This document outlines a federal solicitation for repair and renovation services at an Air National Guard facility in Montgomery, Alabama. The scope of work includes replacement of building mechanical, electrical, and partial plumbing systems, installation of a new sprinkler system and firewater line, replacement of the roof and exterior cladding, and interior renovations. There are also four bid options related to reconfiguration of interior spaces, additional systems, and specialty finishes. The project is set aside for small businesses and has a magnitude between $5-10 million. The contract duration is 425 days from notice to proceed. Interested offerors must register in the System for Award Management and check the government point of entry website periodically for solicitation materials and any amendments.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

187th Fighter Wing Dannelly Field - AL ANG Montgomery, AL

REPAIR WEAPONS SHOP BLDG. 1312

Specifications for the

Date: DECEMBER 2020 Revised: NA Job No: 18075/FAKZ182106/FAKZ172004 Set No:

Submittal: B-3

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS,

OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED

Do not remove this notice Properly destroy documents when no longer needed

ARCHITECTURE & INTERIOR DESIGN

1115 South Court Street | Montgomery, AL 36104

Tel. 334. 263. 5162 | WWW.SSLARCH.COM

VOLUME II

REPAIR WEAPONS SHOP, BUILDING 1312 TYPE B3 (100%) SUBMITTAL

187th Fighter Wing, Dannelly Field, Montgomery, AL December 2020 ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

TABLE OF CONTENTS - 1

TABLE OF CONTENTS

VOLUME 1

DIVISION 00 - PROCUREMENT AND CONTRACTING

REQUIREMENTS

00 0102 PROJECT INFORMATION AND SUMMARY 8

DIVISION 01 - GENERAL REQUIREMENTS

01 0450 CUTTING AND PATCHING 5

01 0500 FIELD ENGINEERING 3

01 2000 PRICE AND PAYMENT PROCEDURES 4

01 2300 BID OPTIONS 3

01 3000 ADMINISTRATIVE REQUIREMENTS 10

01 3001 SUBMITTALS

- AF FORM 66 SUBMITTAL REGISTER

01 3225 PROJECT SUSTAINABILITY SUMMARY 3

01 3329 SUSTAINABLE DESIGN REPORTING 6

01 3553 SECURITY PROCEDURES 2

01 4000 QUALITY REQUIREMENTS 7

01 4100 REGULATORY REQUIREMENTS 3

01 4217 DEFINITIONS AND STANDARDS 3

01 5000 TEMPORARY FACILITIES AND CONTROLS 3

01 5100 TEMPORARY UTILITIES 3

01 5213 FIELD OFFICES AND SHEDS 3

01 5460 SAFETY AND HEALTH 5

01 5500 VEHICULAR ACCESS AND PARKING 3

01 5721 TEMPORARY ENVIRONMENTAL CONTROLS 10

01 6000 PRODUCT REQUIREMENTS 9

01 6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS 6

01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS 14

01 7419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 9

01 7800 CLOSEOUT SUBMITTALS 7

01 7900 DEMONSTRATION AND TRAINING 5

01 9113 GENERAL COMMISSIONING REQUIREMENTS 15

DIVISION 02 - EXISTING CONDITIONS

02 4100 SELECTIVE DEMOLITION 6

DIVISION 03 - CONCRETE

03 3000 CAST-IN-PLACE CONCRETE 30

03 3680 CONCRETE POLISHING AND DYING 8

DIVISION 04 – MASONRY

04 2000 UNIT MASONRY 14

04 7200 CAST STONE MASONRY 8

TABLE OF CONTENTS - 2

DIVISION 05 - METALS

05 1200 STRUCTURAL STEEL FRAMING 6

05 1650 COLD-FORMED RETROFIT ROOF FRAMING SYSTEM 11

05 2100 STEEL JOIST FRAMING 5

05 3100 STEEL DECKING 6

05 4000 COLD-FORMED METAL FRAMING 6

05 5000 METAL FABRICATIONS 8

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 1000 ROUGH CARPENTRY 7

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 0100 SPECIAL PROJECT ROOFING WARRANTY 3

07 1300 SHEET WATERPROOFING 5

07 2100 THERMAL INSULATION 6

07 2119 SPRAY FOAM INSULATION 6

07 2500 WEATHER BARRIERS 17

07 4113 METAL ROOF PANELS 14

07 4213 RIBBED METAL WALL PANELS 11

07 4293 METAL SOFFIT PANELS 8

07 4300 ALUMINUM-FACED COMPOSITE WALL PANELS 13

07 4800 CONTINUOUS INSULATION CHANNELS 9

07 5400 THERMOPLASTIC MEMBRANE ROOFING 14

07 6200 SHEET METAL FLASHING AND TRIM 8

07 6500 WALL FLASHING 7

07 7100 ROOF SPECIALTIES 11

07 8100 APPLIED FIREPROOFING 7

07 8400 FIRESTOPPING 11

07 9005 JOINT SEALERS 12

DIVISION 08 - OPENINGS

08 1113 HOLLOW METAL DOORS AND FRAMES 16

08 3323 OVERHEAD COILING DOORS 6

08 4113 ALUMINUM-FRAMED ENTRANCES 9

08 4413 GLAZED ALUMINUM CURTAIN WALLS 11

08 7100 DOOR HARDWARE 25

08 8000 GLAZING 6

08 9100 LOUVERS 5

DIVISION 09 - FINISHES

09 0561 COMMON WORK RESULTS FOR FLOORING PREPARATION 10

09 2116 GYPSUM BOARD ASSEMBLIES 7

09 3000 TILING 10

09 5100 ACOUSTICAL CEILINGS 8

09 6500 RESILIENT BASE 5

09 6519 RESILIENT TILE FLOORING 9

09 9113 EXTERIOR PAINTING 8

09 9123 INTERIOR PAINTING 12

TABLE OF CONTENTS - 3

09 9600 HIGH-PERFORMANCE COATINGS (SUTP) 7

DIVISION 10 - SPECIALTIES

10 1101 VISUAL DISPLAY BOARDS 5

10 1400 SIGNAGE 6

10 2113 STAINLESS STEEL TOILET COMPARTMENTS 8

10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES 10

10 4400 FIRE PROTECTION SPECIALTIES 3

10 5100 LOCKERS 4

10 7316 ALUMINUM CANOPY SYSTEM 6

10 8500 RECYCLING SPECIALTIES 2

VOLUME 2

DIVISION 11 - EQUIPMENT

11 5213 CEILING-RECESSED FRONT PROJECTION SCREENS 5

11 5223 AUDIO-VISUAL EQUIPMENT SUPPORTS 5

DIVISION 12 - FURNISHINGS

12 2115 OPERABLE MESH SHADES 6

12 3040 MANUFACTURED PLASTIC LAMINATE CASEWORK 17

12 3600 COUNTERTOPS AND WINDOW SILLS 5

DIVISION 13 - SPECIAL CONSTRUCTION

13 3100 FABRIC STRUCTURES 7

DIVISION 21 – FIRE SUPPRESSION

21 1313 WET-PIPE FIRE-SUPRESSION SPRINKLERS 13

DIVISION 22 - PLUMBING

22 0513 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 3

22 0514 COMMON WORK RESULTS FOR PLUMBING 13

22 0519 METERS AND GAGES FOR PLUMBING PIPING 5

22 0523 GENERAL-DUTY VALVES FOR PLUMBING PIPING 5

22 0529 HANGERS & SUPPORTS FOR PLUMBING PIPING & EQUIPMENT 10

22 0553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 4

22 0716 PLUMBING PIPING INSULATION 13

22 1000 FACILITY NATURAL GAS PIPING 11

22 1116 DOMESTIC WATER PIPING 13

22 1119 DOMESTIC WATER PIPING SPECIALTIES 7

22 1316 SANITARY WASTE AND VENT PIPING 7

22 1319 SANITARY WASTE PIPING SPECIALTIES 9

22 1513 GENERAL SERVICE COMPRESSED AIR PIPING & ACCESSORIES 9

22 1519 GENERAL SERVICE PACKAGED AIR COMPRESSORS & RECEIVERS 2

22 3400 FUEL FIRE, DOMESTIC WATER HEATERS-NATURAL GAS 5

22 4100 PLUMBING FIXURES 7

TABLE OF CONTENTS - 4

DIVISION 23 – HEATING, VENTILATION & AIR CONDITIONING

23 0500 GENERAL HVAC REQUIREMENTS 6

23 0500 ATTACHMENT ‘A’ 2

23 0513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 3

23 0517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 3

23 0518 ESCUTCHEONS FOR HVAC PIPING 2

23 0529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 4

23 0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 3

23 0593 TESTING, ADJUSTING, AND BALANCING 10

23 0713 DUCT INSULATION 9

23 0719 HVAC PIPING INSULATION 12

23 0900 HVAC INSTRUMENTATION AND CONTROLS 30

23 0993 SEQUENCE OF OPERATION 2

23 2300 REFRIGERANT PIPING 11

23 3113 METAL DUCTS 14

23 3300 DUCT ACCESSORIES 8

23 3301 COMBINATION LOUVER/DAMPER 6

23 3423 HVAC POWER VENTILATORS 5

23 3713 DIFFUSERS, REGISTERS, AND GRILLES 3

23 5533 GAS-FIRED UNIT HEATERS 4

23 7200 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT 11

23 7313 INDOOR HEAT PUMP 8

23 7433 OUTDOOR HEAT PUMPS 4

23 8126 DUCTLESS SPLIT-SYSTEM AIR CONDITIONING UNITS 5

DIVISION 26 - ELECTRICAL

26 0100 GENERAL ITEMS 9

26 0100 ATTACHMENT ‘A’ 2

26 0271 MEDIUM-VOLTAGE TRANSFORMERS 8

26 0519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 5

26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 7

26 0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 6

26 0533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 14

26 0543 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 12

26 0544 SLEEVES/SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING 5

26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 10

26 0923 LIGHTING CONTROL SYSTEM 35

26 2416 PANELBOARDS 7

26 2418 LOW-VOLTAGE TRANSFORMERS 4

26 2726 WIRING DEVICES 7

26 2813 FUSES 2

26 2816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 7

26 3000 SHORT CIRCUIT COORDINATION STUDY AND ARC FLASH HAZARD ANALYSIS 10

26 4113 LIGHTNING PROTECTION FOR STRUCTURES 4

26 5119 LED INTERIOR LIGHTING 7

26 5619 LED EXTERIOR LIGHTING 9

TABLE OF CONTENTS - 5

DIVISION 27 - COMMUNICATIONS

27 0510 GROUNDING AND BONDING FOR COMMUNICATION SYSTEMS 2

27 0520 COMMUNICATION CABLE MANAGEMENT AND LADDER RACK 4

27 0528 PATHWAYS FOR COMMUNICATION SYSTEMS 5

27 0544 SLEEVES AND SLEEVE SEALS COMMUNICATIONS PATHWAYS AND CABLING 5

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 3111 FIRE DETECTION, EVACUATION, AND MASS NOTIFICATION SYSTEM 66

28 1300 SECURITY SYSTEM 8

- ADVANTOR SYSTEMS SCOPE OF WORK – BUILDING 1312

- ADVANTOR SYSTEMS SCOPE OF WORK – TEMPORARY WORK

STRUCTURE

DIVISION 31 - EARTHWORK

31 0010 SITE PROTECTION 4

31 0200 TEMPORARY EROSION AND SEDIMENT CONTROL 12

31 1001 SITE CLEARING 5

31 2210 EARTHWORK 14

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 1314 CEMENT CONCRETE PAVING 14

32 1720 PAVEMENT JOINT SEALANTS 5

32 9223 SODDING 4

DIVISION 33 - UTILITIES

33 1117 OUTSIDE WATER SYSTEM 6

33 4112 STORM DRAINAGE 4

DIVISION 41- MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 2223.19 MONORAIL HOISTS 14

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

CEILING-RECESSED FRONT PROJECTION SCREENS 11 5213 - 1

SECTION 11 5213 - CEILING-RECESSED FRONT PROJECTION SCREENS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Electrically operated, ceiling recessed, front projection screens.

B. Materials included in this section shall meet the requirements for High Performance Sustainable Buildings for New Construction points for the following Sections:

1. 2-3.1.5 - Standby Powered Devices

2. The contractor is expected to understand the HPSB requirements for these sections and include all applicable overhead in their base bid for the necessary documentation to achieve the above listed credits.

1.02 RELATED SECTIONS

A. Section 01 3325 - Project Sustainability Summary

B. Section 01 3329 - Sustainable Design Reporting

C. Section 01 6000 - Product Requirements

D. Division 5 - Metal Fabrications: Suspension systems for projection screens.

E. Section 09 51 00 - Suspended Acoustical Ceilings.

F. Division 26 for electrical wiring, connections, and installation of remote control switches for electrically operated projection screens.

1.03 REFERENCES

A. NFPA 70 - National Electrical Code.

B. NFPA 701-99 - Fire Tests for Flame-Resistant Textiles and Films.

1.04 SUBMITTALS

A. Submit under provisions of Section 01.

B. Product Data: Manufacturer's data sheets on each product to be used, including:

1. Preparation instructions and recommendations.

2. Storage and handling requirements and recommendations.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

CEILING-RECESSED FRONT PROJECTION SCREENS 11 5213 - 2

3. Installation methods.

C. Wiring diagram for electrically operated units.

D. Shop Drawings: Shop drawings showing layout and types of projection screens. Show the following:

1. Location of screen centerline.

2. Location of wiring connections.

3. Seams in viewing surfaces.

4. Detailed drawings for concealed mounting.

5. Connections to suspension systems.

6. Anchorage details.

7. Accessories.

8. Frame details.

E. Selection Samples: For each finish product specified, two complete sets of color chips representing manufacturer's full range of available colors and patterns.

F. Verification Samples: For each finish product specified, two samples, minimum size 6 inches (150 mm) square, representing actual product, color, and patterns.

G. Sustainability Submittals, Product data for HPSB Compliance:

1. For products using electricity, documentation showing printed statement that device meets FEMP designated efficiency requirements or Energy Star qualified.

2. If the product has a "standby" mode, submit documentation showing that less that one (1) watt of power is consumed when in "standby" mode

1.05 QUALITY ASSURANCE

A. Single Source Responsibility: Obtain each type of projection screen required from a single manufacturer as a complete unit, including necessary mounting hardware and accessories.

B. Coordination of Work: Coordinate layout and installation of projection screens with other construction supported by, or penetrating through, ceilings, including light fixtures, HVAC equipment, fire-suppression system, and partitions.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

CEILING-RECESSED FRONT PROJECTION SCREENS 11 5213 - 3

1.06 DELIVERY, STORAGE, AND HANDLING

A. Do not deliver projection screens until building is enclosed and other construction where screens will be installed is substantially complete.

B. Store products in manufacturer's unopened packaging until ready for installation.

C. Protect screens from damage during delivery, handling, storage, and installation.

1.07 COORDINATION

A. Coordinate work with installation of ceilings, walls, electric service power characteristics, and location.

PART 2 PRODUCTS

2.01 MOTORIZED, CEILING RECESSED, FRONT PROJECTION SCREENS

A. Refer to reflected ceiling plans for locations.

B. Electric motor operated, steel case. Ceiling-recessed, 18-gauge steel headbox, 6-1/2 inches (182 mm) deep and 6-13/16 inches (182 mm) wide with white paint finish and stamped 13-gauge steel end caps. UL approved "Suitable for use in environmental air space." Bottom closure panel forms slot for passage of viewing surface and can be released to hang down or be removed for access to operating mechanism and viewing surface. Bottom perimeter flange provides support and trim for acoustical ceiling panels and trim for gypsum board ceiling. The Access case may be ordered in advance and the screen installed later to eliminate field damage. The screen installs in minutes. Housing is symmetrical allowing for left and right hand motor locations and for viewing surface to unroll off front or back of roller. Steel mounting brackets slide in extruded aluminum mounting system along top of case. Brackets supporting roller/fabric assembly slide in tracks inside the top of the case, allowing viewing surface to be centered in case. Steel leveling brackets are attached to case to prevent deflection. Housing designed with internal junction box and plug-in wiring connections to allow housing to be installed and connected to building power supply separately from motor and viewing surface.

1. Quiet Motor mounted inside screen roller on rubber isolation insulators. Motor operates at 44db and is UL certified, rated 110-120V AC, 60 Hz, three wire, instantly reversible, lifetime lubricated with pre-set accessible limit switches.

2. Motor Screen Controls, UL certified.

a. Low Voltage LVC-IV & LVC-S, Part# 121223

3. Projection Viewing Surface:

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

CEILING-RECESSED FRONT PROJECTION SCREENS 11 5213 - 4

a. Matt White XT1000V - On Axis gain of 1.0. 180 degree viewing cone.

4. Tab-Tensioning System:

a. Viewing surface with integrated tabs and cable on each side of fabric to provide tension and ensure flat viewing surface. Viewing surface and tabs CNC cut as a single piece. Tabs RF welded to the back of viewing surface to prevent tab separation. Tab adhesives are not acceptable. Viewing surface inserted into aluminum bottom dowel. Warranted for 5 years against tab separation.

5. Viewing Area H x W.

a. HDTV Format (16:9). Black masking borders standard.

b. 161 inch (4089 mm) diagonal, 80 inches x 140 inches (2032 mm x 3556 mm).

6. Provide an extra screen drop with an overall screen drop of 6 inches (152mm) with a black masking top border.

PART 3 EXECUTION

3.01 EXAMINATION

A. Do not begin installation until substrates have been properly prepared.

B. Verify rough-in openings are properly prepared.

C. If substrate preparation is the responsibility of another installer, notify Government of unsatisfactory preparation before proceeding.

3.02 PREPARATION

A. Clean surfaces thoroughly prior to installation.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.03 INSTALLATION

A. Refer to reflected ceiling plans for locations.

B. Install in accordance with manufacturer's instructions.

C. Install front projection screens with screen cases in position and relationship to adjoining construction as indicated, securely anchored to supporting substrate, and in

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

CEILING-RECESSED FRONT PROJECTION SCREENS 11 5213 - 5

manner that produces a smoothly operating screen with plumb and straight vertical edges and plumb and flat viewing surfaces when screen is lowered.

D. Test electrically operated units to verify that screen, controls, limit switches, closure and other operating components are in optimum functioning condition.

3.04 PROTECTION

A. Protect installed products until completion of project.

B. Touch-up, repair or replace damaged products before Beneficial Occupancy.

END OF SECTION

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

AUDIO-VISUAL EQUIPMENT SUPPORTS 11 5223 - 1

SECTION 11 5223 - AUDIO-VISUAL EQUIPMENT SUPPORTS

PART 1 GENERAL

1.01 SUMMARY

A. Section Includes: Motorized projector lifts.

B. Materials included in this section shall meet the requirements for High Performance Sustainable Buildings for New Construction points for the following Sections:

1. 2-3.1.5 - Standby Powered Devices

2. The contractor is expected to understand the HPSB requirements for these sections and include all applicable overhead in their base bid for the necessary documentation to achieve the above listed credits.

1.02 RELATED REQUIREMENTS

A. Section 01 3325 - Project Sustainability Summary

B. Section 01 3329 - Sustainable Design Reporting

1.03 ACTION SUBMITTALS

A. Refer to Section: 01 6000 Product Requirements

B. Product Data: For each type of lift, including manufacturer recommended installation procedures.

C. Shop Drawings: Include dimensions, method of attachment, structural support, and electrical wiring.

D. Samples: Provide finish samples.

E. Sustainability Submittals, Product data for HPSB Compliance:

1. For products using electricity, documentation showing printed statement that device meets FEMP designated efficiency requirements or Energy Star qualified.

2. If the product has a "standby" mode, submit documentation showing that less that one (1) watt of power is consumed when in "standby" mode

1.04 CLOSEOUT SUBMITTALS

A. Refer to Section 01 7800 Closeout Submittals

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

AUDIO-VISUAL EQUIPMENT SUPPORTS 11 5223 - 2

B. Maintenance data.

1.05 QUALITY ASSURANCE

A. Motors for projector lifts shall be certified for use in the United States and Canada by Underwriters Laboratory (UL), Inc. and shall bear UL label.

1.06 DELIVERY, STORAGE AND HANDLING

A. Refer to Section 01 60 00 Product Requirements

B. Deliver motorized projector lifts in manufacturer’s original, unopened, undamaged containers with identification labels intact.

C. Inspect motorized projector lifts for freight damage, concealed or otherwise, upon delivery to project site. Report damage to freight carrier immediately for replacement of motorized projector lifts.

D. Store motorized projector lifts in resealed manufacturer’s original containers.

PART 2 PRODUCTS

2.01 SOURCE REQUIREMENTS

A. Source Limitations: Obtain motorized projector lifts from single manufacturer as a complete unit including necessary mounting hardware and accessories.

2.02 MOTORIZED PROJECTOR LIFTS

A. Electrically Operated, Low Profile Lifts: Electrically operated, ceiling recessed projector lift for lowering and retracting projector for operation and storage. Assembly to include controls, mounting hardware, wiring, and other components required for complete operation.

1. Limit Switches: Provide factory set and field adjustable.

2. Maximum Extension: 38.5 inches (622 mm).

3. Maximum Lift Capacity: 100 lbs (45 kg).

4. Approximate Travel Speed: 23 seconds.

B. Operating Mechanism: Operating pan raised and lowered by 110 VAC, 60 HZ, instantly reversible, thermally protected, lifetime lubricated, tubular 3-wire motor and cloth system with scissor arm for stability.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

AUDIO-VISUAL EQUIPMENT SUPPORTS 11 5223 - 3

C. Operating Pan: 28-1/4 by 15 inch (718 by 381 mm), steel pan with black powder coat paint finish for attachment of suspended projector.

1. Projector Attachment: Mounted to operating pan with universal projector mount.

a. Universal Projector Mount: Universal bracket suitable for projectors up to 26 lbs (12 kg) with adjustable arms that can be manipulated to fit most projectors with three or four mounting holes. Tilt, yaw and pan adjustments can be made quickly using spring-loaded bolts.

D. Ceiling Closure Panel: Steel closure panel with ceiling tile lip, suspended below projector from rods attached to operating pan. Closuremounted with recess to allow attachment of acoustical ceiling panels.

1. Trim: Metal trim ring to finish ceiling opening.

2. Color: White powder coat.

a. Size: 30-3/4 by 30-3/4 inches (768 by 768 mm)

E. Environmental Airspace Housing: Fabricated from aluminum and steel panels for recessing projector lift in ceiling space used as return air plenum. Provide with universal closure and metal trim to finish ceiling opening.

1. Size: 29-3/8 by 30-1/4 inches (746 by 768 mm).

2.03 CONTROLS

A. Provide 2 control stations to lower, raise, and stop projector lift.

B. Single Station Control: 3-position 110-120V maintained rocker switch with white switches.

C. Low Voltage Station Control: Control station without switches for interface with master control system. Wiring from switches or receivers to low voltage control unit to be 24 V.

D. Video Interface Control: Interface to allow motorized lift to be controlled simultaneously with video projector with 12V outputs and motorized screen through 110V switched outlet. Equip interface with override switch permitting independent operation of mount and screen.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

AUDIO-VISUAL EQUIPMENT SUPPORTS 11 5223 - 4

2.04 BACKING PLATES

A. Provide and install structural support materials, configured as a backing plate, for mounting of display brackets.

B. Material should be installed directly behind finished gypsum board.

C. Provide 3/4” plywood, suitable to support loads of 100 lbs. using standards lag mounting configurations.

D. Backing plate should be centered near or on the backbox location as shown on the AV drawings.

E. Backing plate should be at least 4’W x 3’H.

F. Fasten securely to structural framing members as required by the Government.

PART 3 EXECUTION

3.01 PREPARATION

A. Coordinate layout and installation of motorized projector lifts with ceiling construction and related components penetrating or above ceilings such as lighting fixtures, mechanical equipment, ductwork, and fire-suppression system.

B. Coordinate requirements for blocking, structural supports, bracing, and ceiling openings to ensure proper installation of motorized projector lifts.

C. Coordinate location and requirements for power supply conduit, and wiring required for motorized projector lifts and controls.

D. Coordinate installation of recessed motorized projector lifts with construction of suspended acoustical panel ceilings specified in Section 09 51 13 Acoustical Panel Ceilings.

E. Coordinate interface and installation of motorized projector lift controls with provision of motorized screen.

3.02 INSTALLATION

A. Install motorized projector lifts and controls at locations and heights indicated on Drawings.

B. Install motorized projector lifts complete with necessary hardware, anchors, brackets and fasteners; according to manufacturer's written instructions and as specified.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

AUDIO-VISUAL EQUIPMENT SUPPORTS 11 5223 - 5

3.03 FIELD QUALITY CONTROL

A. Test motorized projector lifts to verify that lifts, controls, limit switches, closures, and other operating components are functional. Correct deficiencies.

3.04 DEMONSTRATION

A. Demonstrate operation of motorized projector lifts to the Government's designated representatives.

3.05 PROTECTION

A. Protect motorized projector lifts after installation from damage during construction operations. If damage occurs, remove and replace damaged components or entire unit as required to provide units in their original, undamaged condition.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

OPERABLE MESH SHADES 12 2115 - 1

SECTION 12 2115 - OPERABLE MESH SHADES

PART 1 GENERAL

1.01 SUMMARY

A. Section Includes:

1. Manually operated sunscreen roller shades.

B. Materials included in this section shall meet the requirements for High Performance Sustainable Buildings for New Construction points for the following Sections:

1. 2-5.3.2 - Reduce Volatile Organic Compounds (VOC) Low-Emitting Materials

2. The contractor is expected to understand the HPSB requirements for these sections and include all applicable overhead in their base bid for the necessary documentation to achieve the above listed credits.

1.02 REFERENCES

A. AA DAF-45 - Designation System for Aluminum Finishes; Aluminum Association;

1980.

B. NFPA 701-96 - Standard Methods of Fire Tests for Flame-Resistant Textiles and Films;

National Fire Protection Association; 1996.

C. NFPA 70 - National Electrical Code.

1.03 SUBMITTALS

A. Product Data: Manufacturer's specifications describing features, colors, options, accessories, for each type of unit.

1. Include installation instructions and show how installation methods may differ for different openings and mounting substrates.

2. Indicate physical properties, including fade resistance, washability, and fire hazard classification for:

B. Shop Drawings: Plans, elevations, sections, product details, installation details, operational clearances, power and control wiring diagrams, and relationship to adjacent work.

1. Window Treatment Schedule: For all roller shades. Use same room designations as indicated on the Drawings and include opening sizes and key to typical mounting

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

OPERABLE MESH SHADES 12 2115 - 2

details.

C. Shop Drawings:

1. Indicate special parts and installation conditions, related to window treatment units, which are not shown or dimensioned in product data.

2. Show how this work adjoins other work.

D. Schedule: Complete schedule with field measurements for each unit.

E. Samples:

1. For color selection: Color charts showing full range of colors and finishes available.

2. For color verification: Samples of actual components to be used; provide for all exposed materials.

3. For each window treatment type: One sample identical with actual product to be used except overall size may be smaller.

F. Certificates: For review and approval, submit manufacturer's written certification stating compliance with requirements for the following:

1. Fire retardance.

2. Physical properties indicated.

G. Contract Closeout Submittals:

1. Operation and maintenance data: Include manufacturer's written operation and maintenance instructions.

H. Sustainability Submittals, Product data for HPSB Compliance:

1. For products containing VOCs, documentation (material safety data sheets (MSDS), third-party certificates, or test reports) showing printed statement of VOC content.

2. VOC Content Limitations: For the specified products, submit documentation of conformance with Specification Section 01 6116 - Volatile Organic Compound (VOC) Content Restrictions.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

OPERABLE MESH SHADES 12 2115 - 3

1.04 QUALITY ASSURANCE

A. Manufacturer Qualifications: Obtain roller shades through one source from a single manufacturer with a minimum of twenty years experience in manufacturing products comparable to those specified in this section.

B. Installer Qualifications: Installer trained and certified by the manufacturer with a minimum of five years experience in installing products comparable to those specified in this section.

C. Fire-Test Response Characteristics: Passes NFPA 701-99 small and large-scale vertical burn. Materials tested shall be identical to products proposed for use.

D. Anti-Microbial Characteristics: 'No Growth' per ASTM G 21 results for fungi

ATCC9642, ATCC 9644, ATCC 9645.

E. Environmental Certification: Submit written certification from the manufacturer, including third party evaluation, recycling characteristics, and perpetual use certification as specified below. Initial submittals, which do not include the Environmental Certification, below will be rejected. Materials that are simply 'PVC free' without identifying their inputs shall not qualify as meeting the intent of this specification and shall be rejected.

F. Third Party Evaluation: Provide documentation stating the shade cloth has undergone third party evaluation for all chemical inputs, down to a scale of 100 parts per million, that have been evaluated for human and environmental safety. Identify any and all inputs, which are to be known to be carcinogenic, mutagenic, teratogenic, reproductively toxic, or endocrine disrupting. Also identify items that are toxic to aquatic systems, contain heavy metals, or organohalogens. The material shall contain no inputs that are known problems to human or environmental health per the above major criteria, except for an input that is required to meet local fire codes.

G. Recycling Characteristics: Provide documentation that the shade cloth can and is part of a closed loop of perpetual use and not be required to be down cycled, incinerated or otherwise thrown away. Scrap material can be sent back to the mill for reprocessing and recycling into the same quality yarn and woven into new material, without down cycling. Certify that this process is currently underway and will be utilized for this project.

H. Perpetual Use Certification: Certify that at the end of the useful life of the shade cloth, that the material can be sent back to the manufacturer for recapture as part of a closed loop of perpetual use and that the material can and will be reconstituted into new yarn, for weaving into new shade cloth. Provide information on each shade band indicating

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

OPERABLE MESH SHADES 12 2115 - 4

that the shade band can be sent back to the manufacturer for this purpose.

I. Mock-Up: Provide a mock-up (manual shades only) of one roller shade assembly for evaluation of mounting, appearance and accessories.

1. Locate mock-up in window designated by the Government.

2. Do not proceed with remaining work until mock-up is accepted by the Government.

1.05 DELIVERY, STORAGE, AND HANDLING

A. Deliver shades in factory-labeled packages, marked with manufacturer and product name, fire-test-response characteristics, and location of installation using same room designations indicated on Drawings and in the Window Treatment Schedule.

1.06 PROJECT CONDITIONS

A. Environmental Limitations: Install roller shades after finish work including painting is complete and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use.

1.07 WARRANTY

A. Roller Shade Hardware, Chain and Shadecloth (except EcoVeil): Manufacturer's standard non-depreciating twenty-five year limited warranty.

B. Roller Shade Installation: 3 year from date of Beneficial Occpancy, not including scaffolding, lifts or other means to reach inaccessible areas.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. A reputable manufacturer with documented experience furnishing and installing products of this specification section for a minimum of 5 years.

2.02 MANUALLY OPERATED SUNSCREEN ROLLER SHADES

A. Sunshade Cloth: Visually transparent single - fabric shade cloth.

1. Mesh Style: 3 percent open

2. Content: 70% PVC and 30% Polyester

3. NFPA 701-2015 Compliance

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

OPERABLE MESH SHADES 12 2115 - 5

4. Bacterial and Fungal Resistant in accordance with ASTM G21 & ASTM E2180

5. Acoustical Performance: 0.20 NRC / 0.14 SAA

6. Mesh Weight: 13.12 oz/yd 2

7. Fabric Thickness: 0.028 inches

8. Color: As selected from full range of manufacturer's offerings.

B. Shade Bands: Construction of shade band includes the fabric, the hem weight, hem-pocket, shade roller bar, and the attachment of the shade band to roller tube. Sewn hems and open hem pockets are not acceptable.

1. Hem pockets and hem weights: fabric hem pocket with rf-welded seams (including welded ends) and concealed hem weights.

2. Mounting spline and method of attaching shade band to roller tube shall not require the use of adhesive, tapes, staples, or rivets.

C. Manual Operating Mechanism: Similar or equal to Mechoshade Electroshape parts and components. Roller shade on continuous roller, provide manually operated control system.

1. Sizes as required.

2. Allow shade to be adjusted to and hold at any position.

3. Construct to allow easy, routine removal of roller and shade without removing operating mechanism or brackets, shade attached to roller or screen will not be accepted.

D. Facia: Formed steel or extruded aluminum; removable; conceal brackets and operating mechanism without notching or attachment of screens or clips; baked-on enamel finish;

color as selected by the Government.

E. Roller: Extruded aluminum tube or sufficient diameter to minimize deflection along length when shade is mounted, equipped with cover plate to prevent accidental dislocation of tube.

F. Roller: Extruded aluminum tube or sufficient diameter to minimize deflection along length when shade is mounted, equipped with cover plate to prevent accidental dislocation of tube.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

OPERABLE MESH SHADES 12 2115 - 6

2.03 FABRICATION

A. Fabricate to fit actual construction; take field measurements of openings before starting fabrication.

B. Use materials that are compatible, will not need to be lubricated, and which will not adversely affect adjacent materials.

C. Make window treatment units fill each opening completely, from jamb to jamb and from head to sill, with a single unit, unless multiple units are specifically indicated.

D. Where window treatment is not set into openings, but is to be installed continuously across the face of windows or walls, fabricate units so that ends occur only over vertical mullions or other definite vertical lines, and at corners.

1. Install lift cords on right side when facing interior side of blind.

PART 3 EXECUTION

3.01 EXAMINATION

A. Examine substrates at locations in which window treatment units will be installed. Do not begin installation until conditions are correct.

B. Coordinate and provide blocking as required for installation.

3.02 INSTALLATION

A. Install window treatment in accordance with manufacturer's installation instructions.

B. Set units in correct location, plumb, and level; allow clearance for window operating hardware.

C. Fasten securely to substrates.

3.03 PROTECTION

A. Protect installed work.

3.04 SCHEDULE

A. Provide manually operated roller shades at all openings in the following rooms.

1. Base Bid: 101, 109, 113

2. Alternate No. 2: 101, 109

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

MANUFACTURED PLASTIC LAMINATE CASEWORK 12 3040 - 1

SECTION 12 3040 - MANUFACTURED PLASTIC LAMINATE CASEWORK

PART 1 – GENERAL

1.01 SUMMARY

A. Related Documents:

1. Drawings and provisions of the contract including requirements of the Government's Solicitation and Division 1, apply to this section.

B. Section Includes:

1. Furnish and install plastic laminate casework and accessories as shown and listed on drawings and specified herein. Includes all countertops - solid surface specified in section 12 3600 and plastic laminate, sink cutouts, splashes, supports, shelving, and filler panels necessary for a complete casework installation.

C. Related Requirements to be Performed by Others:

1. Section 01 3325 - Project Sustainability Summary

2. Section 01 3329 - Sustainable Design Reporting

3. Section 01 6000 - Product Requirements

4. Section 01 6116 - Volatile Organic Compound (VOC) Content Restrictions

5. Section 01 7419 - Construction Waste Management and Disposal

6. Division 06 Section: “Rough Carpentry” for blocking within walls to adequately support casework.

7. Division 08 Section: “Finish Hardware” for cabinet locks keyed or master keyed to building locks.

8. Division 09 Section: “Resilient Base and Accessories” for resilient base applied to manufactured casework.

9. Division 22 Section: “Plumbing” for furnishing, installation, and hook-up of sinks, fixtures, outlets, strainers, tailpieces, traps, vacuum breakers, and stops shall be performed by the plumbing contractor to state and local codes. In all cases, sink cutouts shall be by the casework contractor.

10. Division 23 Section: “Heating, Ventilating, and Air-Conditioning” for furnishings, installation, and final connections of all ductwork to range hoods and spray booths

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

MANUFACTURED PLASTIC LAMINATE CASEWORK 12 3040 - 2

shall be by the HVAC contractor.

11. Division 26 Section: “Electrical” for the electrical contractor to state and local codes shall perform electrical furnishing, installation, and final connections of wiring, conduit, and/or electrical items within casework.

D. Materials included in this section shall meet the requirements for High Performance Sustainable Buildings for New Construction points for the following Sections:

1. 2-5.3.2 - Reduce Volatile Organic Compounds (VOC) Low-Emitting Materials

2. 2-6.1.2 - Biologically Based Products

3. The contractor is expected to understand the HPSB requirements for these sections and include all applicable overhead in their base bid for the necessary documentation to achieve the above listed credits.

1.02 REFERENCES

A. ANSI-A135: for all hardboard.

B. ANSI-A161.2-1998: for performance of fabricated high-pressure decorative laminate countertops.

C. ANSI-A208.1-2009: for grade M-3 mat-formed wood particleboard.

D. BHMA A156.9: for grade-1 hinge requirements.

E. NEMA 3 LD-2005: for performance requirements of high pressure laminates.

F. SEFA 8PL Recommended Practices: for cabinet construction.

1.03 DEFINITIONS

A. Exposed:

1. In casework, surfaces visible when drawers and opaque doors (if any) are closed;

behind clear glass doors; bottoms of cabinets 42" or more above finished floor; and tops of cabinets less than 78" above finished floor.

B. Semi-Exposed:

1. In casework, surfaces that become visible when opaque doors are open or drawers are extended; bottoms of cabinets more than 30" or tops of cabinets less than 42" above finished floor.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

MANUFACTURED PLASTIC LAMINATE CASEWORK 12 3040 - 3

1.04 SUBMITTALS

A. See Section 01 3001 - Submittals for Submittal Procedure

B. Shop Drawings:

1. Include catalog numbers and specifications of Case Systems, Midland, Michigan.

2. Submit three sets of laser quality, 11 x 17 shop drawings consisting of:

a. Finish, hardware, construction options selection sheet.

b. Small scale floor plan showing casework in relation to the building.

c. Large scale elevations and plan views.

d. Blocking locations within walls (blocking done by others).

C. Samples:

1. Submit one set of laminate color brochures from standard laminate manufacturers Wilsonart, Formica, Pionite, and Nevamar.

2. Submit one edge color sample chain.

3. Submit one set of interior colors samples.

4. Submit one full size cabinet sample with drawer and hinge.

D. Warranty:

1. Provide sample warranty document stating specified terms as referenced in 1.8.

E. Sustainability Submittals, products data for HPSB Compliance:

1. VOC Content Limitations: For the specified products, submit documentation of conformance with Specification Section 01 6116 - Volatile Organic Compound (VOC) Content Restrictions.

2. For products containing VOCs, documentation, (material data sheets (MSDS), third-party certificates, or test reports) showing printed statement of VOC Content.

3. For products having Biologically Based Products, documentation indicating percentages of Biologically-Based Products.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

MANUFACTURED PLASTIC LAMINATE CASEWORK 12 3040 - 4

1.05 QUALITY ASSURANCE

A. Manufacturer Qualifications: Must demonstrate evidence of a minimum of (5) five years experience providing casework similar to this project.

B. Manufacturer to provide SEFA 8 laboratory furniture certificate of performance on construction method.

1.06 DELIVERY, STORAGE, AND HANDLING

A. Delivery and Acceptance Requirements:

1. Deliver casework once painting, and similar requirements have been completed that will not damage casework. This includes ensuring spaces are enclosed and weather tight.

2. All casework shall be blanket wrapped for protection during shipping.

B. Storage and Handling:

1. Casework must be protected from dust, dirt and/or other trades.

2. Countertops are stacked, properly supported and spaced evenly to avoid warping.

Large pieces are stacked first on the pallets with shorter pieces stacked on top.

1.07 SITE CONDITIONS

A. Ambient Conditions:

1. Do not deliver or install the casework until concrete, masonry, and drywall/plaster work is dry; ambient relative humidity is maintained between 25 – 55% prior to delivery and throughout the life of installation; and the temperature is controlled above 55°F.

2. Casework shall not be stored or installed in non-climate controlled conditions.

1.08 WARRANTY

A. Manufacturer shall offer a Ten -Year warranty to the Government against defective material and workmanship. Provide 10 year warranty for total replacement due to delamination of plastic laminate and or 3mm edge banding.

1. The warranty specifically does not cover any product or hardware, which has been incorrectly installed, including poor climate conditions, exposed to excessive loads or abuse.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

MANUFACTURED PLASTIC LAMINATE CASEWORK 12 3040 - 5

2. All non-casework items supplied, but not manufactured at Case Systems including, but not limited to sinks, fixtures, apparatus, fume hoods, keyboard trays, spray booths, lights, power outlets, and power strips shall be covered under the original manufacturers’ warranty.

1.09 SUSTAINABILITY REQUIREMENTS

A. Contractor shall endeavor to provide materials with a high Biobased content where possible.

B. Contractor shall endeavor to provide materials with the lowest possible VOC content.

PART 2– PRODUCTS

2.01 MATERIALS

A. Provide Plastic Laminate Faced Cabinets Manufactured with:

1. Particleboard Core:

a. All particleboard shall be Grade M-3 and shall meet or exceed all requirements as set by ANSI A208.1-2009.

Density 40-50 lbs/cu.ft

Moisture Content 10% Max

Modulus of Rupture 2393 psi

Modulus of Elasticity398,900 psi

Internal Bond 80 psi

Hardness 500 pounds Min

Linear Expansion 0.35%

Thickness Tolerance +/- 0.008"

Face Screw Holding 247 pounds Min

2. MR (Moisture Resistant) Core shall be:

a. Interior-Grade moisture resistant particleboard.

b. Meet or exceed M-3 Grade, according ANSI-A208.1-2009.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

MANUFACTURED PLASTIC LAMINATE CASEWORK 12 3040 - 6

B. Joinery:

1. Mechanical Joinery:

a. All cabinet body components shall be secured utilizing concealed interlocking mechanical fasteners as approved by the AWI Quality Standards 8th Edition -2003 Sections 400A-T-12, 400B-T10 and 1600-T-11.

C. Surface Material:

1. Acceptable laminate color, pattern, and finish as either scheduled or otherwise indicated on drawings or as selected by the Government from manufacturer’s standards types and nominal thickness including:

a. Vertical surface decorative grade VGS: .028” thick

b. General purpose decorative grade HGS: .048” thick

c. Cabinet decorative liner grade CLS: .020” thick

d. Non-decorative backer grade BKH: .028” thick

e. Thermally fused melamine laminate

f. Chemical resistant decorative laminate

D. Edge banding:

1. PVC, 3mm

a. Shall be applied utilizing hot melt adhesive and radiused by automatic trimmers. Edging shall be available in a variety of color options.

E. Adhesives:

1. PVA

a. Adhesive shall be mechanically applied.

b. NAUF, no VOC

2. EVA

a. Adhesive shall be mechanically applied.

3. Comply with all environmental standards and LEED credit requirements.

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

MANUFACTURED PLASTIC LAMINATE CASEWORK 12 3040 - 7

F. Protective coating option:

1. All surfaces, including: pulls, hinges, countertops and edge banding be coated with OEM-treated, quat-silane antimicrobial AEM 5772 from AEGIS Environments.

2.02 FABRICATION

A. General Cabinet Body Construction:

1. Cabinet Box Style shall be Reveal Overlay.

2. Cabinet Box Core shall be Particleboard.

3. Bottoms and ends of cabinets, and tops of wall and tall cabinets (all structural components) shall be 3/4" thick.

4. All panels shall be manufactured with balanced construction.

5. Fixed interior components such as fixed shelves, dividers, and cubicle compartments shall be full 3/4" thick and attached with concealed interlocking mechanical fasteners.

6. Cabinet body exterior surfaces shall be VGS

7. Cabinet finished interior options shall be: Finished At Opens.

8. Cabinet body interior surfaces shall be Thermally Fused.

9. Cabinet body front, drawer, and door edge shall be 3mm PVC. Thermally fused, color as selected by the Government.

10. Mounting stretchers are 3/4" thick structural components fastened to end panels and back by mechanical fasteners, and are concealed by the cabinet back.

11. When the rear of a cabinet is exposed, a separate finished 3/4" thick decorative laminate back panel may be specified.

12. Backs of cabinets are 1/2" thick surfaced both sides for balanced construction and fully captured on both sides and bottom.

13. A 5mm diameter row hole pattern 32mm (1-1/4") on center shall be bored in cabinet ends for adjustable shelves. This row hole pattern shall also serve for hardware mounting and replacement and/or relocation of cabinet components.

14. An upper 3/4" thick stretcher shall be located behind the back panel and attached between the end panels with mechanical fasteners. This stretcher is also fastened to

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

MANUFACTURED PLASTIC LAMINATE CASEWORK 12 3040 - 8

the full sub-top thus capturing the back panel.

B. Base Cabinet Construction:

1. All base cabinets, except sink cabinets, shall have a solid 3/4" thick sub-top of core (as specified above), fastened between the ends with interlocking mechanical fasteners.

2. Sink cabinets with a split removable back panel shall have a formed metal front brace, and steel corner gussets shall be utilized to support and securely fasten top in all four corners. Front brace shall be powder coated black.

3. Tops: Plastic laminate tops (not called for to be solid surface tops) shall be 1.25 inch thick particle board with 3 mm edge banding with non decorative backer.

C. Tall Cabinet Construction:

1. All tall cabinets shall be provided with an intermediate fixed shelf to maintain internal dimensional stability under heavy loading conditions as well as an intermediate 3/4" thick stretcher located behind the back panel and be secured between the cabinet ends with mechanical fasteners. The stretcher shall be secured to the shelf through the back with #8 x 2" plated flat head screws.

D. Wall Cabinet Construction:

1. All wall cabinet bottoms shall be 1" thick core (type specified above), mechanically fastened between end panels and secured to the bottom back stretcher. A lower 3/4" thick stretcher shall be located behind the back panel and attached between the end panels with mechanical fasteners. The stretcher is also secured through the back and into the cabinet bottom.

2. All wall cabinet exterior bottoms shall be Match Standard Interior.

3. All wall cabinet tops shall be: ¾" thick.

E. Tall and Wall Cabinet Top Edges shall be: Raw.

F. Tall, Wall and Hutch Tops shall be: CLS to Match Standard Interior.

G. Tall, Wall and Hutch Upper Door Reveal shall be: 15mm Reveal.

H. Toe Base of Cabinet:

1. Individual bases shall be constructed of Particleboard factory applied to base and tall cabinets and shall support and carry the load of the end panels, and the cabinet

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

MANUFACTURED PLASTIC LAMINATE CASEWORK 12 3040 - 9

bottom, directly to the floor. The base shall be let in from the sides and back of the cabinet to allow cabinets to be installed tightly together and tight against a wall, also to conceal the top edge of applied vinyl base molding (not supplied by casework manufacturer). There shall be a front to back center support for all bases over 30" wide.

2. Toe Base Height 96mm.

3. Toe Base Options shal be factory attached.

I. Drawer Fronts and Solid Doors:

1. All drawer fronts and solid door components shall be Particleboard and surfaced both sides for balanced construction.

2. Options shall be: HPL Door and Drawer Front Exterior and Grade CLS on Interior.

3. Surfaces shall be HPL Grade VGS. NO Thermally Fused or Decorative Thermally Fused cabinets will be accepted.

4. Door and drawer front edge shall be: [Standard: 3mm PVC]

J. Drawer Boxes:

1. Drawer box constructed with a full 1/2" thick core shall be Particleboard non-racking, non-deflecting platform bottom that is grooved into drawer box sides.

Drawer bottoms may be 1/4" tempered hardboard.

2. Drawer box at finished interiors shall be Surface to Match Standard Interior.

3. Slides are secured with 1-1/4" long screws driven through the platform and into the sides. Drawer box sides, backs, sub-front, and bottom shall be 1/2". The top edge shall be nominal 1mm (.020") PVC matching the drawer color. Drawer box corners shall be joined with fluted hardwood dowels and glue spaced at a minimum of 32mm on center. Drawer box fronts shall be removable and attached to drawer box sub-front with screws from inside of drawer. Horizontal parting rails between drawers shall be 3/4" thick core, with balanced surfaces, secured to and further reinforcing cabinet ends. File drawer box shall have full-height sides supporting a heavy-duty support rail for hanging file folders.

K. Doors:

1. Solid Doors shall be ¾" thick core.

2. Glazed Doors, Framed shall be:

ANG Project Number: FAKZ172004 / 182106 SSL#16107 / 18075

MANUFACTURED PLASTIC LAMINATE CASEWORK 12 3040 - 10

a. Hinged or sliding 3/4" thick, framed doors shall be Clear Acrylic Panels.

Panels must be a minimum of ¼" thick. Glazing panel shall be set into the doorframe without the use of a separate molding. Glazing shall be held in place with removable stops.

3. Glazed Doors, Frameless shall be:

a. Sliding, minimum of 1/4" thick tempered glass panels. All edges to be radius ground and polished.

4. Sliding Doors shall be:

a. Extruded aluminum upper track with anodized finish. All tall cabinets shall receive two hanging brackets per door with two rollers per bracket. All other cabinets shall receive two hanging brackets per door with one roller per bracket. The bottom of door shall be captured in a retainer to prevent doors from swinging in or out.

5. Pocket Doors shall be:

a. Zinc plated, self-closing, three-way adjustable geometric door hinge with precision steel ball bearing slides.

6. Grille Doors shall be:

a. Powder coated platinum finish, grille doors where shown or noted with model number shall have individual lock hasps and number plates.

b. Single wide grille doors where shown or noted shall have individual, zinc plated stay-close wire door latches. The wire door latch is a robust, door/side-mounted design made of 13-gauge cold rolled steel.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .