specification.
BLK 14: Report shall be in Microsoft Office or PDF format. Submit through WAWF, DoDAAC, FA8213.
Terry McCurdy, AFLCMC/EBHEC, 586-0535
WAWF 0 1 0
DoDAAC, FA8213
15. TOTAL 0 1 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Lead-Free Control Plan (LFCP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81772
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
BLK 4: Contractor's format required. Follow content preparation instruction and requirements listed in the Data Item Description.
BLK 7: Receiving report shall be submitted electronically via the internet through Wide Area Work Flow (WAWF) at: https://wawf.eb.mil under DoDAAC FA 8213.
BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 14: Submit reports electronically via e-mail in Microsoft Office software or PDF format to the e-mail recipient (s) listed below.
Refer to contract for e-mail address of the Government Contracting Officer (AFLCMC/EBHKC).
blake.bradford.1@us.af.mil (AFLCMC/EBHCC)
Terry McCurdy/AFLCMC/EBHEC/586-0535
AFLCMC/EBHKC 1 1 0
(ref blk 16)
LT 0 1 0
DCMA QAR 1 1 0
DCMA ACO 1 1 0
15. TOTAL 3 4 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
Lot Acceptance Test
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
BLK 4: Contractor format is acceptable.
BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:
https://wawf.eb.mil. The electronic receiving report shall be used only for that data item; do not combine other data item submittals with this requirement.
BLK 8: Comments/approval/disapproval will be submitted within 30 working days of receipt by AFLCMC/EBHCC.
BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 10,12,13: Submit within 30 calendar days after completion of each Lot Acceptance Test.
BLK 14: Report shall be in Microsoft Office software or PDF format.
Submit through WAWF, DoDAAC, FA8213.
Terry McCurdy, AFLCMC/EBHEC, 586-0535
WARP 0 1 0
WAWF 1 0 1
DoDAAC, FA8213
15. TOTAL 1 1 1
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Failure Summary and Analysis Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80255B
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
BLK 4: Contractor's format required for both the Preliminary and Final report.
BLK 7: The Letter of Transmittal shall be annotated to reflect if additional submittals are to be furnished or if this is the final submittal of data. The Letter of Transmittal shall be used only for this data item; do not combine other data item submittals with this requirement.
BLK 8: Comments/approval/disapproval will be submitted within 30 calendar days after receipt by AFLCMC/EBHCC.
BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 10, 12, 13: Submit within 7 calendar days of each failure.
Final with 15 calendar days after receipt of AFLCMC/EBHCC comments.
BLK 14: Report shall be in Microsoft Office or PDF format. Submit via e-mail to cognizant Hill AFB Contracting Officer.
Terry McCurdy, AFLCMC/EBHEC, 586-0535
Contr. Officer 0 1 0
Hill AFB, UT
15. TOTAL 0 1 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Acceptance and Description Sheets
3. SUBTITLE
Propellants and Explosives
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81978
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
SD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
BLK 4: Format and content shall be in accordance with MIL-STD-1171 and the WARP User's Manual. This manual can be accessed at https://mphwarp.redstone.army.mil.
BLK 7: Electronic receiving report required via internet Wide Area Work Flow (WAWF, DoDAAC FA8213) at: https://wawf.eb.mil.The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement.
BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING -This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 10,12,13: Acceptance and Description sheets will be prepared for each lot of propellants, explosive, and chemicals as specified in the contract or specification. The sheets shall be electronic files as specified in MIL-STD-1171 and the on-line WARP User's Manual. Submit 90 calendar days prior to initial use of new original material.
Waiver for this 90 calendar day period must be approved by AFLCMC/EBHCC. No changes to previously approved Acceptance and Description sheets shall be made without prior notification of and approval from AFLCMC/EBHCC.
BLK 14: The Contractor shall prepare and store Acceptance and Description sheets in the Worldwide Ammunition-data Repository Program (WARP). See Addendum A for Interim instructions. Report shall be in Microsoft Office software or PDF format. Submit through WAWF under DoDAAC, FA8213.
FOB DESTINATION
EBH 23-341-001
Terr McCurdy/AFLCMC/EBHEC, 56-86-0535
WAWF 0 1 0
DoDAAC, FA8213
WARP 0 1 0
15. TOTAL 0 2 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER QCIC
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Quality Assurance Program Plan (QAPP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-81794A
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
BLK 4 : Contractor's format is acceptable. Follow content instructions stated in the Data Item Description.
BLK 7: The electronic receiving report required via internet Wide Area Work Flow (WAWF, DoDAAC FA8213) at: https://wawf.eb.mil. The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement.
Electronic receiving report shall be annotated to reflect if additional submittals are to be furnished or if this is the final submittal of data.
BLK 8: Within 30 calendar days of receipt, the Government Engineer through the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response through the Government Contracting Officer will include instructions for remediation.
BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award ). Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 10, 12, 13: The Contractor shall provide a Quality Assurance Program Plan 30 calendar days after contract award. No changes to previously approved QAPP shall be made without prior approval from AFLCMC/EBHCC Engineering, in accordance with Airmunitions Specification.
Submit through WAWF under DoDAAC FA8213.
Terry McCurdy, AFLCMC/EBHEC, 586-0535
WAWF 0 1 0
DoDAAC, FA8213
15. TOTAL 0 1 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER QCIC
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Measurement System Evaluation (MSE)
3. SUBTITLE
Measurement and Inspection Equipment System Design Documentation for Acceptance of Product4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-81960
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
1TIME
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
BLK 4: Contractor's format is acceptable. The plan shall be in accordance with content requirements listed in paragraph 3 of the Data Item Description.
BLK 7: Receiving report shall be submitted electronically via the internet through Wide Area Work Flow (WAWF) at: https://wawf.eb.mil under DoDAAC FA8213. The electronic receiving report shall be used only for this data item, do not combine other data item submittals with this requirement.
BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
BLK 10,11,12, & 13: The Contractor shall submit a completed AIE package no later than 120 days after contract award and no later than 60 calendar days prior to First Article Testing (if FAT is required), production, and/or all acceptance of product under the contract. The Government will furnish disposition within 30 calendar days of final AIE package receipt. If further revisions are necessary, the Contractor shall have 30 calendar days to generate them and the Government shall have 30 calendar days to review and respond to them.
The approved AIE shall be available for First Article Testing (if FAT is required), production, and/or all acceptance of product under the contract. If Contractor revises a previously Government accepted AIE for this contract, the revised AIE must be submitted to the Government for review and approval. Approval must be granted before AIE is used for acceptance of product. The Government will respond within 30 calendar days.
BLK 14: Report shall be submitted electronically in Microsoft Office software or PDF format to the e-mail recipients listed below.
seth.ollis.1@us.af.mil (AFLCMC/EBHCC) blake.bradford.1@us.af.mil (AFLCMC/EBHCC)
FOB DESTINATION
EBH 23-341-001
Terry McCurdy, AFLCMC/EBHEC, 586-0535
WAWF 1 1 0
DoDAAC, FA8213
AFLCMC/EBHCC
6033 Elm Lane
Bldg. 1256
HILL AFB, UT
84056
15. TOTAL 1 1 0
G. PREPARED BY
MCCURDY.TERRY.D.1075978215
H. DATE
2023/12/12
I. APPROVED BY
HARGROVE.ERIC.V.1167016843
J. DATE
2023/12/13
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
1377016407205
E. CONTRACT/PR NO.
FD2020-24-50083
F. CONTRACTOR
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
Technical Data Package Review Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80750
5. CONTRACT REFERENCE
Airmunitions Specification
6. REQUIRING OFFICE
AFLCMC/EBHCC
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
BLK 4: The Technical Data package Review shall be contractor selected. Unless effective presentation would be degraded, the initially used format arrangement shall be used for all subsequent submissions.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .