This document provides specifications for the plumbing system renovation under the solicitation for the Renovation of Building 1407 to AGE Facility at Dannelly Field Air National Guard Base in Montgomery, Alabama. Key requirements include replacing the entire plumbing system to support converting the building into an Air Ground Equipment maintenance facility. The project involves upgrading domestic water, fire water, and sanitary systems. Specific plumbing items specified include fixtures, water heaters, pumps, and joining materials. Performance and material standards are defined drawing from publications including ASME, ASTM, ICC, and NSF.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

187th Fighter Wing Dannelly Field - AL ANG Montgomery, AL

F-35: CONVERT BLDG 1407 FOR AGE

Specifications for the

Date: FEBRUARY 2023 Revised: NA Job No: FAKZ182353 / 18074 Set No:

Submittal: B-3

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS,

OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED

Do not remove this notice Properly destroy documents when no longer needed

ARCHITECTURE & INTERIOR DESIGN

1115 South Court Street | Montgomery, AL 36104

Tel. 334. 263. 5162 | WWW.SSLARCH.COM

VOLUME II

F-35: Convert Bldg 1407 for AGE Facility FAKZ182353/18074 February 2023 187th Fighter Wing, Dannelly Field, ANG, Type B3 (100% Submittal)

TABLE OF CONTENTS 00 0100 - 1

SECTION 00 0100 - TABLE OF CONTENTS

VOLUME I

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 0100 TABLE OF CONTENTS 5

00 0102 PROJECT INFORMATION AND SUMMARY 7

DIVISION 01 - GENERAL REQUIREMENTS

01 0450 CUTTING AND PATCHING 5

01 0500 FIELD ENGINEERING 3

01 2000 PRICE AND PAYMENT PROCEDURES 3

01 2300 BID OPTIONS 4

01 3000 ADMINISTRATIVE REQUIREMENTS 8

01 3001 SUBMITTALS

- AF FORM 66 SUBMITTAL REGISTER

01 3225 PROJECT SUSTAINABILITY SUMMARY 3

01 3329 SUSTAINABLE DESIGN REPORTING

- TPC CHECKLIST

01 3553 SECURITY PROCEDURES 2

01 4000 QUALITY REQUIREMENTS 7

01 4100 REGULATORY REQUIREMENTS 3

01 4217 DEFINITIONS AND STANDARDS 3

01 5000 TEMPORARY FACILITIES AND CONTROLS 3

01 5100 TEMPORARY UTILITIES 3

01 5213 FIELD OFFICES AND SHEDS 3

01 5460 SAFETY AND HEALTH 5

01 5500 VEHICULAR ACCESS AND PARKING 3

01 5719 TEMPORARY ENVIRONMENTAL CONTROLS 9

01 6000 PRODUCT REQUIREMENTS 9

01 6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT

RESTRICTIONS

01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS 12

01 7419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 10

01 7800 CLOSEOUT SUBMITTALS 7

01 7900 DEMONSTRATION AND TRAINING 5

01 9100.15 TOTAL BUILDING COMMISSIONING 17

DIVISION 02 – EXISTING CONDITIONS

02 4100 SELECTIVE DEMOLITION 5

TABLE OF CONTENTS 00 0100 - 2

DIVISION 03 – CONCRETE

03 3000 CAST-IN-PLACE CONCRETE 27

03 3680 CONCRETE POLISHING AND DYING 8

DIVISION 04 – MASONRY

04 2000 UNIT MASONRY 13

DIVISION 05 – METALS

05 1200 STRUCTURAL STEEL FRAMING 6

05 2100 STEEL JOIST FRAMING 5

05 3100 STEEL DECKING 5

05 5000 METAL FABRICATIONS 7

05 5213 PIPE AND TUBE RAILINGS 5

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 1000 ROUGH CARPENTRY 7

06 4100 ARCHITECTURAL WOOD CASEWORK 7

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 0100 SPECIAL PROJECT ROOFING WARRANTY (BID OPTION) 3

07 2100 THERMAL INSULATION 5

07 5400 THERMOPLASTIC MEMBRANE ROOFING (BID OPTION) 12

07 6200 SHEET METAL FLASHING AND TRIM 7

07 6500 WALL FLASHING 4

07 7100 ROOF SPECIALTIES 11

07 8400 FIRESTOPPING 8

07 9005 JOINT SEALERS 12

DIVISION 08 – OPENINGS

08 1113 HOLLOW METAL DOORS AND FRAMES 14

08 1416 FLUSH WOOD DOORS 6

08 3323 OVERHEAD COILING DOORS 6

08 4113 ALUMINUM-FRAMED ENTRANCES 9

08 4413 GLAZED ALUMINUM CURTAIN WALLS 11

08 7100 DOOR HARDWARE 28

08 8000 08 9100

GLAZING

LOUVERS

TABLE OF CONTENTS 00 0100 - 3

DIVISION 09 - FINISHES

09 0561 09 2116

COMMON WORK RESULTS FOR FLOORING PREPARATION

GYPSUM BOARD ASSEMBLIES

09 3000 TILING 10

09 5100 ACOUSTICAL CEILINGS 7

09 6500 RESILIENT BASE 5

09 9113 EXTERIOR PAINTING 8

09 9123 INTERIOR PAINTING 12

09 9600 HIGH-PERFORMANCE COATINGS 9

DIVISION 10 - SPECIALTIES

10 1400 SIGNAGE 5

10 2113 STAINLESS STEEL TOILET COMPARTMENTS 7

10 2223 MOVABLE WALL SYSTEM 7

10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES 9

10 4400 FIRE PROTECTION SPECIALTIES 3

10 5100 LOCKERS 4

10 8500 SPECIALTIES 2

DIVISION 11 - EQUIPMENT

11 3013 RESIDENTIAL APPLIANCES 3

11 5213 CEILING -RECESSED FRONT PROJECTION SCREENS 5

11 5223 AUDIO-VISUAL EQUIPMENT SUPPORTS 5

DIVISION 12 - FURNISHINGS

12 2115 OPERABLE MESH SHADES 6

12 3600 COUNTERTOPS, AND WINDOW SILLS 6

12 4813 ENTRANCE FLOOR MATS AND FRAMES 2

VOLUME II

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 0100 TABLE OF CONTENTS 5

00 0102 PROJECT INFORMATION AND SUMMARY 7

DIVISION 21 – FIRE SUPPRESSION SYSTEMS

21 1313 WET-PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 23

DIVISION 22 – PLUMBING

22 0000 PLUMBING, GENERAL PURPOSE 51

TABLE OF CONTENTS 00 0100 - 4

DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING

23 0300.20 BASIC MECHANICAL MATERIALS AND METHODS 4

23 0593 TESTING, ADJUSTING, AND BALANCING 18

23 0700 THERMAL INSULATION FOR MEHCANICAL SYSTEMS 31

23 0900 INSTRUMENTATION AND CONTROL FOR HVAC 42

23 0913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC 36

23 0923.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC 21

23 3000 HVAC AIR DISTRIBUTION 20

23 8100.20 UNITARY AIR CONDITIONING EQUIPMENT 12

23 8200.20 THERMAL HEATING UNITS 5

DIVISION 25 – INTEGRATED AUTOMATION

25 0511 CYBERSECURITY FOR FACILITY RELATED CONTROL SYSTEMS 39

DIVISION 26 – ELECTRICAL

26 0100 GENERAL ITEMS 9

- ATTACHMENT A 3

26 0124 MEDIUM VOLTAGE CABLES 7

26 0211 ELECTRICITY METERING 11

26 0271 MEDIUM VOLTAGE TRANSFORMERS 8

26 0519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 5

26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 7

26 0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 6

26 0533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 14

26 0543 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 12

26 0544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS & CABLING 5

26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 10

26 0923 LIGHTING CONTROL SYSTEM 35

26 2416 PANELBOARDS 7

26 2418 LOW-VOLTAGE TRANSFORMERS 5

26 2726 WIRING DEVICES 7

26 2813 FUSES 2

26 2816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 7

26 3000 SHORT CIRCUIT COORDINATION STUDY AND ARC FLASH HAZ ANALYSIS 10

26 4113 LIGHTNING PROTECTION FOR STRUCTURES 4

26 5119 LED INTERIOR LIGHTING 7

26 5619 LED EXTERIOR LIGHTING 9

DIVISION 27 – COMMUNICATIONS

27 0500 STRUCTURED CABLING 9

27 0510 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS 2

27 0520 COMMUNICATION CABLE MANAGE AND LADDER RACK 4

27 0528 PATHWAYS FOR COMMUNICATIONS SYSTEMS 5

27 0544 SLEEVES AND SLEEVE SEALS COMMUNICATIONS PATHWAYS 5

TABLE OF CONTENTS 00 0100 - 5

27 0610 INDENTIFICATION FOR COMMUNICATION SYSTEMS 1

27 1300 COMMUNICATION OPTICAL FIBER BACKBONE CABLING 6

27 1500 COMMUNICATIONS COPPER HORIZONTAL CABLING 3

27 2005 COMMUNICATIONS PATCH PANELS AND FIBER OPTIC ENCLOSURES 4

27 2010 COMMUNICATION RACKS, ENCLOSURES 2

27 2015 COMMUNICATION FACEPLATES AND CONNECTORS 4

27 2020 COMMUNICATION PATCH CORDS AND WORKSTATION CORDS 3

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 3176 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM 42

DIVISION 31 - EARTHWORK

31 0010 SITE PROTECTION 4

31 0200 TEMPORARY EROSION AND SEDIMENT CONTROL 12

31 2210 EARTHWORK 14

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 1314 CEMENT CONCRETE PAVING 14

32 1720 PAVEMENT JOINT SEALANTS 5

DIVISION 33 - UTILITIES

33 1117 OUTSIDE WATER SYSTEM 6

33 1700 UL LISTED OIL/WATER SEPARATOR 4

33 4112 STORM DRAINAGE 7

This page intentionally left blank

Montgomery, AL

PROJECT INFORMATION AND SUMMARY 000102 - 1

SECTION 000102 - PROJECT INFORMATION AND SUMMARY

PART 1 GENERAL

1.01 PROJECT IDENTIFICATION

A. Project Name: F-35: Convert Building 1407 for AGE Facility, located at 187th Fighter Wing, Air National Guard (ANG) Base at Dannelly Field, Montgomery, AL.

B. Government Project Number: FAKZ182357

C. Architect's Project Number: 18074

D. The Owner, hereinafter referred to as the Government: Alabama Air National Guard.

E. Owner's Representatives:

1. Contracting Officer: Mr. Craig Kast

2. Contracting Specialist: Mr. Stephen Shanks

3. Contracting Officer Representative: Major Adam Sanders, Base Civil Engineer

4. Alternate Contracting Officer Representative: Major William Sanford, Deputy Base Civil Engineer

1.02 CONTRACT DURATION

A. 395 calendar days from notice to proceed to Beneficial Occupancy. The listed duration shall include completion of all punch list activities identified at the project final inspection. The Government intends to occupy the building upon Beneficial Occupancy.

1.03 PROJECT DESCRIPTION

A. Project scope includes structural, architectural, plumbing, mechanical, electrical and relocation of existing utilities for complete renovation of the existing facility (Building 1407) and associated sitework per the contract documents. The proposed project includes, but is not limited to the following:

1. Existing high-bay maintenance area will remain a maintenance area. The building plumbing, electrical, and mechanical systems will be modified and extended as required to support the new Air Ground Equipment (AGE) function intended to be housed in the renovated facility.

Montgomery, AL

PROJECT INFORMATION AND SUMMARY 000102 - 2

2. A portion of the existing office area will be reconfigured to provide ADA compliance and facilitate the needs of AGE maintenance associated with F-35 airframe.

3. Other portions of the existing office and ancillary work areas will remain in their current configuration and receive finish upgrade.

4. Existing HVAC, lighting, and electrical systems will be removed and replaced with, energy efficient systems.

5. A new UFC 3-600-01 compliant fire suppression system and new fire alarm/mass notification system will be provided.

6. Existing roof covering will remain. A new single ply roof membrane system installation is included as a bid option.

7. The existing structural systems consist of a structural steel roof framing system supported by a combination of load bearing CMU walls and structural steel framing. The slab is a ground supported floor slab. Major bearing components are supported on drilled piers where required based upon allowable soil loading. The existing structural systems will remain with only minor modifications to support new wall configurations and new openings in existing load bearing interior and exterior wall assemblies.

8. Sitework will include, but is not limited to, the following:

a. Installation of new domestic water and fire water service.

b. Installation of new electrical and telecommunications service.

c. Cement concrete pavement patching and repair as required to support new utilities.

d. Installation of a new underground oil/water separator system.

e. Concrete pavement removal and replacement as required to install new wash rack with slope/elevations indicated on the drawings (Bid Option)

B. Antiterrorism and Building Standoff Requirements:

1. The project site and building structural, architectural, electrical and mechanical systems have been designed to meet the prescribed levels of protection against terrorist attacks in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 4-010-01 DoD Minimum Antiterrorism Standards for Buildings.

Montgomery, AL

PROJECT INFORMATION AND SUMMARY 000102 - 3

C. Sustainability Design and Energy Conservation:

1. The project design incorporates Sustainability Concepts to achieve optimum resource efficiency, constructability, sustainability, and energy conservation.

2. This project has been registered with the USGBCI for guiding principles assessment recognition process.

3. The Contractor is responsible for ensuring all specified sustainable and energy conservation goals are achieved and fully implemented. Refer to section 01 3329 for sustainability reporting requirements. Refer to technical specifications for specific product requirements.

D. Building Systems Commissioning:

1. Refer to specification section 01 9100.015 - Total Building Commissioning, and other individual specifications sections for Contractor's responsibilities related to Building Systems Commissioning.

E. Government Furnished Furniture, furnishings and Equipment (FF&E):

1. Contractor's base bid shall include rough-ins for plumbing, mechanical, and electrical; including installation and final connection of all items indicated on the drawings as Government Furnished Contractor Installed (GFCI).

F. Contractor's Qualified Fire Protection Engineer (QFPE) Services:

1. The Contractor shall employ a Qualified Fire Protection Engineer (QFPE) meeting the requirements of UFC 3-600-01.

2. The QFPE shall review, sign, and certify all fire protection and life safety systems including; but, not limited to fire alarm, mass notification, and sprinkler systems included within the proposed project.

3. All shop drawing / calculations / material submittals for applicable life safety systems must be reviewed and stamped by the Contractor’ QFPE in accordance with section 9-6.3 of UFC 3-600-01.

4. Waterflow testing shall be performed under the direction of the Contractor’s QFPE in accordance with section 9-6.4 of UFC 3-600-01. Waterflow testing shall be performed by the Contractor in order to develop required hydraulic calculations.

Use of waterflow testing performed by the Architect during design cannot be utilized by the Contractor for preparation of project submittals.

Montgomery, AL

PROJECT INFORMATION AND SUMMARY 000102 - 4

5. During Construction the Contractor’s QFPE must visit the site in intervals/quantities required to certify that the system has been installed in accordance with the project requirements. At a minimum, the QFPE shall attend/witness the above ceiling inspection and attend/witness final acceptance testing for all fire protection and life safety systems. Additional site inspections are at the discretion of the Contractor’s QFPE. The Contractor’s QFPE shall certify, in writing, that the system has been installed in accordance with project requirements.

The Contractor’s QFPR certification shall be in writing, on company letterhead, and include the QFPE’s registration stamp.

1.04 PERMITS, FEES AND NOTICES

A. Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit and other permits and governmental fees, licenses, and inspections necessary for proper execution and completion of the Work which are customarily secured after award of the Construction Contract and which are in effect on the date of receipt of bids.

1. City of Montgomery Building Permit will not be required.

B. The Contractor shall comply with and give notices required by all laws, ordinances, rules, regulations, and lawful orders of public authorities applicable to performance of the Work.

1.05 USE OF SITE AND MISC. REQUIREMENTS

A. The space available to the contractor for the performance of the work, either exclusively or in conjunction with others performing other construction as part of the project, is as per the Government's approval.

1. Other areas are off limits to all construction personnel.

B. Access to site will be limited; obtain Government's approval of proposed routes of access.

C. Keep existing sidewalks, roads, parking lots and drives on site clear and available at all times. Promptly remove mud, dirt, debris, etc. from sidewalks, streets, and public right-of-way during construction as it occurs.

D. Storage areas on site are very minimal and will be limited to materials that are to be immediately used in the progress of the work. If additional storage is required, then Contractor shall secure and be responsible to pay for such off site storage in a fully bonded and insured facility acceptable to the Government, with all items clearly identified as being assigned to this project.

Montgomery, AL

PROJECT INFORMATION AND SUMMARY 000102 - 5

1. Contractor will be limited to the areas included within the project limits shown on the civil drawings.

E. Provide secure temporary barricades, fencing, etc. as required to separate the public from construction operations. Compliant safety and/or warning signage is to be provided as well in conjunction with fencing and barricades.

1. Site safety and security is the General Contractor's responsibility. Fencing shall be provided as deemed necessary to protect the site from theft and damage and to prevent access to the site by the public. A fence along the project limits is anticipated at a minimum. However, exact location/extents of fencing is at the discretion of the Contractor.

F. Construction operations are not to affect any of the ongoing operations throughout the site and/or adjacent sites. Construction equipment is not to be attached to, or swing over existing buildings to remain, public areas, occupied buildings or parking lots, right-of-ways, etc.

G. Comply with the Government's security requirements - refer to specification section 01 3553.

H. The contractor shall provide all testing, inspections, and similar services; these services also include those specified to be performed by an independent agency.

1.06 UTILITY OUTAGES AND SHUTDOWN

A. All electrical and communication shut downs shall be performed on a non-working day for the Government (Saturday, Sunday, Monday, or Holidays) unless specifically approved by the base Contracting Officer Representative.

B. Limit shutdown of utility services to 8 hours at a time, arranged at least 72 hours in advance with the Government.

C. Prevent accidental disruption of utility services to other facilities.

1.07 PHASING OF WORK

A. The work of this project shall be completed in one phase. However, the Contractor shall coordinate the work as required to ensure all existing roadways and facilities adjacent to the project site remain open and accessible for use by the Government.

1.08 WORK SEQUENCE

A. Coordinate construction schedule and operations with Contracting Officer Representative.

Montgomery, AL

PROJECT INFORMATION AND SUMMARY 000102 - 6

B. The contractor shall be responsible for all means, methods, sequencing of work, demolition, and reparations to the property and facilities as required to accomplish the work. This shall include but is not limited to the installation of all equipment furnishings, and materials.

1.09 PROJECT CONSULTANTS

A. The Architect, hereinafter referred to as Architect: Seay Seay & Litchfield P.C..

1. Address: 1115 South Court Street.

2. City, State, Zip: Montgomery AL 36104.

3. Phone/Fax: 334-263-5162 334-263-5170.

4. Project Manager: Jake Johnson, AIA

5. Prinicipals-in-Charge: Wes R. Osmer, AIA, LEED AP

B. Architect's Consultants:

1. Civil Engineering:

a. Professional Engineering Consultants

b. Address: 822 South McDonough St..

c. City, State, Zip: Montgomery, AL, 36104.

d. Phone/Fax: 334-262-7307 / 334-262-7309.

e. Contact: Steve Green - Pat Moseley

2. Structural Engineering:

a. Grant Engineering

b. Phone/Fax: 334-546-8818

c. Contact: Terry Grant

3. Plumbing, Mechanical & Fire Suppression Engineering:

a. Peterson Engineering

b. Address: 75 South F Street

c. City, State, Zip: Pensacola, FL 32502

Montgomery, AL

PROJECT INFORMATION AND SUMMARY 000102 - 7

d. Phone: 850-434-0513

e. Contact: Steve Johnson, P.E.

4. Electrical Engineering:

a. Garner & Associates

b. Address: 903 South Perry Street

c. City, State, Zip: Montgomery, AL 36104

d. Phone: 334-269-0329

e. Contact: Morgan Garner, P.E.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

END OF SECTION

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 1

SECTION 21 1313 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300

ASME B16.4 (2016) Standard for Gray Iron Threaded Fittings;

Classes 125 and 250

AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)

ASSE 1013 (2021) Performance Requirements for Reduced Pressure

Principle Backflow Prevention Assemblies

ASSE 1015 (2011) Performance Requirements for Double Check Backflow Prevention Assemblies and Double Check Fire Protection Backflow Prevention Assemblies - (ANSI approved 2010)

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA C104/A21.4 (2016) Cement-Mortar Lining for Ductile-Iron Pipe and

Fittings for Water

AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for Water

AWWA C111/A21.11 (2017) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings

AWWA C203 (2020) Coal-Tar Protective Coatings and Linings for

Steel Water Pipelines - Enamel and Tape - Hot-Applied

AWWA M14 (2015) Manual: Recommended Practice for Backflow Prevention and Cross-Connection Control

ASTM INTERNATIONAL (ASTM)

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 2

ASTM A47/A47M (1999; R 2018; E 2018) Standard Specification for Ferritic Malleable Iron Castings

ASTM A53/A53M (2020) Standard Specification for Pipe, Steel, Black and

Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A135/A135M (2021) Standard Specification for Electric-Resistance- Welded Steel Pipe

ASTM A153/A153M (2016a) Standard Specification for Zinc Coating (Hot-

Dip) on Iron and Steel Hardware

ASTM A183 (2014; R 2020) Standard Specification for Carbon Steel Track Bolts and Nuts

ASTM A536 (1984; R 2019; E 2019) Standard Specification for

Ductile Iron Castings

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND

FITTINGS INDUSTRY (MSS)

MSS SP-71 (2018) Gray Iron Swing Check Valves, Flanged and

Threaded Ends

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 13 (2019; Errata 19-1; Errata 19-2; TIA 19-1; TIA 19-2;

TIA 19-3; TIA 19-4; Errata 19-3; Errata 20-4; TIA 19-5;

TIA 19-6) Standard for the Installation of Sprinkler Systems

NFPA 24 (2019; TIA 19-1) Standard for the Installation of Private

Fire Service Mains and Their Appurtenances

NFPA 101 (2018; TIA 18-1; TIA 18-2; TIA 18-3) Life Safety Code

NFPA 291 (2016) Recommended Practice for Fire Flow Testing and Marking of Hydrants

NFPA 1963 (2019) Standard for Fire Hose Connections

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 3

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING

TECHNOLOGIES (NICET)

NICET 1014-7 (2012) Program Detail Manual for Certification in the

Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-600-01 (2016; with Change 6, 2021) Fire Protection

Engineering for Facilities

UNDERWRITERS LABORATORIES (UL)

UL 193 (2016) UL Standard for Safety Alarm Valves for Fire- Protection Service

UL 199 (2020) UL Standard for Safety Automatic Sprinklers for

Fire-Protection Service

UL 312 (2010; Reprint Mar 2018) UL Standard for Safety Check Valves for Fire-Protection Service

UL 405 (2013; Bul. 2020) UL Standard for Safety Fire

Department Connection Devices

UL 668 (2004; Reprint Jul 2016) UL Standard for Safety Hose Valves for Fire-Protection Service

UL Fire Prot Dir (2012) Fire Protection Equipment Directory

1.2 SYSTEM DESCRIPTION

Provide wet pipe sprinkler system(s) in all areas of the building. Except as modified herein, the system must meet the requirements of NFPA 13 and UFC 3-600-01. Pipe sizes which are not indicated on the Contract drawings must be determined by hydraulic calculations.

1.2.1 Hydraulic Design

1.2.1.1 Basis for Calculations

Perform a fire hydrant flow test prior to shop drawing submittal in accordance with NFPA

291. Results must include hydrant elevations relative to the building and hydrant

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 4

number/identifiers for the tested hydrants, including which were flowed, which had a gauge.

This information must be presented in a tabular form if multiple hydrants were flowed. The results must be included with the hydraulic calculations. Hydraulic calculations must be based upon the Hazen-Williams formula with a "C" value noted in NFPA 13 for piping. The minimum residual pressure in a service lateral (lead-in) at the design flow rate must be 20 psi at the inlet to the backflow preventer.

1.2.1.2 Hydraulic Calculations

a. Water supply curves and system requirements must be plotted on semi-logarithmic graph (N^1.85) paper so as to present a summary of the complete hydraulic calculation.

b. Provide a summary sheet listing sprinklers in the design area and their respective hydraulic reference points, elevations, minimum discharge pressures and minimum flows.

Elevations of hydraulic reference points (nodes) must be indicated.

c. Documentation must identify each pipe individually and the nodes connected thereto.

Indicate the diameter, length, flow, velocity, friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe.

d. All calculations must include the backflow preventer manufacturer's stated friction loss at the design flow or 8 psi for double check backflow preventer, whichever is greater.

e. All calculations must be performed back to the actual location of the flow test, taking into account the direction of flow in the service main at the test location.

f. For gridded systems, calculations must show peaking of demand area friction loss to verify that the hydraulically most demanding area is being used. A flow diagram indicating the quantity and direction of flows must be included.

1.2.1.3 Design Criteria

Hydraulically design the system to discharge a minimum density as indicated on the drawings.

Hydraulic calculations must be in accordance with the Area/Density Method of NFPA 13.

Add an allowance for exterior hose streams of 250 gpm to the sprinkler system demand at the fire hydrant shown on the drawings closest to the point where the water service enters the building.

1.2.2 Sprinkler Coverage

Sprinklers must be uniformly spaced on branch lines. Provide coverage throughout 100 percent of the building. This includes, but is not limited to, telephone rooms, electrical equipment rooms (regardless of the fire resistance rating of the enclosure), boiler rooms, switchgear rooms, transformer rooms, attached electrical vaults and other electrical and

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 5

mechanical spaces. Coverage per sprinkler must be in accordance with NFPA 13. Provide sprinklers below all obstructions in accordance with NFPA 13. Exceptions are as follows:

a. Sprinklers may be omitted from small rooms which are exempted for specific occupancies in accordance with NFPA 101.

1.2.3 Qualified Fire Protection Engineer (QFPE)

An individual who is a licensed professional engineer (P.E.) who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveying (NCEES) and has relevant fire protection engineering experience.

The general contractor shall hire the QFPE for the construction project. The QFPE shall be responsible for the QFPE services as outlined in specification sections 21 13 13 and 28 31

76. Services of the QFPE must include:

a. Reviewing SD-02, SD-03, and SD-05 submittal packages for completeness and compliance with the provisions of this specification. Working (shop) drawings and calculations must be prepared by, or prepared under the immediate supervision of, the QFPE. The QFPE must affix their professional engineering stamp with signature to the shop drawings, calculations, and material data sheets, indicating approval prior to submitting the shop drawings to the DFPE.

b. Provide a letter documenting that the SD-02, SD-03, and SD-05 submittal package has been reviewed and noting all outstanding comments.

c. Performing in-progress construction surveillance prior to installation of ceilings (rough-in inspection).

d. Witnessing pre-Government and final Government functional performance testing and performing a final installation review.

e. Signing applicable certificates under SD-07.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Partial submittals and submittals not fully complying with NFPA 13 and this specification section must be returned disapproved without review. SD-02, SD-03 and SD-05 must be submitted simultaneously.

Shop drawings (SD-02), product data (SD-03) and calculations (SD-05) must be prepared by the designer and combined and submitted as one complete package. The QFPE must review the SD-02/SD-03/SD-05 submittal package for completeness and compliance with the

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 6

Contract provisions prior to submission to the Government. The QFPE must provide a Letter of Confirmation that they have reviewed the submittal package for compliance with the contract provisions. This letter must include their professional engineer stamp and signature.

Partial submittals and submittals not reviewed by the QFPE must be returned disapproved without review.

Submit the following in accordance with Section 01 3001 SUBMITTALS:

SD-01 Preconstruction Submittals

Qualified Fire Protection Engineer (QFPE); G

Sprinkler System Designer; G

Sprinkler System Installer; G

SD-02 Shop Drawings

Shop Drawing; G

SD-03 Product Data

Pipe; G

Fittings; G

Valves, including gate, check, butterfly, and globe; G

Alarm Valves; G

Relief Valves; G

Sprinklers; G

Pipe Hangers and Supports; G

Sprinkler Alarm Switch; G

Valve Supervisory (Tamper) Switch; G

Fire Department Connection; G

Backflow Prevention Assembly; G

Air Vent; G

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 7

Hose Valve; G

Nameplates; G

SD-05 Design Data

Hydraulic Calculations; G

SD-06 Test Reports

Test Procedures; G

SD-07 Certificates

Verification of Compliant Installation; G

Request for Government Final Test; G

SD-10 Operation and Maintenance Data

Operating and Maintenance (O&M) Instructions; G

Spare Parts Data; G

SD-11 Closeout Submittals

As-built drawings

1.4 QUALITY ASSURANCE

1.4.1 Preconstruction Submittals

Within 36 days of contract award but no less than 14 days prior to commencing work on site, the prime Contractor must submit the following for review and approval. SD-02, SD-03 and SD-05 submittals received prior to the review and approval of the qualifications will be returned Disapproved Without Review.

1.4.1.1 Shop Drawing

Three copies of the shop drawings, no later than 28 days prior to the start of system installation. Working drawings conforming to the requirements prescribed in NFPA 13 and must be no smaller than the Contract Drawings. Each set of drawings must include the following:

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 8

a. A descriptive index with drawings listed in sequence by number. A legend sheet identifying device symbols, nomenclature, and conventions used in the package.

b. Floor plans drawn to a scale not less than 1/8-inch equals 1-foot clearly showing locations of devices, equipment, risers, and other details required to clearly describe the proposed arrangement.

c. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross mains and branch lines to finished floor and roof or ceiling. A detail must show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.

d. Longitudinal and transverse building sections showing typical branch line and cross main pipe routing, elevation of each typical sprinkler above finished floor and elevation of "cloud" or false ceilings in relation to the building ceilings.

e. Plan and elevation views which establish that the equipment will fit the allotted spaces with clearance for installation and maintenance.

f. Riser layout drawings drawn to a scale of not less than 1/2-inch equals 1-foot to show details of each system component, clearances between each other and from other equipment and construction in the room.

g. Details of each type of riser assembly, pipe hanger, and restraint of underground water main at point-of-entry into the building, and electrical devices and interconnecting wiring. The dimension from the edge of vertical piping to the nearest adjacent wall(s) must be indicated on the drawings when vertical piping is located in stairs or other portions of the means of egress.

h. Details of each type of pipe hanger and related components.

1.4.1.2 Product Data

Three copies of annotated catalog data to show the specific model, type, and size of each item.

Catalog cuts must also indicate the NRTL listing. The data must be highlighted to show model, size, options, and other pertinent information, that are intended for consideration. Data must be adequate to demonstrate compliance with all contract requirements. Product data for all equipment must be combined into a single submittal.

1.4.1.3 Hydraulic Calculations

Calculations must be as outlined in NFPA 13 except that calculations must be performed by computer using software intended specifically for fire protection system design using the design data shown on the drawings.

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 9

1.4.1.4 Operating and Maintenance (O&M) Instructions

Submit in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA as supplemented and modified by this specification section.

Provide six manuals and one pdf version on electronic media. The manuals must include the manufacturer's name, model number, parts list, list of parts and tools that should be kept in stock by the owner for routine maintenance, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment.

Submit spare parts data for each different item of material and equipment specified. The data must include a complete list of parts and supplies, and a list of parts recommended by the manufacturer to be replaced after 1-year and 3 years of service. Include a list of special tools and test equipment required for maintenance and testing of the products supplied.

1.4.2 Qualifications

1.4.2.1 Sprinkler System Designer

The sprinkler system designer must be certified as a Level III Technician by National Institute for Certification in Engineering Technologies (NICET) in the Water-Based Systems Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7.

1.4.2.2 Sprinkler System Installer

The sprinkler system installer must be regularly engaged in the installation of the type and complexity of system specified in the contract documents, and must have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.

1.4.3 Regulatory Requirements

Equipment and material must be listed or approved. Listed or approved, as used in this Section, means listed, labeled or approved by a Nationally Recognized Testing Laboratory (NRTL) such as UL Fire Prot Dir or FM APP GUIDE. The omission of these terms under the description of an item or equipment described must not be construed as waiving this requirement. All listings or approvals by testing laboratories must be from an existing ANSI or UL published standard. The recommended practices stated in the manufacturer's literature or documentation are mandatory requirements.

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 10

1.5 DELIVERY, STORAGE, AND HANDLING

Protect all equipment delivered and placed in storage from the weather, excessive humidity and temperature variations, dirt and dust, or other contaminants. All pipes must be either capped or plugged until installed.

1.6 EXTRA MATERIALS

Spare sprinklers and wrench(es) must be provided as spare parts in accordance with NFPA 13.

PART 2 PRODUCTS

2.1 MATERIALS AND EQUIPMENT

2.1.1 Standard Products

Provide materials, equipment, and devices listed for fire protection service when so required by NFPA 13 or this specification. Select material from one manufacturer, where possible, and not a combination of manufacturers, for a classification of material. Material and equipment must be standard products of a manufacturer regularly engaged in the manufacture of the products for at least 2 years prior to bid.

2.1.2 Nameplates

Major components of equipment must have the manufacturer's name, address, type or style, model or serial number, catalog number, date of installation, installing Contractor's name and address, and the contract number provided on a new name plate permanently affixed to the item or equipment. Nameplates must be etched metal or plastic, permanently attached by screws to control units, panels or adjacent walls.

2.1.3 Identification and Marking

Pipe and fitting markings must include name or identifying symbol of manufacturer and nominal size. Pipe must be marked with ASTM designation. Valves and equipment markings must have name or identifying symbol of manufacturer, specific model number, nominal size, name of device, arrow indicating direction of flow, and position of installation (horizontal or vertical), except if valve can be installed in either position. Markings must be included on the body casting or on an etched or stamped metal nameplate permanently on the valve or cover plate.

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 11

2.1.4 Pressure Ratings

Valves, fittings, couplings, alarm switches, and similar devices must be rated for the maximum working pressures that can be experienced in the system, but in no case less than 175 psi.

2.2 UNDERGROUND PIPING COMPONENTS

2.2.1 Pipe

Pipe must comply with NFPA 24. Minimum pipe size is 6 inches. Piping more than 5 feet outside the building walls must comply with Section 33 1117 OUTSIDE WATER SYSTEM.

