FAKZ182353 Type B3 Drawings SIGNED.pdf
PDF 24 MB Posted
- Attached to
- Renovation of Building 1407 to AGE
- Solicitation number
- W50S6N-23-B-0005
About this file
This file contains technical drawings related to a federal solicitation for building renovation services. The solicitation number is W50S6N-23-B-0005 and is being issued by the Department of the Army Alabama Army National Guard for the renovation of Building 1407 to house additional aging equipment. Interested parties should review the 24MB PDF file containing Type B3 drawings prior to submitting a proposal in response to this solicitation. The opportunity type is listed as a solicitation, suggesting proposals are due in the near future and a contract award will be subsequently issued for the specified renovation work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T1.0
TITLE SHEET
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
DRAWING INDEX
SHEET NO. SHEET NAME
09 ELECTRICAL
E0.1 ELECTRICAL SYMBOL LEGEND
E0.2 LIGHTING FIXTURE SCHEDULE & GENERAL NOTES
E0.3 POWER RISER DIAGRAM & SCHEDULES
E0.4 PANELBOARD SCHEDULES
E0.5 PANELBOARD SCHEDULES
E0.6 ELECTRICAL DETAILS
E0.7 ELECTRICAL DETAILS
E0.8 AUXILIARY RISER DIAGRAM, DETAILS & NOTES
E0.9 AUXILIARY DETAILS
E0.10 GROUNDING RISER DIAGRAM & DETAILS
E0.11 ELECTRICAL DEMOLITION PLAN
E1.1 SITE ELECTRICAL PLAN
E2.1 LIGHTING PLAN
E3.1 POWER PLAN - AREA A
E3.2 POWER PLAN - AREA B
E3.3 POWER PLAN - AREA C
E3.4 POWER PLAN - MEZZANINE
E3.5 MECHANICAL EQUIPMENT POWER PLAN
E4.1 MECHANICAL EQUIPMENT POWER PLAN - FIRST FLOOR
E5.1 GROUNDING PLAN
E5.2 LIGHTNING PROTECTION PLAN
09.1 FIRE ALARM
FA0.1 FIRE ALARM MATRIX AND GENERAL NOTES
FA0.2 FIRE ALARM RISER AND DETAILS
FA1.1 FIRE ALARM PLAN - DEMOLITION
FA1.2 FIRE ALARM PLAN - NEW WORK
DRAWING INDEX
SHEET NO. SHEET NAME
07 MECHANICAL
M0.1 GENERAL MECHANICAL NOTES, LEGEND AND INDEX OF DRAWINGS
M1.1 MECHANICAL DEMOLITION ROOF PLAN
M1.2 MECHANICAL DEMOLITION FLOOR PLAN
M2.1 MECHANICAL NEW WORK FLOOR PLAN - AREA A
M2.2 MECHANICAL NEW WORK FLOOR PLAN - AREA B
M2.3 MECHANICAL NEW WORK FLOOR PLAN - AREA C
M2.4 MECHANICAL NEW WORK UPPER PLAN - AREA C
M5.1 MECHANICAL DETAILS
M5.2 MECHANICAL DETAILS
M6.1 MECHANICAL SCHEDULES
M6.2 MECHANICAL SCHEDULES
M7.1 MECHANICAL CONTROLS
M7.2 MECHANICAL CONTROLS
08 PLUMBING
P1.1 PLUMBING PLAN - DEMOLTION - WASTE & AIR
P1.2 PLUMBING PLAN - DEMOLITION - WATER
P1.3 PLUMBING PLAN - NEW WORK - WASTE & AIR
P1.4 PLUMBING PLAN - NEW WORK - WATER
P1.5 PLUMBING SCHEDULES
P1.6 WASTER AND VENT RISER DIAGRAM
DRAWING INDEX
SHEET NO. SHEET NAME
A2.6 ROOF DETAILS
A2.7 ROOF DETAILS
A3.1 FINISH SCHEDULES
A3.2 DOOR SCHEDULE
A3.3 WINDOW AND DOOR DETAILS
A3.4 WINDOW AND DOOR DETAILS
A3.5 OPENING SCHEDULE
A4.1 ELEVATIONS
A6.1 ENLARGED PLANS & ELEVATIONS - BASE BID
A6.2 ENLARGED PLANS & ELEVATIONS - BID OPTION
A6.3 RESTROOM ELEVATIONS AND DETAILS
A7.1 CASEWORK ELEVATIONS
A7.2 CASEWORK DETAILS
A8.1 REFLECTED CEILING PLAN
A9.1 FLOOR PATTERN PLAN - BASE BID
A9.2 FLOOR PATTERN PLAN - BID OPTION
05 STRUCTURAL
S1.0 GENERAL STRUCTURAL NOTES
S2.0 FOUNDATION PLAN AND NEW MEZZANINE PLAN
S3.0 STRUCTURAL DETAILS
S4.0 STRUCTURAL DETAILS
S5.0 STRUCTURAL DETAILS
06 FIRE PROTECTION
FX0.1 FIRE SPRINKLER GENERAL NOTES
FX1.1 FIRE SPRINKLER PLAN - DEMOLITION
FX1.2 FIRE SPRINKLER PLAN - NEW WORK
FX5.1 FIRE SPRINKLER DETAILS
DRAWING INDEX
SHEET NO. SHEET NAME
00 TITLE
T1.0 TITLE SHEET
T2.0 GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS
T3.0 TYPICAL MOUNTING HEIGHTS & CLEARANCES
01 LIFE SAFETY
LS1.0 LIFE SAFETY
LS2.0 FIRST FLOOR LIFE SAFETY PLAN
03 CIVIL
C1.1 SITE DEMOLITION PLAN
C2.1 SITE LAYOUT PLAN
C3.1 SITE GRADING & DRAINAGE PLAN
C4.1 SITE UTILITIES PLAN
C5.1 SITE EROSION & SEDIMENT CONTROL PLAN
C6.1 SITE DETAILS
C7.1 SITE DETAILS
C8.1 SITE DETAILS
C9.1 SITE DETAILS
04 ARCHITECTURAL
A1.0 DEMOLITION NOTES
A1.1 DEMOLITION FLOOR PLAN
A1.2 DEMOLITION ELEVATIONS
A2.1 FIRST FLOOR PLAN
A2.2 MEZANINE PLAN AND DETAILS
A2.3 WALL TYPE PLAN
A2.4 ROOF PLAN - BASE BID
A2.5 ROOF PLAN - BID OPTION
ARCHITECTURALCIVIL STRUCTURAL MECHANICAL ELECTRICAL
SEAY SEAY & LITCHFIELD, P.C.
1115 SOUTH COURT STREET
MONTGOMERY, AL 36104
334-263-5162
PROFESSIONAL ENGINEERING CONSULTANTS
822 S MCDONGOUGH STREET
MONTGOMERY AL, 36104
334-262-7307
GRANT ENGINEERING, L.L.C
432 HERRON STREET
MONTGOMERY, AL 36104
334-265-4631
PETERSON ENGINEERING, INC.
75 SOUTH F STREET
PENSACOLA, FL 32502
850-434-0513
GARNER & ASSOCIATES, P.C.
903 SOUTH PERRY STREET
MONTGOMERY, AL 36104
334-647-1596
Approvals:
Title: Signature: Date:
Base Commander
Base Civil Engineer
Base Project Engineer
Bio Environmental Eng.
Safety
Security Police
Base Communications
Fire Chief
Option #3
Schedule of Bid Options:
Replace Exterior Roll Up Doors
Option #2
Epoxy Floor System
Option #1
Recover Roof
Option #4
Wash Rack
Bathroom TileOption #5
Structured CablingOption #6
F-35: CONVERT BLDG 1407 FOR AGE
Montgomery, AL
FAKZ182353 / 18074
187th Fighter Wing Dannelly Field - AL ANG
No. Revision Date
ED1.1
202A
A101
1Ref
Re f
1 Ref
Re f
A101
Ref
1Re f
1 Re f
Ref
ROOM NAME
150 SF
1t
1i
A101
SIM
A101
SIM
A101
SIM
Building Elevation Tag
Interior Elevation Tag
Building Section Tag
Wall Section Tag
Detail Tag
General Symbol Legend
Room Tag
ADA Approved Turning Space
Spot Elevation
Door Tag (See Door Schedule)
Window Tag (See Window Schedule)
Wall/Storefront Tag (See Wall/Storefront Schedule)
Revision Tag (See Revision Schedule)
X Specific Note Tag
Electric Water Cooler (See Plumbing)
Fire Extinguisher Cabinet
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T2.0
GENERAL WORK
NOTES,
ABBREVIATIONS &
SYMBOLS
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
General Project Notes:
GENERAL NOTES APPLY TO THE ENTIRE PROJECT. SPECIFIC NOTES APPLY TO ISOLATED
WORK AREAS AND ARE FOR THE CONVENIENCE OF THE CONTRACTOR. HOWEVER, ALL
ISOLATED WORK AREAS ARE NOT NOTED. SHOULD A CONDITION OCCUR THAT IS NOT
SPECIFICALLY NOTED, THE CONTRACTOR SHALL PROCEED WITH WORK PER GENERAL
DEMOLITION NOTES OR A SPECIFIC WORK NOTE(S) USED IN OTHER SIMILAR
CONDITIONS, WHICHEVER IS MORE STRINGENT, PER APPROVAL OF THE GOVERNMENT.
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY CONDITIONS
1. CONTRACTOR TO VISIT SITE AND TO BECOME TOTALLY FAMILIAR WITH EXTENT OF
WORK REQUIRED PRIOR TO BID.
2. CONTRACTOR TO VERIFY DIMENSIONS OF INTERIOR PARTITION WALLS. IF
DISCREPANCY OCCURS, NOTIFY THE GOVERNMENT PRIOR TO FRAMING.
3. CONTRACTOR TO VERIFY ALL FINISHED DIMENSIONS BEFORE INSTALLATION OF
CABINET WORK AND TRIMWORK.
4. DIMENSIONS OF EXISTING STRUCTURES ARE ONLY FOR THE CONVENIENCE OF THE
CONTRACTOR, VERIFY ALL EXISTING CONDITIONS. LOCATION OF WALLS SHALL BE
AS SHOWN ON PLAN RELATIVE TO EXISTING CONDITIONS.
5. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD CONDITIONS WITH THE
DRAWINGS, IN PARTICULAR: WALL DIMENSIONS, INCOMING UTILITIES, ETC. REPORT
IMMEDIATELY TO THE GOVERNMENT ANY VARIANCES OR FIELD CONDITIONS THAT
MAY CAUSE CONSTRUCTION PROBLEMS PRIOR TO COMMENCING WORK.
CONTRACTOR'S REPONSIBILITY TO COORDINATE THE WORK
1. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO COMMENCING.
FURNISH INFORMATION NECESSARY TO ADJUST, MOVE OR RELOCATE EXISTING
STRUCTURES, UTILITY POLES, LINES, SERVICES OF OTHER SYSTEMS LOCATED IN,
OR AFFECTED BY CONSTRUCTION. COORDINATE WITH LOCAL AUTHORITIES
HAVING JURISDICTION WITH CONSTRUCTION.
2. CONTRACTOR TO VERIFY APPLICABLE OPENINGS, DOOR SIZES, AND DIMENSIONS
OF MECHANICAL ROOMS WITH EQUIPMENT. IF DISCREPANCY OCCURS, NOTIFY
THE GOVERNMENT PRIOR TO FRAMING.
3. CONTRACTOR TO COORDINATE PLUMBING AND MECHANICAL LINES WITH CEILING
HEIGHTS, ABOVE CEILING AREAS AND STRUCTURAL ELEMENTS.
4. CONTRACTOR TO VERIFY WITH STRUCTURAL, PLUMBING, MECHANICAL, AND
ELECTRICAL THE QUANTITY AND SIZES OF ALL SLEEVES REQUIRED. ALL SLEEVES
TO BE ONE HOUR RATED, PROVIDE GREATER RATING IF PENETRATING INTO HIGHER
RATED SPACE.
5. COORDINATE CONDUIT, PIPING, AND DUCTWORK SO THAT THE HEAD HEIGHT IS
NOT ENCUMBERED AND SERVICES ARE AS TIGHT UP TO STRUCTURE AS POSSIBLE.
6. CONTRACTOR TO COORDINATE PLUMBING, MECHANICAL, FIRE SPRINKLER,
ELECTRICAL, AND LIGHTING WITH STRUCTURAL ELEMENTS WHERE THERE IS
EXPOSED STRUCTURE. CONDUIT LINES, ECT. SHALL RUN AT RIGHT ANGLES OR
SEGMENTED BETWEEN COLUMN LINES AND BE CLEAN AND NEAT IN APPEARANCE.
7. COORDINATE LOCATION OF SWITCHES, OUTLETS, THERMOSTATS, LIGHTS, ETC. W/
SHELVING, TRIM, MARKER BOARDS, AND CABINETRY. MOVE AS REQUIRED TO
MISS SHELVING, STORAGE, CASEWORK, VISUAL DISPLAY BOARDS.
8. COORDINATE CONDUIT, PIPING, AND DUCTWORK SO THAT HEAD HEIGHT IS NOT
ENCUMBERED AND SERVICES ARE AS TIGHT UP TO STRUCTURE AS POSSIBLE,
THIS WILL INCLUDE JOGGING DUCTS, SPRINKLER LINES, PLUMBING LINES,
CONDUIT, ECT. UP AND DOWN OR AROUND AS REQUIRED TO ACHIEVE CEILING
HEIGHTS AS INDICATED. COORDINATE INSTALLATION AND SEQUENCING OF
DISCIPLINES TO ACHIEVE.
9. THE GENERAL CONTRACTOR SHALL STAKE OUT ALL MAJOR FEATURES SHOWN ON
THE SITE PLAN TO VERIFY THE SITE LAYOUT RELATIVE TO THE PROPERTY LINES AND
SITE CONDITIONS PRIOR TO ANY UTILITIES OR FOOTINGS BEING INSTALLED.
10. COORDINATE FINAL CEILING HEIGHT WITH ALL WINDOWS. ALL TRADES SHOULD BE
ABLE TO FIT WITHIN THE ALLOTTED SPACE IF COORDINATED BY THE GENERAL
CONTRACTOR AND EACH TRADE. IF FURR DOWNS ARE REQUIRED TO
ACCOMMODATE ABOVE CEILING ITEMS, THE CONTRACTOR IS RESPONSIBLE TO
PROVIDE FURR DOWNS AND COORDINATE LOCATIONS WITH THE GOVERNMENT.
11. PLUMBING, FIRE-PROTECTION, MECHANICAL, AND ELECTRICAL WORK REQUIRED BY
THIS CONTRACT IS NOTED ON CONTRACT DOCUMENTS. THE TRADE
CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF THEIR WORK
WITH ALL TRADES. CHANGE ORDERS SHALL NOT BE APPROVED FOR EXTRA WORK
ARISING FROM TRADE CONTRACTORS NOT COORDINATING WORK.
12. CONTRACTOR WILL BE RESPONSIBLE FOR ALL LAYOUT FOR INTERIOR/EXTERIOR
WALLS AND FOUNDATION AND WILL BE RESPONSIBLE FOR MAINTAINING A
BENCHMARK AND CONTROL LINES AT EACH FLOOR LEVEL. CONTRACTOR IS ALSO
RESPONSIBLE FOR VERIFYING ACTUAL FLOOR HEIGHTS AND COORDINATING NEW
AND EXISTING FLOORS TO ALIGN.
13. EACH TRADE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING AND
INSTALLING CEILING OR WALL-MOUNTED ACCESS DOORS AS REQUIRED TO
ACCESS COMPONENTS OF ITS SYSTEM AND TO COORDINATE WITH OTHER
TRADES SO ACCESS IS MAINTAINED
14. PLUMBING, FIRE-PROTECTION, MECHANICAL, AND ELECTRICAL WORK REQUIRED BY
THIS CONTRACT IS NOTED ON CONTRACT DOCUMENTS. THE TRADE
CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF THEIR WORK
WITH ALL TRADES. CHANGE ORDERS SHALL NOT BE APPROVED FOR EXTRA WORK
ARISING FROM TRADE CONTRACTORS NOT COORDINATING WORK.
15. CONTRACTOR SHALL COORDINATE TO ASSURE ALL EQUIPMENT CAN BE BROUGHT
INTO THE BUILDING. THIS INCLUDES MANUFACTURE COMPONENT SIZE/ASSEMBLY,
CRITICAL PATH SCHEDULING, AND COORDINATION OF OTHER TRADES.
ACT Acoustical Ceiling Tile A/C Air Conditioning AB Anchor Bolt ADA American Disabilities Act AFF Above Finish Floor BM Beam BRG Bearing BRK Brick CFCI Contractor Furnished
Contractor Installed CIP Cast In Place CJ Control Joint CL Column Line CLG Ceiling CLR Clear CMU Concrete Masonry Unit COL Column CONC Concrete CONT Continuous CONTR Contractor COORDF Coordination CORR Corridor CT Ceramic Tile CTR Center DBL Double DET Detail DIA Diameter DR Drain DN Down DS Downspout DW Dishwasher DWG Drawing DWR Drawer EA Each EF Exhaust Fan EJ Expansion Joint EL Elevation ELEC Electrical EQ Equal EX Existing EXT Exterior FF Finish Floor FIN Finish FL Floor Line FlSNG Flashing FTG Footing GA Gauge GFRC Glass Fiber Reinforced
Concrete
GWB GWB
HT Height HM Hollow Metal HOR Horizontal HR Handrail HTR Heater HVAC Heating, Ventilation & Air
Conditioning HxWxL Height, width, length IN Inches INSUL Insulation INT Interior JST Joist
JT Joint LAM Laminate LAV Lavatory LVR Louver MIN Minimum MAX Maximum MECH Mechanical MET Metal MFR Manufacturer MH Man Hole MIN Minimum MISC Miscellaneous MLDG Moulding MO Masonry Opening MTD Mounted MW Microwave NIC Not In Contract NO Number NOM Nominal NTS Not to Scale OC On Center OFCI Owner Furnished
Contractor Installed OFOI Owner Furnished
Owner Installed OPP Opposite P Paint PL Plate / Property Line PL LAM Plastic Laminate PLYWD Plywood PNL Panel PT Pressure Treated R Radius / Riser RB Rubber Base REFR Refrigerator REINF Reinforce (D) REV Revised RM Room SCHED Schedule SECT Section SHT Sheet SHW Single Hung Window SIM Similar SPECS Specifications SQ Square SS Sanitary Sewer STD Standard SVT Solid Vinyl Tile STL Steel T Tile T&G Tongue & Groove TYP Typical UNO Unless Noted
Otherwise VERT Vertical VTR Vent Thru Roof VWC Vinyl Wall Covering WD Wood WWM Welded Wire Mesh WWF Welded Wire Fabric YP Yellow Pine
Typical Abbreviation Legend:General Project Notes (Continued):
CONTRACTOR'S RESPONSIBILTY TO COMPLY WITH APPLICABLE GOVERNING
CODES/AUTHORITIES:
1. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES, LAWS,
AND ORDINANCES. EACH TRADE CONTRACTOR IS RESPONSIBLE FOR
OBTAINING ALL PERMITS, INSPECTIONS, AND CERTIFICATES REQUIRED BY
GOVERNING ENTITIES.
2. CONTRACTOR TO CONFIRM ALL OSHA AND APPLICABLE STANDARDS TO
ASSURE SAFETY OF ALL PERSONS ON SITE DURING ENTIRE COURSE OF
CONSTRUCTION.
3. NEITHER THE ARCHITECT, NOR THE GOVERNMENT SHALL BE RESPONSIBLE
FOR JOB SAFETY. EACH TRADE CONTRACTOR SHALL BE RESPONSIBLE FOR
JOB SITE SAFETY AND SAFETY OF THE PUBLIC DURING CONSTRUCTION AND
SHALL PROVIDE APPROPRIATE WARNINGS, BARRICADES, ETC. AS REQUIRED
PER CODES.
4. PROMPTLY NOTIFY THE GOVERNMENT IN WRITING IF ANY CONTRACT
DOCUMENTS ARE FOUND TO BE IN VARIANCE WITH THE APPLICABLE LAWS
AND ORDINANCES. NECESSARY CHANGES WILL BE MADE BY APPROPRIATE
MODIFICATIONS.
5. IF ANY WORK IS PERFORMED KNOWING IT TO BE CONTRARY TO SUCH CODES,
LAWS, ORDINANCES, RULES AND REGULATIONS, AND WITHOUT NOTICE TO
THE GOVERNMENT, THAT TRADE CONTRACTOR ASSUMES FULL
RESPONSIBILITY AND BEARS COSTS ATTRIBUTED TO BRING WORK TO
COMPLIANCE OF SUCH CODES, LAWS, ORDINANCES, AND RULES AND
REGULATIONS.
GENERAL PROVISIONS FOR FIRE RATED CONSTRUCTION
1. ALL RECESSED ACCESSORIES LOCATED IN FIRE RATED WALLS SHALL BE
EITHER OF FIRE RATED CONSTRUCTION OR COORDINATED WITH THE
ADJACENT TRADES TO ALLOW THE GYPSUM BOARD TO BE CONTINUOUS
BEHIND THE ACCESSORIES.
2. EACH RESPONSIBLE CONTRACTOR SHALL SEAL ALL PENETRATIONS MADE AS
PART OF THEIR WORK IN FIRE-RATED CONSTRUCTION AS REQUIRED BY ALL
APPLICABLE CODES. EACH CONTRACTOR TO VERIFY WITH LOCAL FIRE
MARSHAL OR BUILDING OFFICIAL HAVING JURISDICTION. EACH RESPONSIBLE
CONTRACTOR WILL SEAL ALL PENETRATIONS MADE AS PART OF THEIR WORK
THROUGH NON-RATED PARTITIONS. ALL FIRE CAULK TO BE THE SAME BRAND
AS DETERMINED BY CONTRACTOR.
3. ALL NEW AND EXISTING FIRE WALLS IN WORK AREAS ARE TO BE CARRIED TO
THE UNDERSIDE OF THE ROOF DECK AND SEALED AS REQUIRED FOR
NECESSARY FIRE RATINGS, AND LABELED PER THE AUTHORITY HAVING
JURISDICTION.
4. MATERIALS WITHIN PLENUMS. EXCEPT AS REQUIRED BY THE 2009
INTERNATIONAL MECHANICAL CODE SECTION 602.2.1.1 THROUGH
602.2.1.6, MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR
SHALL HAVE A FLAME SPEAD INDEX OF NOT MORE THAN 25 AND A SMOKE-
DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE
WITH ASTM E84 OR UL 723.
MISCELLANEOUS GENERAL PROVISIONS:
1. CONTRACTOR TO NOTIFY THE GOVERNMENT IMMEDIATELY IF THERE ARE ANY
DISCREPANCIES WITH TAGGED DETAILS, ENLARGED PLANS, ELEVATIONS, ETC.
2. IN ROOMS WITH FLOOR DRAINS, SLOPE TO DRAIN AT 1 PERCENT SLOPE
UNLESS SPECIFICALLY NOTED OTHERWISE.
*PROVIDED FOR MOUNTING HEIGHT INFORMATION ONLY. FIXTURES SHOWN ARE NOT NECCESSARILY INCLUDED IN PROJECT*
*PROVIDED FOR MOUNTING HEIGHT INFORMATION ONLY. FIXTURES SHOWN ARE NOT NECCESSARILY INCLUDED IN PROJECT*
M A X
" M
A X
" M
IN
PAPER TOWEL
DISPENSER
MIRROR
SOAP
DISPENSER
ROBE
HOOK
TO
T
O P
O F
H O
O K
" T
YP
LAVATORY. PROVIDE ADA
INSULATION KIT WHEN REQUIRED
URINAL
42" MIN
MAX
1' - 0"
" M
IN
" M
IN
" M
IN
" M
IN
WATER
CLOSET
TOILET
PAPER
DISPENSER
SANITARY
NAPKIN
DISPOSAL
HORIZONTAL
GRAB BAR
VERTICAL GRAB BAR
MIN
1' - 3"
39 MIN - 41 MAX
" A B O
V E
FI
N
IS
H
ED
F
LO
O R
SHOWER ROD
FOLDING SHOWER SEAT
FOR TRANSFER-TYPE
SHOWERS. LOCATE ON
WALL OPPOSITE THE
CONTROLS AND HAND
SHOWER WALL.
TOWEL BAR
ALLOWABLE
MOUNTING
AREA
TO
B
O
TT
O M
O F
RE
FL
EC
TI
V E
S U
RF
AC
E
" M A X
H A
FF
M
IN
M A X
H A
FF
M
IN
M
AX
AC
MAX.
15"
MAX.
15"
" M
IN
" M A X
CONTROLS AND HAND
SHOWER SHALL BE
LOCATED WITHIN HATCH
AREA
HAND SHOWER GLIDE
RAIL NOT SHOWN,
SEE SPECS
TRANSFER
SHOWER
CONTROL
WALL LOCATED
OPPOSITE
SEAT WALL.
4" MAX.
18"
" M A X
/2 " M
AX
1 1/2" MAX.
22" - 23"
15" - 16"
C O
M
PA
R
TM
EN
T
EN
TR
Y
" M A X
O F
L-SHAPED
SHOWER
SEAT
16" - 18"
M
IN
M
AX
12 MIN
36 MIN.
HORIZONTAL
GRAB BAR
TYPICAL ADA MOUNTING HEIGHTS (UNLESS OTHERWISE NOTED)
MINIMUM
4' - 0"
M
IN
IM
U
M
C O
M
PA
R
TM
EN
T
EN
TR
Y
" M A X
O F
3' - 0"
CLEAR
FLOOR
SPACE
TRANSFER TYPE SHOWER
" M
IN
18" MIN
(A)
FRONT APPROACH, PULL SIDE
" M
IN
(B)
FRONT APPROACH, PUSH
SIDE
" M
IN12" MIN
(C)
FRONT APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH
CLOSER AND LATCH
36" MIN
" M
IN
(D)
HINGE APPROACH, PULL SIDE
42" MIN
" M
IN
(E)
HINGE APPROACH, PULL SIDE
" M
IN
22" MIN
(F)
HINGE APPROACH, PUSH SIDE
(G)
HINGE APPROACH, PUSH SIDE, DOOR
PROVIDED WITH BOTH CLOSER AND
LATCH
" M
IN
22" MIN
24" MIN
" M
IN
(H)
LATCH APPROACH, PULL SIDE
(I)
LATCH APPROACH, PULL SIDE,
DOOR PROVIDED WITH CLOSER
" M
IN 24" MIN
24" MIN
" M
IN
(J)
LATCH APPROACH, PUSH SIDE
(K)
LATCH APPROACH, PUSH SIDE,
DOOR PROVIDED WITH CLOSER
24" MIN
" M
IN
" M
IN
12" MIN
(C)
PUSH SIDE, DOOR PROVIDED WITH
BOTH CLOSER AND LATCH
X > 8"4
" M
IN
(B)
PUSH SIDE
" M
IN
18" MIN
X > 8"
(A)
PULL SIDE
24" MIN
" M
IN
(D)
STOP OR LATCH APPROACH
22 MIN
m in
(C)
POCKET OR HINGE APPROACH
(B)
SIDE APPROACH
M
IN
m in
(A)
FRONT APPROACH
TO
F
IR
E
EX
TI
N G
U
IS
H
ER
H
AN
D
LE
'-6
" M
AX
A D
A M
AX
" M
AX
FIRE
EXTINGUISHER
CABINET
ADA ELECTRIC
WATER COOLER
H A
FF
" M
IN
" M
A X.
M
IN
" M
IN
MIN.
8"
" M
AX
6" MAX.
11" MIN
CL
5" MAX. 15" MIN.
MIN. CLEAR DEPTH
48"
M
IN
C
LE
AR
W
ID
TH
ADA ELECTRIC
FOUNTAIN SKIRT
WHERE LOCATED IN
CIRCULATION PATH
AREA OF
REFUGE
AREA OF
REFUGE
" M
IN
" M A X
CL
18 MIN
M
IN
CENTERED ON RAISED CHARACTERS
HEIGHT OF RAISED CHARACTERS ABOVE FLOOR LOCATION OF SIGNS AT DOORS
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T3.0
TYPICAL
MOUNTING
HEIGHTS &
CLEARANCES
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
1/2" = 1'-0"T3.0
1 TYPICAL MOUNTING HEIGHTS UNLESS NOTED OTHERWISE
3/8" = 1'-0"T3.0
2 DOOR CLEARANCES
1/8" = 1'-0"T3.0
5 TYPICAL SIGNAGE MOUNTING DIAGRAMS
1. ADA STANDARDS FOR ACCESSIBLE DESIGN AND ICC/ANSI A117.1 ARE THE REFERENCE
STANDARDS USED FOR SCOOPING PROVISIONS FOR ACCESSIBILITY. THE MORE STRINGENT
PROVISIONS OF THE TWO STANDARDS ARE INDICATED.
2. DIAGRAMS SHOWN ARE FOR MOUNTING HEIGHT INFORMATION ONLY. FIXTURES SHOWN ARE NOT
NECESSARILY INCLUDED IN THE PROJECT.
3. COORDINATE ADA REQUIREMENTS WITH ALL REQUIRED CONCEALED WOOD BLOCKING.
4. REFER TO MANUFACTURER'S LITERATURE REGARDING RECOMMENDATIONS FOR MOUNTING
PRODUCTS AND MATERIALS IN COMPLIANCE WITH ADA STANDARDS.
GENERAL NOTES:
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
LS1.0
LIFE SAFETY
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
APPLICABLE CODES:
BUILDING CODE..............UFC 1-200-01 / 2018 INTERNATIONAL BUILDING
CODE
STRUCTURAL CODE.........UFC 3-301-01 / IBC 2018
PLUMBING CODE............UFC 3-420-01 / IBC 2018
MECHANICAL CODE........UFC 3-401-01 / IBC 2018
ELECTRICAL CODE..........UFC 3-501-01 / IBC 2018 / NFPA 70
ENERGY CODE...............UFC 1-200-02
ACCESSIBILITY CODE......ARCHITECTURAL BARRIERS ACT STANDARDS
LIFE SAFETY CODE.........UFC 3-600-01 / NFPA 101
ANTI-TERRORIST FORCE PROTECTION.....UFC 4-010-01
IBC CHAPTER 3 AND UFC 3-600-01 OCCUPANCY & USE:
NFPA 101 CHAPTER 6:
• SEE LEGEND ON LIFE SAFETY PLAN
IBC CHAPTER 4 - SPECIAL DETAILED REQUIREMENTS:
• NOT APPLICABLE
IBC CHAPTER 5 - GENERAL BUILDING HEIGHTS & AREAS:
• CONSTRUCTION TYPE = II-B, SPRINKLED
• ALLOWABLE BUILDING HEIGHT (PER TABLE 504.3)
TYPE B / S-1 - 75 FEET ABOVE GRADE PLANE
• ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLANE (PER TABLE 504.4)
TYPE B - 4 STORIES ABOVE GRADE PLANE
TYPE S-1 -3 STORIES ABOVE GRADE PLANE
• TABULAR BUILDING AREA (PER TABLE 506.2)
OCCUPANICES ALLOWABLE AREA
B 92,000 SF
S-1 70,000 SF
• FRONTAGE INCREASE FORMULA PER 506.3
I=(F/P -0.25)W/30 = (625/625-0.25)30/30 = 0.75
• ALLOWABLE BUILDING AREA (PER SECTION 506.2)
92,000 + (23,000*.75)=109,250 (GROUP B)
70,000 + (17,500*.75)= 83,125 (GROUP S-1)
• 508.4.2 ALLOWABLE BUILDING AREA IN EACH STORY, THE BUILDING AREA
SHALL BE SUCH THAT THE SUM OF THE RATIOS OF THE ACTUAL BUILDING
AREAS OF EACH SEPARATED OCCUPANCY DIVIDED BY THE ALLOWABLE
BUILDING AREA OF EACH SEPARATED OCCUPANCY SHALL NOT EXCEED 1.
(5,676 / 109,250) + (11,559 / 83,125) = .19 < 1.0
• FIRE SEPARATION REQUIREMENTS PER TABLE 508.4
OCCUPANCIES RATING (HR)
B | S-1 0
• PROTECTION FROM HAZARDS (PER NFPA 101 38.3.2) - PROVIDE SMOKE
PARTITIONS TO SEPARATE BUSINESS AREAS FROM STORAGE.
IBC CHAPTER 6 TYPES OF CONSTRUCTION:
• CONSTRUCTION TYPE: II-B
• FIRE RATINGS (PER TABLE 601) AS FOLLOWS (EXCEPT WHERE NOTED
OTHERWISE)
PRIMARY STRUCTURAL FRAME.............................. 0 HOUR
BEARING WALLS (INTERIOR & EXTERIOR)...................0 HOUR
NON-BEARING WALLS AND PARITIONS (INTERIOR)........0 HOUR
FLOOR CONSTRUCTION AND SECONDARY MEMBERS...0 HOUR
ROOF CONSTRUCTION AND SECONDARY MEMBERS....0 HOUR
• REQUIRED FIRE RATING (PER TABLE 602)
OCCUPANCY FIRE SEPARATION REQ.
TYPE (ACTUAL) SEPARATION
NO FIRE SEPARATION REQUIRED
UFC 3-600-01(REPLACES IBC CHAPTER 9) - FIRE PROTECTION SYSTEMS:
• SECTION 9-1 - EMERGENCY VEHICLE ACCESS
1. FACILITY REQUIRES ONE MEANS OF ALL-WEATHER EMERGENCY VEHICLE GROUND
ACCESS IN ACCORDANCE WITH 9-1.1
2. FACILITY REQUIRES AERIAL APPARATUS ACCESS IN ACCORDANCE WITH 9-1.2
• SECTION 9-2 - FIRE FLOW FOR FACILITIES
1. FIRE FLOW FOR SPRINKLER SYSTEM IS PROVIDED IN ACCORDANCE WITH 9-2.1
• SECTION 9-3 - SERVICE MAINS AND LATERALS
1. FIRE HYDRANTS ARE PROVIDED IN ACCORDANCE WITH 9-3.5.8
A. HYDRANTS ARE SPACED AT 300 FT MAXIMUM
• SECTION 9-5 - FIRE PUMPS
1. A FIRE PUMP IS NOT REQUIRED TO MEET FIRE PROTECTION DEMAND
• SECTION 9-7 - AUTOMATIC SPRINKLER SYSTEMS
1. PER 9-7.2.1, AN AUTOMATIC SPRINKLER SYSTEM IS REQUIRED
• SECTION 9-10 - STANDPIPE SYSTEMS
1. PER 9-10, A STANDPIPE SYSTEM IS NOT REQUIRED
• SECTION 9-17 - PORTABLE FIRE EXTINGUISHERS
1. PER 9-17.1, PORTABLE FIRE EXTINGUISHERS ARE REQUIRED FOR BUSINESS
AREAS.
2. PER 9-17.1, PORTABLE FIRE EXTINGUISHERS ARE NOT REQUIRED FOR STORAGE
AREAS.
3. FIRE EXTINGUISHERS ARE PROVIDED, SEE PLANS FOR LOCATIONS
• SECTION 9-18- FIRE ALARM SYSTEMS
1. PER 9-18.1 A FIRE ALARM SYSTEM IS NOT REQUIRED.
NOTE: THE FACILITY WILL BE PROVIDED WITH A MASS NOTIFICAITON SYSTEM PER UFC
4-021-01
IBC CHAPTER 7 - FIRE AND SMOKE PROTECTION FEATURES:
• MAXIMUM EXTERIOR WALL OPENINGS (PER SECTION 705)
FIRE SEPARATION: DEGREE OF OPENING PROTECTION: ALLOWABLE AREA:
GREATER THAN 30 FT PROTECTED, SPRINKLERED , (UP, S) NO LIMIT
• FIRE WALLS (PER SECTION 706)
NO FIRE WALLS ARE PRESENT WITHIN THE SCOPE OF THE PROJECT
• SHAFT ENCLOSURE (PER SECTION 713)
NO SHAFTS ARE PRESENT WITHIN THE DESIGN
• OPENING PROTECTIVES (PER SECTION 716)
TYPE OF ASSEMBLY ASSEMBLY RATING REQUIRED OPENING PROTECTION (DOOR/SIDELITE)
CORRIDOR O HOUR 0 HOUR
• CONCEALED SPACES (PER SECTION 718)
NOT APPLICABLE
IBC CHAPTER 8, UFC 3-600-01, NFPA 101 - INTERIOR FINISHES:
• FINISH MATERIAL RATING REQUIREMENTS (PER NFPA 101)
BUSINESS (CHAPTER 38)
EXITS AND EXIT ACCESS CORRIDORS
INTERIOR WALL AND CEILING FINISH - CLASS A OR B (38.3.3.2.1)
INTERIOR FLOOR FINISH - CLASS I OR CLASS II (38.3.3.2)
AREAS OTHER THAN EXITS AND EXIT ACCESS CORRIDORS
INTERIOR WALL AND CEILING FINISH - CLASS A, B, OR C (38.3.3.2.2)
STORAGE (CHAPTER 42)
EXITS AND EXIT ACCESS CORRIDORS
INTERIOR WALL AND CEILING FINISH - CLASS A, B, OR C (42.3.3.2)
INTERIOR FLOOR FINISH - CLASS I OR CLASS II (42.3.3.3.1)
AREAS OTHER THAN EXITS AND EXIT ACCESS CORRIDORS
INTERIOR FLOOR FINISH - NO REQUIREMENT (42.3.3.3.2)
NFPA CHAPTER 7 (REPLACES IBC CHAPTER 10) - MEANS OF EGRESS:
• OCCUPANCY LOAD (PER TABLE 7.3.1.2):
SEE OCCUPANCY TABLE
• EGRESS CAPACITY SIZING (PER TABLE 7.3.3.1)
SEE CODE CALCULATIONS TABLE(S)
SEE LIFE SAFETY PLAN FOR INDIVIDUAL ROOM EGRESS ANALYSIS
• MINIMUM STAIR WIDTH (PER SECTION 7.3.3.1)
- NOT APPLICABLE - NO STAIRS PROVIDED, ONE FLOOR FACILITY
• NUMBER OF MEANS OF EGRESS (PER SECTION 7.4.1)
TOTAL NUMBER OF EXITS REQUIRED
BUSINESS OCCUPANCY (CHAPTER 38)
GROUND FLOOR - 2 EXITS REQUIRED
STORAGE OCCUPANCY (CHAPTER 42)
GROUND FLOOR - 2 EXITS REQUIRED
• COMMON PATH OF EGRESS TRAVEL DISTANCE
BUSINESS OCCUPANCY (CHAPTER 38)
100 FT PER 38.2.5.3.1
STORAGE OCCUPANCY (CHAPTER 42)
100 FEET PER TABLE 42.2.5
OTHER (CHAPTER 7)
MECHANICAL EQUIPMENT ROOMS, BOILER ROOMS, AND
FURNACE ROOMS - 100 FT PER 7.12.1
• EXIT ACCESS TRAVEL DISTANCE
BUSINESS OCCUPANCY (CHAPTER 38)
300 FT PER 38.2.6.3
SEE LIFE SAFTEY PLAN FOR EXIT ACCESS TRAVEL DISTANCE
STORAGE OCCUPANCY (CHAPTER 42)
400 FEET PER TABLE 42.2.6
• CORRIDORS
OCCUPANCY TYPE (B) REQUIRES:
NO FIRE RATING REQUIRED FOR CORRIDOR WALLS
SEE LIFE SAFTEY PLAN FOR LOCATIONS OF RATED CORRIDORS
MINIMUM CORRIDOR WIDTH
BUSINESS OCCUPANCY (CHAPTER 38)
44 INCHES PER 38.2.3.2
DEAD END CORRIDORS
BUSINESS OCCUPANCY (CHAPTER 38)
MAXIMUM OF 50 FEET PER 38.2.5.3.1
STORAGE OCCUPANCY (CHAPTER 42)
MAXIMUM OF 100 FEET PER TABLE 42.2.5
Ground Floor Plan Code Calculations
Name
Egress Calculations
Area (square feet)
Occupancy Factor (SF per person)
Total Occupant Load (persons)
Egress Component Width Factor
(inches per person) Req. Width Egress Components (nches)
BUSINESS 2605 SF 150 SF 18 0.2 3.60
BUSINESS (CONCENTRATED) 1381 SF 50 SF 29 0.2 5.80
BUSINESS (CONFERENCE) 843 SF 15 SF 57 0.2 11.40
BUSINESS (IT) 148 SF 300 SF 1 0.2 0.20
BUSINESS (MECHANICAL) 699 SF 500 SF 6 0.2 1.20
Storage S-1 (STORAGE) 1784 SF 500 SF 4 0.2 0.80 Storage S-1 (WORK AREA) 9775 SF 100 SF 98 0.2 19.60
17235 SF 213 42.60
PLUMBING FIXTURE CALCULATIONS
NAME 2
Male
Occupancy Female
Occupancy
Plumbing Fixture Calculations Water Closets Required Lavatories Required Drinking
Foundations Req.Men Women Men Women
BUSINESS / STORAGE 24 6 0.96 0.24 0.60 0.15 0.30
PLUMBING FIXTURE CALCULATIONS ARE BASED UPON UTA OCCUPANCY OF 30 PERSONNEL AND 80% MALE OCCUPANCY RATES IN ACCORDANCE WITH
ANGETL 15-01-00
UP
A
W as he r
D ry er
913 SF
Penetrant/Magnetics
383 SF
X-Ray
132 SF
Dark Room
12535 SF
Control
25 SF
Trap
147 SF
Lobby
257 SF
NDI Office
170 SF
Testing & Training
267 SF
Storage
156 SF
Battery Shop & Storage
949 SF
Tool Crib
185 SF
Flight Chief
185 SF
Supervisor & Administration
250 SF
Men's
360 SF
ALIS Ready Room
182 SF
JOAP Lab
169 SF
NDI OFFICE
44 SF
HVAC
45 SF
Janitor
213 SF
Conference & Meeting
105 359 SF
Break Area
106 704 SF
Welding Shop
265 SF
Women's
632 SF
Circulation
241 SF
Circulation
91 SF
Boiler Room
335 SF
Storage
374 SF
HAZMAT
Accumulation
Point
6994 SF
General Purpose Equipment & Repair Bay
212 SF
FSR Office
110 SF
HVAC
117 SF
COMM
84 SF
ELEC
25 SF
HVAC
45 SF
VEST
135 SF
Covered Entry
70 OCCUPANTS 3.
3.45
4.5
5.55
2 OCCUPANTS
24 OCCUPANTS 15 OCCUPANTS 12
OCCUPANTS
OCCUPANTS
OCCUPANTS 8 OCCUPANTS 6
OCCUPANTS
10 OCCUPANTS
OCCUPANTS
6.3
OCCUPANT
OCCUPANTS
OCCUPANTS
OCCUPANTS
OCCUPANT
O
C C
U
PA
N
TS
0.6
OCCUPANT
OCCUPANT
OCCUPANTS
OCCUPANTS
OCCUPANTS
OCCUPANTS
OCCUPANTS
FEB
FEB
FEB
FEB
FEB
FEB
FEB
FEB
FEB
EWC
EWC
EWS
EWS
FEC
FEC
HANDICAP ACCESSIBLE EXIT LOCATION
EXIT TRAVEL PATH
ELECTRIC WATER COOLER - SEE PLUMBINGEWC
EMERGENCY EXIT SIGNAGE
LIFE SAFETY LEGEND
FIRE EXTINGUISHER & BRACKET (CFCI)
(UL RATED 4A:80B:C - SEE SPECIFICATION SECTION 10 4400)FEB
IBC OCCUPANCY TYPE (B) BUSINESS
150 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD PER NFPA 101
EWS EMERGENCY EYE WASH
STATION - SEE PLUMBING
IBC OCCUPANCY TYPE (B) BUSINESS
15 SF PER OCCUPANT PER UFC 3-600-01
ORDINARY HAZARD PER NFPA 101
IBC OCCUPANCY TYPE (B) BUSINESS
50 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD PER NFPA 101
IBC OCCUPANCY TYPE (S-1) STORAGE
100 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD PER NFPA 101
IBC OCCUPANCY TYPE (S-1) STORAGE
500 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD PER NFPA 101
IBC OCCUPANCY TYPE (B) BUSINESS
500 SF PER OCCUPANT PER UFC 3-600-01
ORDINARY HAZARD PER NFPA 101
IBC OCCUPANCY TYPE (B) BUSINESS
300 SF PER OCCUPANT PER UFC 3-600-01
ORDINARY HAZARD PER NFPA 101
3.2
8 OCCUPANT LOAD
EGRESS REQUIREMENTS:
REQUIRED EGRESS
COMPONENT WIDTH
1 HOUR FIRE BARRIER UL# U905
INDICATES SMOKE PARTITION PER
SECTION 8.4 OF NFPA 101. EXTEND
WALLS TO UNDERSIDE OF
ROOF/FLOOR ABOVE. SEAL ALL
PENETRATIONS
FIRE EXTINGUISHER & CABINET (CFCI)
(UL RATED 4A:80B:C - SEE SPECIFICATION SECTION 10 4400)
FEC
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
LS2.0
FIRST FLOOR LIFE
SAFETY PLAN
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
1/8" = 1'-0"LS2.0
1 LIFE SAFETY PLAN
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A1.0
DEMOLITION
NOTES
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
General Demolition Notes:
THE INTENT OF DEMOLITION IS TO ACCOMPLISH ALL WORK NECESSARY TO PROVIDE A FINISHED, COMPLETE BUILDING AS INDICATED IN THE PLANS AND SPECIFICATIONS. THE FOLLOWING GENERAL NOTES ARE APPLICABLE
TO ALL DEMOLITION ACTIVITIES REQUIRED BY THE SCOPE OF THE CONTRACT DOCUMENTS.
CONTRACTOR'S RESPONSIBILTY TO VERIFY ACCURACY OF EXISTING CONDITIONS:
1. DOCUMENTATION CONTAINED IN THESE CONSTRUCTION DOCUMENTS OF EXISTING CONDITIONS MAY
NOT BE ENTIRELY ACCURATE. CONTRACTOR IS TO TAKE THE INITIATIVE TO VISIT THE SITE PRIOR TO AND
DURING THE PRE-BID MEETING TO VERIFY ACTUAL CONDITIONS, THEREFORE RENDERING THE
CONTRACTOR RESPONSIBLE FOR AN ACCURATE REPRESENTATION OF THE EXISTING CONDITIONS.
2. CONTRACTOR TO VISIT SITE TO VERIFY EXISTING CONDITIONS AND SHALL BE RESPONSIBLE FOR
DETERMINING THE SCOPE OF WORK PRIOR TO DEMOLITION . EXISTING CONDITIONS SHALL BE
THOROUGHLY RESEARCHED PRIOR TO CONSTRUCTION AND ANY DRAWINGS SHALL BE IMMEDIATELY DISCUSSED WITH THE GOVERNMENT PRIOR TO BEGINNING CONSTRUCTION IN THE AFFECTED AREA.
CHANGE ORDERS WILL NOT BE APPROVED PRIOR TO WORK TAKING PLACE FOR EXISTING CONDITIONS
READILY APPARENT BY A THOROUGH OBSERVATION.
3. CONTRACTOR TO VERIFY ALL EXISTING FLOOR ELEVATIONS AND VERIFY WITH PLANS. REPORT ANY
DISCREPANCIES TO THE GOVERNMENT PRIOR TO CONSTRUCTION
4. CONTRACTOR SHALL VERIFY IF THERE ARE EXISTING TILE SETTING BEDS. IN SUCH CASE, CONTRACTOR IS RESPONSIBLE FOR DEMOING EXISTING SETTING BED(S) AND FILL EXISTING DEPRESSED CONCRETE SLAB AREAS WITH MATERIALS CONSISTENT WITH ADJACENT MATERIALS AND FINISHES REQUIRED TO MEET ALL
APPLICABLE CODES.
5. DIMENSIONS OF EXISTING STRUCTURES ARE ONLY FOR THE CONVENIENCE OF THE CONTRACTOR.
CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS. LOCATION OF WALLS SHALL BE AS SHOWN ON
PLANS RELATIVE TO EXISTING CONDITIONS.
6. THE GOVERNMENT ASSUMES NO RESPONSIBILITY FOR EXISTING UNKNOWN CONDITIONS. EACH
CONTRACTOR SHALL COORDINATE NEW CONSTRUCTION WITH EXISTING CONSTRUCTION AND
INVESTIGATE IN A REASONABLE MANNER REGARDING HIDDEN CONDITIONS.
SAFEGUARDS DURING DEMOLITION:
1. CONTRACTOR TO MAKE SURE ALL INFRASTRUCTURE (POWER, GAS, WATER, CABLING, ETC...) IS TURNED
OFF AND/OR REMOVED PRIOR TO DEMOLITION.
2. CONTRACTOR TO VERIFY ALL LOAD BEARING CONDITIONS AND PROVIDE SHORING AS REQUIRED IN ALL
AFFECTED AREAS PRIOR TO & DURING DEMOLITION AND/OR CONSTRUCTION.
3. ALL CURRENT OSHA AND APPLICABLE STANDARDS SHALL BE UPHELD TO ASSURE SAFETY OF ALL
PERSONS ON SITE DURING ENTIRE COURSE OF CONSTRUCTION.
CONTRACTOR'S RESPONSIBILTY TO REMOVE ALL ENCUMBRANCES REQUIRED FOR PROPER INSTALLATION OF
NEW SYSTEMS:
1. REMOVAL OF ALL ENCUMBRANCES INCLUDING BUT NOT LIMITED TO CONCRETE, WOOD, DUCTS, PIPING, WIRING, SHALL BE DONE BY THE CONTRACTOR TO ACHIEVE FLOOR PLANS AS SHOWN EVEN IF NOT
SHOWN ON DEMOLITION PLANS.
2. REMOVE ALL CEILINGS AND ITEMS ABOVE CEILINGS THAT ARE NOT REQUIRED IN THE RENOVATED BUILDING AND AS REQUIRED TO INSTALL NEW HVAC, PLUMBING, LIGHTING, ELECTRICAL, ETC. FOR FULLY
FUNCTIONING SYSTEMS.
3. REMOVE ANY UNUSED PENETRATIONS AND INSTALL NEW DECKING/ROOFING OVER ANY OPENINGS
4. UNLESS NOTED OTHERWISE, CONTRACTOR SHALL REMOVE GYPSUM WALLBOARD AND ANY FURRING
STRIPS AND/OR FASTENERS FROM EXTERIOR WALLS TO PREPARE FOR NEW FINISH.
5. REMOVE ALL ABANDONED FIXTURES, PIPING, CONDUIT WIRING, INSULATION, EQUIPMENT, STRUCTURAL
SUPPORTS, ARCHITECTURAL SYSTEMS., ETC… NO LONGER IN USE OR UNNECESSARY FOR THE
RENOVATED PROJECT. PROVIDE PATCHING WITH MATERIALS CONSISTENT WITH ADJACENT MATERIALS
AND FINISHES REQUIRED, UNLESS OTHERWISE NOTED, TO MEET ALL APPLICABLE CODES.
6. REMOVE ALL MISCELLANEOUS HARDWARE, PANELING, CLIPS, FASTENERS, WIRE, CONDUIT, PIPES, ETC… FROM ANY AND ALL SURFACES TO RECEIVE A NEW FINISH. PATCH SUBSTRATES BY FILLING, GRINDING
AND SANDING SMOOTH WITH ACCEPTABLE CONSTRUCTION INDUSTRY AND CODE COMPLIANT
MATERIALS. PREPARE SURFACE FOR ACCEPTANCE OF MANUFACTURER SPECIFIED FINISH AND SURFACE TREATMENT. INSTALLATION OF FINISH INDICATES ACCEPTANCE OF SUBSTRATE BY APPLICATOR. WHERE NO NEW FINISHES OCCUR, PATCH EXISTING MATERIALS WITH MATCHING MATERIALS SO THAT PATCH
WORK IS NOT VISIBLE.
7. REMOVE ALL EXISTING ACOUSTICAL TILE, CEILING GRID, HANGERS, AND ASSOCIATED FRAMING UP TO
UNDERSIDE OF ROOF.
8. REMOVE EXISTING FLOORING AS REQUIRED TO INSTALL NEW FLOORING. PROVIDE MANUFACTURE’S REQUIRED LEVELING MATERIALS PRIOR TO INSTALLING NEW FLOORS. REFER TO SPECIFICATIONS OF FLOORING FOR ADDITIONAL REQUIREMENTS. FIELD TEST EXISTING FLOORING SUBSTRATE AS REQUIRED BY PROJECT SPECIFICATIONS AND/OR FLOORING MANUFACTURER TO ENSURE MOISTURE CONTENT, RELATIVE HUMIDITY, FLOOR FLATNESS, AND OTHER SUBSTRATE CONDITIONS ARE WITHIN ACCEPTABLE RANGES FOR INSTALLATION OF NEW SCHEDULED FLOOR MATERIALS INTENDED TO BE INSTALLED.
PROVIDE MANUFACTURER'S WRITTEN ACCEPTANCE OF SUBSTRATE CONDITIONS PRIOR TO PROCEEDING WITH INSTALLATION OF NEW FLOOR SYSTEMS. INSTALLATION OF NEW FLOORING SYSTEMS INDICATED
ACCEPTANCE OF THE SUBSTRATE BY THE CONTRACTOR AND INSTALLER.
9. THE CONTRACTOR IS ALSO RESPONSIBLE FOR THE REMOVAL OF DEMOLISHED MATERIALS: FOR THE PATCHING OF EXISTING SURFACES, INCLUDING OPENINGS IN FLOORS, WALLS, ETC. TO MATCH UNDISTURBED EXISTING SURFACES, AND FOR LEAVING THE AREA IN A CLEAN CONDITION. REFER TO
CONTRACT DOCUMENTS FOR SPECIFIC FLOOR RELATED DETAILS.
General Demolition Notes (Continued):
CONTRACTOR'S RESPONSIBILTY TO RETURN THE SITE/STRUCTURE TO PRE-WORK CONDITIONS
1. CONTRACTOR TO TAKE EXTREME CARE AT EXISTING EXTERIOR FINISHES, INCLUDING BUT NOT LIMITED TO
BRICK, METALWORK, WINDOWS, AND DOORS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REPAIR ANY
EXTERIOR FINISHES THAT WERE COMPROMISED DURING THE COURSE OF CONSTRUCTION.
2. CONTRACTOR TO PROTECT ALL FINISHES TO REMAIN ON INTERIOR OF EXISTING SPACES INCLUDING
WALLS, CEILINGS, FLOORS, DOORS, FIXTURES, ETC.
CONTRACTOR'S RESPONSIBILITY REGARDING REMOVAL AND DISPONSAL OF DEMOLISHED MATERIALS:
1. EACH TRADE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL LAWS, REGULATIONS, AND/OR ORDINANCES REGARDING THE METHOD OF DEMOLITION AND DISPOSAL OF WASTE MATERIALS.
THE GOVERNMENT ASSUMES NO LIABILITY FOR EXTRA WORK OR ADDITIONAL COMPENSATION DUE TO FAILURE OF THE TRADE CONTRACTOR OR SUBCONTRACTORS TO COMPLY WITH ANY AND ALL SUCH
REGULATIONS THAT APPLY.
CONTRACTOR'S RESPONSIBILTY REGARDING HAZARDOUS MATERIALS:
1. CONTRACTOR SHALL COMPLY WITH ALL SPECIFIED REQUIREMENTS AND GOVERNING
CODES/LAWS/REGULATIONS REGARDING REMOVAL AND DISPOSAL OF HAZARDOUS MATERIALS, IF
ENCOUNTERED.
2. IF HAZARDOUS MATERIALS ARE ENCOUNTERED, NOTIFY THE GOVERNMENT PRIOR TO PROCEEDING.
ADDITIONAL MISCELLANEOUS PROVISIONS
1. GENERAL DEMOLITION NOTES APPLY TO THE ENTIRE PROJECT. SPECIFIC NOTES (DESIGNATED) APPLY TO
ISOLATED WORK AREAS AND ARE FOR THE CONVENIENCE OF THE CONTRACTOR. HOWEVER, ALL
ISOLATED WORK AREAS ARE NOT NOTED. SHOULD A CONDITION OCCUR THAT IS NOT SPECIFICALLY NOTED, THE CONTRACTOR SHALL PROCEED WITH WORK PER GENERAL DEMOLITION NOTES OR A SPECIFIC WORK NOTE(S) USED IN OTHER SIMILAR CONDITIONS, WHICHEVER IS MORE STRINGENT, PER APPROVAL
OF THE GOVERNMENT.
2. REFER ALSO TO SELECTIVE DEMOLITION, SUMMARY OF WORK, GOVERNMENT SOLICITATION
REQUIREMENTS, AND OTHER SPECIFICATION SECTIONS AS REQUIRED.
3. REFER TO OTHER DISCIPLINES TO INCLUDE BUT NOT LIMITED TO LANDSCAPE, CIVIL, PLUMBING, MECHANICAL, AND STRUCTURAL FOR ADDITIONAL DEMOLITION AND REPARATION REQUIREMENTS. PATCH
ALL LOCATIONS REQUIRED BY PLUMBING, MECHANICAL, AND ELECTRICAL DEMOLITION. MATCH
ADJACENT CONDITIONS, UNLESS OTHERWISE NOTED. ALL REQUIRED TRENCHING AND REPLACEMENT OF
EXISTING SLABS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
4. CONTRACTOR TO REPAINT ALL EXTERIOR HOLLOW METAL FRAMES. BOTH INTERIOR AND EXTERIOR OF
FRAME TO BE PAINTED.
5. DURING ROOFING DEMOLITION PROVIDE TEMPORARY ROOFING AS REQUIRED TO PROTECT BUILDING
FROM DAMAGE.
6. CONTRACTOR TO ASSUME ALL CONCRETE INDICATED TO BE REMOVED IS REINFORCED.
7. IN LOCATION WHERE THE PLANS CALL FOR THE DEMOLITION OF THE EXISTING EXTERIOR BRICK VENEER, THE CONTRACTOR SHALL DISMANTLE THE BRICK VENEER AND REMOVE ALL MORTAR FOR USE IN OTHER LOCATIONS FOR PATCHING. CONTRACTOR SHALL COORDINATE, WITH THE GOVERNMENT, LOCATIONS
WHERE RECYCLED BRICK ARE TO BE USED FOR PATCHING.
8. AT LOCATIONS IN EXISTING FIRE WALLS WHERE SERVICES ARE REMOVED OR OPENINGS ARE CREATED, PATCH WALLS TO MAINTAIN REQUIRED FIRE RATING.
9. REMOVE AND REPLACE ALL EXISTING VERTICAL AND HORIZONTAL EXTERIOR BRICK VENEER CONTROL JOINTS. SUBMIT ACTUAL SEALANT JOINT COLOR SAMPLES TO THE GOVERNMENT FOR APPROVAL.
Specific Demolition Notes:
DEMOLISH EXISTING WALL AS REQURIED TO INSTALL NEW OPENING. SEE OPENING SCHEDULE.
SALVAGE BRICK FOR PATCHING IN OTHER AREAS WHERE APPLICABLE. REFER TO STRUCTURAL FOR
SHORING AND LINTEL REQUIREMENTS.
EXISTING OVERHEAD DOOR ASSEMBLY TO REMAIN IN BASE BID. IF BID OPTION IS AWARDED,
REMOVE AND REPLACE EXISTING DOOR/FRAME WITH NEW DOOR AND FRAME. SEE OPENING
SCHEDULE.
EXISTING FRAME TO REMAIN. REMOVE EXISTING DOOR AND INSTALL NEW DOOR IN EXISTING FRAME.
PATCH, REPAIR, AND PAINT EXISTING FRAME. REINFORCE FRAME AS REQUIRED TO RECEIVE
SPECIFIED HARDWARE.
REMOVE EXISTING DOOR (OR WINDOW) AND FRAME. REFER TO OPENING SCHEDULE FOR NEW
OPENING.
REMOVE EXISTING DOOR AND FRAME. INFILL EXISTING OPENING WITH NEW WALL ASSEMBLY
MATCHING ADJACENT WALL ASSEMBLIES SCHEDULED TO REMAIN.
REMOVE EXISTING WALL AS REQUIRED TO CREATE NEW OPENING. REFER TO STRUCTURAL FOR
OPENING REINFORCEMENT AND SHORING REQUIREMENTS
REMOVE EXISTING FILM PASS THRU. INFILL EXISTING OPENING WITH NEW WALL ASSEMBLY MATCHING
ADJACENT WALL ASSEMBLIES SCHEDULED TO REMAIN.
REMOVE EXISTING SLAB AS REQUIRED TO INSTALL NEW HELICAL PIERS - SEE STRUCTURAL.09
REMOVE CMU WALL AS REQUIRED TO INSTALL NEW STRUCTURAL COLUMN. REMOVE BRICK VENEER AND SALVAGE FOR REINSTALLATION. TOOTH NEW BRICK INTO EXISTING BRICK AND PROVIDE NEW
MASONRY VENEER ANCHORS.
REMOVE AND REPLACE EXISITING FLOOR SLAB AS REQUIRED TO REMOVE EXISITNG SYSTEMS AND
INSTALL NEW SYSTEMS.11
SAWCUT AND CHIP OUT EXISITNG CONCRETE AS REQUIRED TO INSTALL NEW WALK OFF MAT.12
EXISTING TRENCH DRAIN TO REMAIN13
EXISITNG CASEWORK TO BE DEMOLISHED.14
EXISITNG EQUIPMENT TO REMAIN. CONTRACTOR TO PROTECT EQUIPMENT DURING DURATION OF
CONSTRUCTION.
EXISITING DOOR AND FRAME TO REMAIN PAINT.16
REMOVE EXISTING CEILING SYSTEMS INCLUDING ALL HANGARS AND ACCESSORIES. REFER TO
MECHANICAL, PLUMBING, FIRE PROTECTION, FIRE ALARM AND ELECTRICAL DRAWINGS FOR
ADDITIONAL DEMOLITION REQUIREMENTS.
REMOVE EXISITNG FLOOR FINISH. CLEAN AND STRIP SUBSTRATE AS REQUIRED TO INSTALL
SPECIFIED NEW FINISH.
CLEAN/BLAST/STRIP EXISITNG CONCRETE FLOORS AS REQUIRED TO INSTALL NEW FINISH.19
REMOVE EXISITING GLAZED TILE FINISH ON ALL WALLS OF THIS SPACE. PREPARE WALLS FOR NEW
FINISH.
No. Revision Date
REMOVE EXISITNG HOST BEAM AND TROLLEY SYSTEM.21
EXISTING HVAC LOUVER TO BE DEMOLISHED. PATCH WALL SUBSTRATE, INSULATION, AND BRICK.
TOOTH NEW BRICK INTO EXISTING BRICK. USE EXISTING BRICK SALVAGED FROM DEMOLITION.
EXISTING HVAC LOUVER TO BE DEMOLISHED23
EXISTING HVAC EQUIPMENT TO BE DEMOLISHED. PATCH WALL SUBSTRATE, INSULATION, AND BRICK.
TOOTH NEW BRICK INTO EXISTING BRICK. USE EXISTING BRICK SALVAGED FROM DEMOLITION.
REMOVE EXISTING SPLIT FACE CMU VENEER. SALVAGE AND REINSTALL. TOOTH CMU INTO EXISTING
CMU. REPAIR AIR BARRIER AND INSULATION AS REQUIRED. PROVIDE NEW MASONRY VENEER
ANCHORS. REFER TO DEMOLITION PLAN FOR ADDITIONAL REQUIREMENTS.
REMOVE EXISTING WALL ASSEMBLY AS REQUIRED TO INSTALL NEW LOUVERS- SEE MECHANICAL. 26
EXISTING DOWNSPOUT TO REMAIN (BASE BID) IF BID OPTION FOR THE ROOF MEMBRANE IS
ACCEPTED, REMOVE AND REPLACE DOWNSPOUT AS INDICATED.
IF BID OPTION IS NOT AWARDED, REMOVE AND REINSTALL DOWNSPOUT AS REQUIRED TO INSTALL
NEW OPENINGS AND TOOTH IN NEW MASONRY VENEER
EXISTING DOWNSPOUT TO REMAIN.29
OMITTED08
EXISTING EMERGENCY THROUGH WALL OVERFLOW DRAIN TO REMAIN. IF BID OPTION FOR TPO ROOF
MEMBRANE IS ACCEPTED, TERMINATED NEW MEMBRANE TO EXISTING METAL THROUGH WALL
OVERFLOW DRAIN AS RECOMMENDED BY TPO MANUFACTURER.
EXISTING LOUVER TO REMAIN31
02 01
03 03
05 03 05
06 01
04 04
06 06 06 06 06
02 02
17 18
17 14
99 9
LEGEND:
EXISTING TO BE DEMOLISHED
EXISTING TO REMAIN
DOTTED LINE GENERALLY INDICATES EXISTING AREAS TO BE
REMOVED, INCLUDING BUT NOT LIMITED TO WALLS, DOORS,
FLOOR COVERING, CEILINGS, ETC... IN CASE OF UNCERTAINTY
PROVIDE WRITTEN REQUEST TO ARCHITECT.
xx SPECIFIC NOTE TAG (SEE
DEMOLITION NOTES SHEET)
REMOVE EXISTING CONCRETE
IN LOCATION MARKED IN
PREPARATION FOR NEW WORK
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A1.1
DEMOLITION
FLOOR PLAN
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
1/8" = 1'-0"A1.1
1 FIRST FLOOR DEMOLITION PLAN
Level 1 0' - 0"
25 2525 25
01 01 01 01 04 04 01 01
30 30
Level 1 0' - 0"
23 26
01 01 04 01 01 03 02
Level 1 0' - 0"
23 24
29 29 28
16 01 02
30 30
Level 1 0' - 0"
03 01 02 01
DEMOLITION ELEVATION LEGEND
EXISTING BRICK MASONRY TO REMAIN
EXISTING METAL WALL PANEL TO REMAIN
1 SPECIFIC NOTE TAG
SPECIFIC NOTE LEGEND
REFER TO SHEET A1.0
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A1.2
DEMOLITION
ELEVATIONS
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
1/8" = 1'-0"A1.2
1 NORTH ELEVATION - DEMOLITION
1/8" = 1'-0"A1.2
2 WEST ELEVATION - DEMOLITION
1/8" = 1'-0"A1.2
3 SOUTH ELEVATION - DEMOLITION
1/8" = 1'-0"A1.2
4 EAST ELEVATION - DEMOLITON
R R
D W
W as he r
D ry er
913 SF
Penetrant/Magnetics
383 SF
X-Ray
132 SF
Dark Room
35 SF
Control
25 SF
Trap
147 SF
Lobby
257 SF
NDI Office
170 SF
Testing & Training
267 SF
Storage
156 SF
Battery Shop & Storage
185 SF
Flight Chief
185 SF
Supervisor & Administration
250 SF
Men's
360 SF
ALIS Ready Room
182 SF
JOAP Lab
169 SF
NDI OFFICE
44 SF
HVAC
45 SF
Janitor
213 SF
Conference & Meeting
359 SF
Break Area
704 SF
Welding Shop
265 SF
Women's
632 SF
Circulation
241 SF
Circulation
91 SF
Boiler Room
949 SF
Tool Crib
335 SF
Storage
374 SF
HAZMAT
Accumulation
Point
6994 SF
General Purpose Equipment & Repair Bay
212 SF
FSR Office
W O
RK
B
EN
C
H /T
O O
L B O
X
WORK BAY 1
W O
RK
B
EN
C
H /T
O O
L B O
X
W O
RK
B
EN
C
H /T
O O
L B O
X
W O
RK
B
EN
C
H /T
O O
L B O
X
W O
RK
B
EN
C
H /T
O O
L B O
X
W O
RK
B
EN
C
H /T
O O
L B O
X
W O
RK
B
EN
C
H /T
O O
L B O
X
WORK BAY 2 WORK BAY 3 WORK BAY 4 WORK BAY 5 WORK BAY 6 WORK BAY 7
PA
RT
S W
AS
H
ER
12' - 0" 6' - 0"
110 SF
HVAC
117 SF
COMM
10884 SF
ELEC
25 SF
HVAC
45 SF
VEST
WH
135 SF
Covered Entry
160167
172 170
115 114b
101a121
113 112
130b
130a
105 106
111a 110a
111b
110b
101b
114a
151 152
3 4 5
010101
A7.2 5
EXISTING BOLLARDS
TO REMAIN
NEW BOLLARD
(SEE DETAIL)
EXISTING BOLLARDS
TO REMAIN
NEW BOLLARD
(SEE DETAIL)
NEW BOLLARDS AT
FDC - SEE DETAIL
NEW BOLLARD (SEE DETAIL)
S
EE
C
IV
IL
F
O R
C O
N
TI
N U
AT
IO
N
NEW BOLLARDS AT
FDC - SEE DETAIL
S
EE
C
IV
IL
F
O R
C O
N
TI
N U
AT
IO
N
A6.3
LEGEND:
DOOR - SEE DOOR SCHEDULE
101 DOOR TAG - SEE DOOR SCHEDULE
ROOM NAME
101 ROOM TAG
00 SPECIFIC NOTE TAG
OPENING TAG - SEE OPENING SCHEDULE
SPECIFIC NOTES:
EXISITNG WALL REQUIRED TO BE SMOKE PARTITION. SEAL
ALL EXISITNG OPERATIONS. REFER TO LIFE SAFETY
EXISTING WALL TO BE FIRE RATED. FIRE SEAL ALL
PENETRATIONS AND WALL TO FLOOR INTERSECTIONS.
REFER TO LIFE SAFETY.
XX
NEW WALL - SEE WALL TYPE PLAN
EXISTING WALL TO REMAIN
03 NEW SITE PAVING - SEE CIVIL
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A2.1
FIRST FLOOR PLAN
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
1/8" = 1'-0"A2.1
1 FIRST FLOOR PLAN
0' 4' 8' 16' 32'
A2.2
A2.2
A2.2
EXISTING STAIR TO REMAIN (PAINT)
EXISTING LOCKERS TO REMAIN
EXISTING GUARDRAIL TO REMAIN (PAINT)
1/2" x 3" RAILS SPACED TO
ALLOW 24" CLEAR BETWEEN RAILS
1" ROUND STEEL RUNGS -
CORRUGATED, KNURLED, OR
CRIMPED - EQUAL SPACING NOT
TO EXCEED 12" O.C. (NOT LESS
THAN 10" O.C.)
LADDER BRACKET - FASTEN AS
REQUIRED TO WALL AT 6'-0" MAX.
TOP RUNG LEVEL WITH LANDING
EXPANSION BOLT TO FLOOR AND
MEZZANINE AS REQUIRED
PROVIDE REMOVABLE CHAIN ACCROSS LADDER OPENING
ADJACENT REMOVABLE GUARDRAIL
24" min.
" m in
PAINT THE GUARDRAIL AND LADDER
COMPONENTS SAFETY YELLOW IN
ACCORDANCE WITH SPECIFICATION
SECTION 09 9123
FILL JOIST SEAT SPACE WITH SOLID CMU / GROUT
TO PREVENT AIR TRANSFER BETWEEN ROOMS 129
430 ON ALL SIDES OF NEW MEZZANINE
1 1/2" ⌀ METAL
PIPE GUARDRAIL
1 1/2" ⌀ METAL
GUARDRAIL
CONCRETE ON METAL DECK - SEE
STRUCTURAL
SEE STRUCTURAL FOR STEEL
ANGLE
GUARDRAIL SLEEVE FULLY
WELDED TO STEEL ANGLE
TOE KICK - 4" TALL
WELD TO POST
REMOVEABLE 1 1/2"
⌀ VERTICAL METAL
POST 4'-0" MAX O.C.
NOTE: REMOVEABLE SECTIONS SHALL BE NO
LONGER THAN 8'-0" - SPACE BETWEEN
SECTIONS SHALL BE NOT GREATER THAN 4".
BOND BEAM - SEE STRUCTURAL
" M
IN
IM
U M
" M
A X
" M
A X
FILL JOIST SEAT SPACE WITH
SOLID CMU / GROUT TO
PREVENT AIR TRANSFER
BETWEEN ROOMS 129 430
ON ALL SIDES OF NEW
MEZZANINE
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A2.2
MEZANINE PLAN
AND DETAILS
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
1/8" = 1'-0"A2.2
1 MEZZANINE PLAN
1 1/2" = 1'-0"A2.2
2 LADDER DETAIL
1 1/2" = 1'-0"A2.2
3 REMOVABLE RAILING DETAIL
D W
W as he r
D ry er
SILL
PLAN
HEAD
CONFIRM 1 " REQUIRED CLEAR
SPACE FOR DEFLECTION
PROVIDE FLEXIBLE CLOSURE
STRIPS AS REQUIRED IN DECK
FLUTES
SEE STRUCTURAL FOR TOP OF
WALL BRACING
XX
TAG INDICATES WALL TYPE
OVER CMU MASONRY
**NOTE: IF WALL IS SCHEDULED TO
RECEIVE TILE, PROVIDE CONCRETE
BOARD AND WATERPROOFING FOR
TILE INSTALLATION. REFER TO FINISH
SCHEDULE, INTERIOR ELEVATIONS AND
SECTIONS, AND GYPSUM BOARD
ASSEMBLIES SPECIFICATIONS FOR
TYPES AND OTHER
SUBSTRATE/FURRING REQUIREMENTS**
TYPE N
N8N8
N8 N8 N8
N8
N8
N8
N8
N8N8
N8
N8
N8N8 N8
N8
N8
N8
N8
N8
N8
N8
N8
N8 N8
N8
N8
N8
N8
N8
N8 N8
N8
N8
N4N4
A2 A2 A2
A2
A2
A2
A2
A2A2 A2
A2
A2
A2
A2
A2
A2
A2 A2 A2
A2A2
A2
A2
A2
A2
A2
A2
A2A2 A3
A2 A2
A2
A2
N8
N8 N8
N8
N8
N8
N8
N8 N8
N8
A2
A2
A2
A2
A2
A2
A2
A2 A2
A2
A2
A2
A2
A2
N8
SILL
PLAN
HEAD
5/8" GYPSUM WALL BOARD
METAL STUD FRAMING - SEE
SCHEDULE FOR THICKNESS
NOTE: IF WALL IS SCHEDULED TO
RECEIVE TILE, PROVIDE CONCRETE
BOARD AND WATERPROOFING FOR TILE
INSTALLATION. REFER TO FINISH
SCHEDULED, INTERIOR ELEVATIONS
AND SECTIONS, AND GYPSUM BOARD
ASSEMBLIES SPECIFICATIONS FOR
TYPES AND OTHER SUBSTRATE/FURRING
REQUIREMENTS.
CEILING - SEE REFLECTED CEILING PLAN
STRUCTURE ABOVE
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A2.3
WALL TYPE PLAN
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
N4 3 5/8"
N8 7 5/8" FIELD VERIFY AND MATCH EXISTING PARTITION THICKNESS
TYPE STRUCTURE THICKNESS NOTES
1 1/2" = 1'-0"A2.3
2 Wall Type N
1/8" = 1'-0"A2.3
1 WALL TYPE PLAN
SPECIFIC NOTES
PATCH EXISITNG WALL TO MATCH EXISTING CONSTRUCTION
CONSISTING OF METAL BUILDING SYSTEMS WALL GIRTS
AND METAL PANELS.
1 1/2" = 1'-0"A2.3
3 PARTITION TYPE A
A3 3 5/8" 4 1/4" - -
A2 2 1/2" 3 1/8" - -
TYPE STUD THICKNESS PARTITION THICKNESS FIRE RATING STC RATING
EXISTING BUILT UP
ROOF TO REMAIN
EXISTING BUILT UP
ROOF TO REMAIN
1/ 4"
1'
-0
1/ 2"
1'
-0
1 EXISTING HVAC SYSTEMS TO BE REMOVED. EXISTING CURB TO REMAIN.
PROVIDE NEW INSULATED METAL COVER CAP - SEE 1/A2.6
2 EXISTING HVAC SYSTEMS TO REMAIN
3 NEW HVAC SYSTEMS - SEE MECHANICAL, PROVIDE NEW ROOF CURB PER
DETAIL 2/A2.5.
4 EXISTING HVAC SYSTEMS TO BE REMOVED. PROVIDE NEW HVAC EQUIPMENT
IN SAME LOCATION. MODIFY/EXTEND EXISTING ROOF CURB AS REQUIRED.
5 EXISTING VENT TO ROOF TO BE ABANDONED CUT PIPE OF BELOW ROOF DECK
AND SUPPORT PIPE PENETRATION THROUGH ROOF TO REMAIN.
- IF BID OPTION IS AWARDED- REMOVE PIPE PENETRATION THROUGH
ROOF PRIOR TO INSTALLING NEW ROOF MEMBRANE ASSEMBLY
VTR
VTR
VTR
VTR
VTR
VTR
VTR
EOD EOD
EOD EOD EOD EOD EOD EOD EOD
BASE BID ROOF PLAN LEGEND
STANDING SEAM METAL ROOF (EXISTING TO REMAIN)
EXISTING BUILT UP ROOF TO REMAIN
SCUPPER / LEADER HEAD / DOWNSPOUT
(EXISTING TO REMAIN UNLESS NOTED OTHERWISE)DS
VTR VENT TO ROOF - SEE MECHANICAL / PLUMBING
(EXISTING TO REMAIN UNLESS NOTED OTHERWISE)
SPECIFIC NOTES
XX SPECIFIC NOTE TAG
EOD
EXISTING EMERGENCY THROUGH WALL OVERFLOW DRAIN TO REMAIN.
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A2.4
ROOF PLAN - BASE
BID
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
1/8" = 1'-0"A2.4
1 ROOF PLAN
NEW TPO MEMBRANE ROOF
NEW TPO MEMBRANE ROOF
1/ 4"
1'
-0
1/ 2"
1'
-0
1 PROVIDE METAL STUD FRAMING AND FIRE RETARDANT PLYWOOD UNDER
NEW RECOVERY BOARD AND TPO MEMBRANE AS REQUIRED TO SUPPORT
NEW ROOF SYSTEM AT ABANDONED HVAC UNIT IN THIS AREA.
2 NEW EXHAUST FAN - SEE MECHANICAL AND DETAIL 5/A2.6
3 NEW HVAC SYSTEMS - SEE MECHANICAL, PROVIDE NEW ROOF CURB PER
DETAIL 2/A2.5.
4 EXISTING HVAC SYSTEMS TO BE REMOVED. PROVIDE NEW HVAC EQUIPMENT
IN SAME LOCATION. MODIFY/EXTEND EXISTING ROOF CURB AS REQUIRED.
A2.6
Sim
SPECIFIC NOTE LEGEND
BID OPTION ROOF PLAN LEGEND
STANDING SEAM METAL ROOF (EXISTING TO REMAIN)
NEW TPO ROOF MEMBRANE
VTR VENT THROUGH ROOF - SEE PLUMBING
A2.7
Sim
A2.7
Sim
A2.7
Sim
A2.7
Sim
A2.7
Sim
A2.7
Sim
A2.7
Sim
A2.7
Sim
EOD EOD
DS DS
VTR
VTRVTR
VTRVTR
EOD EOD EOD EOD EOD EOD EOD
DS DS DS DS DS DS DS DS
DS NEW SCUPPER / LEADER HEAD / DOWNSPOUT SEE DETAIL 5/A2.7
EOD
EXISTING EMERGENCY THROUGH WALL OVERFLOW DRAIN TO REMAIN.
IF BID OPTION FOR TPO ROOF MEMBRANE IS ACCEPTED, TERMINATE NEW
MEMBRANE TO EXISTING METAL THROUGH WALL OVERFLOW DRAIN AS
RECOMMENDED BY TPO MANUFACTURER
XX SPECIFIC NOTE TAG
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A2.5
ROOF PLAN - BID
OPTION
F-
: C O
N V
E
RT
B
LD
G
F
O R
A G
E
D A
N N
E
LL
Y F
IE
LD
A N
G
FAKZ182353 / 18074
FEB 2023
ME, JJ, DD
DD
1/8" = 1'-0"A2.5
1 ROOF PLAN OPTION
EXISTING EQUIPMENT
TO BE DEMOLISHED
DEMOLITION
NEW FIRE RETARDANT PLYWOOD - PROVIDE
SUPPLEMENTAL METAL STUD FRAMING WHERE
SPAN EXCEEDS 32" O.C.
EXISTING BUILT UP ROOF TO REMAIN
VARIES - FIELD VERIFY
V A R
IE
S
F
IE
LD
V
ER
IF
Y
1/4" / 12"
EXISTING ROOF SLOPE
NEW
1/4" / 12"
CURB PLAN DETAIL (BASE BID)
NEW TPO MEMBRANE (ONE PIECE)
TPO COATED METAL EDGE
FLASHING
PT WOOD BLOCKING AS REQ.
METAL COUNTER FLASHING
CONTINUOUS CLEAT
EXISTING ROOF FLASHING
TO REMIAN
EXISTING ROOF CURB TO REMAIN
NEW RIGID INSULATION AS REQUIRED
NEW FIRE RETARDANT PLYWOOD - PROVIDE
SUPPLEMENTAL METAL STUD FRAMING WHERE
SPAN EXCEEDS 32" O.C.
NEW TPO ROOF MEMBRANE
NEW RECOVERY BOARD
NEW METAL STUD
FRAMING AS REQUIRED
LINE OF EXISTING (DEMOLISHED)
ROOF CURB
NEW TPO MEMBRANE (ONE PIECE)EXISTING CURB FRAMING
TO BE DEMOLISHED
EXISTING CURB TO
REMAIN
BASE BID BID OPTION
SEALANT
NEW…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .