Fairchild B1033 - Type B3_Drawings_r2.pdf
PDF 47 MB Posted
- Attached to
- Hangar 1033 Renovation **ABSTRACT OF OFFERS Federal contract opportunity
- Solicitation number
- W50S9D22B5001
- Issued by
- Department of the Army National Guard
About this file
This solicitation is for renovation services for Hangar 1033 located at Fairchild Air Force Base in Washington. The contractor will upgrade all building systems including HVAC, fire suppression, electrical, finishes, plumbing, and applicable exterior areas to construct an 18,282 square foot maintenance shop space. Required spaces include avionics, jet engine maintenance, non-destructive inspection, parts/tool storage, structural maintenance, corrosion control, and administrative areas. The space must support the Air Force Repair Enhancement Program and meet UFC 4-211-01 requirements including fire suppression. Bid pricing must break down costs for each trade and aspect of the project. The Department of the Army National Guard will award a firm-fixed price contract through sealed bidding procedures outlined in FAR 14.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| H1033 1419-ABSTRACT.pdf | ||
| Hardware Sets.docx | DOCX document | |
| RFI Response 3.pdf | ||
| Solicitation Amendment 2 Date Change_QA.pdf | ||
| RFI Response 2.pdf | ||
| Solicitation Amendment 1 Date Change- QA.pdf | ||
| App D_Fairchild_GPR Investigation.pdf | ||
| RFI Response 1.pdf | ||
| App A_Revise Fairchild Air Force Base Building 1033 HBM Inspection Report_final with appendices (1).pdf | ||
| A-1 Site Visit Sign In.pdf | ||
| App C_Repair Maintenance Hangar B1033 Technical Memorandum 4.1.2020.pdf | ||
| App A_Revise Fairchild Air Force Base Building 1033 HBM Inspection Report_final with appendices.pdf | ||
| SOLICITATION - FINAL 17 May 2022.pdf | ||
| Fairchild Hangar B1033_Specifications_Type B3_VOL2.pdf | ||
| Authority to Advertise (NGB PM).pdf | ||
| Fairchild Hangar B1033_Specifications_Type B3_VOL1.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHKD:
DRWN:
PROJ:
DESN:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
3/
/2
:2 4:
P
M
O :\P
R O
JE
C
TS
\IR
VI
N
E\
6\
0-
6-
8\
C
AD
\S H
EE
TF
IL
ES
\G -0
C
O
VE
R
IN
D
EX
.D W
G
N
EW
TO
N
, D
EV
IN
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch, otherwise drawing not to scale
C op yr ig ht : T et ra
T ec h
/3
0/
TY
PE
B -3
S U
BM
IT
TA
L
200-38546-19018
R
EP
AI
R
B
S
U
ST
. H
AN
G
AR
/S H
O
PS
W
AS
H
IN
G
TO
N A
IR
N
AT
IO
N
AL
G U
AR
D
1s t A
IR
R
EF
U
EL
IN
G
W
IN
G
FA
IR
C H
IL
D
A
FB
, W A
G-000
C O
VE
R
SH
EE
T
IN
D
EX
TR
TR
TL
WASHINGTON AIR NATIONAL GUARD
141st Air Refueling Wing, Fairchild Air Force Base, Washington
Repair Maintenance Hangar B1033 Project Number: GJKZ182085
Contract Number: W9133L-16-D-007 Type B3 - Final Drawings
SHEET INDEX
GENERAL
G-000 COVER SHEET INDEX
G-001 ABBREVIATIONS AND SYMBOLS
G-100 SITE PLAN
HZ-100 HAZARDOUS MATERIALS ABATEMENT PLAN
STRUCTURAL
S-001 STRUCTURAL NOTES
S-002 SPECIAL INSPECTIONS
S-101 DEMO PLAN
S-102 FOUNDATION PLAN WEST
S-103 FOUNDATION PLAN EAST
S-104 FRAMING PLAN WEST
S-105 FRAMING PLAN EAST
S-301 STRUCTURAL SECTIONS
S-302 STRUCTURAL SECTIONS
S-303 STRUCTURAL SECTIONS
S-501 TYPICAL DETAILS
S-502 TYPICAL DETAILS
S-503 FOUNDATION AND WALL DETAILS 1
S-504 FOUNDATION AND WALL DETAILS 2
S-505 ROOF FRAMING DETAILS 1
S-506 ROOF FRAMING DETAILS 2
S-507 ROOF FRAMING DETAILS 3
S-508 ROOF FRAMING DETAILS 4
S-509 MISCELLANEOUS DETAILS 1
S-510 MISCELLANEOUS DETAILS 2
S-511 MISCELLANEOUS DETAILS 3
ARCHITECTURAL
AD-100 DEMOLITION PLAN
A-100 REFERENCE PLAN
A-101 WEST FLOOR PLAN
A-102 EAST FLOOR PLAN
A-103 WEST REFLECTED CEILING PLAN
A-104 EAST REFLECTED CEILING PLAN
A-200 NORTH - SOUTH EXTERIOR ELEVATIONS
A-201 EAST - WEST EXTERIOR ELEVATIONS
A-300 BUILDING SECTIONS
A-301 WALL SECTIONS
A-302 WALL SECTIONS
A-400 INTERIOR ELEVATIONS
A-401 INTERIOR ELEVATIONS
A-402 ENLARGED PLANS AND ELEVATIONS
A-403 ENLARGED PLANS AND ELEVATIONS
A-404 ENLARGED PLANS AND ELEVATIONS
A-405 ENLARGED PLANS AND ELEVATIONS
A-500 DETAILS
A-501 DETAILS
A-502 DETAILS
A-503 DETAILS
A-504 DETAILS
A-600 ROOM FINISH SCHEDULE
A-601 DOOR AND FRAME SCHEDULE
A-602 SCHEDULES
FIRE PROTECTION
F-001 FIRE PROTECTION NOTES
F-101 LIFE SAFETY FLOOR PLANS
F-102 HAZARD CLASSIFICATION PLAN
F-103 WEST FIRE PROTECTION PLAN
F-104 EAST FIRE PROTECTION PLAN
F-105 WEST FIRE ALARM PLAN
F-106 EAST FIRE ALARM PLAN
F-501 FIRE PROTECTION DETAILS
F-601 FIRE PROTECTION RISER DIAGRAM &
FUNCTIONAL MATRIX
PLUMBING
PD-101 PLUMBING DEMOLITION PLAN
P-001 PLUMBING ABBREVIATIONS, SYMBOLS, AND NOTES
P-100 PLUMBING SITE PLAN
P-101 FIRST FLOOR PLUMBING PLAN - AREA A
P-102 FIRST FLOOR PLUMBING PLAN - AREA B
P-401 ENLARGED MEN'S RESTROOM - AREA C
P-402 ENLARGED MECHANICAL ROOM - AREA D
P-403 ENLARGED WEST MEZZANINE - AREA E
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-901 PLUMBING RISER DIAGRAMS
P-902 PLUMBING RISER DIAGRAMS
P-903 PLUMBING RISER DIAGRAMS
MECHANICAL
MD-101 MECHANICAL DEMOLITION PLAN
M-001 MECHANICAL ABBREVIATIONS, SYMBOLS, AND NOTES
M-100 MECHANICAL SITE PLAN
M-101 FIRST FLOOR HVAC PLAN - AREA A
M-102 FIRST FLOOR HVAC PLAN - AREA B
M-401 ENLARGED HVAC MEN'S RESTROOM - AREA C
M-402 ENLARGED HVAC MECHANICAL ROOM - AREA D
M-403 ENLARGED WEST MEZZANINE - AREA E
M-404 ENLARGED EAST MEZZANINE - AREA F
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-901 MECHANICAL CONTROLS
M-902 MECHANICAL CONTROLS
M-903 MECHANICAL CONTROLS
M-904 MECHANICAL CONTROLS
M-905 MECHANICAL CONTROLS
ELECTRICAL
E-001 ELECTRICAL LEGEND AND NOTES
E-002 HAZARDOUS LOCATION PLAN
ED-101 SITE DEMOLITION PLAN
ED-102 LIGHTING DEMOLITION PLAN
ED-110 POWER DEMOLITION PLAN
ED-601 ONE-LINE DEMOLITION PLAN
E-101 ELECTRICAL SITE PLAN
E-102 ELECTRICAL REFERENCE FLOOR PLAN
E-103 WEST ELECTRICAL LIGHTING PLAN
E-104 EAST ELECTRICAL LIGHTING PLAN
E-105 WEST ELECTRICAL POWER PLAN
E-106 EAST ELECTRICAL POWER PLAN
E-401 ELECTRICAL ENLARGED PLAN
E-501 ELECTRICAL DETAILS AND SCHEDULES
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-504 ELECTRICAL DETAILS
E-601 ELECTRICAL ONE-LINE DIAGRAM
E-602 ELECTRICAL ONE-LINE DIAGRAM
E-603 ELECTRICAL PANEL SCHEDULES
E-604 ELECTRICAL PANEL SCHEDULES
TECHNOLOGY
T-001 TELECOMMUNICATIONS LEGEND AND NOTES
TD-101 TELECOMMUNICATION SITE DEMOLITION PLAN
TD-102 TELECOMMUNICATION DEMOLITION PLAN
T-101 TELECOMMUNICATIONS SITE PLAN
T-102 WEST TELECOMMUNICATIONS PLAN
T-103 EAST TELECOMMUNICATIONS PLAN
T-401 ENLARGED TELECOMMUNICATIONS PLAN
T-501 TELECOMMUNICATIONS DETAILS
T-502 TELECOMMUNICATIONS DETAILS
T-601 TELECOMMUNICATIONS RISER DIAGRAM
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
ARCHITECT
AutoCAD SHX Text
M. MARCEL BODSKY
AutoCAD SHX Text
STATE OF WASHINGTON
AutoCAD SHX Text
PROJ:
DESN:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
3/
/2
:2 4:
P
M
O :\P
R O
JE
C
TS
\IR
VI
N
E\
6\
0-
6-
8\
C
AD
\S H
EE
TF
IL
ES
\G -0
A
BB
R
EV
IA
TI
O
N S
AN
D
S
YM
BO
LS
.D W
G
N
EW
TO
N
, D
EV
IN
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch, otherwise drawing not to scale
C op yr ig ht : T et ra
T ec h
/3
0/
TY
PE
B -3
S U
BM
IT
TA
L
200-38546-19018
R
EP
AI
R
B
S
U
ST
. H
AN
G
AR
/S H
O
PS
W
AS
H
IN
G
TO
N A
IR
N
AT
IO
N
AL
G U
AR
D
1s t A
IR
R
EF
U
EL
IN
G
W
IN
G
FA
IR
C H
IL
D
A
FB
, W A
G-001
AB
BR
EV
IA
TI
O
N S
AN
D
S
YM
BO
LS
TR
TR
TL
INTERIOR
HEADER
INSIDE DIAMETER
INSULATION
HEAT, VENT/AIR COND
FLOOR DRAIN
FIRE ALARM
FEET PER MINUTE
GAUGE, GAGE
GUARD POST
GUTTER LINE
HOLLOW CORE
GYPSUM WALLBOARD
HEIGHT
HORIZONTAL
DIA
DIM
DIAMETER
DIMENSION
DEPT
DF
DG
DEMO
DEG/
DET
DOOR GRILLE
DRINKING FOUNTAIN
DEMOLISH
DEPARTMENT
DEGREE°
DETAIL
IN/ "
JAN
JT
INCH
JANITOR
JOINT
HYD
HVAC
INT
INSUL
ID
HDR
HYDRANT
FOOTFT/ '
CORNER GUARD
CONSTRUCTION
CONC
CONT
CO
CONCRETE
CONTINUOUS
CLEAN OUT
CT
CONST
CMU
CIP
CLR
CB
CAST IN PLACE
CERAMIC TILE
CLEAR
CATCH BASIN
GP
HORIZ
HR
HT
HC
HB
HOUR
HOSE BIBB
GALV
GL
GL
GM
GWB
GA
GLASS
GALVANIZED
GAS METER
BUILDING
BOTTOM OF WALL
BOTTOM OF DUCT
CAB
CBB
CPT
BW
BR
B.O.
BOD
CABINET
CARPET
BOTTOM OF
BRICK
BD
BLKG
BM
BLDG
BLK
BOARD
BENCH MARK
BLOCKING
BLOCK
FD
FNC
FPM
FHC
FEC
FENCE
FIRE HOSE CABINET
ESMT
ETC
EXH
FA
EXHAUST
EXTRUDED
ET CETERA
EASEMENT
OH OVERHEAD
OFFICE
PAV
OFF
PAVEMENT
NTS
N
OC
OD
NFA
NIC
NOS/ #
N/A
MIN
MISC
MTD
MH
MB
MFR
MECH
MAX
NOT TO SCALE
ON CENTER
NORTH
OUTSIDE DIAMETER
NOT APPLICABLE
NOT IN CONTRACT
NET FREE AREA
NUMBER
MISCELLANEOUS
MOUNTED
MINIMUM
MANUFACTURER
MECHANICAL
MAIL BOX
MANHOLE
MAXIMUM
DOWNSPOUT
DISHWASHER
EXHAUST FAN
EXPANSION JOINT
ELEVATION
EXHAUST REGISTER
EA
EJ
ELEC
EQ
ER
ELEV
E
EF
EQUATION
ELECTRICAL
EAST
EACH
DWG
DW
DR
DS
DN
DOOR
DRAWING
DOWN
LENGTH
LIGHT STANDARD
LINEAR FEET
POUNDSLBS
LT STD
LTG
MAINT
M
LF
L
MAINTENANCE
METER
LIGHTING
EXISTINGEXIST
AVE
ASPH ASPHALT
AVENUE
AND
ANCHOR BOLT
ALUMINIUM
ACOUSTICAL CEILING PANEL
CENTER LINE
ARCHITECT
APPROX
ARCH
ALUM
AP
AFF
ADJ
ACOUS
ACT
ACP
ANGLE POINT
APPROXIMATELY
ADJUSTABLE
ABOVE FINISH FLOOR
ACOUSTICAL
ACOUSTICAL CEILING TILE
AB
ANGLE
AT
C
AMERICAN NATIONAL
L
APPROXIMATEAPPROX
ANSI
APWA AMERICAN PUBLIC
CG
CAST IRONCI
CONTROL JOINTCJ
CEILINGCLG
COL COLUMN
EXTERIOR OREXT
EP ELECTRICAL PANEL
FIN FINISH
FURR FURRING
GRAB BARGB
HM HOLLOW METAL
PERFORATEDPERF
OA OVER ALL
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OPPOSITEOPP
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
QUARRY TILEQT
RISER or RADIUS
RETURN AIRRA
RUBBER BASERB
RCP
ROOF DRAINRD
REFERENCEREF
RST RESILIENT STAIR TREAD
REFRIG REFRIGERATOR
REIN REINFORCEMENT
REQ REQUIRED
RESIL RESILIENT
RM ROOM
RO ROUGH OPENING
RTM RUBBER TIRE MAT
SOUTH
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SHT SHEET
SIM SIMILAR
SQ SQUARE
SST STAINLESS STEEL
STD STANDARD
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMETRICAL
TREAD
TEL TELEPHONE
TEMP TEMPERED
THK THICK
T.O. TOP OF
TYP TYPICAL
UNFIN UNFINISHED
UNO
TEMP TEMPERED
THK THICK
VAR VARIES
VERT VERTICAL
VCT
VEST VESTIBULE
VER VERIFY
UTIL UTILITIES
UG UNDERGROUND
WEST/ WIDTH/ WASHER
w/
WITH
WC WATER CLOSET
WD WOOD
WG WIRE GLASS
WH WATER HEATER
w/o WITH OUT
WP WATER PROOF
WT WEIGHT
WM WATER METER
A Q R
G
H B
C
D
E
F
P
O
N
M
L
J
K
S
T
I
U
V
W
X Y Z
STANDARD INSTITUTE
WORKS ASSOCIATION
TWS TRACER WIRE SYSTEM
CONCRETE MASONRY
UNIT
FIRE EXTINGUISHER
CABINET
REFLECTED CEILING
PLAN
UNLESS NOTED
OTHERWISE
VINYL COMPOSITION
TILE
BOARD
CEMENTIOUS BACKER
CPT CARPET TILE
CHEM CHEMICAL
D DRYER
EQUIP EQUIPMENT
FLR FLOOR
IDEN IDENTIFY/IDENTITY
LVL LEVEL
MTL METAL
GROSS SQUARE GSF
FOOTAGE
VTR
VENT THROUGH ROOF
REV REVISION
STL STEEL
SF
SQUARE FOOT
SV
SHEET VINYL
PANELPNL
PERFORATEDPERF
PAINTP
R
T
LAVATORYLAV
TTD TOILET TISSUE DISPENSER
PART PARTITION
SCD SEAT-COVER DISPENSER
PTWR PAPER TOWEL DISPENSER
WASTE RECEPTACLE
SNV SANITARY NAPKIN VENDOR
SND SANITARY NAPKIN DISPOSAL
SD SOAP DISPENSER
RH ROBE HOOK
GYPSUM BOARDGYP
EPS EXTRUDED POLYSTYRENE
SC SCUPPER
S
W
T
VL
VINYL
FOIO FURNISHED BY OWNER
INSTALLED BY OWNER
FINISHED FLOOR
FINISHED GRADE
FF
FG
FTG FOOTING
FO FACE OF
VL
A-530
WALL SECTION
SCALE: 3/4" = 1'-0"1
A-530
X
X-XX
X
X-XX
X
X-XX
X
X-XX
H
IN
G E
SI
D
E
LA
TC
H S
ID
E
4" TO RO
UNLESS
OTHERWISE NOTED
1A
DOOR NUMBER
ROOM ACCESSED
NORTH ARROW
BAR SCALE
0'4'
SCALE: 1/4"=1'-0"
8'4'
ROOM NAME AND NUMBER
CUT LINE
ELEVATION IN RELATION TO BENCHMARK
WALL
PARTITION TYPE
LOUVER TYPE
LOBBY
S1
W8
DOOR TYPE
WINDOW TYPE
L1
DS DOWN SPOUT
FIRE EXTINGUISHER
DATUM
REVISION
GRIDB
111A
STANDARD REFERENCE BUBBLE
DETAIL NUMBER
SHEET DETAIL IS LOCATED ON
DRAWING / DETAIL TITLE AND SCALE
WALL SECTION
SECTION LETTER
SHEET SECTION IS LOCATED ON
BUILDING SECTION
SECTION LETTER
SHEET SECTION IS LOCATED ON
DETAIL OR ENLARGED PLAN
INTERIOR ELEVATION
ELEVATION LETTER
SHEET ELEVATION IS LOCATED ON
DETAIL OR PLAN NUMBER
SHEET DETAIL OR PLAN IS LOCATED ON
GENERAL NOTES
1. DO NOT SCALE DRAWINGS.
2. ALL WORK SHALL COMPLY WITH REFERENCED CODE AND
UFC STANDARDS.
3. VERIFY FIELD CONDITIONS PRIOR TO BEGINNING WORK.
4. THE CONTRACTOR SHALL COORDINATE ALL PORTIONS OF
WORK AS DESCRIBED IN THE CONTRACT DOCUMENTS.
NOTIFY THE CONTRACTING OFFICER FOR RESOLUTION OF
ALL DISCREPANCIES PRIOR TO CONSTRUCTION.
5. MECHANICAL AND ELECTRICAL INFORMATION SHOWN ON
THE ARCHITECTURAL DRAWINGS ARE PROVIDED FOR
CLARITY AND/OR LOCATION PURPOSES ONLY. REFER TO
MECHANICAL AND ELECTRICAL DRAWINGS FOR
MECHANICAL, PLUMBING AND ELECTRICAL WORK.
WOOD- FRAMING
INSULATION,
INSULATION,
MASONRY,
ALUMINUM
TILE
WOOD- FRAMING
PLYWOOD
STEEL
GRAVEL,
CRUSHED ROCK
EARTH,
SAND,
CONCRETE,
GRATING
CONTINUOUS
UNDISTURBED
MORTAR,
CAST-IN-PLACE
CONCRETE
BLOCKING
BATT
RIGID
PLASTER
GYPSUM
BOARD
MATERIALS
ABBREVIATIONS SYMBOLS
SFRM SPRAY-APPLIED FIRE-RESISTANT MATERIALS
AutoCAD SHX Text N
AutoCAD SHX Text 100'-0"
AutoCAD SHX Text T.O.
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
ARCHITECT
AutoCAD SHX Text
M. MARCEL BODSKY
AutoCAD SHX Text
STATE OF WASHINGTON
GATE
HOUSE
G A T E
36.61 I.E. E.
36.81 I.E. W.
LAWN
LANDSCAPE AREA WITH WASHED ROCK
ELECTRICAL SWITCH & TRANSFORMERS
39.17 I.E. W.
BLDG.
MH 16
I.E.=37.29
MH 17
I.E.=37.21 MH 18
I.E.=36.71
TG=42.40
I.E.=41.65
SLOPE
U N
D
ER
G R
O U
N D
ST
M
(A
BA
N D
O N
ED
I.E.@BLDG
40.51
A I R F I E L D F E N C E L I N E - C H A I N LINK
EXISTING STRUCTURED PARKING LOT ACCESSIBLE PARKING STALL, SIGNS &
ACCESSIBLE ROUTE TO HANGAR B1033 MAIN ENTRANCE - NOT INCLUDED IN
E X I S T I N G S T R U C T U R E D P A R K I N G L O T A C C E S S
PROJECT SCOPE
-5
0' C
LO
SE
ST
S
TR
U
C
TU
R E
DRIVE
SECURED
ASPHALT PAVING, TYP ASPHALT PAVING, TYP
ASPHALT
PAVING, TYP
ASPHALT
PAVING, TYP
SANITARY SEWER
STORM DRAIN
WATER
POWER
TELEPHONE
FUEL LINES
STEAM
FOAM/WATER DRAINAGE
MONITOR WELL
GATE VALVE
FIRE HYDRANT
NON-POTABLE WATER FOR
AFFF SYSTEM
MANHOLE
TRENCH DRAIN
CATCH BASIN
FLOW DIRECTION
STEAM VAULT
ELECTRICAL BOX
CHAIN LINK FENCE
BUILDING OUTLINE
ADD NEW CONCRETE PAD AND RELOCATE EXISTING
CANOPY. REFER TO SHEET A-101. PATCH ASPHALT
AS REQUIRED.
ADD NEW CANOPY & CONCRETE SLAB AT DOOR
117A. REFER TO SHEET A-102. SLOPE AWAY FROM
BUILDING. PATCH ASPHALT AS REQUIRED.
VERIFY THAT EXISTING ASPHALT PAVING AT
PROPOSED DOORS 112A & 121B SLOPES AWAY
FROM OPENINGS. PATCH/OVERLAY ASPHALT IF
REQUIRED. REFER TO SHEETS A-101 & A-102.
INSTALL BOLLARDS. REFER TO SHEET A-102.
INSTALL CONCRETE HOUSEKEEPING PAD, 2 BOLLARDS
& NEW CHILLER. REFER TO SHEET A-102.
EXISTING BOLLARDS TO REMAIN (4)
REFER TO SHEETS ED101 - SITE DEMOLITION PLAN
& E101 - ELECTRICAL SITE PLAN FOR ELECTRICAL
UTILITY WORK THIS AREA.
INSTALL NEW CONDENSING UNIT ON CONCRETE
HOUSEKEEPING PAD. REFER TO SHEET A-102.
CHKD:
DRWN:
PROJ:
DESN:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
3/
/2
:2 4:
P
M
O :\P
R O
JE
C
TS
\IR
VI
N
E\
6\
0-
6-
8\
C
AD
\S H
EE
TF
IL
ES
\G -1
S
IT
E
PL
AN
.D
W G
N
EW
TO
N , D
EV
IN
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch, otherwise drawing not to scale
C op yr ig ht : T et ra
T ec h
/3
0/
TY
PE
B -3
S U
BM
IT
TA
L
200-38546-19018
R
EP
AI
R
B
S
U
ST
. H
AN
G
AR
/S H
O
PS
W
AS
H
IN
G
TO
N A
IR
N
AT
IO
N
AL
G U
AR
D
1s t A
IR
R
EF
U
EL
IN
G
W
IN
G
FA
IR
C H
IL
D
A
FB
, W A
G-100
SI
TE
P
LA
N
TR
TR
TL
SITE PLAN1
SCALE: 1/16"=1'-0"
SCALE:
8' 16' 32'
1/16" = 1'-0''
N
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text 6"
AutoCAD SHX Text
STM
AutoCAD SHX Text
STM
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text 8"
AutoCAD SHX Text
CO
AutoCAD SHX Text S
AutoCAD SHX Text 4"
AutoCAD SHX Text
SD
AutoCAD SHX Text 6"
AutoCAD SHX Text
CO
AutoCAD SHX Text 8"
AutoCAD SHX Text S
AutoCAD SHX Text
TD
AutoCAD SHX Text 12"
AutoCAD SHX Text
FW
AutoCAD SHX Text 12"
AutoCAD SHX Text 8"
AutoCAD SHX Text
FW
AutoCAD SHX Text 12"
AutoCAD SHX Text
FW
AutoCAD SHX Text
NW
AutoCAD SHX Text 14"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SD
AutoCAD SHX Text 6"
AutoCAD SHX Text
%%UH A N G A R B 1 0 3 3
AutoCAD SHX Text
HAZARDOUS MATERIALS:
AutoCAD SHX Text
A HAZARDOUS MATERIALS INVESTIGATION WAS CONDUCTED
AutoCAD SHX Text
BY FULCRUM ENVIRONMENTAL CONSULTING INC.
AutoCAD SHX Text
THE HAZARDOUS BUILDING MATERIALS REPORT DATED
AutoCAD SHX Text
NOVEMBER 6, 2019 IS AVAILABLE TO ALL BIDDERS.
AutoCAD SHX Text W
AutoCAD SHX Text 6"
AutoCAD SHX Text
STM
AutoCAD SHX Text 12"
AutoCAD SHX Text
SD
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text
FW
AutoCAD SHX Text S
AutoCAD SHX Text 8"
AutoCAD SHX Text
%%UPLAN LEGEND
AutoCAD SHX Text 12"
AutoCAD SHX Text
NW
AutoCAD SHX Text 14"
AutoCAD SHX Text
%%UEXISTING
AutoCAD SHX Text
%%UKEYED NOTES
AutoCAD SHX Text
%%UEXTENT OF PROPOSED SITEWORK
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
ARCHITECT
AutoCAD SHX Text
M. MARCEL BODSKY
AutoCAD SHX Text
STATE OF WASHINGTON
F
G
2 3 5 6 7 8 9 10 11 12 13 14 15
E
D
E
D
4 12.1 14.1
LEGEND
REMOVE ASBESTOS CONTAINED IN TSI RUNS AND JETS
REMOVE ASBESTOS CONTAINING BLACK ADHESIVE UNDER
NON-ASBESTOS CONTAINING 12" VINYL TILE
IF ENCOUNTERED IN AN AREA DISTURBED BY
CONSTRUCTION, REMOVE ANY ASBESTOS CONTAINING
CAB WITHIN INTERSTITIAL EXTERIOR WALL CAVITY UP TO
5'-8" A.F.F. IT WAS NOT DETERMINED IF THIS MATERIAL IS
STILL PRESENT, BUT IT IS SHOWN ON THE ORIGINAL 1953
CONSTRUCTION DRAWINGS.
1. CONTRACTOR TO VERIFY ALL ITEMS SHOWN, LOCATIONS AND QUANTITIES OF
ASBESTOS-CONTAINING MATERIALS (ACMs), AND DIMENSIONS PRIOR TO REMOVAL. ANY
DEVIATIONS FROM THE SPECIFICATION THAT ARE DISCOVERED BY THE CONTRACTOR
SHALL BE REPORTED TO THE OWNER'S REPRESENTATIVE PRIOR TO REMOVAL. THE
DRAWINGS ARE FOR DIAGRAMMATIC PURPOSES ONLY. GENERAL LOCATIONS OF SOME
HAZARDOUS MATERIALS ARE DEPICTED DIAGRAMMATICALLY ON THE DRAWINGS. THE
REMAINING MATERIAL LOCATIONS ARE DESCRIBED TEXTUALLY ON THESE DRAWINGS.
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND PERMITS
FOR THE REMOVAL AND DISPOSAL OF HAZARDOUS MATERIALS.
2. REMOVAL OF HAZARDOUS MATERIALS MAY COMPROMISE THE SECURITY OF THE SITE. THE
CONTRACTOR IS FULLY RESPONSIBLE FOR MAINTAINING SITE SECURITY AND PUBLIC
SAFETY THROUGHOUT THE PROJECT. SEE SPECIFICATIONS REGARDING SECURITY AND
PUBLIC SAFETY.
3. ABATEMENT CONTRACTOR TO COORDINATE ALL ACTIVITIES WITH PRIME CONTRACTOR
INCLUDING, BUT NOT LIMITED TO; SCHEDULE, ACCESS, ELECTRICAL/UTITLITY SHUTDOWNS,
AND DEMOLITION. PERFORM SELECTIVE DEMOLITION AS NECESSARY TO ACCESS
CONCEALED HAZARDOUS AND/OR ASBESTOS-CONTAINING MATERIALS TO BE REMOVED.
ABATEMENT CONTRACTOR TO REPORT LOCATIONS AND QUANTITIES OF ALL HAZARDOUS
MATERIALS TO BE DEMOLISHED TO THE OWNERS REPRESENTATIVE PRIOR TO
ABATEMENT/DEMOLITION.
GENERAL NOTES
1. PERFORM ACTIVITES IMPACTING ASBESTOS-CONTAINING MATERIALS ACCORDING TO
SPECIFICATION 028200, ASBESTOS ABATEMENT, AND ALL APPLICABLE REGULATIONS AS
NECESSARY TO ACCOMPLISH THE WORK
2. REMOVE APPROXIMATELY 70 EACH OF HARD MUDDED FITTINGS ASSOCIATED WITH 4-INCH
AIR-CELL LIKE PIPE RUNS. SEE LEGEND FOR LOCATIONS.
3. REMOVE APPROXIMATELY 390 LINEAR FEET OF 6-INCH TAN MAG-LIKE PIPE RUNS WITH
ASSOCIATED WHITE CLOTH OUTER COVERING. SEE LEGEND FOR LOCATIONS.
4. REMOVE APPROXIMATELY 900 SQUARE FEET OF 12-INCH VINYL FLOOR TILE WITH ASSOCIATED
BLACK ADHESIVE. SEE LEGEND FOR LOCATIONS.
5. REMOVE APPROXIMATELY 10 EACH OF HARD MUDDED FITTINGS ASSOCIATED WITH 8-INCH
MAG-LIKE PIPE RUNS. SEE LEGEND FOR LOCATIONS.
6. REMOVE APPROXIMATELY 20 EACH OF HARD MUDDED FITTINGS ASSOCIATED WITH 6-INCH
MAG-LIKE PIPE RUNS. SEE LEGEND FOR LOCATIONS.
7. REMOVE APPROXIMATELY 130 LINEAR FEET OF 3-INCH MAG-LIKE PIPE RUNS WITH
ASSOCIATED WHITE OUTER CLOTH COVERING. SEE LEGEND FOR LOCATIONS.
8. REMOVE APPROXIMATELY 210 SQUARE FEET OF CEMENT ASBESTOS BOARD (CAB)
POTENTIALLY LOCATED WITHIN INTERSTITIAL WALL AREAS PLANNED TO BE IMPACTED DURING
PENETRATIONS FOR DOORS, WINDOWS, AND BAY DOORS. SEE LEGEND FOR LOCATIONS.
ASBESTOS CONTAINING MATERIAL
1. LEAD-CONTAINING PAINT IS PRESUMED ON STEEL STRUCTURAL MEMBERS AND
HANDRAILS THROUGHOUT THE BUILDING. PERFORM ALL DEMOLITION ACTIVITIES
IMPACTING STEEL STRUCTURAL MEMBERS AND HANDRAILS ASSOCIATED WITH
STAIRWAYS IN ACCORDANCE WITH SPECIFICATION SECTION 028300.
LEAD CONTAINING MATERIAL
1. ALL LIGHT FIXTURE BALLASTS INSPECTED WERE PRESUMED TO BE PCB-CONTAINING.
APPROXIMATELY UP TO 328 LIGHT BALLASTS ARE TO BE BE PROPERLY REMOVED,
STORED, TRANSPORTED, AND DISPOSED OF IN ACCORDANCE WITH SPECIFICATION
SECTION 028416.
PCB CONTAINING MATERIAL
1. ALL FLUORESCENT LAMPS ARE CONSIDERED MERCURY-CONTAINING. REMOVE, HANDLE,
AND RECYCLE UP TO 636 FLUORESCENT LAMPS IN ACCORDANCE WITH SPECIFICATION
SECTION 028416.
MERCURY CONTAINING MATERIAL
CHKD:
DRWN:
PROJ:
DESN:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
3/
/2
:2 4:
P
M
O :\P
R O
JE
C
TS
\IR
VI
N
E\
6\
0-
6-
8\
C
AD
\S H
EE
TF
IL
ES
\H Z-
H
AZ
M
AT
P
LA
N .D
W G
N
EW
TO
N , D
EV
IN
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch, otherwise drawing not to scale
C op yr ig ht : T et ra
T ec h
/3
0/
TY
PE
B -3
S U
BM
IT
TA
L
200-38546-19018
R
EP
AI
R
B
S
U
ST
. H
AN
G
AR
/S H
O
PS
W
AS
H
IN
G
TO
N A
IR
N
AT
IO
N
AL
G U
AR
D
1s t A
IR
R
EF
U
EL
IN
G
W
IN
G
FA
IR
C H
IL
D
A
FB
, W A
HZ-100
H
AZ
M
AT
P
LA
N
TR
TR
TL
WEST MEZZANINE2
SCALE: 3/32"=1'-0"
EAST MEZZANINE3
SCALE: 3/32"=1'-0"
FIRST FLOOR PLAN1
SCALE: 3/32"=1'-0"
N 0 5' 10' 20'12 3 4 15'
SCALE: 3/32" = 1'-0"
FULCRUM ENVIRONMENTAL CONSULTING, INC.
207 W. BOONE AVENUE
SPOKANE, WASHINGTON 99201
(509) 459-9220 www.efulcrum.net
PROJ:
DESN:
w w w t e t r a t e c h c o m
M A
R K
D A
T E
D E
S C
R I P
T I O
N B
Y
P
M
P
C
A D
S
H E
E T
F I L
E S
S
S
T R
U C
T U
R A
L
N
O T
E S
D
W
N
A Y
R A
M
A R
K
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch, otherwise drawing not to scale
C o p y r i g h t
T e t r a
T e c h
T
Y P
E
B
U B
M I T
T A
L
200-38546-19018
R E
P A
I R
B
S
T
H
A N
G A
R S
H O
P S
W A
S H
I N
G T
O
A
T
I O
N A
L
G
U A
R D s t
A
E F
U E
L I N
G
W
I N
G
F
A I R
C H
I L
D
A
F B
W
A
S-001
S T
R U
C T
U R
L
T
E S
MO
MH
MY
GENERAL STRUCTURAL NOTES
THESE NOTES SHALL APPLY UNLESS SHOWN/INDICATED OTHERWISE ELSEWHERE IN
THE STRUCTURAL DRAWINGS.
GENERAL
1. ALL MATERIALS AND CONSTRUCTION SHALL CONFORM TO THE 2018 EDITION OF THE
INTERNATIONAL BUILDING CODE (IBC).
2. THE CONTRACTOR ACKNOWLEDGES RESPONSIBILITY FOR JOBSITE SAFETY AND
ACKNOWLEDGES THAT THE ENGINEER WILL NOT HAVE SUCH RESPONSIBILITY. IF A LAWSUIT IS
FILED BY ONE OF THE CONTRACTOR'S OR SUBCONTRACTOR'S EMPLOYEES, OR ANY ONE ELSE,
THE CONTRACTOR WILL INDEMNIFY, DEFEND AND HOLD THE OWNER AND TETRA TECH, INC.,
THEIR PARENT AND SUBSIDIARY COMPANIES HARMLESS OF ANY AND ALL SUCH CLAIMS.
3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS BEFORE STARTING
WORK. SHOULD CONDITIONS EXIST WHICH ARE CONTRARY TO THOSE SHOWN ON PLANS, THE
ENGINEER SHALL BE NOTIFIED IN WRITING BEFORE PROCEEDING WITH WORK.
4. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL WORK IS
ADEQUATELY BRACED AND SHORED DURING CONSTRUCTION. ALL BRACING/SHORING SHALL BE
DESIGNED BY A REGISTERED ENGINEER HIRED BY THE CONTRACTOR. THE CONTRACTOR SHALL
NOT PLACE SOIL BACKFILL AGAINST WALLS UNTIL THE CONCRETE OR MASONRY GROUT HAS
REACHED THE MINIMUM SPECIFIED 28 DAY COMPRESSIVE STRENGTH (F'C) AND IS AT LEAST 10
DAYS OLD.
5. UNLESS DETAILED, SPECIFIED, OR INDICATED OTHERWISE, CONSTRUCTION SHALL BE AS
INDICATED IN THE APPLICABLE TYPICAL DETAILS AND THESE GENERAL NOTES. TYPICAL
DETAILS ARE MEANT TO APPLY EVEN THOUGH NOT REFERENCED AT SPECIFIC LOCATIONS ON
DRAWINGS WHERE THEY OCCUR.
6. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY
DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL
MEASURES NECESSARY TO PROTECT THE STRUCTURE, WORKERS AND PEDESTRIANS DURING
CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO BRACING,
SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, TEMPORARY STRUCTURES, AND
PARTIALLY COMPLETED WORK, ETC. OBSERVATION VISITS TO THE SITE BY THE ENGINEER
SHALL NOT BE CONSIDERED AS INSPECTION OF SUCH ITEMS.
7. DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALES SHOWN ON DRAWINGS.
8. ALL ITEMS REMOVED DURING CONSTRUCTION WORK (I.E. DRYWALL, PLYWOOD, CEILING
PANELS, ETC.) SHALL BE REPLACED TO MATCH EXISTING.
9. ALL WORK SHALL CONFORM TO THE PLANS AND SPECIFICATIONS IN ALL RESPECTS AND SHALL
BE SUBJECT TO APPROVAL BY THE ENGINEER.
10.SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL OPENINGS, FLOOR FINISHES, ETC.
11.BY ACCEPTING THIS CONTRACT, CONTRACTOR HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND, HOLD HARMLESS THE OWNER, ENGINEER, (HEREINAFTER TETRA TECH, INC.), THEIR
PARENT AND SUBSIDIARY COMPANIES, AGENTS, EMPLOYEES, CONSULTANTS AND
REPRESENTATIVES FOR ANY AND ALL DAMAGE TO PERSONS OR PROPERTY OR WRONGFUL
DEATH REGARDLESS OF WHETHER OR NOT SUCH CLAIM, DAMAGE, LOSS OR EXPENSE IS
CAUSED IN WHOLE OR IN PART BY THE NEGLIGENCE, ACTIVE OR PASSIVE, OF OWNER,
ENGINEER, THEIR PARENT AND SUBSIDIARY COMPANIES AS WELL AS THEIR AGENTS AND
EMPLOYEES, TO THE FULLEST EXTENT PERMITTED BY LAW. SUCH INDEMNIFICATION SHALL
EXTEND TO ALL CLAIMS, DEMANDS, ACTIONS, OR LIABILITY FOR INJURIES, DEATH OR DAMAGES
OCCURRING AFTER COMPLETION OF THE PROJECT, AS WELL AS DURING THE WORK'S
PROGRESS. CONTRACTOR FURTHER AGREES THAT IT SHALL ACCOMPLISH THE ABOVE AT ITS
OWN COST, EXPENSE AND RISK EXCUSIVE OF AND REGARDLESS OF ANY APPLICABLE
INSURANCE POLICY OR POSITION TAKEN BY ANY INSURANCE COMPANY REGARDING
COVERAGE.
12.SOIL PROPERTIES, ALLOWABLE DESIGN VALUES, GRADING AND COMPACTION REQUIREMENTS
AS PER SOILS REPORT BY LANDAU ASSOCIATES JOB NUMBER 0043017.010.011, DATED APRIL 1, 2020. THIS REPORT SHALL BE CONSIDERED A PART OF THESE PLANS AND SHALL BE KEPT AT
THE JOB SITE AT ALL TIMES. A COPY OF THIS REPORT IS AVAILABLE FOR REVIEW IN THE
ENGINEER'S OFFICE.
13.CONTRACTOR SHALL VERIFY LOCATION OF ALL SITE UTILITIES PRIOR TO STARTING WORK, BOTH
ABOVE GROUND AND BELOW GROUND, WHICH MAY BE IMPACTED BY THE WORK SHOWN ON
THESE DRAWINGS. ANY CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER.
14.CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE CLIENT AND TETRA TECH, INC. THEIR
PARENT AND SUBSIDIARY COMPANIES, ITS EMPLOYEES, OFFICERS, OR AGENTS, HARMLESS
AGAINST ANY AND ALL CLAIMS BY ANY PARTIES ARISING FROM, OR RELATING TO, ANY AND ALL
DAMAGES, INCLUDING LEGAL COSTS AND ATTORNEY'S FEES, RESULTING FROM INTERFERENCE
WITH, INTERRUPTION OF, DAMAGE TO, OR ANY AND ALL INJURIES WHICH RESULT FROM
DAMAGE CAUSED TO SUBSURFACE INSTALLATION, WHICH IS UNFORESEEN AND DESPITE
ENGINEER'S EFFORT DURING THE DESIGN PROCESS WAS NOT LOCATED, EXCEPTING ONLY THE
GROSS NEGLIGENCE OR WILLFUL MISCONDUCT OF ENGINEER IN PROVIDING ITS SERVICES.
15. ALL ITEMS SHOWN ON THESE PLANS ARE NEW UNLESS NOTED (E), EXIST. OR EXISTING.
REINFORCING NOTES
1. REINFORCEMENT FOR CONCRETE AND MASONRY SHALL BE DEFORMED BARS CONFORMING TO
A.S.T.M. SPECIFICATION A615 (A706/A706M FOR WELDED REINFORCING). GRADE 60 STEEL
SHALL BE USED EXCEPT THAT #3 BARS AND SMALLER MAY BE GRADE 40 STEEL.
2. WIRE MESH SHALL CONFORM TO A.S.T.M. A185. LAP 12" WHERE SPLICED.
3. ALL REINFORCEMENT, ANCHOR BOLTS, AND OTHER ANCHORAGES PLACED IN CONCRETE SHALL
BE ACCURATELY PLACED AND POSITIVELY SECURED AND SUPPORTED BY CONCRETE BLOCKS,
METAL CHAIRS, SPACERS, OR METAL HANGERS, AND SHALL BE IN POSITION BEFORE
CONCRETE PLACING OR GROUTING IS BEGUN. DETAILING AND PLACING OF BARS SHALL
CONFORM TO THE A.C.I. MANUAL OF STANDARD PRACTICES.
4. BARS SPECIFIED AS "CONTINUOUS" SHALL EXTEND THE FULL LENGTH OF THE MEMBER
CONTAINING THEM AND MAY BE SPLICED (UNLESS NOTED OR SHOWN WITHOUT SPLICES ON
THE PLANS). IN CONCRETE, PROVIDE LAPS PER DETAIL 4 ON SHEET S-501. STAGGER ALL
SPLICES.
5. DOWELS SHALL BE PROVIDED AT ALL POUR JOINTS AND SHALL BE THE SAME SIZE AND SPACING
AS REINFORCING DIRECTLY BEYOND POUR JOINTS.
6. WELDING OF REINFORCING STEEL, METAL INSERTS AND CONNECTIONS IN REINFORCED
CONCRETE OR MASONRY CONSTRUCTION SHALL CONFORM TO ANSI/AWS D1.4-11. USE LOW
HYDROGEN E-70 SERIES ELECTRODES FOR WELDING OF REINFORCING BARS. CONTINUOUS
INSPECTION IS REQUIRED OF ALL FIELD WELDING IN ACCORDANCE WITH IBC CHAPTER 17.
7. THE SPECIFIED DIMENSIONS OF THE VERTICAL LEGS OF "L" DOWELS, WHOSE HORIZONTAL LEGS
ARE CAST INTO A FOOTING OR SLAB CAST ON TOP OF EARTH, ARE BASED UPON THE SLAB
THICKNESS AS SHOWN ON THE DRAWINGS. IF A SLAB IS POURED THICKER THAN SHOWN ON
THE DRAWINGS, SUCH AS FOR THE SUBGRADE OCCURRING AT A LOWER ELEVATION THAN
SHOWN, THE VERTICAL LEGS MUST BE FABRICATED TO A LONGER LENGTH OR THE HORIZONTAL
TAILS MUST BE SUPPORTED ABOVE SUBGRADE HIGH ENOUGH TO PROVIDE THE SAME AMOUNT
OF LAP LENGTH BETWEEN THE DOWEL AND THE WALL VERTICAL REINFORCING.
CONCRETE NOTES
1. ALL CONCRETE SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH OF 4000 PSI AT 28
DAYS. AGGREGATES SHALL CONFORM TO A.S.T.M. C33. AGGREGATES FOR LIGHTWEIGHT
CONCRETE SHALL CONFORM TO A.S.T.M. C330.
2. CEMENT FOR CONCRETE SHALL BE TYPE II/V PORTLAND CEMENT CONFORMING TO A.S.T.M.
C150.
3. CONCRETE COVER FOR REINFORCING BARS SHALL BE:
CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH = 3"
EXPOSED TO EARTH OR WEATHER: NO. 6 THROUGH NO. 18 BARS = 2"
NO. 5 BARS, W31 OR D31 WIRE, AND SMALLER = 1 1/2"
NOT EXPOSED TO WEATHER OR IN CONTACT WITH THE GROUND:
SLABS, WALLS, JOISTS: NO. 14 AND NO. 18 BARS = 1 1/2"
NO. 11 BARS AND SMALLER = 3/4"
BEAMS, COLUMNS: PRIMARY REINFORCEMENT, TIES, STIRRUPS, SPIRALS = 1 1/2"
4. DRYPACK SHALL BE 1 PART CEMENT AND 3 PARTS SAND (BY VOLUME).
5. NO PIPES OR DUCTS SHALL BE PLACED IN STRUCTURAL CONCRETE UNLESS SPECIFICALLY
DETAILED. SEE CIVIL DRAWINGS FOR LOCATION OF SLEEVES THROUGH WALLS.
6. REFER TO ARCHITECT'S DETAILED DRAWINGS FOR ALL MOLDS, GROOVES, CLIPS, GROUNDS, ORNAMENTS AND OTHER INSERTS TO BE CAST IN CONCRETE.
7. THE LOCATION OF ALL CONSTRUCTION JOINTS NOT SPECIFICALLY NOTED OR SHOWN SHALL BE
APPROVED BY THE STRUCTURAL ENGINEER.
8. "ROUGHENED SURFACES", WHERE SPECIFIED ON THE DRAWINGS, SHALL BE MECHANICALLY
ROUGHENED SUCH THAT A 1/4" AMPLITUDE (±) IS ACHIEVED BETWEEN HIGH AND LOW SPOTS OF
THE ROUGHENED SURFACE. THE SURFACE SHALL BE CLEAN AND FREE OF LAITANCE.
9. BOTH FACES OF CONCRETE WALLS, EDGES OF CONCRETE FOUNDATIONS, AND OTHER FORMED
CONCRETE SURFACES WHERE THE SPECIFIED CONCRETE COVER IS 2 INCHES, SHALL BE
PLACED AGAINST FORMWORK WHICH COMPLIES WITH THE PROJECT SPECIFICATIONS.
CONCRETE FOR THESE ELEMENTS SHALL NOT BE CAST AGAINST EARTH.
STRUCTURAL STEEL NOTES
1. ALL WIDE FLANGE MEMBERS SHALL BE IN ACCORDANCE WITH A.S.T.M. A-992. ALL OTHER
STRUCTURAL AND MISCELLANEOUS STEEL SHALL BE A.S.T.M. A36 UNLESS NOTED OTHERWISE.
STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH THE AISC
SPECIFICATION FOR THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR
BUILDINGS. SPECIAL INSPECTION SHALL BE PROVIDED FOR ALL STRUCTURAL STEEL IN
ACCORDANCE WITH IBC SECTION 1705.2.1, UNLESS FABRICATION IS PERFORMED ON THE
PREMISES OF A FABRICATOR REGISTERED AND APPROVED TO PERFORM SUCH WORK WITHOUT
SPECIAL INSPECTION, IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND SECTION
1704.2.5.1 OF THE 2018 IBC. AT THE COMPLETION OF FABRICATION, THE APPROVED FABRICATOR
SHALL SUBMIT A CERTIFICATE OF COMPLIANCE TO THE CITY BUILDING OFFICIAL (OR OWNER IF
THE PROJECT IS NOT UNDER THE JURISDICTION OF A BUILDING DEPARTMENT) AND TO THE
ENGINEER STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS.
2. STEEL TUBES SHALL CONFORM TO A.S.T.M. A500, GRADE B OR BETTER, U.N.O.
3. STEEL PIPES SHALL CONFORM TO A.S.T.M. A53, GRADE B.
4. BOLTS SHALL CONFORM TO ASTM A325 OR BETTER, UNLESS NOTED OTHERWISE.
5. HIGH STRENGTH BOLTS SHALL BE ASTM F3125 AS NOTED AND SHALL CONFORM TO THE
REQUIREMENTS THE RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS (RCSC)
SPECIFICATION FOR STRUCTURAL JOINTS USING HIGH STRENGTH BOLTS. CONTACT FACES OF
STEEL AT CONNECTIONS WHERE HIGH STRENGTH BOLTS ARE USED SHALL NOT BE PAINTED.
JOINTS WILL RECEIVE CAULKING FOLLOWING ERECTION AND COATING.
COMPRESSIBLE-WASHER-TYPE DIRECT TENSION INDICATORS OR TWIST-OFF-TYPE
TENSION-CONTROL BOLTS SHALL BE PROVIDED AT ALL HIGH STRENGTH BOLTED CONNECTIONS
PER UFC 3-301-01 SECTION 2.6.1.1.
6. HOLES FOR BOLTS IN STEEL SHALL BE OF SAME DIAMETER AS BOLT +1/16" MAXIMUM.
7. ALL WELDING SHALL CONFORM TO THE AMERICAN WELDING SOCIETY'S SPECIFICATION FOR
THE MATERIAL BEING WELDED (AWS D1.1/D1.1M - D1.8/D1.8M). SEE STRUCTURAL WELDING
SPECIFICATION UFGS 05 05 23.16.
8. TEMPORARY BRACING AND SHORING SHALL BE PROVIDED AS REQUIRED FOR ERECTION AND
SAFETY. THESE BRACING AND SHORING MEMBERS SHALL NOT BE REMOVED UNTIL ALL BOLTING
AND WELDING IS COMPLETED.
9. ALL STRUCTURAL STEEL WORK, EXCEPT THAT STEEL TO BE EMBEDDED IN CONCRETE, SHALL
BE SHOP PAINTED PER UFGS 09 97 13.27 AND TOUCHED UP IN THE FIELD AFTER ERECTION.
10.BOLT JOINT TYPES SHALL BE SNUG-TIGHT PER AISC SPECIFICATIONS UNLESS NOTED
OTHERWISE. LOCATION OF SLIP-CRITICAL JOINTS PER PLANS.
11.STRUCTURAL STEEL CONSTRUCTION AND DETAILS SHALL CONFORM TO AISC MANUAL OF STEEL
CONSTRUCTION LOAD AND RESISTANCE FACTOR DESIGN (LRFD) 15TH EDITION.
12.NO STRUCTURAL STEEL MEMBER SHALL BE CUT FOR PIPES, DUCTS, ETC. UNLESS
SPECIFICALLY DETAILED AND APPROVED BY STRUCTURAL ENGINEER.
13. ALL STEEL EXPOSED TO WEATHER SHALL BE GALVANIZED. STEEL NOT EXPOSED TO WEATHER
SHALL RECEIVE APPROVED SHOP COAT PRIMER.
14.STAINLESS STEEL SHALL CONFORM TO A.S.T.M. A276/A.I.S.I. 316. STAINLESS STEEL BOLTS SHALL
CONFORM TO A.S.T.M. F593. STAINLESS STEEL NUTS SHALL CONFORM TO A.S.T.M. F594. DO NOT
COAT STAINLESS STEEL.
15.WELDING OF STAINLESS STEEL SHALL CONFORM TO STRUCTURAL WELDING CODE - STAINLESS
STEEL, ANSI//AWS D1.6-07.
16. WELDING OF SEISMIC FORCE RESISTING SYSTEMS - IN ADDITION TO THE GENERAL WELDING
REQUIREMENTS, THE FOLLOWING REQUIREMENTS APPLY TO WELDS USED IN MEMBERS AND
CONNECTIONS WHICH ARE PART OF A SEISMIC FORCE RESISTING SYSTEM AS IDENTIFIED IN
THE DRAWINGS. WELDING SHALL CONFORM TO AWS D1.8 "STRUCTURAL WELDING CODE -
SEISMIC SUPPLEMENT." WELDING SHALL BE PERFORMED IN ACCORDANCE WITH A WELDING
PROCEDURE SPECIFICATION AS REQUIRED IN AWS D1.1 AND AWS D1.8 AND SHALL BE
APPROVED BY THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. WELDS
SHALL BE MADE WITH A FILLER MEETING THE REQUIREMENTS SPECIFIED IN CLAUSE 6.3 OF AWS
D1.8.
17.WELDS SPECIFIED AS "DEMAND CRITICAL" (DC) ON THE DRAWINGS SHALL BE MADE WITH A
FILLER METAL MEETING THE REQUIREMENTS SPECIFIED IN CLAUSE 6.3 OF AWS D1.8.
STEEL DECK NOTES
1. REFER TO STEEL DECK SPECIFICATIONS (UFGS 05 30 00) FOR ADDITIONAL INFORMATION.
2. DECK ERECTION CONTRACTOR SHALL CUT DECK TO SUIT DETAILS AT ALL FRAMED OPENINGS
AS INDICATED ON THE DRAWINGS.
3. THE OPENINGS SHOWN ON THE FRAMING PLANS INDICATE THE GENERAL ARRANGEMENT AND
LOCATION ONLY. VERIFY OUTING LENGTH OF DECK WITH ELECTRICAL AND MECHANICAL
DRAWINGS.
4. ALL WELDERS SHALL BE CERTIFIED FOR LIGHT GAGE STEEL WELDING IN THE STATE OF
WASHINGTON. ALL FIELD WELDING SHALL BE PERFORMED IN THE PRESENCE OF THE WELDING
SPECIAL INSPECTOR.
5. CONTINUOUS INSPECTION BY A DEPUTY INSPECTOR IS REQUIRED OF THE WELDING.
6. THE EFFECTIVE AREA OF A 3/4" PLUG WELD SHALL NOT BE LESS THAN 1/2"Ø
7. ALL LIGHT GAGE STEEL DECKING AND FLASHING SHALL BE FABRICATED OF SHEET METAL
CONFORMING TO A.S.T.M. A-446.
8. DECKING SHALL BE GALVANIZED PER COATING DESIGNATION G60 IN ACCORDANCE WITH ASTM
A653, UNLESS NOTED OTHERWISE.
9. EDGE OF PERIMETER CLOSURE SHALL BE HELD WITHIN ±1/2" OF THE DIMENSIONS REQUIRED ON
THE ARCHITECTURAL DRAWINGS. CONFIRM THE LOCATION OF THE BEAM AND COLUMN
CENTER LINES FROM FIXED REFERENCE EDGE LINES.
10. MINIMUM DECK SECTION PROPERTIES SHALL BE AS FOLLOWS:
GAUGE DEPTH +I (IN) -I (IN) +S(IN) -S(IN)
18 1 1/2" 0.302 0.306 0.314 0.331
ADHESIVE ANCHORS
1. ADHESIVE ANCHORS SHALL BE "HIT HY-200" ADHESIVE ANCHORS, MANUFACTURED BY HILTI, INC.
OR APPROVED EQUAL, ASTM DESIGNATION F1554 GR. 36, U.N.O. FOR CONCRETE APPLICATIONS.
ANCHORS SHALL BE "SIMPSON SET-XP" ADHESIVE ANCHORS, MANUFACTURED BY SIMPSON
STRONG-TIE, INC. OR APPROVED EQUAL, ASTM DESIGNATION F1554 GR. 36, U.N.O. FOR
MASONRY APPLICATIONS.
2. ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH ICC-ES EVALUATION REPORT NO. 3187
FOR HILTI HY-200, AND ICC-ES EVALUATION REPORT (UES) NO. 265 FOR SIMPSON SET-XP.
3. SPECIAL INSPECTION PER CHAPTER 1705.3 OF THE I.B.C. SHALL BE PROVIDED DURING ANCHOR
INSTALLATION.
4. AN ALTERNATIVE ADHESIVE ANCHOR PRODUCT MAY BE SUBMITTED TO THE ENGINEER FOR
APPROVAL, PROVIDED THAT IT HAS A CURRENT ICC-ES EVALUATION REPORT APPROVAL.
5. ALL ABANDONED HOLES SHALL BE FILLED WITH A DRYPACK GROUT A MINIMUM 28-DAY
COMPRESSIVE STRENGTH OF 5,000 PSI. THE FILLED HOLE(S) SHALL BE PREPARED AND
CLEANED AS REQUIRED BY THE GROUT MANUFACTURER.
6. LOCATE EXISTING REINFORCING USING A NON-DESTRUCTIVE METHOD (PACHOMETER OR
OTHER PRIOR TO STEEL FABRICATION OF THE AFFECTED COMPONENTS AND PRIOR TO
DRILLING HOLES FOR ANCHORS. MAINTAIN A MINIMUM CLEARANCE OF 1" BETWEEN THE
REINFORCEMENT AND THE ANCHOR. NOTIFY ENGINEER IF ADHESIVE ANCHORS CANNOT BE
INSTALLED DUE TO REBAR INTERFERENCE(S) SO STRUCTURAL STEEL DETAILING SHOWN
HEREON CAN BE MODIFIED TO ACCOMMODATE.
DESIGN CRITERIA
DESIGN CODES AND REFERENCES:
- 2018 INTERNATIONAL BUILDING CODE
- ASCE 7-16 MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND OTHER
STRUCTURES
- AISC MANUAL OF STEEL CONSTRUCTION, LRFD 15TH EDITION
- ACI 318-14, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
- UFC 1-200-01, DOD BUILDING CODE
- UFC 3-301-01, STRUCTURAL ENGINEERING
LIVE LOADS:
ROOF LIVE LOAD = 20 PSF (ROOFS, ORDINARY FLAT)
SEISMIC DESIGN PARAMETERS:
ANALYSIS PROCEDURE USED: MODAL RESPONSE ANALYSIS
LOCATION: FAIRCHILD AIR FORCE BASE
SITE CLASS: C
SEISMIC DESIGN CATEGORY: B
Fa = 1.3 Fv = 1.5
Ss = 0.307g S1 = 0.113g
SDs = 0.266g SD1 = 0.113g
INTERIOR IMPROVEMENT STRUCTURES
OCCUPANCY CATEGORY: III
Ie = 1.25
R = 1.25 (ASCE 7-16 TABLE 12.2-1: STEEL ORDINARY CANTILEVER COLUMN SYSTEMS)
DESIGN BASE SHEAR = 0.266*W
R = 3.50 (ASCE 7-16 TABLE 12.2-1: STEEL ORDINARY MOMENT FRAMES)
DESIGN BASE SHEAR = 0.095*W
R = 5.00 (ASCE 7-16 TABLE 12.2-1: SPECIAL REINFORCED MASONRY SHEAR WALLS)
DESIGN BASE SHEAR = 0.067*W
SOIL DESIGN PARAMETERS (BASED ON GEOTECHNICAL INVESTIGATION PERFORMED BY LANDAU
ASSOCIATES):
ALLOWABLE SOIL BEARING = 1300 PSF + 1/3 INCREASE FOR SHORT DURATION LOADS
PASSIVE SOIL PRESSURE = 240 PSF/FT
COEFFICIENT OF FRICTION = 0.35
STRUCTURAL OBSERVATION
STRUCTURAL OBSERVATION AS REQUIRED BY IBC CHAPTER 17, AND AS DEFINED BY IBC SECTION
1702. STRUCTURAL OBSERVATIONS SHALL BE PROVIDED DURING THE STAGES OF CONSTRUCTION
LISTED BELOW.
1. CONCRETE:
REINFORCING STEEL AND EMBEDDED STRUCTURAL ANCHORAGES PRIOR TO PLACEMENT
OF CONCRETE FOR FOLLOWING:
A. FOUNDATIONS
2. STRUCTURAL STEEL:
A. ERECTED COLUMN, BEAMS AND GIRDERS, PRIOR TO INSTALLATION OF ROOF JOISTS,
TRUSSES AND DECKING
DEFERRED SUBMITTALS/CERTIFICATIONS
1. OFF-SITE FABRICATION:
FABRICATORS SHALL SUBMIT A CERTIFICATE OF COMPLIANCE FOR ALL OFFSITE
FABRICATION OF THE ITEMS LISTED BELOW:
A. STRUCTURAL STEEL (MILL REPORTS AND IDENTIFICATION OF STEEL, AFFIDAVIT OF
COMPLIANCE).
2. DEFERRED SUBMITTALS/CERTIFICATIONS:
SUBMITTAL DOCUMENTS FOR THE DEFERRED SUBMITTAL ITEMS LISTED BELOW SHALL BE
SUBMITTED TO THE CONTRACTING OFFICER FOR APPROVAL. THE DEFERRED SUBMITTAL
ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND SUBMITTAL DOCUMENTS HAVE
BEEN APPROVED BY THE CONTRACTING OFFICER.
A. CONCRETE MIX
ANCHOR BOLT
AMERICAN CONCRETE INSTITUTION
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ARCHITECT
AMERICAN SOCIETY FOR TESTING AND MATERIALS
AMERICAN WELDING SOCIETY
BOTTOM
BOTTOM OF CEILING
BOTTOM OF ROOF
CLEAR
CONCRETE MASONRY UNIT
CONCRETE
CONSTRUCTION
CONTINUOUS
CONCRETE REINFORCING STEEL INSTITUTE
DIAMETER
EXISTING
EACH
EACH FACE
ELEVATION
ELEVATION
EQUAL
EACH WAY
EXISTING
FOUNDATION
FINISH FLOOR
FINISH GRADE
FINISHED SURFACE
GAUGE
GALVANIZED
GENERAL CONTRACTOR
GENERAL
HIGH
HORIZONTAL
HOLLOW STEEL SECTION
HEIGHT
INTERNATIONAL BUILDING CODE
INTERNATIONAL CODE COUNCIL
INVERT
KIPS
KIPS PER SQUARE INCH
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MASONRY OPENING
NUMBER
NOT TO SCALE
ON CENTER
POUNDS PER CUBIC FOOT
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
REINFORCING
REQUIRED
SQUARE FEET
SIMILAR
SPECIFICATIONS
SHEET METAL SCREW
SQUARE
STRUCTURAL
TOP OF
TOP OF FOOTING
TOP OF ROOF
TOP OF STEEL
TOP OF WALL
TYPICAL
UNLESS NOTED OTHERWISE
VERTICAL
WIDE
WITH
WIDE FLANGE
AT
AND
NUMBER
A.B.
A.C.I.
A.I.S.C.
ARCH.
A.S.T.M.
A.W.S.
BTM.
B.O.C.
B.O.R.
CLR.
CMU
CONC.
CONST.
CONT.
C.R.S.I.
DIA.
(E)
EA.
E.F.
EL.
ELEV.
EQ.
E.W.
EXIST.
FDN.
F.F.
F.G.
F.S.
GA.
GALV.
G.C.
GEN.
H
HORIZ.
HSS
HT.
IBC
ICC
INV
K
KSI
MAX.
MECH.
MFR.
MIN.
M.O.
NO.
N.T.S.
O.C.
PCF
PSF
PSI
REINF.
REQ'D.
SF
SIM.
SPECS.
S.M.S.
SQ.
STRUCT.
T.O.
T.O.F.
T.O.R.
T.O.S.
T.O.W.
TYP.
U.N.O.
VERT.
W w/
WF
STRUCTURAL ABBREVIATIONS
PROJ:
DESN:
w w w t e t r a t e c h c o m
M A
R K
D A
T E
D E
S C
R I P
T I O
N B
Y
P
M
P
C
A D
S
H E
E T
F I L
E S
S
P E
C I A
L
I N
S P
E C
T I O
N S
D
A Y
R A
M
A R
K
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch, otherwise drawing not to scale
C o p y r i g h t
T e t c h
T
Y P
E
B
B
M I T
T A
L
200-38546-19018
R E
P A
S
T
H
A N
G A
R S
H O
P S
W A
S H
I N
G T
T
I O
N A
L
G
U A
R D s t
A
F
U E
L I N
G
W
I N
G
F
A I R
C H
I L
D
A
F B
W
A
S-002
S P
E C
I A
L
I N
S P
E C
T I O
N S
MO
MH
MY
STEEL CONSTRUCTION (STRUCTURAL STEEL):
R - INSPECT THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING
THESE INSPECTIONS
C - INSPECT THESE ITEMS ON A CONTINUOUS BASIS
1. INSPECTION TASKS PRIOR TO WELDING
A. WELDING PROCEDURE SPECIFICATIONS (WPSs) AVAILABLE
B. MANUFACTURERS CERTIFICATIONS FOR WELDING CONSUMABLES AVAILABLE
C. MATERIAL IDENTIFICATION (TYPE/GRADE)
D. WELDER IDENTIFICATION SYSTEM
E. FIT-UP OF GROOVE WELDS (INCLUDING GEOMETRY)
- JOINT PREPARATION
- DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL)
- CLEANLINESS (CONDITION OF STEEL SURFACES)
- TACKING (TACK WELD QUALITY AND LOCATION)
- BACKING TYPE AND FIT (IF APPLICABLE)
F. CONFIGURATION AND FINISH OF ACCESS HOLES
G. FIT-UP OF FILLET WELDS
- DIMENSIONS (ALIGNMENT, GAPS AT ROOT)
- CLEANLINESS (CONDITION OF STEEL SURFACES)
- TACKING (TACK WELD QUALITY AND LOCATION)
2. INSPECTION TASKS DURING WELDING
A. USE OF QUALIFIED WELDERS
B. CONTROL AND HANDLING OF WELDING CONSUMABLES
- PACKAGING
- EXPOSURE CONTROL
C. NO WELDING OVER CRACKED TACK WELDS
D. ENVIRONMENTAL CONDITIONS
- WIND SPEED WITHIN LIMITS
- PRECIPITATION AND TEMPERATURE
E. WPS FOLLOWED
- SETTINGS ON WELDING EQUIPMENT
- TRAVEL SPEED
- SELECTED WELDING MATERIALS
- SHIELDING GAS TYPE/FLOW RATE
- PREHEAT APPLIED
- INTERPASS TEMPERATURE MAINTAINED (MIN./MAX.)
- PROPER POSITION (F, V, H, OH)
F. WELDING TECHNIQUES
- INTERPASS AND FINAL CLEANING
- EACH PASS WITHIN PROFILE LIMITATIONS
- EACH PASS MEETS QUALITY REQUIREMENTS
3. INSPECTION TASKS AFTER WELDING
A. WELDS CLEANED
B. SIZE, LENGTH AND LOCATION OF WELDS
C. WELDS MEET VISUAL ACCEPTANCE CRITERIA
- CRACK PROHIBITION
- WELD/BASE-METAL FUSION
- CRATER CROSS SECTION
- WELD PROFILES
- WELD SIZE
- UNDERCUT
- POROSITY
D. ARC STRIKES
E. K-AREA
- WHEN WELDING OF DOUBLER PLATES, CONTINUITY PLATES OR STIFFENERS
HAS BEEN PERFORMED IN THE K-AREA, VISUALLY INSPECT THE WEB K-AREA
FOR CRACKS WITHIN 3 IN. (75 MM) OF THE WELD
F. BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED)
G. REPAIR ACTIVITIES
H. DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR MEMBER
SPECIAL INSPECTIONS
REQUIRED ( YES NO)
R C N/A
CONCRETE CONSTRUCTION:
1. INSPECTION OF REINFORCING STEEL AND PLACEMENT
2. INSPECTION OF REINFORCING STEEL WELDING IN ACCORDANCE
WITH I.B.C. TABLE 1705.3, ITEM 2.
3. INSPECTION OF ANCHORS CAST IN CONCRETE WHERE ALLOWABLE
LOADS HAVE BEEN INCREASED OR WHERE STRENGTH DESIGN IS USED.
4. INSPECTION OF ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS
5. VERIFYING USE OF REQUIRED DESIGN MIX
6. AT THE TIME FRESH CONCRETE IS SAMPLED TO FABRICATE
SPECIMENS FOR STRENGTH TESTS, PERFORM SLUMP AND AIR
CONTENT TEST, AND DETERMINE THE TEMPERATURE OF THE
CONCRETE
7. INSPECTION OF CONCRETE AND SHOTCRETE PLACEMENT FOR
PROPER APPLICATION TECHNIQUES
8. INSPECTION FOR MAINTENANCE OF SPECIFIED CURING
TEMPERATURE AND TECHNIQUES
9 VERIFICATION OF IN-SITU CONCRETE STRENGTH, PRIOR TO
REMOVAL OF SHORES AND FORMS FROM BEAMS AND
STRUCTURAL SLABS
10. INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF
CONCRETE MEMBER BEING FORMED
MASONRY CONSTRUCTION (LEVEL B, FOR RISK CATEGORY I, II AND III):
1. COMPLIANCE WITH REQUIRED INSPECTION PROVISIONS OF THE CONSTRUCTION
DOCUMENTS AND THE APPROVED SUBMITTALS SHALL BE VERIFIED.
2. VERIFICATION OF SLUMP FLOW AND VSI AS DELIVERED TO THE PROJECT SITE FOR
SELF-CONSOLIDATING GROUT
3. VERIFICATION OF F'm AND F'AAC PRIOR TO CONSTRUCTION
4. VERIFY COMPLIANCE WITH THE APPROVED SUBMITTALS
5. AS MASONRY CONSTRUCTION BEGINS, VERIFY THAT THE FOLLOWING ARE IN
COMPLIANCE:
A. PROPORTIONS OF SITE-PREPARED MORTAR
B. CONSTRUCTION OF MORTAR JOINTS
C. LOCATION OF REINFORCEMENT, CONNECTORS, AND ANCHORAGES
D. PROPERTIES OF THIN-BED MORTAR FOR AAC MASONRY
6. PRIOR TO GROUTING, VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE:
A. GROUT SPACE
B. GRADE, TYPE , SIZE OF REINFORCEMENT AND ANCHOR BOLTS
C. PLACEMENT OF REINFORCEMENT AND CONNECTORS
D. CONSTRUCTION OF MORTAR JOINTS
7. VERIFY DURING CONSTRUCTION:
A. SIZE AND LOCATION OF STRUCTURAL ELEMENTS
B. TYPE, SIZE, AND LOCATION OF ANCHORS, INCLUDING
OTHER DETAILS OF ANCHORAGE OF MASONRY TO
STRUCTURAL MEMBERS, FRAMES OR OTHER CONSTRUCTION
C. WELDING OF REINFORCING BARS
D. PREPARATION, CONSTRUCTION AND PROTECTION OF MASONRY DURING
EXTREME WEATHER CONDITIONS
(TEMPERATURE BELOW 40°F (4.4°C)) OR
(TEMPERATURE ABOVE 90°F (32.2°C))
E. PLACEMENT OF AAC MASONRY UNITS AND CONSTRUCTION
OF THIN-BED MORTAR JOINTS
8. OBSERVE PREPARATION OF ANY GROUT SPECIMENS, MORTAR
SPECIMENS AND/OR PRISMS
CONT PERIODIC N/A
REQUIRED VERIFICATION AND INSPECTION OF SOILS (TO BE PERFORMED UNDER THE
RESPONSIBLE CHARGE OF A LICENSED GEOTECHNICAL ENGINEER):
1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE
THE DESIGN BEARING CAPACITY
2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND
HAVE REACHED PROPER MATERIAL
3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL
MATERIALS
4. PERFORM CLASSIFICATION AND TESTING OF NATIVE SOILS TO
VERIFY ANY SOIL PROPERTIES ASSUMED AS PART OF DESIGN
FOR THIS PROJECT IN THE ABSENCE OF A SOILS REPORT
(SEE SOIL PROPERTIES ON THIS DRAWING). THIS TESTING
SHALL BE PERFORMED IN ADVANCE OF ANY CONSTRUCTION. THE
STRUCTURAL ENGINEER SHALL BE NOTIFIED IF THE ASSUMED
VALUES ARE NOT VALID.
5. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT
THICKNESSES DURING PLACEMENT AND COMPACTION OF
COMPACTED FILL
6. PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE SUBGRADE
AND VERIFY THAT SITE HAS BEEN PREPARED PROPERLY
CONT PERIODIC N/A
SPECIAL INSPECTIONS REQUIRED
SPECIAL INSPECTIONS REQUIRED FOR THIS PROJECT SHALL BE PERFORMED IN ACCORDANCE
WITH I.B.C. CHAPTER 17. SPECIAL INSPECTIONS SHALL BE PERFORMED BY AN APPROVED
INSPECTION AGENCY U.N.O, EMPLOYED BY THE OWNER.
THE SPECIAL INSPECTOR SHALL BE CERTIFIED BY THE INTERNATIONAL CODE COUNCIL (I.C.C.)
TO PERFORM INSPECTION FOR THE PARTICULAR TYPE OF CONSTRUCTION OR OPERATION
REQUIRING SPECIAL INSPECTION PRIOR TO THE COMPLETION OF THAT PHASE OF THE WORK.
THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL
AND/OR THE ENGINEER. ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE
ATTENTION OF THE CONTRACTOR FOR CORRECTION, THEN, IF UNCORRECTED, TO THE
STRUCTURAL ENGINEER AND TO THE BUILDING OFFICIAL.
THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL SIGNED REPORT STATING WHETHER THE
WORK REQUIRING SPECIAL INSPECTION WAS, TO THE BEST OF THE INSPECTOR'S KNOWLEDGE,
IN CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS AND THE APPLICABLE
WORKMANSHIP PROVISIONS OF THIS CODE.
IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROVIDE AT LEAST 48 HOURS
ADVANCE NOTICE TO THE OWNER/OWNER'S REPRESENTATIVE WHEN HIS WORK IS READY FOR
ANY REQUIRED SPECIAL INSPECTIONS.
SHOP INSPECTION OF STEEL CONSTRUCTION IS NOT REQUIRED WHEN THE WORK IS DONE ON
THE PREMISES OF A FABRICATOR REGISTERED AND APPROVED TO PERFORM SUCH WORK
WITHOUT SPECIAL INSPECTION. APPROVAL SHALL BE BASED UPON REVIEW OF THE
FABRICATOR'S WRITTEN PROCEDURAL AND QUALITY CONTROL MANUALS AND PERIODIC
AUDITING OF FABRICATION PRACTICES BY AN APPROVED SPECIAL INSPECTION AGENCY. AT
COMPLETION OF FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT A CERTIFICATE OF
COMPLIANCE TO THE BUILDING OFFICIAL STATING THAT THE WORK WAS PERFORMED IN
ACCORDANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS.
CONTRACTOR RESPONSIBILITY
EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A MAIN WIND- OR
SEISMIC-FORCE-RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM OR A WIND- OR
SEISMIC-RESISTING COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS SHALL
SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE
OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. THE
CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN ACKNOWLEDGMENT OF
AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL
INSPECTION.
OWNER OR OWNER'S REPRESENTATIVE SHALL BE SYNONYMOUS WITH 'BUILDING OFFICIAL' IN
THE FOREGOING IF THE PROJECT IS NOT UNDER THE JURISDICTION OF A BUILDING
DEPARTMENT
SPECIAL INSPECTION SHALL BE PROVIDED FOR THE FOLLOWING TYPES OF WORK PERFORMED
IN THE FIELD, OR NOT PERFORMED IN AN APPROVED FABRICATION SHOP AS DEFINED ABOVE,
UNLESS NOTED AS "N/A".
OF STEEL, AFFIDAVIT OF COMPLIANCE)
A. CONCRETE MIX
DEFERRED SUBMITTALS/CERTIFICATIONS
REQUIRED ( YES NO)
SUBMITTALS
N/A
REQUIRED ( YES NO)
STRUCTURAL OBSERVATIONS
STRUCTURAL OBSERVATION
THE STRUCTURAL ENGINEER, OR ANOTHER ENGINEER DESIGNATED BY THE
STRUCTURAL ENGINEER SHALL BE RETAINED BY THE OWNER TO PERFORM
STRUCTURAL OBSERVATION AS REQUIRED BY I.B.C. CHAPTER 17.
STRUCTURAL OBSERVATION SHALL BE PROVIDED DURING THE STAGES OF
CONSTRUCTION LISTED BELOW. IT SHALL BE THE SOLE RESPONSIBILITY OF
THE CONTRACTOR TO PROVIDE AT LEAST 48 HOURS ADVANCE NOTICE TO
THE STRUCTURAL ENGINEER WHEN HIS WORK IS READY FOR STRUCTURAL
OBSERVATION FOR EACH OF THESE STAGES.
1. CONCRETE:
REINFORCING STEEL AND EMBEDDED STRUCTURAL
ANCHORAGES PRIOR TO PLACEMENT OF
CONCRETE FOR THE FOLLOWING:
A. FOUNDATIONS
B. SLABS-ON-GRADE (EXCEPT SITE PAVING AND
FLATWORK)
2. MASONRY:
A. REINFORCING STEEL AND EMBEDDED STRUCTURAL
ANCHORAGES PRIOR TO GROUTING OF MASONRY WALLS
3. STRUCTURAL STEEL:
A. ERECTED COLUMN, BEAMS AND GIRDERS, PRIOR
TO INSTALLATION OF ROOF AND FLOOR JOISTS,
TRUSSES AND DECKING
4. WOOD FRAMING:
A. ROOF, FLOOR AND WALL FRAMING AND MEMBER
CONNECTIONS, AND STRUTS AND CHORDS,
PRIOR TO INSTALLATION OF SHEATHING OR
ANY COVERING THAT WOULD CONCEAL THE
STRUCTURAL FRAME
B. PLYWOOD ROOF, FLOOR AND WALL SHEATHING
PRIOR TO INSTALLATION OF ROOFING AND
ANY OTHER BUILDING MATERIALS THAT WOULD
CONCEAL THE NAILING
1. OFF-SITE FABRICATION:
FOR ALL OFFSITE FABRICATION OF THE ITEMS
LISTED BELOW:
A. TRUSSES
B. STRUCTURAL STEEL (MILL REPORTS AND IDENTIFICATION
2. DEFERRED SUBMITTALS:
SUBMITTAL DOCUMENTS FOR THE DEFERRED SUBMITTAL ITEMS
LISTED BELOW SHALL BE DESIGNED BY A LICENSED PE OR SE
AND SUBMITTED BY THE CONTRACTOR TO THE BUILDING
DEPARTMENT/APPROVAL AGENCY AND STRUCTURAL ENGINEER
FOR REVIEW AND APPROVAL. THE DEFERRED SUBMITTAL ITEMS
SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND SUBMITTAL
DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL.
ADHESIVE ANCHORS:
1. VERIFY ANCHOR TYPE:
2. VERIFY ADHESIVE IDENTIFICATION AND
EXPIRATION DATE
3. VERIFY ANCHOR DIMENSIONS:
4. VERIFY CONCRETE TYPE:
5. VERIFY CONCRETE COMPRESSIVE STRENGTH
6. VERIFY HOLE DRILLING METHOD
7. VERIFY HOLE DIMENSIONS
8. VERIFY HOLE CLEANING PROCEDURES
9. VERIFY ANCHOR SPACING
10. VERIFY EDGE DISTANCES
11. VERIFY CONCRETE THICKNESS
12. VERIFY ANCHOR EMBEDMENT
13. VERIFY TIGHTENING TORQUE
14. VERIFY ADHERENCE TO THE MANUFACTURER'S
PRINTED INSTALLATION INSTRUCTIONS
THE SPECIAL INSPECTOR MUST VERIFY THE INITIAL INSTALLATIONS OF EACH
TYPE AND SIZE OF ADHESIVE ANCHOR INSTALLED BY THE CONSTRUCTION
PERSONNEL ON SITE. SUBSEQUENT INSTALLATIONS OF THE SAME ANCHOR TYPE
AND SIZE BY THE SAME CONSTRUCTION PERSONNEL MAY BE PERMITTED, WITH
THE APPROVAL OF THE ENGINEER AND THE SPECIAL INSPECTOR, TO BE
PERFORMED IN THE ABSENCE OF THE SPECIAL INSPECTOR. ANY CHANGE IN THE
ANCHOR PRODUCT BEING INSTALLED OR THE PERSONNEL PERFORMING THE
INSTALLATION REQUIRES AN INITIAL INSPECTION. FOR ONGOING INSTALLATIONS
OVER AN EXTENDED PERIOD, THE SPECIAL INSPECTOR MUST MAKE REGULAR
INSPECTIONS TO CONFIRM CORRECT HANDLING AND INSTALLATION OF THE
PRODUCT. THE SPECIAL INSPECTOR SHALL INFORM THE ENGINEER OF THE
FREQUENCY OF THE PERIODIC ANCHOR INSPECTIONS. THE ENGINEER MAY
REQUEST ADDITIONAL INSPECTIONS AT ANY TIME.
CONT PERIODIC N/A
STEEL CONSTRUCTION (STRUCTURAL STEEL CONT.):
4. INSPECTION TASKS PRIOR TO BOLTING
A. MANUFACTURER'S CERTIFICATION AVAILABLE FOR FASTENER MATERIAL
B. FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS
C. PROPER FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, TYPE,
BOLT LENGTH IF THREADS ARE TO BE EXCLUDED FORM SHEAR PLANE)
D. PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL
E. CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING
SURFACE CONDITION AND HOLE PREPARATION, IF SPECIFIED, MEET
APPLICABLE REQUIREMENTS
F. PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION PERSONNEL
OBSERVED AND DOCUMENTED FOR FASTENER ASSEMBLIES AND METHODS
USED
G. PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND OTHER FASTENER
COMPONENTS
5. INSPECTION TASKS DURING BOLTING
A. FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL HOLES AND
WASHERS (IF REQUIRED) ARE POSITIONED AS REQUIRED
B. JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO THE PRETENSIONING
OPERATION
C. FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED FOR
ROTATING
D. FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC
SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID
POINT TOWARD THE FREE EDGES
6. INSPECTION TASKS AFTER BOLTING
A. DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONECTIONS
7. INSPECTION OF STEEL ELEMENTS OF COMPOSITE CONSTRUCTION PRIOR
TO CONCRETE PLACEMENT
A. PLACEMENT AND INSTALLATION OF STEEL DECK
B. PLACEMENT AND INSTALLATION OF STEEL HEADED STUD ANCHORS
C. DOCUMENT ACCEPTANCE OR REJECTION OF STEEL ELEMENTS
R C N/A
STEEL CONSTRUCTION (OTHER THAN STRUCTURAL STEEL):
1. MATERIAL VERIFICATION OF COLD-FORMED STEEL DECK
A. IDENTIFICATION MARKINGS TO CONFORM TO ASTM STANDARDS SPECIFIED
IN THE APPROVED CONSTRUCTION DOCUMENTS.
B. MANUFACTURER'S CERTIFIED TEST REPORTS.
2. INSPECTION OF WELDING
A. COLD-FORMED STEEL DECK
1) FLOOR AND ROOF DECK WELDS.
B. REINFORCING STEEL
1) VERIFICATION OF WELDABILITY OF REINFORCING STEEL OTHER THAN
ASTM A 706
2)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .