This document is a Material Sale Contract between the State of Alaska's Department of Natural Resources (DNR) and the Department of Transportation and Public Facilities (DOT&PF) for a sand and gravel extraction site located at the end of the Central Airstrip in Central, Alaska. The contract covers approximately 20 acres within Sections 26 and 35, Township 9 North, Range 14 East, Fairbanks Meridian, and authorizes the extraction of 500,000 cubic yards of sand and gravel at a unit price of $0.50 per cubic yard, for a total contract value of $250,000. The contract is effective from May 9, 2023, to May 8, 2028, with provisions for periodic installment payments and annual reporting.

The contract includes detailed provisions for material extraction, including measurement methods, environmental protections, and reclamation requirements. DOT&PF is responsible for maintaining accurate records of extracted materials, conducting operations in an environmentally consistent manner, and implementing a reclamation plan that includes grading slopes, spreading overburden and organic materials, and reestablishing vegetation. The material site is designated for public project use, with the first 5,000 cubic yards of material each year being provided at no charge, and subsequent material charged at the unit price. The contract also specifies requirements for trail access, cultural resource protection, and maintaining a 100-foot buffer from Crooked Creek, which runs along the southern boundary of the site.

View the file

Other files

File Type Posted
ITB 2525N125 Amendment 3.pdf PDF
Tok 2 FUP & DNR.pdf.crdownload CRDOWNLOAD file
ITB 2525N125 Amendment 2.pdf PDF
Dalton 1 FUP & DNR.pdf PDF
Dalton 2 FUP & DNR.pdf PDF
Tok 2 FUP & DNR.pdf PDF
ITB 2525N125 Amendment 1.pdf PDF
Tazlina FUP & DNR.pdf PDF
Tok 1 FUP & DNR.pdf PDF
ITB 2525N125 Northern Region Aggregate Stockpile.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF ALASKA

DEPARTMENT OF NATURAL RESOURCES

DIVISION OF MINING, LAND AND WATER

X Northern Region

3700 Airport Way Fairbanks, AK 99709

(907) 451-2740

Southcentral Region 550 W 7th Ave., Suite 900C Anchorage, AK 99501-3577

(907) 269-8552

Southeast Region 400 Willoughby, #400 Juneau, AK 99801

(907) 465-3400

MATERIAL SALE CONTRACT

AS 38.05.550 – 38.05.565, AS 38.05.810

Issuance Date: May 9, 2023 Expiration Date: May 8, 2028

ADL 422115

Under AS 38.05.550-38.05.565 (Disposal of Materials) and AS 38.05.810(a) (Public and Charitable Use) and the regulations implementing these statutes, the State of Alaska, Department of Natural Resources (DNR), the seller, whose address is 3700 Airport Way, Fairbanks, Alaska 99709, agrees to sell, and the buyer, State of Alaska, Department of Transportation and Public Facilities (DOT&PF), whose address is 2301 Peger Road, Fairbanks, Alaska 99709, agrees to buy the material designated in this contract, subject to the provisions that follow:

1. Description: Location, Material, Quantity, and Price.

(a) The material sale area covered by this contract consists of approximately 20 acres. This area is designated by the boundaries shown on the attached sale area map, which is made a part of this contract, or as designated on the ground by the seller, and described as follows:

Designated Material Site ADL 419609, DOT MS 670-089-2, located at the end of the Central Airstrip in Central, Alaska within Sections 26 and 35, Township 9 North, Range 14 East, Fairbanks Meridian.

(b) The material to be removed and the price are:

Type of Material No. of Units Unit Price Total Price Sand and Gravel 500,000 cubic yards $0.50 $250,000

2. Payments and Deposits. No part of the materials sold under this contract may be extracted from the sale area by the buyer except in accordance with the following terms:

(a) The buyer shall remit an earnest money deposit in the amount of $ N/A (consistent with 11 AAC

71.045 or 11 AAC 71.065, and no less than $250) along with the bid for a competitive sale contract or at the time a negotiated sale buyer signs this contract. The seller will retain the deposit to cover administrative costs incurred in offering the material sale, except that if the buyer removes and pays for at least 75% of the material volume covered by this contract, the deposit may be applied, in whole or in part, to the final payment that becomes due under this contract.

(b) Additional periodic installment payments as required in paragraph 2(c) must be made for material extracted as of the date payment becomes due but may not exceed the total purchase price.

102-137 (Rev. 10/01) Page 2 of 10

(c) Each periodic installment payment becomes due and payable on December 31 of each year without prior notice to the buyer, for the value of material extracted during the calendar year of January 1 through December 31. The installment must be based on records required in paragraph 3 of this contract and must be submitted to the seller no later than the fifth working day following the date the installment is due.

(d) An annual report is due by December 31 of each year, without prior notice to the buyer that details the volume of material removed during the calendar year of January 1 through December 31 and must be submitted to the seller no later than the fifth working day following the date the installment is due. This report shall be filed regardless of whether material was removed during the reporting period. Failure to file the report by the deadline may result in suspension of the contract and financial penalties. A final accounting and payment for material removed, and a completion statement, must be submitted no later than 30 days following contract completion, or when the contractor has completed removal under the contract, or following termination of the contract by the seller or by operation of law. Whether completion is satisfactory will be decided by the Director of the Division of Mining, Land & Water (DMLW) within 45 days after receiving the final accounting report and completion statement.

(e) If the buyer fails to make a payment provided for in this contract, the seller may, under paragraph 8(b) of this contract, order all material extraction suspended immediately. Materials extracted by the buyer during any period of suspension are considered taken in trespass and are to be charged to and paid for by the buyer at triple the unit contract price. Resumption of the lawful taking of materials may be authorized, in writing, by the DMLW only after the payments in arrears plus the penalty provided for in paragraph 2(f) have been paid.

(f) Late Payment Penalty will be the greater of either the fee specified in 11 AAC 05.030 or interest at the rate set by AS 45.45.010(a) will be assessed on a past-due account until payment is received by the seller.

(g) All payments and deposits must be remitted to the DMLW and must be made payable to the Alaska Department of Revenue.

(h) The following special provisions also apply to payments and deposits under this contract:

Should the administrative base price be changed during the term of this contract, the new price will be effective and apply to the material remaining to be extracted under this contract as of the effective date of the price adjustment.

Material extraction in excess of the contract amount will be considered taken in trespass and at the discretion of the Director, DMLW, Lands Section, charged to and paid for by the buyer at no less than triple the current unit fair market value as established periodically by the Northern Regional Office or up to three times the pecuniary gain realized by the buyer as a result of the trespass. Said trespass penalties are in additional to any other administrative or legal proceedings imposed by state law.

11 AAC 05.130(e) requires state, federal and local agencies to pay for materials used in constructing, reconstructing or maintaining a public project as follows: 1) no charge for the first 5,000 cy of material to be used on a project (each year of maintenance constitutes a separate project); and 2) material in excess of 5,000 cy will be charged at the unit price listed in the annual base price schedule established under 11 AAC 71.090 (currently $ 0.50 cy).

3. Method of Volume Determination.

(a) The method of volume determination for purposes of payment under this contract, along with any special provisions applicable to volume determination, is:

102-137 (Rev. 10/01) Page 3 of 10

(1) Based on a loose cubic yard quantity as determined by an "in-place" measurement multiplied by a factor of 1.3; or,

(2) Based on a loose cubic yard quantity as determined by a daily vehicle count designating type of vehicle and vehicle capacity; or

(3) Based on an industry standard method acceptable to the department.

(i) If the method of volume determination is based on a weight measurement of the extracted material, the buyer must provide to the seller the standard of density and conversion rate from weight to cubic yards.

(b) The buyer shall keep accurate and up-to-date records of all materials extracted. These records are subject to verification by check measure and inspection of the buyer's books by the seller at any time without notice.

(c) All measurements are to be made by or under the direct supervision of buyer personnel acceptable to the seller, including a qualified engineer where the seller deems appropriate, with quantities certified by that person.

4. Operating Requirements.

(a) Boundary Lines and Survey Monuments. No boundary mark of the sale area or any survey line or witness tree for any survey corner or monument may be severed or removed, nor may any survey corner or monument be damaged or destroyed. Any violation of this clause requires the buyer to bear the expense of re-establishing the line, corner, or monument by a registered surveyor in a manner approved by the seller.

(b) Standard of Operations. The buyer shall properly locate the buyer's operations and buyer's improvements within the sale area, and may not commit waste, whether ameliorated or otherwise. In addition to complying with all laws, regulations, ordinances, and orders, the buyer shall maintain the land in a reasonably neat and clean condition. No construction material, fill, waste asphalt, damaged culverts or any other debris shall be stockpiled within pit boundaries. Stockpiled material and/or overburden shall not be placed in wetlands. After completion, expiration, or termination of the contract, the site will be left in a condition that is acceptable to the seller, and reclaimed in accordance with the approved reclamation plan.

(c) Erosion Control and Protection of Waters. Operations in connection with this contract must be conducted so as to avoid damage to streams, lakes, or other waters and land adjacent to them.

Vegetation and materials may not be deposited into any stream or other waters. Locations and improvements necessary for stream crossings for haul roads must be approved in advance by the seller.

All roads to be abandoned must be treated with measures necessary to prevent erosion in a manner acceptable to the seller. Any damage resulting from failure to perform these requirements must be repaired by the buyer to the satisfaction of the seller. Waters include waters defined in 5 AAC 95.010, Protection of Fish and Game Habitat.

(d) Fire Protection. The buyer shall take all necessary precautions for the prevention of wildfires and is responsible for the suppression, and must bear the suppression costs, of all destructive or uncontrolled fires occurring in or outside the sale area resulting from any of the buyer's operations under this contract.

The buyer shall comply with all laws, regulations, and ordinances promulgated by all governmental agencies responsible for fire protection in the area.

(e) Roads. Before constructing any main haul, secondary or spur road across state land, the buyer shall obtain written approval of the proposed location and construction standards of the road from the seller.

102-137 (Rev. 10/01) Page 4 of 10

(f) Supervision. The buyer shall maintain adequate supervision at all times when operations are in progress to ensure that the provisions of this contract and all applicable federal, state, and local laws, regulations, and ordinances governing the operations are enforced. At all times when operations are in progress, the buyer, or a person authorized by the buyer to assume the responsibilities imposed by this contract, shall be present on the sale area.

(g) Agents. The provisions of this contract apply with equal force upon an agent, employee, or contractor designated by the buyer to perform any of the operations relating to extraction of the materials sold under this contract. The buyer is liable for noncompliance caused by any such agent, employee, or contractor.

(h) Location. The buyer is responsible for the accurate location of operations under this contract, including any survey that may be necessary for accurate location unless otherwise specified in this contract.

(i) Access. The seller makes no representations that it will construct or maintain access to the land.

Access over any route not under the seller's control is the responsibility of the buyer. The buyer agrees that any permanent access or right-of-way obtained over privately owned property will provide a permanent easement to the seller.

(j) Mining Reclamation. This contract is subject to the attached approved reclamation plan and/or attached letter of intent under AS 27.19.

(k) Special Provisions. The following special provisions also apply to operations under this contract:

(1) Survey. An as built survey of the material site is not required at this time.

(2) Extraction Area. This contract authorizes removal of material only from the area defined in Section 1(a) of this contract. The buyer is responsible for properly locating the material site and the working limits within that area, as shown on the attached map.

(3) Potential Processing Activities and Other Authorizations. The issuance of this authorization does not alleviate the necessity of the purchaser to obtain authorizations required by other agencies for this activity. Any asphalt processing or related activities and associated structures will not be allowed without prior approval from DNR, the Department of Environmental Conservation (DEC) and other agencies that require authorizations from the buyer.

(4) Water Quality. The buyer shall comply with the State of Alaska water quality standards pursuant to 18 AAC 70, including discharge standards when conducting material washing operations.

(5) Other Authorizations. The issuance of this authorization does not alleviate the necessity of the purchaser to obtain authorizations required by other agencies for this activity.

(6) Alaska Historic Preservation Act. The buyer will consult the Alaska Heritage Resources Survey

(907) 269-8721 so that known historic, archaeological and paleontological sites may be avoided. The Alaska Historic Preservation Act (AS 41.35.200) prohibits the appropriation, excavation, removal, injury, or destruction of any state-owned historic, prehistoric (paleontological) or archaeological site without a permit from the commissioner. Should any sites be discovered during the course of field operations, activities that may damage the site will cease and the Office of History and Archaeology in the Division of Parks and Outdoor Recreation (907) 269-8721 and will be notified immediately.

(7) Vehicle Maintenance. Vehicle maintenance will be performed only over an effective impermeable barrier.

(8) Fuel and hazardous substances. No fuel or hazardous substances are to be stored on the subject parcel. Prior written approval from the seller is required for a change in this restriction. Such

102-137 (Rev. 10/01) Page 5 of 10 approval may include additional operating requirements and a change in the amount required for the performance guarantee. The disposal of hazardous substances or hydrocarbons is prohibited.

(9) Notification. The buyer shall immediately notify DNR and DEC (18 AAC 75.300) by phone, fax and/or email of any unauthorized discharge of oil to water, any discharge of hazardous substance (other than oil), and any discharge of oil greater than 55 gallons to land. Any unauthorized discharge of oil to land greater than 10 gallons but less than 55 gallons must be reported to DEC within 48 hours. Oil discharges to land less than 10 gallons and greater than 1 gallon must be recorded and submitted to DEC in a monthly report. All fires and explosions must also be reported. The DNR spill report number is (907) 451-2739; the email is dnr.nro.spill@alaska.gov. The DEC spill number during normal business hours is (907) 451-2121, outside of normal business hours contact 1 (800) 478- 9300; the fax number is (907) 451-2362. DNR and DEC shall be supplied with all follow-up incident reports.

(10) Reclamation. Upon completion, expiration, or termination of the contract, the site will be left in a condition that is acceptable to the DMLW and reclaimed in accordance with the DNR approved Mining and Reclamation plan. Reclamation shall be to the standards of the DMLW and shall include repair of access roads to and within the site, disposal of remaining stockpiles, other procedures that will be used to stabilize and reclaim the area and any other site specific measures that may be necessary. The buyer shall leave all slopes in a safe and stable condition at the end of each season.

(11) SWPPP and APDES. The buyer shall comply with the requirement of the Alaska Pollutant Discharge Elimination System (APDES), and if applicable, to maintain and operate the site in accordance with an approved Storm Water Pollution Prevention Plan (SWPPP).

(12) Invasive Species. The buyer shall implement best management practices for minimizing the introduction and proliferation of invasive plant species, including thoroughly washing equipment prior to use on the material site. This is particularly important for work at material sites adjacent to rivers, where introduced species can be transported downstream and spread throughout areas that would not otherwise be exposed to invasive species.

(13) Coordination. The buyer shall coordinate all operations with the other contractors in the site prior to and during mobilization to ensure access and safety is maintained for all users. If necessary to support the continuation of public or private projects, DNR may provide additional guidance or limitations related to the location and/or timing of extraction activities during the construction season.

(14) Stockpiles. The buyer shall not disturb or remove material from existing stockpiles. Any material extracted by the buyer must be mined according to the approved mining and reclamation plan. Any stockpiles left in the pit by the buyer are the property of the seller unless the buyer receives prior written approval from the seller and, upon approval, purchases the material.

(15) Equipment Storage. The buyer shall remove all machinery, equipment, and other items at the end of each construction season. Prior written approval from the seller is required for a change in this restriction.

(16) Use of Material. This contract authorizes the excavation and use of material for the express purpose of providing material for construction and maintenance of public projects.

(17) Completion Report. A final accounting and payment for material removed and a completion report must be submitted no later than 30 days following contract completion, or following termination of the contract by the seller or by operation of law. The completion report shall include a series of ground level photographs taken before, during, and after the extraction along with a statement confirming:

i.) compliance with stipulations requiring the removal of personal property, restoration of the extraction area to a clean condition, and reclamation.

mailto:dnr.nro.spill@alaska.gov

102-137 (Rev. 10/01) Page 6 of 10 ii.) accuracy of the photographs accompanying the report as depicting the site before extraction, during operations, and after completion and reclamation at the end of each contract period.

Failure to submit a satisfactory report and/or required photographs subjects the site to a field inspection requirement for which the buyer may be assessed, at the Director’s discretion, either the actual cost incurred by the Division of Mining, Land & Water, or a minimum of $500.00. (11 AAC 05.130). Reimbursement for costs for the field inspection under this section may be taken from the performance guaranty.

(18) Project Specific Operating Requirements.

i) Migratory Birds. Vegetation clearing will follow, within practicable limits, Migratory Bird Treaty Act-based recommendations by USFWS regarding migratory bird nesting and rearing windows, with the net outcome of conducting the majority of clearing activities outside of pre-nesting or post-fledge periods for avian protection.

ii) Timber Salvage. To reduce bark beetle risk, live white spruce trees greater than four (4) inches in diameter should not be cut/cleared during the bark beetle flight period (May 1-July

31) if possible. White spruce trees/limbs greater than four (4) inches in diameter that are cut/cleared should be processed or otherwise utilized before the next beetle flight period (May 1). “Processed” means chipped; bark removed; or cut, split, and stacked for firewood. Any cut/cleared, unprocessed, white spruce trees/limbs greater than four (4) inches in diameter that will be left onsite shall be cut into logs no more than 15 feet in length and stacked into tight triangular decks of 10-15 logs each. Decks can be placed in the woods, but should be placed away from (not touching) remaining live white spruce trees. To minimize the risk of wildfire, brush and slash less than four (4) inches in diameter shall be disposed of by chipping or lop and scatter techniques. Questions should be directed to the Area Forester at 907-451- 2601.

iii) Eagle Nests. The Bald Eagle and Golden Eagle Protections Act protects eagles from take, as well as disturbance of their nests, roosts, and foraging sites. Projects are responsible for preventing disturbance to eagles and their nests. If an eagle nest is discovered within one-mile of a project site please contact the US Fish & Wildlife Service Regional Office at 907-456- 0203.

iv) Trail Access. Activities related to this material sale should maintain a 25-foot undisturbed, vegetative buffer on the northern and southern edges of the trail, ADL 409468, that runs east/west through the northern part of the designated material site. Location of the trail should be identified on site prior to material extraction. Public access to the trail should be maintained as part of the trail easement.

v) Cultural Resource. DOT will coordinate with SHPO regarding avoidance of any known cultural or historical locations in the material site. If other mitigation measures are not sufficient, DOT will obtain a cultural resource survey as-needed.

vi) Crooked Creek. No mining or ground disturbing activities may occur within 100-feet of the ordinary high water mark of Crooked Creek, which runs along the southern boundary of the designated material site.

vii) Groundwater Level. Pit excavations shall not reach groundwater or cause surface water to pond within the excavated areas so as to not attract birds in proximity of the runway.

5. Indemnity of Seller and Bonding. Not applicable.

(a) The buyer shall indemnify and hold the seller harmless from:

102-137 (Rev. 10/01) Page 7 of 10

(1) all claims and demands for loss or damage, including property damage, personal injury, wrongful death, and wage or employment claims, arising out of or in connection with the use or occupancy of the land or operations by the buyer or the buyer's successors, or at the buyer's invitation; and

(2) any accident or fire on the land; and

(3) any nuisance on the land; and

(4) any failure of the buyer to keep the land in a safe and lawful condition consistent with applicable laws, regulations, ordinances, or orders; and

(5) any assignment, sublease, or conveyance, attempted or successful, by the buyer that is contrary to the provisions of this contract.

The buyer will keep all goods, materials, furniture, fixtures, equipment, machinery, and other property on the land at the buyer's sole risk, and will hold the seller harmless from any claim of loss or damage to them by any cause.

(b) At the seller's discretion, a buyer may be required to file a bond designed to ensure the buyer's performance and to help protect the seller against any liability that may arise as a result of the activities of the buyer. If required, a bond acceptable to the seller in the amount of $N/A must be filed with the seller at the time of execution of this contract to ensure the buyer's performance and financial responsibility.

6. Improvements and Occupancy.

(a) Any improvements or facilities including crushers, mixing plants, buildings, bridges, roads, etc., constructed by the buyer in connection with this sale and within the sale area must be in accordance with plans approved by the seller.

(b) The buyer must, within 60 days after contract completion or termination of the contract by the seller or by operation of law, remove the buyer's equipment and other personal property from the sale area. After removal, the buyer must leave the land in a safe and clean condition that is acceptable to the seller. If the buyer can demonstrate undue hardship, the time for removal of the improvements under this paragraph may be extended at the seller's discretion.

(c) If any of the buyer's property having an appraised value in excess of $10,000, as determined by the seller, is not removed within the time allowed, that property may, upon 30 days' notice to the buyer, be sold at public auction under the direction of the seller. The proceeds of the sale will inure to the buyer after satisfaction of the expense of the sale and deduction of all amounts then owed to the seller. If there are no other bidders at the sale, the seller may bid on the property, and the seller will acquire all rights, both legal and equitable, that any other purchaser could acquire through a sale and purchase.

(d) If any of the buyer's property having an appraised value of $10,000 or less, as determined by the seller, is not removed within the time allowed, title to that property automatically vests in the seller.

(e) Special provisions. Special provisions applicable to improvements and occupancy under this contract are listed in paragraph 4 of this contract.

7. Inspection.

(a) The seller must be accorded access, at all times, to the sale area and to the books and records of the buyer, the buyer's contractors, and any sub-contractors relating to operations under this contract for purposes of inspection to assure the faithful performance of the provisions of this contract and other lawful requirements.

102-137 (Rev. 10/01) Page 8 of 10

(b) At all times when construction or operations are in progress, the buyer shall have a representative readily available to the area of operations who is authorized to receive, on behalf of the buyer, any notices and instructions given by the seller in regard to performance under this contract, and to take appropriate action as is required by this contract.

8. Termination and Suspension.

(a) The seller may terminate the buyer's rights under this contract if the buyer breaches the contract and fails to correct this breach within 30 days after written notice of the breach and an opportunity to be heard.

(b) If the buyer fails to comply with any of the provisions of this contract, the seller may shut down the buyer's operations upon issuance of written notice, until corrective action, as specified by the seller in its notice, is taken. If this corrective action is not taken within 30 days after written notice is served upon the buyer, the seller may terminate the contract under paragraph 8(a) of this contract. The buyer's failure to take immediate corrective action when ordered to remedy dangerous conditions or unwarranted damage to natural resources may be corrected by the seller to prevent danger or additional damage. Any cost incurred by the seller as a result of this corrective action, or by the buyer's failure to take corrective action, must be paid by the buyer.

(c) This contract may also be terminated by mutual agreement of both parties on terms agreed to in writing by both parties.

9. Reservations. The seller reserves the right to permit other compatible uses, including the sale of materials, on the land in the sale area if the seller determines that those uses will not unduly impair the buyer's operations under this contract. Under AS 38.05.125 the seller further expressly reserves to itself, and its successors, forever,

(a) all oil, gas, coal, ores, minerals, fissionable materials, geothermal resources, and fossils of every kind, that may be in or upon the land described above, or any part of it; and

(b) the right to explore the land for oil, gas, coal, ores, minerals, fissionable materials, geothermal resources, and fossils; and

(c) the right to enter by itself or its agents, attorneys, and servants on the land, or any part of it, at any time for the purpose of opening, developing, drilling, and working mines or wells on this or other land and taking out and removing from it all oil, gas, coal, ores, minerals, fissionable materials, geothermal resources, and fossils; and

(d) the right by itself or its agents, attorneys, and servants at any time (1) to construct, maintain, and use all buildings, machinery, roads, pipelines, powerlines, and railroads; (2) to sink shafts, drill wells, and remove soil; and (3) to occupy as much of the land as may be necessary or convenient for these purposes; and

(e) generally all rights to and control of the land, that are reasonably necessary or convenient to make beneficial and efficient the complete enjoyment of the property and rights that are expressly reserved.

10. Inclusion of Applicable Laws and Regulations. The buyer shall comply with all laws and regulations applicable to operations under this contract, including the provisions of AS 27.19 and 11 AAC 97 regarding mining reclamation, the provisions of AS 41.15 for wildfire prevention and control, the provisions of AS 38.05.550 - 38.05.565, material sale regulations 11 AAC 71, state fish and game regulations pertaining to the protection of wildlife and wildlife habitat, and state regulations pertaining to safety, sanitation, and the use of explosives. These laws and regulations are, by this reference, made a part of this contract, and a violation of them is cause for termination or suspension of this contract in addition to any penalties prescribed by law. These laws and regulations control if the terms of this contract are in conflict with them in any regard.

102-137 (Rev. 10/01) Page 9 of 10

11. Assignment. This contract may not be assigned by the buyer without the seller's prior written consent to the assignment.

12. Permits. Any permits necessary for operations under this contract must be obtained by the buyer before commencing those operations.

13. Passage of Title. All right, title and interest in or to any material included in the contract shall remain in the State until it has been paid for; provided, however, that the right, title and interest in or to any material that has been paid for but not removed from the sale area by the buyer within the period of the contract or any extension thereof as provided for in this contract shall vest in the seller.

14. Expiration and Extension. This contract expires on the date stated at the top of the contract unless an extension is granted by the seller in accordance with 11 AAC 71.210 (material sale regulations).

15. Warranties. This sale is made without any warranties, express or implied, as to quantity, quality, merchantability, profitability, or fitness for a particular use, of the material to be extracted from the area under contract.

16. Valid Existing Rights. This contract is entered into and made subject to all valid existing rights, including easements, rights-of-way, reservations, or other interests in land, in existence on the date the contract is entered into.

17. Notices. All notices and other writings required or authorized under this contract must be made by certified mail, postage prepaid, to the parties at the following address:

To the Seller: Alaska Department of Natural Resources

Division of Mining, Land and Water 3700 Airport Way Fairbanks, Alaska 99709-4699

To the Buyer: Alaska Department of Transportation and Public Facilities 2301 Peger Road Fairbanks, Alaska 99709

18. Integration and Modification. This contract, including all laws and documents that by reference are incorporated in it or made a part of it, contains the entire agreement between the parties. This contract may not be modified or amended except by a document signed by both parties to this contract. Any amendment or modification that is not in writing, signed by both parties, and notarized is of no legal effect.

19. Severability of Clauses of Sale Contract. If any provision of this contract is adjudged to be invalid, that judgment does not affect the validity of any other provision of this contract, nor does it constitute any cause of action in favor of either party as against the other.

20. Construction. Words in the singular number include the plural, and words in the plural number include the singular.

21. Headings. The headings of the numbered paragraphs in this contract shall not be considered in construing any provision of this contract.

22. "Extracted," "Extraction". In this contract, use of the terms "extracted" and "extraction" encompasses the severance or removal, as well as extraction, by the buyer of any materials covered by this contract.

23. Waiver. No agent, representative or employee of the seller has authority to waive any provision of this contract unless expressly authorized to do so in writing by the director of the DMLW.

Form 102-4018 (Rev 06/21) Page 1 of 5

DEPARTMENT OF NATURAL RESOURCES

Division of Mining, Land and Water

Northern Regional Land Office 3700 Airport Way

Fairbanks, AK 99709-4699

(907) 451-2740 nro.lands@alaska.gov

Southcentral Regional Land Office 550 West 7th Ave, Suite 900C Anchorage, AK 99501-3577

(907) 269-8503 dnr pic@alaska.gov

Southeast Regional Land Office P. O. Box 111020

Juneau, AK 99811-1020

(907) 465-3400 sero@alaska.gov

Statewide TTY – 771 for Alaska Relay or 1-800-770-8973

MATERIAL SITE RECLAMATION PLAN OR

LETTER OF INTENT/ANNUAL RECLAMATION STATEMENT

AS 27.19.030 – 27.19.050

In accordance with Alaska Statute 27.19, reclamation is required of all mining operations, including sand and gravel extraction. Completion of this form will meet the law's requirements for a reclamation plan (see below for filing requirements; due date: at least 45 days before mining is proposed to begin; requires approval by the Division of Mining, Land and Water). Completion of this form will also serve as a letter of intent for operations exempt from the plan requirement (due date: before mining begins). No approval is required for a letter of intent, but a miner who files a letter of intent must, before December 31, file an annual reclamation statement (Section 8 of this form).

Check applicable box:

A. RECLAMATION PLAN (REQUIRED if the operation will disturb five or more acres this year, OR 50,000 cubic yards, OR if the operation has a cumulative disturbed area of five or more acres)

B. RECLAMATION PLAN-VOLUNTARY (for an operation below the limits shown in Box A but wanting to qualify for the statewide bonding pool)

C. LETTER OF INTENT (less than five acres to be disturbed AND less than 50,000 cubic years AND less than five acres unreclaimed area) NOTE:

A miner who files a letter of intent is also required to file an annual reclamation statement at the end of the year.

THIS RECLAMATION PLAN/LETTER OF INTENT IS FOR CALENDAR YEAR ____2023 -2028________________________ (If you checked either box a or b above and propose a multi-year plan, state all years covered.)

1. MINER INFORMATION (If there is more than one miner, attach a list of the names, addresses, and telephone numbers of all other owners, operators, or leaseholders of the mining operation)

Name of miner who will serve as agent for notice purposes

Address (notify the department of any later change of address)

City State Zip code Telephone

Name of landowner (if other than miner) or public land management agency

Federal or state casefile number (if any) assigned to the site sjdurand Highlight

Form 102-4018 (Rev 06/21) Page 2 of 5

2. LEGAL DESCRIPTION OF PROPOSED MINING SITE

Legal Subdivision/Section/Quarter-Section Township Range Meridian

3. DESCRIPTION OF THE MINING OPERATION (if you checked box a or b on p. 1 of this form and are proposing a multi-year reclamation plan, attach separate sheets as needed showing acreage to be mined, volume to be mined, and existing acreage of mined area for each year covered by the plan)

a. ____________________ Total acreage to be mined or disturbed during the year.

b. ____________________ Estimated total volume to be mined or disturbed, including overburden.

c. ____________________ Type of material (sand, gravel, peat, etc.).

d. ____________________ Existing acreage of mined area (disturbed area that has not yet been reclaimed, but counting only acreage disturbed after October 15, 1991).

4. DESCRIPTION OF THE RECLAMATION OPERATION

a. The total acreage that will be reclaimed during the year (or each year, if for a multi-year reclamation plan) is:

b. Provide a list of equipment (type and quantity) to be used during the reclamation operation.

c. A time schedule of reclamation measures shall be included as part of the plan.

The following measures must be considered in preparing and implementing the reclamation plan. Please mark those measures appropriate to your reclamation activity:

Topsoil that is not promptly redistributed to an area being reclaimed will be separated and stockpiled for future use.

This material will be protected from erosion and contamination by acidic or toxic materials and preserved in a condition suitable for later use.

The area will be backfilled, graded and recontoured using strippings, overburden, and topsoil to a condition that allows for the reestablishment of renewable resources on the site within a reasonable period of time. It will be stabilized to a condition that will allow sufficient moisture to be retained for natural revegetation.

Stockpiled topsoil will be spread over the reclaimed area to promote natural plant growth that can reasonably be expected to revegetate the area within five years.

Stream channel diversions will be relocated to a stable location in the flood plain.

