Combined_Synopsis_Solicitation_FCU-15-0031318_11_24_15.docx

DOCX document 119 KB Posted

Attached to
Interim Pre-engineered Modular Training Facility Redstone
Solicitation number
FCU-15-0031318
Issued by

About this file

Combined Synopsis/Solicitation Interim Pre-engineered Modular Training Facility Redstone

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS

General Information

Document Type:
Combined Solicitation/Synopsis
Solicitation Number:
FCU-15-0031318
Posted Date:
24 November 2015
Original Response Date:
N/A
Current Response Date:
23 December 2015
Product or Service Code:
5410
Set Aside:
Small business
NAICS Code:
321992

Contracting Office Address U.S. Department of Justice Federal Bureau of Investigation Facilities Contracts Unit, Room 6329 935 Pennsylvania Avenue NW Washington, D.C. 20535 Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, “Streamlined Procedures for Evaluation and Solicitation for Commercial Items,” as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation document will not be issued.

This solicitation is a request for quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-83.

The associated North American Industrial Classification System (NAICS) code for this procurement is 321992 - Prefabricated Wood Building Manufacturing, with a small business size standard of 500.

The FBI does not intend to reimburse recipients of this RFQ for any costs incurred in preparing a proposal. Prior to the preparation of your proposal, please read all instructions contained herein. A Contractor's quote shall be clearly stated, complete and provide a straightforward, concise delineation if its capabilities and services to satisfy this RFQ. The contractor’s quote should be inclusive of detailed pricing for all necessary labor, material, and equipment to furnish and install a complete turnkey project.

The following schedule of events is included for your information. Every effort will be made to adhere to this schedule; however, the FBI Contracting Officer reserves the right to change these dates as necessary: *(Any changes will be made by Amendment to the RFQ).

EVENT
DATE
Release of RFQ
Tuesday, 24 November 2015
“Site Visit Request Form”, (See Attachment L) - 12:00 p.m. (EST). Completed forms must be provided to Mr. David Triplett via email at David.Triplett@ic.fbi.gov.
Due date not later than Thursday, 3 December 2015

Mandatory Site Visit - 10:OO a.m. Local Time (CT) Redstone Arsenal, Huntsville, Alabama (SEE Site Visit provision below for additional information and required form) Thursday, 10 December 2015

Questions Due to the Government no later than 4:00 p.m. (EST)
Monday, 14 December 2015
Release of Government’s Written Response to Contractor Questions
Wednesday, 16 December 2015
Quotes Due to the Government no later than 11:00 a.m. (EST)
Wednesday, 23 December 2015

U.S. Department of Justice Federal Bureau of Investigation 935 Pennsylvania Avenue NW Washington, D.C. 20535

Combined Solicitation/Synopsis Request For Quote FCU-15-0031318

This document is the property of the U.S. Government and is for official use only. Further reproduction and/or distribution outside the Contractor Team is prohibited without the express written approval of the U.S. Federal Bureau of Investigation, Project Contracting Officer, Clarksburg, WV 26306.

21 of 48 | Page

The Federal Bureau of Investigation (FBI) Facilities Contracts Unit (FCU) is seeking to a new pre-engineered modular classroom and office complex at Redstone Arsenal, Alabama.

All interested companies shall provide quotation for the following:

Supplies

Line Item
Description
Quantity
Unit
Total Price
0001
Modular Classroom & Office Complex Install
1
Job
$______________
0002
Installation and Site Preparation for CLIN 0001 - Modular Classroom & Office Complex Install
1
Job
$______________
0003
Provide and install furniture for CLIN 0001 - Modular Classroom & Office Complex Install
1
Job
$______________

GRAND TOTAL ALL CLINS: $________________

· Total price included shall be Firm-Fixed Price (FFP).

· FFP provided shall be FOB: Destination.

· FFP shall be inclusive of all labor, design, management, equipment, supplies, and materials needed for the subject project, in strict accordance with the attached Scope of Work. Price shall include all applicable Federal, State, and Local taxes.

Services

SCOPE OF WORK

Federal Bureau of Investigation Interim Training Center Redstone Arsenal, Alabama

1.1 PURPOSE

The purpose of this acquisition is to secure additional training capacity and capabilities required by the FBI to perform its national security, criminal investigative, and criminal justice services missions.

1.2 BACKGROUND

The FBI’s Training Division (TD) is experiencing a demand for training capacity that exceeds current capacity due to high levels of new agent and intelligence analyst hiring that will continue for the next several years and growing requirements for in-service, workforce development, and career-path training opportunities. Additionally, on-going and future renovations of FBI Academy facilities are impacting the availability of classrooms and conference rooms used for training. The establishment of an interim training center using pre-engineered modular units is considered the most effective and efficient solution to providing near-term training capacity relief until additional permanent facilities can be constructed.

The design and configuration of the interim training center and classrooms will allow for the delivery of training in several pedagogies (traditional, computer-based, seminar, and small group). Classroom design will emphasize flexibility in seating configurations to allow for maximum use and will be equipped, by the Government, with appropriate multi-media and audio-visual systems. Management and staff offices will also be provided.

Redstone Arsenal (RSA) is a United States Army post adjacent to the city of Huntsville in Madison County, Alabama, United State. The US Army is making available to the FBI a parcel of land at RSA (Reference Attachments A and B) that recently sited pre-engineered modular unit installations and is presently unoccupied. The site, commonly identified as Building 3334, is bounded by Patton Road to the east, Wells Road to the south and Mauler Road to the west. The site includes paved parking for approximately 200 vehicles, eight (8) graded gravel trailer pads, additional gravel parking areas, and utilities at each pad site. A previous RSA tenant sited 8 pre-engineered modular units (approximately 82’x70’ each) on the site that provided nearly 46,000 SF of space. The site also includes a small permanent building (3334) that is currently assigned to another Redstone tenant and is not part of this project. Contractor shall avoid disruption to tenant’s operations at the aforementioned building during contractor’s use of the site, especially for delivery and installation of buildings and utilities. The site perimeter is fenced. Domestic water is available at the site (Reference Attachment B for location and size of domestic water service) RSA Department of Public Works advises the site utility drawings included in this RFQ are the most recent versions available.

A notional site plan has been prepared by the FBI as guidance to developing quotations. (Reference Attachment C)

Attachments:

A.Bldg. 3334 ACC Relocatables Site Plan, dated 28042010
B.Bldg. 3334 ACC Relocatables Utility Plan, dated 28042010
C.Notional Site Plan for Interim Training Center Site, dated November 9, 2015
D.Green Training Module mock up
E.Red Training Module mock up
F.Orange Training Module mock up
G.Blue Administrative Module #1 (Training) mock up
H.Blue Administrative Module #2 (FLSD/FD) mock up
KFurniture and Equipment List

1.2.1 AGENCY MISSION

The mission of the FBI is to protect and defend the United States against terrorist and foreign intelligence threats, to uphold and enforce the criminal laws of the United States, and to provide leadership and criminal justice services to federal, state, municipal, and international agencies and partners. To carry out this mission, the FBI uses, collects, and share intelligence to counter threats to national security and to bring to justice those who violate the law.

Performance of the FBI’s mission requires a highly trained workforce comprised of Special Agents, Intelligence Analysts, and professional staff. Training is also provided to FBI partners, including representatives of other federal, state, municipal, and international law enforcement and other agencies participating in joint task forces, formal and informal working groups, and other collaborative initiatives. Training ranges from basic and advanced investigative techniques to specialized topics, from career-path development to leadership preparation. The FBI is committed to providing training and development opportunities to employees over the course of their entire career with the FBI.

This project will support the mission of the FBI by providing the training capability and capacity needed to meet current and future demand for in-service and advanced training for Special Agents, Intelligence Analysts, professional support staff and others who require special knowledge to perform the Bureau’s national security and criminal investigative missions.

1.3 SCOPE

The Contractor shall furnish all parts, material, labor, manufactured articles, transportation, supervision, and all else necessary to design, fabricate, assemble, deliver (FOB Destination), install, anchor, and skirt a new pre-engineered modular classroom and office complex at Redstone Arsenal, Huntsville, Alabama, to satisfy the requirements identified in this Statement of Work (SOW) as specified herein and indicated diagrammatically on the attached drawings (Reference Attachments C, D, E, F, G and H). The actual number of modular classroom and office units will be determined through responses to this solicitation. The classroom and office complex (i.e., structures, stairs/ramps, decking, anchoring, fire protection, mechanical (HVAC), and electrical systems shall comply with applicable requirements of the laws, codes, ordinances, and regulations of Federal, State, and Municipal authorities having jurisdiction. The Contractor shall obtain approvals and permits from all such authorities, if applicable. The Contractor shall comply with the applicable portions of the latest edition of each code, standard, and other document invoked by this Statement of Work.

1.3.1 SPECIFIC REQUIREMENTS

The Government has categorized its requirements by defined training and administrative modules, which allow the agency flexibility to serve its various training goals in support of the agency mission. As envisioned by the Government, the initial build-out of the Interim Training Center will consist of five separate structures – three training structures and two administrative structures. The site also provides space and flexibility for future structures. A notional site plan has been prepared by the Government as guidance to developing quotations in response to this solicitation. (Reference Attachment C) The modules are referenced by the following color scheme:

· Green training module shall accommodate at minimum:

· Two (2) 50-seat traditional classrooms

· One (1) 25-seat seminar room

· Four (4) small group teaming/collaboration rooms

· Entrance vestibule/mantrap, ADA compliant restrooms (men and women), janitor’s closet, and utilities/communications closets (fire service, telecommunications, electrical, and network), and hoteling area

· See notional diagrammatic layout of training module Attachment D.

· Red training module shall accommodate at minimum:

· Two (2) 50-seat traditional computer-based classrooms

· One (1) 25-seat seminar room

· Four (4) small group teaming/collaboration rooms

· Entrance vestibule/mantrap, ADA compliant restrooms (men and women), janitor’s closet, and utilities/communications closets (fire service, telecommunications, electrical, and network), and hoteling area

· See notional diagrammatic layout of training module Attachment E.

· Orange training module shall include at minimum:

· Two (2) 50-seat traditional computer-based classrooms

· One (1) 25-seat seminar room

· Four (4) small group teaming/collaboration rooms

· Entrance vestibule/mantrap, ADA compliant restrooms (men and women), janitor’s closet, server room, and utilities/communications closets (fire service, telecommunications, electrical, and network), and hoteling area

· See notional diagrammatic layout of training module Attachment F.

**SEE SPECIAL FEATURES SECTION BELOW FOR ORANGE MODULE ONLY

· Blue administrative module #1 (Training) shall include at minimum:

· Manager’s office

· Staff and instructor offices (with hoteling stations)

· Conference room

· Break area/kitchenette

· Mother’s Nursing Room

· Nurse’s office and day sick bay room

· Supplies and materials storage room

· Entrance vestibule/mantrap, ADA compliant restrooms (men and women), janitor’s closet, and utilities/communications closets (fire service, telecommunications, electrical, and network)

· See notional diagrammatic layout of administrative module Attachment G.

· Blue administrative module #2 (FLSD/FD) shall include at minimum:

· Two (2) Manager’s office

· Staff offices (with hoteling stations)

· Conference room

· Break area/kitchenette

· Supplies and materials storage room

· Entrance vestibule/mantrap, ADA compliant restrooms (men and women), janitor’s closet, and utilities/communications closets (fire service, telecommunications, electrical, and network)

· See notional diagrammatic layout of administrative module Attachment H.

· Each of the above described modules shall be a stand-alone structure.

· Each module shall be sited so that a minimum of 20 feet separates each structure from another.

1.4 GENERAL PLANNING AND DESIGN FEATURES

General planning and design features used by the Government in preparing this RFQ are included in the following tables.

1.4.1 MODULE DESIGN FEATURES

The Contractor shall provide complete drawings and specifications for Government review and approval prior to fabrication. Drawings consist of plans, elevations, and sections/details with enough information to adequately illustrate the requirements described herein. The attached referenced floor plan sketches that are included in this RFQ illustrate the desired layout only.

The Contractor shall provide and transport pre-engineered modular units to the RSA site. Modular units and training complex shall comply with the 2012 International Building Code, the Americans with Disabilities Act, and the Architectural Barriers Act which includes compliance with the Uniform Federal Accessibility Standards (UFAS).

Additionally, the Orange training module must be able to be accredited by the Government as a Sensitive Compartmented Information Facility (IC Tech Spec for ICD/ICS 705). SEE additional requirements in “Special Features - Orange Module only” section below.

· The contractor will inspect the site and identify any site work needed to facilitate the installation of pre-engineered modular units. Upon approval of the Contracting Officer (CO), perform agreed to site work.

· Modular unit drawings shall be designed, signed, and sealed by applicable disciplines licensed in the State of Alabama and provided by the manufacturer.

· The contractor is responsible for coordinating all final inspections by the Redstone Arsenal Fire Marshall.

· The contractor is responsible for verifying building pads have minimum soil bearing capacity of 2,000 pounds per square foot (psf).

1.4.2 ARCHITECTURAL DESIGN FEATURES

General Features

· Modular buildings shall be assembled and placed on CMU block footing and anchored according to individual classroom or office units consistent with attached floor plans or final plans agreed to by the Government

· Each pre-engineered modular unit shall be bonded together with a 4/O bonding cables

· 24 inch by 24 inch by 8 inch thick pre-cast concrete footings are acceptable

· Contractor shall provide the specification for Government review and approval

· Modular units shall be a minimum of 60 feet by 12 feet, close coupled to form single units consistent with attached floor plans or final plans agreed to by the Government

· Modular structural metal framing shall be steel frame 12” Jr. I beam and cross members at 48 inch O.C.

· Undercarriage shall be painted with corrosive inhibiting paint

· Axels and hitches shall be removed from site by contractor

· Modular unit materials shall be standard equipment, devices, colors, and etc. offered by the modular building manufacturer unless otherwise noted

· Design, construct, and provide building floors and roofs which meet or exceed the following loads:

· Floor:Live load: 150 psf
· Roof:Live load: 20 psf, or 2012 IBC code requirement, whichever is greater

· The Contractor shall propose a roof design which achieves the dictated loading requirements and is clear span providing unobstructed open areas in all rooms and passageways

· Insulation: Floor R-19; Exterior walls, R-13; Ceiling, R-30; Partition walls, R-11 sound attenuating batting

· Ramps, landings, stairs and handrails:

· Design, construct, and provide each building with appropriate means of ingress/egress as dictated by IBC 2012.

· Provide a covered landing at each building specifically at each point of ingress/egress.

· Ramps, landings, stairs and handrails shall be OSHA and ADA compliant.

· Ramps, landings, stairs and handrails are to be made from aluminum or steel.

· All covered building landings shall be provided with gutters of the same material and construction as adjacent building roof system.

· Ramps and walkways are not required to be covered.

· There shall be a single point of connection for electrical, sanitary sewer system, both domestic and fire water (if necessary) supply for each module

· Contractor shall assume domestic water service is available at the installation site.

· Contractor shall be responsible for making temporary and final connections to all site utilities as well as providing metering of all utilities.

· Contractor is responsible for providing furniture and equipment in each modular unit, SEE Attachment K. The products referenced in Attachment K are "brand name or equal". To be considered for award, offers of “equal” products, including “equal” products of the brand name manufacturer, must meet the conditions of FAR 52.211-6 -- BRAND NAME OR EQUAL (AUG 1999).

Exteriors

· Fire rating: 1 hour

· Sheathing: 5/8’ gypsum board

· Siding: T1-11 grooved, manufacturers standard color to be selected by the Government

· Windows: 36”x53” vinyl, vertical slider with Level 4 Kane security screening

· Exterior Doors: 3’-0” x 80” steel w/welded steel frame and vision panel, panic hardware (standard crash bar with Night Latch (NL) function

· Siding, Fascia: Smartpanel 7/16” treated engineered textured wood siding with vertical grooves, 8” O.C.

· Roof: ¼” slope with 20p.s.f. snow load, transverse, truss IBC at 24” O.C. 5/8” CDX plywood with 45 mil black EPDM/Densdeck roof material

· No exposed rafter tails

· Combustible eaves, fascia and soffits shall be enclosed with non-combustible solid materials a minimum of ¾ in thick

· Exterior Finishes: Primed and painted with two coats of exterior latex paint, manufacturer’s standard colors to be selected by the Government

· Aluminum gutters – gutters, gutter covers (similar to “Gutter Helmet”), downspouts and underground drainage piping out to roadway or storm drain

· Skirting shall extend from the bottom of the units to the ground

· Any attic vents and vent openings in vertical exterior walls shall not exceed 144 inΛ2 and shall be covered with N/C corrosion-resistant mesh with openings<=0.25”

Interiors

· Finished ceiling height: 8 feet from finished floor to ceiling tile; the area above ceiling plane in each module shall allow for the installation of above ceiling work, i.e., cable trays, electrical, network, communications, etc. (SEE SPECIAL FEATURES – ORANGE MODULE ONLY BELOW)

· It is the government’s intent to have clear spaces in classrooms and open spaces. The Contractor shall propose a roof design which achieves the dictated loading requirements and is clear span providing unobstructed open areas.

· Door keying: Construction cores with final cores by the Government

· Interiors: 8’ ceiling height at sidewalls

· Floors: Shall be sized appropriately to meet “live load” requirements under “General Features” section above.

· Partition walls: 2”x4”, 5/8” vinyl coated gypsum, manufacturer’s standard colors to be selected by the Government

· Interior doors: 3’0”x80” solid core Oak veneer with steel frame

· Ceiling: T-grid 2’x4’ moisture resistant acoustical tile

· The Contractor shall furnish and install rough-ins above ceiling prior to communications being stalled by the Government; communications will not be installed by the Government until the modules have been accepted by the Government

· Outside wall corners shall receive corner guards 4’0” above finished floor

· Floors in wet areas, storage rooms, corridors, mechanical rooms, utility closets, server rooms, and telecommunications rooms shall be resilient vinyl composition tile, manufacturer’s standard colors to be selected by the Government

· Carpet shall be 26 oz. or greater anti-static, high-traffic commercial grade installed in classrooms, seminar rooms, offices, conference rooms, mothers/nursing room, and teaming rooms, manufacturer’s standard colors to be selected by the Government

· A minimum 4” cove base must be included in carpeted and tiled areas

· Restrooms shall be furnished with toilet paper holders, paper towel dispenser or electric hand dryers, liquid soap dispenser for each sink, 18”X24” mirrors over each sink, and stainless steel handicap bars

· Commercial grade (neutral color) mini blinds for all windows

· Restroom urinal screens and modesty panels shall be solid high density polyethylene or equal

· Each module (Green, Red, Orange, and Blue) must contain one security man trap at the main external entrance/exit

· This security man trap must have a ½ inch conduit next to the interior door of the mantrap to allow for the installation of an electronic entrance control system by the user and the interior mantrap door must have an lock meeting Federal Specification FF-L-2740A

· The walls of the mantrap must be STC-45 rated with a complete wall floor to ceiling

Mechanical and Plumbing

· HVAC systems shall be manufacturer’s standard and sized to adequately heat and cool each module, to include computer classrooms, server room and communications rooms/closets, based on the building layout installed and anticipated heating/cooling loads once computers are installed by the Government in classrooms and offices.

· Desired temperature range is 65F and 90F

· Dehumidifiers are not required with HVAC units

· Training shall be provided to the Government in the operation and maintenance of all HVAC systems

· Heat trace all exposed piping

· Plumbing fixtures:

· Water heater: 120 gallon, fast recovery

· Water closet: floor mounted with flush valve

· HC water closet: Handicap floor mounted with flush valve

· Urinals: Standard

· Mop sink: Fiberglass with legs and hot/cold water faucet

· Lavatory: Wall hung with insulation kit

· Supply water lines: copper

· Waste piping: PVC

Fire Suppression and Fire Alarm Systems

· Design, install, and test a fire suppression system (sprinklers), if required, that complies with NFPA 13, Standard for the Installation of Sprinkler Systems and is stamped by a licensed Professional Engineer in the State of Alabama

· Training shall be provided to the government in the operation and maintenance of the fire suppression system

· Provide conditioned space for the sprinkler riser to include the above ground portion of the sprinkler supply piping coming into the trailer

· Design, install, and test a central Class A fire alarm system with radio transmitter that complies with NFPA 72, National Fire Alarm Code and is stamped by a licensed Professional Engineer in the State of Alabama

· The fire alarm system shall be 100% compatible with Redstone Arsenal Fire Marshall/Fire Department requirements

· The fire alarm system installation company shall have a local maintenance branch located within a three-hour response window to the complex site

· Training shall be provided to the Government in the operation and maintenance of the fire alarm system

· Contractor shall select a fire alarm system that must be capable of communicating with and providing notification to Redstone Arsenal Fire Alarm communication system, Monaco brand.

· Contractor shall assume one fire alarm communication device per module

· Fire alarm notification systems shall be sized to allow for future expansion consistent with the notional site plan

• The Contractor shall make all necessary internal connections for fire alarm, HVAC, electrical, and sprinkler (if installed) systems.

Electrical

· 3 phase, 12,470 volt distribution circuit runs along Mauler Road; Taylor Electric is the approved base contractor to install new services; there is no charge for new service connections

· All electrical work must meet NEC 2008 edition

· Provide electrical panels and breakers details for Government review and approval

· Conductors shall be copper only

· Grounding shall be counterpoise 5 ohms to ground maximum

· Provide one (1) each incandescent light with photo sensor next to each entrance

· The Contractor shall install GFCI receptacles at each electrical power panel, outside exterior doors, in kitchen area, in restrooms, and in custodial room

· Power for office cubicles must be provided in the form of coiled cabling (Minimum of 10 ft) above the ceiling tile ready for installation into power drop down poles (four circuits to each)

· Coordinate with the Government to obtain the final furniture/ modular workstations drawing

· Use Minimum No. 12 AWG for branch circuit wiring

· All exterior risers to panels shall be rigid conduit with rigid 90-degree elbows and weather tight connections

· All switches and receptacles shall be 20 amp rated

· Provide a minimum of 100 amp Electrical Panels for each of the modular units

· Electrical panels shall be compatible with, and support mechanical systems

· Provide pull strings with permanently printed measurements in one-foot increments and minimum 1200 lb average breaking strength in any empty roughed-in system conduits

· Provide power drops in the ceiling at the center of each conference room for Audio/Visual (AV) Equipment

· Provide a 2” empty conduit with pull string from the AV drop location to above the workstation. Coordinate locations and installation with the Government

· Contractor shall provide provisions (floor, wall and ceiling boxes) for A/V, IT, security, and telecommunications equipment. Cabling and equipment will be provided by the Government. Floor boxes shall be coordinated by the Contractor with Government provided furniture layout.

Interior Lighting

· General classroom and offices: design for 50 foot candles maintained

· Hallways and lavatories: design for 30 foot candles maintained

· Utility closets: design for 30 foot candles maintained

· Lighting fixtures: 2’x4’, 2 tube, T8 EB with acrylic lens (Lithonia model #2SPG-B-32-A19-GEB 10IS or an approved equal)

· Occupancy Sensing Light Switches for all rooms

· Wall-box dimming controls for all classrooms, conference rooms, and Mother’s Nursing Room

· Emergency lights wall mounted with battery back-up

· Exit signs LED with battery backup

Permits and Fees

· Contractor shall obtain a digging permit prior to beginning construction and verify location of existing utilities. RSA Point of Contact is Mr. Jimmy Fuller, Wolf Creek Management Services, (256) 876-2758

· A Construction General Permit must be obtained for work from RSA.

· The operator of a construction activity must submit a complete copy of the Notice of Intent and a copy of the Construction Best Management Practices Plan (CBMPP) to the Garrison Environmental Office prior to breaking ground activities.

· Operators of construction activities must obtain coverage under the National Pollutant Discharge Elimination System (NPDES) General Permit. To obtain coverage under the general permit, the operator of a construction activity must file a completed Notice of Intent with the Alabama Department of Environmental Management. Submitting a Notice of Intent is an affirmation that a CBMPP has been prepared for the site and will be implemented prior to breaking ground activities.

· Points of Contact for questions regarding the NPDES construction general permitting process are Ms. Jennifer Passineau, (334) 394-4313, Alabama Department of Environmental Management (ADEM) or Ms. Colleen Forrer, (334) 271-7762, ADEM-Montgomery.

· The proposed site for the Interim Training Center is/is not a priority construction site.

· Coverage/work under the general permit will begin following Notice of Intent submittal if the site is not a priority construction site.

· If the site is a priority construction site, the operator must wait thirty (30) business days, after receipt of a completed Notice of Intent by the ADEM before construction begins.

· ADEM’s construction general permit requires the contractor to post and maintain facility identification.

· The Contractor is required to post a sign at easily accessible location(s) to identify the site.

· An example of a facility identification sign can be viewed or downloaded from the Alabama Department of Environmental Management Construction Permit website.

· To apply for a NPDES construction general permit, the Contractor shall complete the following:

· Complete ADEM form CSW-CGP-NOI and signed by a Qualified Credentialed Professional (QCP). The permit form can be filed electronically at https://app.adem.alabama.gov/eNOI

· Provide a topographic map for the designated site, including CBMPP and other attachments, if required

· Provide $1.155.00 for an application fee

· Mail to: ADEM Water Division, 1400 Coliseum Boulevard, Montgomery, AL, 36110-2059 or P.O. Box 301463, Montgomery, AL, 36130-1463

· Forms may be faxed to the ADEM Montgomery office at (334) 394-4326

· The permitting forms can be viewed or downloaded at:

· http://adem.alabama.gov/programs/water/constructionstormwater.cnt

· The construction storm water Fee schedule D can be viewed at:

· http://adem.state.al.us/programs/watrer/waterforms/FeeScheduleD.pdf

· A copy of the Construction General Permit must be submitted by the Contractor to the Garrison Environmental Office when received, as follows: US Army Garrison, Environmental Management Division, (IMRE-PWE-I, Ramzi Makkouk), Building 4488 Martin Road.

· Contractor should not assume any fees for connecting to RSA domestic water or sewer system.

· RSA will provide main water and main sewer final connection/tie-in at no charge.

Site Utilities and Metering

· The contractor is responsible for providing temporary and final utility metering.

· The Contractor, at its expense, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purposes of determining charges.

· Actual utility usage costs shall be paid by the Government.

· Before final acceptance of the work by the Government, the Contractor shall remove all temporary utility connections, distribution lines, meters, and associated paraphernalia.

· When connecting to existing franchised or Government controlled utilities for necessary services, the Contractor shall comply with service company recommendations, or Government requirements, on materials and methods, or engage service companies to install services.

· The Contractor shall notify the Government 72 hours in advance of utility service planned interruptions, where necessary, to make connections to temporary services.

Communications/IT/A-V/Security

· Coordinate with the Government the location of all communications, IT, A-V, and security device cable tray, conduit and outlet requirements prior to fabrication

· Provide conduits from telecommunications/LAN closets for both secure and non-secure connectivity

· Provide electrical and cable outlet connections for a minimum of three (3) wall mount flat-screen TVs on side walls in all classrooms; one each at front of classroom and one each on classroom side walls

· Provide electrical and cable outlet connections for a minimum of one (1) wall mount flat-screen TVs on side walls in all teaming rooms, seminar rooms, manager and staff offices, hallways, and conference rooms

· Provide electrical and cable outlets for ceiling mounted video projector in all classrooms, seminar rooms, and conference rooms

· Provide electrical outlets for ceiling mounted, motor-driven projector screen in all classrooms, seminar rooms, and conference rooms

· Provide a minimum of one (1) electrical outlets every 6’ on all walls or as necessary to allow for 30% student utilization in all classrooms, seminar rooms, and teaming rooms

· Install cable trays from each utility/communications/LAN closet to each room

· Cable trays shall be ladder type, galvanized steel, 4 inches deep, 4 rung spacing, 18 inches wide.

· Contractor shall assume for purposes of this RFQ that cable tray routing should be to the center of each room that requires A/V, IT, and communications.

· Provide a minimum of one (1) telephone outlet in each classroom, seminar room, teaming room, conference room, manager office, staff cubicle, vestibule/man trap, and hoteling station in the Administration Building

· Prepare and install all the exterior doors as described below to meet the badge reader function/ equipment installation by others:

· Install a standard crash bar with Night Latch (NL) function (cannot be left unlocked) for the door hardware.

· Rough in the conduit, and install a single gang box on the outside of the building about 10” from the door frame and a ¾” conduit from this box to a flush mounted 10x10 enclosure located on the inside next to the door, a ½” conduit to the door frame to the strike area, and a 1” conduit back to the phone closet

· If additional information is needed, contact the Contracting Officer

Special Features – Orange Module only

The following special construction features apply to the Orange Module only as specified above under Section 1.4.1 – Module Design Features:

Perimeter wall construction

Perimeters include all walls that outline the Orange module confines, floors, ceilings, doors, windows and penetrations by ductwork, pipes, and conduit. Perimeter walls –

· Shall be constructed of three (3) layers of ⅝ inch-thick wallboard, one layer on the exterior of the Orange module and two on the interior of the Orange module

· A layer of ¾” 9-10 gauge expanded metal mesh shall be secured to the inside of the studs

· A layer of TVM Ultra NT radiant barrier r-foil, part # 1800 48 125s www.tvim.com) (or foil backed drywall) shall be installed on the first layer of interior wallboard and tack stapled in place, with an overlap 2-3” on seams

· A layer of plywood may be substituted for the first layer of wallboard (against the studs)

· The seams of interior wallboard panels must be staggered

· Provide a minimum of 3 ½” sound batting between studs and meet at a minimum Sound Transmission Class (STC) 45 or better.

· Shall be constructed using either metal studs that are 3 ⅝ inch-wide, 16 gauge metal, mounted a maximum of 16 inches on center.

· Continuous runners (same gauge as studs) for securing studs shall be anchored to the true floor and true ceiling structures.

· Walls, true ceilings, and true floor must be permanently attached to each other (slab to slab)

· Top and bottom of walls where drywall meets the slab must be sealed with caulk sealant

· Openings where pipes or wires run through must be filled with self-hardening sealant

Perimeter Penetrations Criteria –

· All penetrations of perimeter walls should be minimized

· All metallic penetrations through perimeter walls must be provided with dielectric unions or a dissimilar metal fitting/union adjacent to the pipe penetration through the perimeter wall (inside wall), or grounded using a no. 4 wire (0.2043-diameter copper wire) to the building ground.

· Utilities shall enter the Orange module at a single point

· All utility (power, communications, network, etc.) distribution on the interior of perimeter and interior walls shall be surface mounted, contained in a raceway

· All vents and ducts shall be protected to meet the acoustic requirements of the Orange module (minimum of STC 45)

· Walls surrounding duct penetrations shall be finished to eliminate any opening between the duct and the wall

· All vents and ducts that penetrate the exterior of the Orange module and exceed 96 square inches shall be protected with permanently affixed man bars or grills

· If one dimension of the penetration measures less than six inches, man bars or grills are not required

· If bars or grill are required, an access port shall be installed inside the perimeter of the Orange module to allow visual inspection of the man bars or grill

· Man bars must be ½” steel welded, 6” horizontally and vertically

· Grills must be ¾”-mesh 9 gauge, case-hardened expanded metal

Interior wall construction –

• Wall construction is the same as perimeter walls without the requirement for mesh

Doors

Doors may be either wood or metal, as follows:

· Wood doors shall be 1 ¾” solid wood core (wood stave)

· Metal doors shall be 16 gauge metal clad door with wood or sound material infill

· All doors shall have

· Hinges reinforced to 7 gauge

· Door closure reinforced to 12 gauge

· Lock area pre-drilled and/or reinforced to 10 gauge

· Sound gaskets and door sweeps

· A Sentrol 2707 high security triple-biased balanced magnetic switch

· Protected hinge pins if hinges are exposed

· Pneumatic door closers installed on the inside

· Comply with applicable building, safety, and accessibility codes and requirements

• Primary entrance door –

· Only one primary entrance door is permitted

· Be equipped with a GSA-approved pedestrian door deadbolt meeting Federal Specification FF-L-2890

· Be cored and plugged for a GSA-approved combination lock meeting Federal Specification FF-L-2740A

· Be cored and for an external high security keyway (Medeco)

· Fire egress door –

· Shall open to the outside

· Must have a Von-Duprin 3-point crash bar installed on the interior

· No external hardware on the exterior Windows

The Orange module shall have no windows

Ceiling tiles

Ceiling tiles in the Orange module shall have foil-backing

Inspections and Installation Accreditation

The Government reserves the right to monitor and inspect the construction of the Orange module for compliance with special features and to permit accreditation.

The contractor is responsible for providing a turnkey facility, whereupon installation, is capable of being fully accredited. In doing so, the contractor shall engage the services of an independent testing and inspection firm, approved by the Contracting Officer, which complies with the specific requirements described above for Orange Module fabrication. This independent testing and inspection firm shall be certified and specialize in the types of inspections and tests to be performed. Further, the approved independent testing and inspection firm is required to perform the required testing and retesting where results of the required inspections, tests or similar services provided by the Contractor indicate installed or fabricated work is not in compliance with the requirements. The independent testing and inspection firm shall submit, simultaneously to the Government, copies of certified testing and inspection reports of each test and inspection immediately following the completion of the test or inspection.

1.4.3 MODULE ROOM REQUIREMENTS

The following table summarizes room size requirements for the respective modules:

**(SEE Attachment K - Furniture and Equipment List)**

Green Module (Attachment D)
Red Module (Attachment E)
Orange Module

(Attachment F)

Administrative Module #1 (Attachment G)
Administrative Module #2 (Attachment H)
Traditional classrooms
Two (2) 50-seat
None
None
None
None
Computer-based traditional classrooms
None
Two (2) 50-seat
Two (2) 50-seat
None
None
Seminar Rooms
One (1) 25 seat
One (1) 25 seat
One (1) 25 seat
None
None
Teaming/Collaboration
Four (4) 10-seat
Four (4) 10-seat
Four (4) 10-seat
None
None
Custodial closet (mop sink, water heater)
Approximately 70 sq. ft.
Approximately 70 sq. ft.
Approximately 70 sq. ft.
Approximately 70 sq. ft.
Approximately 70 sq. ft.
Fire service closet
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Telecommunications closet
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Electrical closet
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
LAN closet
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Secure LAN closet
n/a
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
SWE closet
n/a
n/a
Approximately 80 sq. ft.
n/a
n/a
Key Pad room
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Approximately 80 sq. ft.
Server room
n/a
n/a
Approximately 100 sq. ft.
n/a
n/a
Key Pad
For all modules, prepare and install all interior and exterior doors as described below to meet the badge reader function/equipment installation by others: The Contractor is to install a standard crash bar with Night Latch (NL) function (cannot be left unlocked) for the door hardware. The Contractor will rough in the conduit and pull string, and install a sing gang box on the outside of the building (exterior doors)/outside of door (interior doors) about 10” from the door frame and a ¾” conduit from this box to a flush mounted 10x10” enclosure located on the inside next to the door, a ½” conduit to the door frame to the strike area, and a 1” conduit back to the phone closet.
Green Module (Attachment D)
Red Module (Attachment E)
Orange Module

(Attachment F)

Administrative Module #1 (Attachment G)
Administrative Module #2 (Attachment H)
Vestibule/Man trap at Main Entrance
Approximately 100 sq. ft.
Approximately 100 sq. ft.
Approximately 100 sq. ft.
Approximately 100 sq. ft.
Approximately 100 sq. ft.
Restrooms
All modules shall provide for ADA compliant restroom facilities, designed in accordance with the applicable portions of the latest edition of each code, standard.
Manager’s office
n/a
n/a
n/a
One (1) office, approximately 120 sq. ft.
Two (2) offices, approximately ~120 sq. ft. each
Staff offices
n/a
n/a
n/a
(9) 56 sq. ft. cubicles
(9) 56 sq. ft. cubicles
Hoteling stations
Four (4) stations
Four (4) stations
Four (4) stations
Six (6) stations in staff room
Six (6) stations in staff room
Nurse’s office
n/a
n/a
n/a
One (1) office, approximately 100 sq. ft.
n/a
Nurse’s Day Sick Bay
n/a
n/a
n/a
One (1) room, approximately 100 sq. ft.
n/a
Mother’s Nursing Room
None
None
None
One (1) office, approximately 50 sq. ft.
n/a
Water Fountains w/purified bottle water capability
One location within module
One location within module
One location within module
One location within module
One location within module
Estimated capacity for HVAC estimates
130 total (125 students, 5 others)
130 total (125 students, 5 others)
130 total (125 students, 5 others)
30
30
Maximum capacity for HVAC estimates
105 total (100 students, 5 others)
105 total (100 students, 5 others)
105 total (100 students, 5 others)
30
30
Minimum capacity for HVAC estimates
80 total (75 students, 5 other)
80 total (75 students, 5 other)
80 total (75 students, 5 other)
20
20

Classroom Sizes and Standards

**(SEE Attachment K - Furniture and Equipment List)**

Traditional – Moveable furniture, flexible; used for lecture, seminar, group work; instructor AV podium at front of classroom

· 25 or 50 non-fixed seats, depending on room size

· Flat floor

· Carpeted

· Approximately 22 sq. ft. per student

· Approximately 10 sq. ft. for instructor’s station/AV podium

· 5 students per table; two sets of 5 rows with center aisle

Computer-based – Two floor standing CPUs, minimum 24” monitor, keyboard, and mouse, and switch box at each student workstation; instructor AV podium at front of classroom
· 50 non-fixed seats, depending on room size

· Flat floor

· Carpeted

· Approximately 30 sq. ft. per student

· Approximately 10 sq. ft. for instructor’s station/AV podium

· 5 students per table; two sets of 5 rows with center aisle

· Floor mounted electrical duplex outlets per student and instructor workstation (total of 4 outlets per station)

· Floor mounted LAN drops (2 for Red module, 3 for Orange module) per student and instructor workstation

Seminar – Moveable furniture; used for interactive seminar, group work; face-to-face seating arrangement
· 25 non-fixed seats and table(s), depending on room size

· Flat floor

· Carpeted

· Approximately 22 - 25 sq. ft. per student

· 10 sq. ft. for instructor’s station/AV podium

Teaming/Collaboration – Moveable furniture; used for small group work, breakout sessions, informal collaboration
· 8 to 10 non-fixed seats and table(s), depending on room size

· Flat floor

· Carpeted

· Approximately 22 - 25 sq. ft. per student

Hoteling Stations – computer stations to allow email checks by students
· Approximately 2’x4’ per station

· Flat floor

· Carpeted

· Electrical outlet per station

· Conduits from telecommunications/LAN closets to provide secure and non-secure connectivity

Administrative Module Sizes and Standards

**(SEE Attachment K - Furniture and Equipment List)**

Manager Offices
· Flat floors required

· Carpeted

· Minimum of 120 sq. ft.; maximum of 150 sq. ft.

Staff Offices
· Flat floors required

· Carpeted

· Electrical connectivity for 9’x6’ cubicle workstation

· Electrical outlet for copying machine

Mother’s Nursing Room
· Approximately 50 sq. ft.

· Flat floors required

· Tile

· Electrical connectivity for small office/dorm-room refrigerator

· Dimmable lights

Nurse’s Office
· Approximately 100 sq. ft.

· Flat floors required

· Carpeted

· Doorway to Sick Bay room

Nurse’s Day Sick Bay
· Approximately 100 sq. ft.

· Flat floors required

· Tile

· Dimmable lights

· Doorway to Nurse’s office

· Electrical connectivity for small office/dorm-room refrigerator

Secure Video Conference Room
· Flat floor

· Carpeted

· Conduits from telecommunications/LAN closets to provide secure and non-secure connectivity

· Electrical and telephone floor outlets for conference table connectivity

Conference Room
· Flat floor

· Carpeted

· Electrical and telephone floor outlets for conference table connectivity

Hoteling
· Approximately 2’x4’ per station

· Electrical outlet per station

· Conduits from telecommunications/LAN closets to provide secure and non-secure connectivity

Breakroom/Kitchenette
· Flat floor required

· Vinyl tile

· Electrical outlets for (1) microwave oven (~1100 watts), (1) upright refrigerator/freezer

· Sink area with hot/cold water, counter space, cabinet storage

1.5 REQUIRED SUBMITTALS

The Contractor shall provide to the Government, prior to the start of work, four (4) sets of cut sheets that show the characteristics of a product, and/or explains its operation plans, for the items listed below. Review of each item will be made within fourteen (14) working days of receipt of the submittal. Drawings and calculations shall be stamped by a licensed Architect and/or Professional Engineer in the state of Alabama.

a. Copies of all permits

b. Contractor safety and health plans

c. Work schedule

d. Drawings with enough information to adequately illustrate what is being provided and compliance:

i. Floor plans

ii. Elevations

iii. Sections and details

e. Foundation support system – Anchoring plan for modules

f. Building material submittals including carpet, roofing system, windows, paint, etc.

g. Sprinkler system shop drawings, if sprinkler system proposed

h. Fire alarm shop drawings

i. HVAC shop drawings

j. Electrical panel schedules

k. Shop drawings of ramps, decks, stairs and handrails

l. Shop drawings of signs, posts and concrete foundations

m. Operation and Maintenance Manuals

n. Provide color samples for all interior and exterior finishes for approval

o. Provide furniture descriptions and pictures for approval (SEE Attachment K - Furniture and Equipment List)

p. Interior and exterior door hardware schedule

1.6 GENERAL CLAUSES

Quantities: The Contractor shall be responsible for all the requirements of this project. The Contractor shall accomplish a Site Survey to verify existing site conditions and to obtain all required site measurements. The contractor is responsible for verifying building pads have minimum soil bearing capacity of 2,000 pounds per square foot (psf).

Redstone Arsenal Regulations: The Contractor shall follow all applicable Redstone Arsenal regulations and directives that pertain to safety, security, fire regulations, traffic and personnel clearances to accomplish the work.

Safety: The Contractor shall abide by all OSHA and Redstone Arsenal safety requirements while on Redstone Arsenal property, and shall review all applicable safety regulations before beginning work. The contractor shall provide, as a minimum, any signs, barriers, and or caution tape as a safety precaution around the work site.

Permits: The Contractor shall obtain all required permits prior to starting project work and shall provide a copy of all permits to the Government to include; Environmental, NESHAPS, digging, burn, etc.

Work hours: The Contractor shall accomplish the project work during normal business duty days Monday through Thursday from 07:00 to 17:30 hours unless other arrangements have been made with the Government. Specific working hours will be discussed with Redstone Arsenal and the Government during the project site visit.

Performance: See Section below entitled “Period of Performance”.

Workmanship, Quality, Method, and Processes: The Contractor shall accomplish project work in accordance with the minimum requirements outlined in this statement of work, and Federal and Local Building Codes.

Change orders: Any changes to this Statement of Work must be requested in writing and made through the FBI Contracting Officer listed below.