A continuous section of welded stainless steel fire water service piping from a point outside the building perimeter to a fitting at least 12-inches above the finished floor within the building shall be used.

2.2.2 Fittings and Gaskets

Fittings must be ductile-iron conforming to AWWA C110/A21.10 with cement mortar lining conforming to AWWA C104/A21.4. Gaskets must be suitable in design and size for the pipe with which such gaskets are to be used. Gaskets for ductile-iron pipe joints must conform to

AWWA C111/A21.11.

2.2.3 Buried Utility Warning and Identification Tape

Provide detectable aluminum foil plastic backed tape or detectable magnetic plastic tape manufactured specifically for warning and identification of buried piping. Tape must be detectable by an electronic detection instrument. Provide tape, 3 inches minimum width, color coded for the utility involved with warning and identification imprinted in bold block letters continuously and repeatedly over the entire tape length. Warning and identification must read "CAUTION BURIED WATER PIPING BELOW" or similar wording. Use permanent code and letter coloring unaffected by moisture and other substances contained in trench backfill material.

2.3 ABOVEGROUND PIPING COMPONENTS

2.3.1 Steel Piping Components

2.3.1.1 Steel Pipe

Except as modified herein, steel pipe must be black as permitted by NFPA 13 and conform to the applicable provisions of ASTM A53/A53M, ASTM A135/A135M or ASTM A153/A153M.

Steel pipe must be Schedule 40 only.

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 12

2.3.1.2 Fittings

Fittings must be welded, threaded, or grooved-end type. Threaded fittings must be cast-iron conforming to ASME B16.4, malleable-iron conforming to ASME B16.3 or ductile-iron conforming to ASTM A536. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe, steel press fittings and field welded fittings are not permitted. Fittings, mechanical couplings, and rubber gaskets must be supplied by the same manufacturer. Threaded fittings must use Teflon tape or manufacturer's approved joint compound. Reducing couplings are not permitted except as allowed by NFPA 13.

2.3.1.3 Grooved Mechanical Joints and Fittings

Joints and fittings must be designed for not less than 175 psi service and the product of the same manufacturer. Field welded fittings must not be used. Fitting and coupling housing must be malleable-iron conforming to ASTM A47/A47M, Grade 32510; ductile-iron conforming to ASTM A536, Grade 65-45-12. Rubber gasketed grooved-end pipe and fittings with mechanical couplings are permitted in pipe sizes 2 inches and larger. Gasket must be the flush type that fills the entire cavity between the fitting and the pipe. Nuts and bolts must be heat-treated steel conforming to ASTM A183 and must be cadmium-plated or zinc-electroplated.

2.3.2 Pipe Hangers and Supports

Provide galvanized pipe hangers and supports in accordance with NFPA 13.

2.3.3 Valves

Provide valves of types approved for fire service. Valves must open by counterclockwise rotation.

2.3.3.1 Control Valve

Manually operated sprinkler control/gate valve must be outside stem and yoke (OS&Y) type and must be listed.

2.3.3.2 Check Valves

Check valves must comply with UL 312. Check valves 4 inches and larger must be of the swing type, have a clear waterway and meet the requirements of MSS SP-71, for Type 3 or 4.

Inspection plate must be provided on valves larger than 6 inches.

2.3.3.3 Hose Valve

Valve must comply with UL 668.

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 13

2.3.4 Alarm Valves

Provide variable pressure type alarm check valve, standard trim piping, pressure gauges, bypass, retarding chamber, testing valves, and main drain, and other components as required for a fully operational system. Alarm valves must comply with UL 193.

2.4 ALARM INITIATING AND SUPERVISORY DEVICES

2.4.1 Sprinkler Alarm Switch

Vane -type flow switch shall be used. Connection of switch must be by the fire alarm installer. Vane type alarm actuating devices must have mechanical diaphragm controlled retard device adjustable from 10 to 60 seconds and must instantly recycle.

2.4.2 Valve Supervisory (Tamper) Switch

Switch must be integral to the control valve or suitable for mounting to the type of control valve to be supervised open. The switch must be tamper resistant and contain SPDT (Form C) contacts arranged to transfer upon removal of the housing cover or closure of the valve of more than two rotations of the valve stem.

2.5 BACKFLOW PREVENTION ASSEMBLY

Double-check valve assembly backflow preventer complying with ASSE 1013, ASSE 1015 and AWWA M14. Each check valve must have a drain. Backflow prevention assemblies must have current "Certificate of Approval from the Foundation for Cross-Connection Control and Hydraulic Research, FCCCHR List" and be listed for fire protection use. Listing of the specific make, model, design, and size in the FCCCHR List is acceptable as the required documentation.

2.5.1 Backflow Preventer Test Connection

Test connection must consist of a series of listed hose valves with 2 1/2-inch National Standard male hose threads with cap and chain.

2.6 FIRE DEPARTMENT CONNECTION

Fire department connection must be projecting type with cast-brass body, matching wall escutcheon lettered "Auto Spkr" with a polished-brass finish. The connection must have individual self-closing clappers, caps with drip drains and chains. Female inlets must have 2 1/2-inch diameter American National Fire Hose Connection Screw Threads (NH) per NFPA 1963. Comply with UL 405.

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 14

2.7 SPRINKLERS

Sprinklers must comply with UL 199 and NFPA 13. Sprinklers with internal O-rings are not acceptable. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters must have temperature classification in accordance with NFPA 13. Extended coverage sprinklers are permitted for loading docks, residential occupancies and high-piled storage applications only.

2.7.1 Pendent Sprinkler

Pendent sprinkler must be quick-response type with nominal K-factor of 5.6. Pendent sprinklers must have a polished chrome finish. Assembly must include an integral escutcheon.

2.7.2 Upright Sprinkler

Upright sprinkler must be brass quick-response type and have a nominal K-factor of 5.6 for light hazard areas and 8.0 for ordinary hazard areas.

2.7.3 Sidewall Sprinkler

Sidewall sprinkler must be the dry sidewall type. Sidewall sprinkler must have a nominal K-factor of 8.0. Sidewall sprinkler must have a stainless steel finish.

2.7.4 Concealed Sprinkler

Concealed sprinkler must be chrome-plated quick-response type and have a nominal K-factor of 5.6. Coverplate must be chrome.

2.8 ACCESSORIES

2.8.1 Sprinkler Cabinet

Provide spare sprinklers in accordance with NFPA 13 and must be placed in a suitable metal or plastic cabinet of sufficient size to accommodate all the spare sprinklers and wrenches in designated locations. Spare sprinklers must be representative of, and in proportion to, the number of each type and temperature rating of the sprinklers installed as required by NFPA

13. At least one wrench of each type required must be provided.

2.8.2 Pendent Sprinkler Escutcheon

Escutcheon must be one-piece metallic type with a depth of less than 3/4-inch and suitable for installation on pendent sprinklers. The escutcheon must have a factory finish that matches the pendent sprinkler.

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 15

2.8.3 Pipe Escutcheon

Provide split hinge metal plates for piping entering walls, floors, and ceilings in exposed spaces. Provide polished stainless steel plates or chromium-plated finish on copper alloy plates in finished spaces. Provide paint finish on metal plates in unfinished spaces.

2.8.4 Sprinkler Guard

Listed guard must be a steel wire cage designed to encase the sprinkler and protect it from mechanical damage. Guards must be provided on sprinklers located in communications, mechanical rooms, and janitor closets.

2.8.5 Relief Valve

Relief valves must be listed and installed at the riser in accordance with NFPA 13.

2.8.6 Air Vent

Air vents must be of the automatic type and piped to drain to the building exterior.

2.8.7 Identification Sign

Valve identification sign must be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gage steel or 0.024-inch aluminum with red letters on a white background or white letters on red background. Wording of sign must include, but not be limited to "main drain", "auxiliary drain", "inspector's test", "alarm test", "alarm line", and similar wording as required to identify operational components. Where there is more than one sprinkler system, signage must include specific details as to the respective system.

PART 3 EXECUTION

3.1 VERIFYING ACTUAL FIELD CONDITIONS

Before commencing work, examine all adjoining work on which the contractor's work that is dependent for perfect workmanship according to the intent of this specification section, and report to the Contracting Officer's Representative a condition that prevents performance of first class work. No "waiver of responsibility" for incomplete, inadequate or defective adjoining work will be considered unless notice has been filed before submittal of a proposal.

3.2 INSTALLATION

The installation must be in accordance with the applicable provisions of NFPA 13, NFPA 24 and publications referenced therein. Locate sprinklers in a consistent pattern with ceiling grid, lights, and air supply diffusers. Install sprinkler system over and under ducts, piping and

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 16

platforms when such equipment can negatively affect or disrupt the sprinkler discharge pattern and coverage.

a. Piping offsets, fittings, and other accessories required must be furnished to provide a complete installation and to eliminate interference with other construction.

b. Wherever the contractor's work interconnects with work of other trades the Contractor must coordinate with other Contractors to insure all Contractors have the information necessary so that they may properly install all necessary connections and equipment.

Identify all work items needing access (dampers and similar equipment) that are concealed above hung ceilings by permanent color coded pins/tabs in the ceiling directly below the item.

c. Provide required supports and hangers for piping, conduit, and equipment so that loading will not exceed allowable loadings of structure. Submittal of a bid must be a deemed representation that the contractor submitting such bid has ascertained allowable loadings and has included in his estimates the costs associated in furnishing required supports.

3.2.1 Waste Removal

At the conclusion of each day's work, clean up and stockpile on site all waste, debris, and trash which may have accumulated during the day as a result of work by the contractor and of his presence on the job. Sidewalks and streets adjoining the property must be kept broom clean and free of waste, debris, trash and obstructions caused by work of the contractor, which will affect the condition and safety of streets, walks, utilities, and property.

3.3 UNDERGROUND PIPING INSTALLATION

The fire protection water main must be laid, and joints anchored, in accordance with NFPA

24. Minimum depth of cover must be 3 feet or the frost line, whichever is deeper. The supply line must terminate inside the building with a flanged piece, the bottom of which must be set not less than 1-foot above the finished floor. A blind flange must be installed temporarily on top of the flanged piece to prevent the entrance of foreign matter into the supply line. A concrete thrust block must be provided at the elbow where the pipe turns up toward the floor.

In addition, joints must be anchored in accordance with NFPA 24. Buried steel components must be provided with a corrosion protective coating in accordance with AWWA C203.

Piping more than 5 feet outside the building walls must meet the requirements of Section 33

1117 OUTSIDE WATER SYSTEM.

3.4 ABOVEGROUND PIPING INSTALLATION

The methods of fabrication and installation of the aboveground piping must fully comply with the requirements and recommended practices of NFPA 13 and this specification section.

WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION 21 1313 - 17

3.4.1 Protection of Piping Against Earthquake Damage

Seismic restraint is not required.

3.4.2 Piping in Exposed Areas

Install exposed piping without diminishing exit access widths, corridors or equipment access.

Exposed horizontal piping, including drain piping, must be installed to provide maximum headroom.

3.4.3 Piping in Finished Areas

In areas with suspended or dropped ceilings and in areas with concealed spaces above the ceiling, piping must be concealed above ceilings. Piping must be inspected, hydrostatically tested and approved before being concealed. Risers and similar vertical runs of piping in finished areas must be concealed.

3.4.4 Pendent Sprinklers

a. Drop nipples to pendent sprinklers must consist of minimum 1-inch pipe with a reducing coupling into which the sprinkler must be threaded.

b. Where…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .