FAKZ182355 Type B-3 Drawings SIGNED.pdf
PDF 8 MB Posted
- Attached to
- Allied Support Sun Shelters
- Solicitation number
- W50S6N-21-B-0006
About this file
This solicitation package includes drawings and specifications for an Allied Support Sun Shelter project at Dannelly Field in Montgomery, Alabama. The project involves extending existing open-air covered shelters to accommodate additional F-35 aircraft parking. It will also include painting taxi lines and electrical and plumbing work. The procurement is a firm fixed-price construction contract with a magnitude between $500,000 and $1,000,000 issued by the U.S. Army Alabama Army National Guard. The North American Industry Classification System code is 236210. The solicitation is 100% set aside for small businesses with a size standard of $39.5 million. The solicitation number is W50S6N-21-B-0006 and responses are due based on the date listed on the cover sheet of the provided drawings and specifications package dated June 2021.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T1.0
TITLE SHEET &
DRAWING INDEX
F-
: A
LL
IE
D
S U
PP
O
RT
A
IR
CR
A
FT
S H
E
LT
E R
7T
H F
IG
H
TE
R
W
IN
G
M O
N
TG
O M
E
RY
, A L
17135.00/FAKZ182355
JUNE 2021
DCD
DCD
DRAWING INDEX
SHEET NO. SHEET NAME
03 ELECTRICAL
E0.1 ELECTRICAL LEGEND & NOTES
E1.1 SITE PLAN -ELECTRICAL
E2.1 PANELBOARD SCHEDULES DETAILS & NOTES
E3.1 ELECTRICAL SINGLE LINE DIAGRAMS & NOTES
E4.1 GROUNDING DETAILS & NOTES
04 Phasing
P1.0 PHASING PLAN
P1.1 LIGHTED BARRIER REQUIREMENTS
DRAWING INDEX
SHEET NO. SHEET NAME
00 TITLE
T1.0 TITLE SHEET & DRAWING INDEX
01 CIVIL
C1.1 SITE DEMOLITION PLAN
C2.1 SITE PLAN
C3.1 SITE DETAILS
C4.1 SITE DETAILS
02 ARCHITECTURAL
A0.1 SITE PLAN
A0.2 SHELTER ROOF PLAN, REFLECTED CEILING PLAN, AND SECTION
A0.3 DETAILS
A0.4 TYPICAL SHELTER PAINTED MARKINGS DIAGRAM
A0.5 DETAILS
F-35: ALLIED SUPPORT AIRCRAFT SHELTER
MONTGOMERY, AL
FAKZ182355
187TH FIGHTER WING, DANNELLY FIELD, AL ANG
Approvals:
Title: Signature: Date:
Base Commander
Base Civil Engineer
Base Project Engineer
Bio Environmental Eng.
Safety
Security Police
Base Communications
Fire Chief
ABI #3
Schedule of Additive Bid Items:
NA
ABI #2 NA
ABI #1 NA
ABI #4 NA
ABI #5 NA
Architect:
Design Team:
Consulting Engineers:
Electrical:
Structural:
Civil:
No. Revision Date
LEGEND:
PRIMARY/THROUGH TAXI LANE
SECONDARY/INTERIOR PERIPHERAL TAXI LANE
EDGE OF APRON PAVEMENT
DENOTES EXTENTS OF PAVEMENT CLEANING
C26
SHELTER
NOTES:
1. REMOVE EXISTING APRON PAVING IN THIS
LOCATION AS REQUIRED TO INTSTALL
DIRECTIONAL BORE RECEIVING PIT AS REQUIRED
TO INSTALL NEW ELECTRICAL AND
COMMUNICATIONS SERVICE. INSTALL NEW
CONCRETE PAVING AFTER INSTALLATION OF NEW
SERVICES. REFER TO CIVIL AND ELECTRICAL
DRAWINGS.
2. STRIPING SHOWN ON THIS DRAWING IS FOR
THE GOVERNMENT'S USE ONLY. REFER TO CIVIL
DRAWINGS AND SHEET A0.4 FOR DETAILED
REQUIREMENTS FOR NEW STRIPING.
3. REMOVE EXISTING APRON PAVING AS
REQUIRED TO INSTALL NEW FOOTINGS FOR
SHELTER FOUNDATION. REFER TO DETAIL
3/A0.3. TYPICAL AT ALL NEW SHELTER FOOTING
LOCATIONS.
4. REFER TO SHEET A0.4. REMOVE EXISTING
APRON PAVING AS REQUIRED TO INSTALL NEW
GROUNDING/MOORING POINTS.
EXISTING SHELTERS TO REMAIN
EX
IS
TI
N G
S H
EL
TE
RS
T O
R
EM
AI
N
EX
IS
TI
N G
S H
EL
TE
R S
TO
R
EM
A
IN
SEE NOTE 1
A0.2
A0.2
SEE NOTE 3
SEE NOTE 4
SEE NOTE 2
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A0.1
SITE PLAN
F-
: A
LL
IE
D
S U
PP
O
RT
A
IR
CR
A
FT
S H
E
LT
E R
7T
H F
IG
H
TE
R
W
IN
G
M O
N
TG
O M
E
RY
, A L
17135.00/FAKZ182355
JUNE 2021
DCD
DCD
1" = 40'-0"A0.1
1 SHELTER SITE PLAN
70' - 0"
5' - 0"
M A
TC
H E
XI
S
TI
N G
M A
TC
H E
XI
S
TI
N G
LIGHT FIXTURE
(SEE ELECTRICAL)
EX
IS
TI
N G
S H
EL
TE
R T
O R
EM
A
IN
PAINT SHELTER COORDINATES ON
INTERIOR VERTICAL FACE OF STEEL
STRUCTURE. EXACT COORDINATES
AND LOCATION OF MARKING TO BE AS
DIRECTED ON SITE
PAINT "C" ON EXTERIOR VERTICAL
FACE OF STEEL STRUCTURE
12 12 3/8" 3/8"
EXISTING SHELTER
TO REMAIN
SLOPE SLOPE
3/8" 12"
EXISTING SUN SHELTERS
5' - 0"
3/8" 12"
A0.3
A0.3
M
IN
C
LE
A R
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A0.2
SHELTER ROOF
PLAN, REFLECTED
CEILING PLAN,
AND SECTION
F-
: A
LL
IE
D
S U
PP
O
RT
A
IR
CR
A
FT
S H
E
LT
E R
7T
H F
IG
H
TE
R
W
IN
G
M O
N
TG
O M
E
RY
, A L
17135.00/FAKZ182355
JUNE 2021
DCD
DCD
1/8" = 1'-0"A0.2
2 REFLECTED CEILING PLAN
1/8" = 1'-0"A0.2
1 ROOF PLAN
1/8" = 1'-0"A0.2
3 SHELTER SECTION
DESIGN PARAMETERS:
• INTERNATIONAL BUILDING CODE 2015
• RISK CATEGORY IV
• WIND DESIGN:
• ULTIMATE WIND SPEED - 122 MPH
• LOADING CRITERIA
• 20 PSF LIVE LOAD
• 5 PSF SNOW LOAD
• SUPERIMPOSED DEAD LOAD ALLOWANCES
• ROOFING AND INSULATION - 6PSF
• SEISMIC DESIGN
• SITE SOIL C
• SEISMIC CATEGORY D
• SDS = 0.116
• SD1 = 0.076
STEEL FRAME (BEYOND)
PAINT
STEEL 'Z" PURLINS
PAINT
EAVE TRIM
METAL FLASHING
AND CLEAT
EAVE STRUT
METAL ROOF PANEL
STEEL FRAME (BEYOND)
PAINT
STEEL "Z" PURLINS
PAINT
RIDGE VENT
RIDGE VENT COVER
2' - 3" 2' - 3"
0' - 9" 0' - 9"
AS REQ. TO INSTALL NEW FOOTING
+/- 3' - 6"
SEE CIVIL DOWEL AND
JOINT SEAL DETAIL
3/4" PEJ WITH JOINT SEALANT (ALL SIDES)
NEW 4' - 6" x 4' - 6" x 12"
CONCRETE FOOTING WITH (5) #5
BARS EACH WAY TOP & BOTTOM
ALDOT SECTION 825, TYPE A
CRUSHED AGGREGATE BASE 100%
COMPACTION, ASTM D698
18" x 18" PIER WITH (8) #8 HOOK BARS
AND #4 STIRRUPS AT 6" O.C. WITH TWO
IN THE TOP 6" OF PIER
(4) 1" DIAMETER ANCHOR BOLTS WITH 24"
EMBEDMENT
NEW AIRCRAFT APRON PAVING - SEE CIVIL
AS REQ. TO INSTALL NEW FOOTING
+/- 3' - 6"
SAW CUT EXISTING CONCRETE APRON SAW CUT EXISTING CONCRETE APRON
COORDINATE EXACT EXTENTS OF NEW CONCRETE WITH BUILDING LAYOUT AND EXISTING APRON JOINTS - REFER TO A0.3
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A0.3
DETAILS
F-
: A
LL
IE
D
S U
PP
O
RT
A
IR
CR
A
FT
S H
E
LT
E R
7T
H F
IG
H
TE
R
W
IN
G
M O
N
TG
O M
E
RY
, A L
17135.00/FAKZ182355
JUNE 2021
DCD
DCD
1 1/2" = 1'-0"A0.3
1 EAVE DETAIL
3" = 1'-0"A0.3
2 SHELTER SECTION1 - Callout 2
1" = 1'-0"A0.3
3 Column Footing Detail
70' - 0"
6' - 0"
M A
TC
H E
XI
S
TI
N G
EX
IS
TI
N G
S H
EL
TE
R T
O R
EM
A
IN
35' - 0" 35' - 0"
10' - 0" 17' - 6" 17' - 6" 10' - 0"
TAXI LINE
0' - 6"
0' - 6"
3' - 0"
EDGE OF SHELTER ROOF ABOVE
10' WINGTIP CLEARANCE
INDICATION LINE (6" WIDE,
RETRO-REFLECIVE YELLOW)
SUPPORT EQUIPMENT MARKING -
SEE OVERALL PLAN FOR
LOCATIONS (6" WIDE, YELLOW,
RETRO-REFLECTIVE)
CONTINUE MARKING TO INTERSECT WITH
ADJACENT SHELTER 10' WINGTIP
CLEARANCE INDICATION LINE WHERE
MARKINGS ARE REQUIRED
10' WINGTIP CLEARANCE
INDICATION LINE
EXISTING APRON JOINT AND
JOINT SEAL TO REMAIN (TYPICAL)
GROUNDING/MOORING POINT -
SEE DETAIL ON A0.5
NOTE:
1) ALL EXISTING APRON TIE DOWN LOCATIONS
WILL REMAIN. PROVIDE NEW
MOORING/GROUNDING POINTS
INDICATED ON THIS SHEET AT NEW
AIRCRAFT SHELTER ONLY.
2) CONTRACTOR SHALL PROVIDE TEMPORARY
MARKING FOR APPROVAL BY
GOVERNEMNT PRIOR TO INSTALLATION
OF PERMANENT STRIPING.
F-35
F-16
STENCIL "F-16" IN WHITE LETTERING
WITHIN YELLOW STOP BAR
STENCIL "F-35" IN WHITE
LETTERING WITHIN YELLOW
STOP BAR
ENGINE INLET
DANGER AREA
E N
G
IN
E
IN
LE
T
D A
N G
E R A
RE
A E
N G
IN
E
IN
LE
T D
A N
G E
R A
RE
A
4" HIGH RED RETRO-REFLECTIVE
LETTERING, WHITE RETRO-
REFLECTIVE BACKGROUND, 2"
WIDE RED RETRO-REFLECTIVE
BOUNDARY (TYPICAL)
R 25' - 0"
6" RETRO-REFLECTIVE RED STRIPING
6" WIDE, RETRO-REFLECIVE
YELLOW LEAD-IN/TAXIWAY LINE
10' WINGTIP CLEARANCE
INDICATION LINE (6" WIDE,
RETRO-REFLECIVE YELLOW)
OUTLINE OF NEW FOOTING BELOW
NEW PAVING - SEE CIVIL
REROUTE PAVEMENT DRAIN AT THESE NEW FOUNDATIONS - SEE CIVIL
A0.3
5' - 0" 5' - 0"
5' - 0" 5' - 0"
0' - 6"
ENGINE INLET TY
P
4' - 6"
DANGER AREA
WHITE RETRO-REFLECTIVE
BACKGROUND
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A0.4
TYPICAL SHELTER
PAINTED
MARKINGS
DIAGRAM
F-
: A
LL
IE
D
S U
PP
O
RT
A
IR
CR
A
FT
S H
E
LT
E R
7T
H F
IG
H
TE
R
W
IN
G
M O
N
TG
O M
E
RY
, A L
17135.00/FAKZ182355
JUNE 2021
DCD
DCD
1/4" = 1'-0"A0.4
1 SHELTER PAINTED TYPICAL MARKING DIAGRAM
1" = 1'-0"A0.4
2 ENGINE INLET AREA SIGN
TYP.
8"
TYP.
8"
1" DIAMETER DOWELS#5 REBAR - 4 EACH WAY
CENTERED IN CONCRETE DEPTH
M
IN
MIN.
3"
42"
EXISTING APRON
TO REMAIN
NON-DEFORMED #7
BAR, AISI 8620H
EXISTING APRON
TO REMAIN
PLAN
SECTION
R=3"
NEW SILICONE JOINT SEAL. REFER TO
CIVIL DRAWINGS.
5"
/4
8" 8" 8" 8"
1" DIAMETER DOWEL
#5 REBAR, 4 EACH WAY CENTERED IN
CONCRETE DEPTH
NON-DEFORMED #7 BAR, AISI 8620H
3/4" DIAMETER x 10'-0" LONG, COPPER CLAD, GROUND ROD - DRIVE TO 6 INCHES BELOW
APRON PAVING
THERMAL WELD
THERMAL WELD
#4/0 BARE COPPER GROUNDING CONDUCTOR -
THERMALLY WELDED TO REBAR AND GROUND ROD
NOTE: BOND ALL STATIC GROUND POINTS TOGETHER USING #4/0 BARE COPPER WIRE. BOND STATIC GROUND SYSTEM TO STRUCTURAL STEEL AND BOND STRUCTURAL STEEL TO GROUND BUS AT SERVICE POINT PANELL "MSS" WITH #4/0 COPPER
CONDUCTOR IN 1" CONDUIT. REFER TO E3.1 AND E4.1 FOR FURTHER REQUIREMENTS
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A0.5
DETAILS
F-
: A
LL
IE
D
S U
PP
O
RT
A
IR
CR
A
FT
S H
E
LT
E R
7T
H F
IG
H
TE
R
W
IN
G
M O
N
TG
O M
E
RY
, A L
17135.00/FAKZ182355
JUNE 2021
DCD
DCD
1 1/2" = 1'-0"A0.5
1 MOORING/GROUNDING POINT DETAIL
Project Title
Job Number
Date
Drawn By
Checked By
S o u th
C o u rt
S tr ee t
M o n tg o m er y, A
L
T el
W W
W .S
S L
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
F -3
A
L L
IE
D
S U
P P
O R
T
A
IR
C R
A F
T S
H E
L T
E R
T
H F
IG
H
T E
R W
IN
G
M O
N T
G O
M E
R Y
A
L
17135.00/FAKZ182355
JUNE 2021
JBG
JBG
No. Revision Date
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#18-337Tel: 334.285.1273
6-12-20
E0.1
ELECTRICAL
LEGEND &
NOTES
CEILING OUTLETS
ELECTRICAL LEGEND
WALL OUTLETS
WALL SWITCHES (UNLESS OTHERWISE NOTED, MOUNT 48" A.F.F.)
BRANCH CIRCUITING
PANELS AND POWER
MISCELLANEOUS EQUIPMENT
MISCELLANEOUS
GENERAL ELECTRICAL NOTES:
Project Title
Job Number
Date
Drawn By
Checked By
S o u th
C o u rt
S tr ee t
M o n tg o m er y, A
L
T el
W W
W .S
S L
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
F -3
A
L L
IE
D
S U
P P
O R
T
A
IR
C R
A F
T S
H E
L T
E R
T
H F
IG
H
T E
R W
IN
G
M O
N T
G O
M E
R Y
A
L
17135.00/FAKZ182355
JUNE 2021
JBG
JBG
No. Revision Date
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#18-337Tel: 334.285.1273
6-12-20
E1.1
SITE PLAN -
ELECTRICAL
EXISTING SHELTERS TO REMAIN
EX
IS
TI
N G
S H
EL
TE
RS
T O
R
EM
AI
N
SCALE: 1" = 40'-0"
4040' 0 80FT
GRAPHIC SCALE
SCALE: 1"=40'-0"
SITE PLAN - SUN SHELTER POWER1
E1.1
SITE LEGEND
UNDERGROUND UTILITY NOTES:
SHEET NOTES:
SCALE: 1"=40'-0"
PARTIAL SITE PLAN - GROUNDING & LIGHTNING PROTECTION3
E1.1
8'
1/8" = 1'-0
0 8 16 FT
GRAPHIC SCALE
N.T.S.
SUN SHELTER HAZARDOUS AREA DIAGARM2
E1.1
HAZARDOUS AREA CLASSIFICATIONS
Project Title
Job Number
Date
Drawn By
Checked By
S o u th
C o u rt
S tr ee t
M o n tg o m er y, A
L
T el
W W
W .S
S L
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
F -3
A
L L
IE
D
S U
P P
O R
T
A
IR
C R
A F
T S
H E
L T
E R
T
H F
IG
H
T E
R W
IN
G
M O
N T
G O
M E
R Y
A
L
17135.00/FAKZ182355
JUNE 2021
JBG
JBG
No. Revision Date
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#18-337Tel: 334.285.1273
6-12-20
E2.1
PANELBOARD
SCHEDULES,
DETAILS &
NOTES
PANELBOARD NOTES:
DETAIL - TYPICAL PANELBOARD NAMEPLATE
ARC FLASH WARNING LABELS
Project Title
Job Number
Date
Drawn By
Checked By
S o u th
C o u rt
S tr ee t
M o n tg o m er y, A
L
T el
W W
W .S
S L
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
F -3
A
L L
IE
D
S U
P P
O R
T
A
IR
C R
A F
T S
H E
L T
E R
T
H F
IG
H
T E
R W
IN
G
M O
N T
G O
M E
R Y
A
L
17135.00/FAKZ182355
JUNE 2021
JBG
JBG
No. Revision Date
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#18-337Tel: 334.285.1273
6-12-20
E3.1
ELECTRICAL
SINGLE LINE
DIAGRAM &
NOTES
SINGLE LINE DIAGRAM
DETAIL - SERVICE ENTRANCE FAULT CURRENT NAMEPLATE
SINGLE LINE DIAGRAM NOTES: KEYED NOTES:
DETAIL-TYPICAL INDOOR INSTALLATION OF DRY TYPE TRANSFORMERS
DETAIL - TYPICAL MOUNTING OF PANEL OR DISCONNECT
Project Title
Job Number
Date
Drawn By
Checked By
S o u th
C o u rt
S tr ee t
M o n tg o m er y, A
L
T el
W W
W .S
S L
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
F -3
A
L L
IE
D
S U
P P
O R
T
A
IR
C R
A F
T S
H E
L T
E R
T
H F
IG
H
T E
R W
IN
G
M O
N T
G O
M E
R Y
A
L
17135.00/FAKZ182355
JUNE 2021
JBG
JBG
No. Revision Date
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#18-337Tel: 334.285.1273
6-12-20
E4.1
GROUNDING
DETAILS &
NOTES
DETAIL - TYPICAL GROUND BUS INSTALLATION
DETAIL - SERVICE ENTRANCE GROUNDING INSTALLATION
NO SCALE
DETAIL - TYPICAL GROUND BUSHING INSTALLATION 1
E4.1
DETAIL NOTES
C26
SHELTER
ACCESS POINT A
ACCESS POINT B
PHASE II BOUNDARY
PHASE I BOUNDARY
PHASE III BOUNDARY
PHASE IV
BOUNDARY
CONTRACTOR STAGING/STORAGE AREA
ARROWS DENOTE REQUIRED
DIRECTION OF APRON CLEANING
ACTIVITIES - SEE PHASING NOTES
ARROWS DENOTE REQUIRED
DIRECTION OF APRON CLEANING
ACTIVITIES - SEE PHASING NOTES
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
P1.0
PHASING PLAN
F-
: A
LL
IE
D
S U
PP
O
RT
A
IR
CR
A
FT
S H
E
LT
E R
7T
H F
IG
H
TE
R
W
IN
G
M O
N
TG
O M
E
RY
, A L
17135.00/FAKZ182355
JUNE 2021
DCD
DCD
1" = 50'-0"P1.0
1 Phasing Plan
PHASING NOTES:
• SEE SPECIFICATION SECTION 01 1000 FOR PHASING DURATIONS AND
REQUIREMENTS.
• A GOVERNMENT PROVIDED ESCORT WILL BE REQUIRED AT ALL TIMES THAT
WORK IS BEING ACCOMPLISHED WITHIN THE RESTRICTED AREA.
• WORK WITHIN THE RESTRICTED AREA WILL BE REQUIRED TO BE COMPLETED
DURING NORMAL ANG WORKING HOURS, TUESDAY THROUGH FRIDAY 07:00AM
TO 05:30PM. OVERTIME WORK WILL NOT BE PERMITTED.
• CONTRACTOR SHALL PROVIDE AND INSTALL LOW-PROFILE, LIGHTED,
TEMPORARY BARRICADES SEPARATING THE DIFFERENT PHASES OF WORK.
BARRIERS MAY BE CONSTRUCTED OR PURCHASED (CONTRACTOR'S OPTION).
BARRIERS MUST MEET AND EXCEED THE REQUIREMENTS OF FIGURE 8-4 OF
UFC 3-260-04. BARRIERS SHALL BE DELIVERED TO THE OWNER FOLLOWING
COMPLETION OF THE WORK.
• CONTRACTOR TO LIMIT CONSTRUCTION PERSONNEL TO AREAS INCLUDED
WITHIN THE PHASE OF WORK ONGOING AT EACH TIME. ACCESS TO AREAS OF
THE RAMP OUTSIDE OF THE DELINEATED PHASE WILL NOT BE TOLERATED.
PHASING NOTES (CONTINUED):
• ACCESS TO THE RESTRICTED AREA FOR CONSTRUCTION OPERATIONS WILL
BE THROUGH ACCESS POINT B NOTED ON THE PLAN ABOVE FOR PHASE I.
ACCESS TO THE RESTRICTED AREA FOR ALL OTHER CONSTRUCTION PHASES
WILL BE THROUGH ACCESS POINT A NOTED ON THE PLAN ABOVE.
• IN PHASE I, CONTRACTOR SHALL WORK APRON CLEANING ACTIVITIES FROM
THE EAST EXTENTS OF PHASE I BACK TO THE WEST EXTENTS TO PREVENT
DIRT/DEBRIS FROM APRON CLEANING FROM BEING PUSHED INTO THE AREAS
OF PHASES II AND III.
• IN PHASE II, CONTRACTOR SHALL WORK APRON CLEANING ACTIVITIES FROM
THE SOUTH AND WEST EXTENTS OF PHASE II BACK TO THE NORTH AND EAST
EXTENTS TO PREVENT DIRT/DEBRIS FROM APRON CLEANING FROM BEING
PUSHED INTO THE AREAS OF PHASES I AND III.
• IN PHASE III, CONTRACTOR SHALL WORK APRON CLEANING ACTIVITIES FROM
THE NORTH AND WEST EXTENTS OF PHASE III BACK TO THE SOUTH AND EAST
EXTENTS TO PREVENT DIRT/DEBRIS FROM APRON CLEANING FROM BEING
PUSHED INTO THE AREAS OF PHASES II AND III.
FOREIGN OBJECT DAMAGE (FOD) PREVENTION REQUIREMENTS:
• THE EXISTING APRON WILL REMAIN OPEN DURING THE ENTIRE DURATION OF THE PROJECT. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS
NECESSARY TO ENSURE DIRT, DEBRIS, AND OTHER ITEMS THAT COULD POTENTIALLY BECOME AIRBORNE ARE ROUTINELY REMOVED FROM THE SITE, SECURED IN PLACE, OR KEPT IN CLOSED LID STORAGE CONTAINERS. ITEMS CAN EASILY BECOME AIRBORNE, ENTER THE ENGINE INTAKE OF AIRCRAFT OPERATING ON THE RAMP, AND CAUSE SIGNIFICANT DAMAGE TO THE AIRCRAFT. THE CONTRACTOR IS RESPONSIBLE FOR PREVENTING CONSTRUCTION
RELATED MATERIALS AND DEBRIS FROM DAMAGING AIRCRAFT OPERATING ON THE APRON.
• CONTRACTOR SHALL ALSO ENSURE THAT ALL DEBRIS AND FOREIGN OBJECTS ARE CONTINUOUSLY PICKED UP AND REMOVED FROM CONSTRUCTION
AREAS.
• PRIOR TO STARTING CONSTRUCTION, ALL PERSONNEL WHO WILL WORK ON THE AIRCRAFT APRON WILL BE REQUIRED TO COMPLETE THE FOD
PREVENTION BRIEFING FROM THE 187TH AIRFIELD MANAGER.
• ADDITIONALLY, THE CONTRACTOR SHALL COMPLY WITH ANY AND ALL DIRECTIVES FROM THE AIRFIELD MANAGER AND FOD MANAGER REGARDING FOD
PREVENTION FOR THE DURATION OF THE PROJECT.
• THE CONTRACTOR SHALL INSPECT VEHICLES PRIOR TO ENTERING THE RESTRICTED AREA AND REMOVE ANY ROCK, DIRT, DEBRIS, OR OTHER POTENTIAL FOD FROM THE VEHICLE. ADDITIONAL REQUIREMENTS AND PROTOCOLS FOR FOD INSPECTION AND REMOVAL WILL BE PROVIDED AT THE FOD
PREVENTION BRIEFING.
ACCEPTABLE LIGHTED BARRIER SYSTEM
AVAILABLE FROM TRAFFIC SAFETY WAREHOUSE
www.trafficsafetywarehouse.com
ACCEPTABLE SOLAR POWERED BEACON FOR BARRIER
AVAILABLE FROM TRAFFIC SAFETY WAREHOUSE
www.trafficsafetywarehouse.com
SOLAR POWERED
BEACON - SPACE
AT MAXIMUM OF
10'-0" INTERVALS
WARNING FLAGS (OPTIONAL)
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
P1.1
LIGHTED BARRIER
REQUIREMENTS
F-
: A
LL
IE
D
S U
PP
O
RT
A
IR
CR
A
FT
S H
E
LT
E R
7T
H F
IG
H
TE
R
W
IN
G
M O
N
TG
O M
E
RY
, A L
17135.00/FAKZ182355
JUNE 2021
DCD
DCD
1/2" = 1'-0"P1.1
1 LIGHTED BARRIER REQUIREMENTS
NOT TO SCALE 1/2" = 1'-0"P1.1
2 BARRICADE OPTION
NOT TO SCALE
| T1-0 - TITLE SHEET & DRAWING INDEX |
| Sheets |
| A0.1 - SITE PLAN |
| A0.2 - SHELTER ROOF PLAN, REFLECTED CEILING PLAN, AND SECTION |
| A0.3 - DETAILS |
| A0.4 - TYPICAL SHELTER PAINTED MARKINGS DIAGRAM |
| A0.5 - DETAILS |
| T1.0 - TITLE SHEET & DRAWING INDEX |
| C1.1 Site Demolition Plan |
| C2.1 Site Plan |
| C3.1 Site Details |
| C4.1 Site Details |
| A0-1 - SITE PLAN |
| Sheets |
| A0.1 - SITE PLAN |
| A0.2 - SHELTER ROOF PLAN, REFLECTED CEILING PLAN, AND SECTION |
| A0.3 - DETAILS |
| A0.4 - TYPICAL SHELTER PAINTED MARKINGS DIAGRAM |
| A0.5 - DETAILS |
| T1.0 - TITLE SHEET & DRAWING INDEX |
| A0-2 - SHELTER ROOF PLAN, REFLECTED CEILING PLAN, AND SECTION |
| Sheets |
| A0.1 - SITE PLAN |
| A0.2 - SHELTER ROOF PLAN, REFLECTED CEILING PLAN, AND SECTION |
| A0.3 - DETAILS |
| A0.4 - TYPICAL SHELTER PAINTED MARKINGS DIAGRAM |
| A0.5 - DETAILS |
| T1.0 - TITLE SHEET & DRAWING INDEX |
| A0-3 - DETAILS |
| Sheets |
| A0.1 - SITE PLAN |
| A0.2 - SHELTER ROOF PLAN, REFLECTED CEILING PLAN, AND SECTION |
| A0.3 - DETAILS |
| A0.4 - TYPICAL SHELTER PAINTED MARKINGS DIAGRAM |
| A0.5 - DETAILS |
| T1.0 - TITLE SHEET & DRAWING INDEX |
| A0-4 - TYPICAL SHELTER PAINTED MARKINGS DIAGRAM |
| Sheets |
| A0.1 - SITE PLAN |
| A0.2 - SHELTER ROOF PLAN, REFLECTED CEILING PLAN, AND SECTION |
| A0.3 - DETAILS |
| A0.4 - TYPICAL SHELTER PAINTED MARKINGS DIAGRAM |
| A0.5 - DETAILS |
| T1.0 - TITLE SHEET & DRAWING INDEX |
| A0-5 - DETAILS |
| Sheets |
| A0.1 - SITE PLAN |
| A0.2 - SHELTER ROOF PLAN, REFLECTED CEILING PLAN, AND SECTION |
| A0.3 - DETAILS |
| A0.4 - TYPICAL SHELTER PAINTED MARKINGS DIAGRAM |
| A0.5 - DETAILS |
| T1.0 - TITLE SHEET & DRAWING INDEX |
| E0.1 Electrical Legend & Notes |
| E1.1 - Site Plan Electrical |
| Sheets and Views |
| Model |
| E2.1 Panelboard Schedules, Details & Notes |
| E3.1 Electrical Signle Line Diagram & Notes |
| E4.1 Grounding Details & Notes |
| P1-0 - PHASING PLAN.pdf |
| Sheets |
| P1.0 - PHASING PLAN |
| P1.1 - LIGHTED BARRIER REQUIREMENTS |
| P1-1 - LIGHTED BARRIER REQUIREMENTS.pdf |
| Sheets |
| P1.0 - PHASING PLAN |
| P1.1 - LIGHTED BARRIER REQUIREMENTS |
| 2021-06-22T17:09:24-0500 | |
| David Donovan |
File details come from the government source that posted it. Updated .