Exploration trenches or pits will be backfilled. Brush piles, vegetation, topsoil, and other organics will be spread on the backfilled surface to inhibit erosion and promote natural revegetation.

All buildings and structures constructed, used, or improved on land owned by the State of Alaska will be removed, dismantled, or otherwise properly disposed of at the completion of the mining operation.

Any roads, airstrips or other facilities constructed to provide access to the mining operation shall be reclaimed (unless otherwise authorized) and included in the reclamation plan.

Peat and topsoil mine operations shall ensure a minimum of two inches of suitable growing medium is left or replaced on the site upon completion of the reclamation activity.

If extraction occurs within a flood plain, the reclamation activity shall reestablish a stable bed and bank profile such that river currents will not be altered and erosion and deposition patterns will not change.

NOTE: If you propose to use reclamation measures other than those shown above, or if the private landowner or public land manager of the site requires you to use stricter reclamation measures than those shown above, attach a list of those measures to this plan.

Form 102-4018 (Rev 06/21) Page 3 of 5

5. ALTERNATE POST-MINING LAND USE

The mining site is public land. The land management agency's land use plan (if any) for post-mining land use is:

The mining site is public land. As allowed by AS 27.19.030(b), I propose to reclaim it to the following post-mining land use:

The mining site is private property. The private landowner plans to use it for the following post-mining land use:

6. ATTACHMENTS

If the mining operation has additional owners, operators, or leaseholders not shown on p. 1 of this form, attach a list of their names, addresses, and telephone numbers.

Attach a USGS map at a scale no smaller than 1:63,360 (inch to the mile) showing the general vicinity of the mining operation and the specific property to be mined. Option: If you checked Box C on the first page of this form and the mining site is adjacent to an airport or public highway, state the name of the airport or the name and milepost of the public highway.

Attach a diagram of the mined area (this term includes the extraction site, stockpile sites, overburden disposal sites, stream diversions, settling ponds, etc.) and the mining operation as a whole (this term includes the roads you plan to build, your power lines, support facilities, etc.). Show and state the number of acres to be mined during the year. (If you checked Box A or B on the first page of this form and your plan covers more than one year, show each year's work.) Show the location corners or property boundaries of the site in relation to the reclamation work and any other areas affected by the operation.

Attach a list of the equipment (type and quantity) to be used during the reclamation activity.

A time schedule of events must be attached that includes dates and activities related to this reclamation plan.

If the site is private land not owned by the miner, attach a signed, notarized statement from the landowner indicating the landowner's consent to the operation. The landowner may also use the consent statement to notify the department that the landowner plans a post-mining land use incompatible with natural revegetation and therefore believes that reclamation to the standard of AS 27.19.020 is not feasible.

For those miners that are required to file an annual reclamation statement, attach photographs and/or videotapes dated and described as to location of the reclamation activity that was completed.

If you propose to use reclamation measures other than those listed on this form, or if the private landowner or public land manager of the site requires you to use stricter reclamation measures, attach a list of those measures.

sjdurand Highlight

Form 102-4018 (Rev 06/21) Page 4 of 5

7. RECLAMATION BONDING (REQUIRED ONLY IF YOU CHECKED BOX A or B ON THE FIRST PAGE OF THIS FORM)

The total acreage of my mining operation that is subject to the bonding requirement for the current year is

_______________acres (add acreages stated in Section 3(a) and 3(d) of this form).

The per-acre bond amount is $750/acre or a total bond amount of $_______________

Please check the appropriate bonding method that you will apply toward this reclamation plan:

Participation in the statewide bonding pool.

Posting a corporate surety bond.

Posting a personal bond accompanied by a letter of credit, certificate of deposit, or a deposit of cash or gold.

Posting a bond or financial guarantee with another government agency that has jurisdiction over the mining operation, as allowed by a cooperative management agreement between that agency and the Division of Mining, Land and Water.

Posting a general performance bond with a state agency that meets the requirements of 11 AAC 97.400(4).

The above reclamation plan/letter of intent and all attachments are correct and complete to the best of my knowledge.

Signature of Miner Date

AS 27.19.030 and AS 27.19.050 require a miner either to file a reclamation plan for approval or to file a letter of intent followed by an annual reclamation statement. AS 38.05.035(a) authorizes the director to decide what information is needed to process an application for the sale or use of state land and resources. This information is made a part of the state public land records and becomes public information under AS 40.25.110 and 40.25.120 (unless the information qualifies for confidentiality under AS 38.05.035(a)(8) and confidentiality is requested, AS 43.05.230, or AS 45.48).

Public information is open to inspection by you or any member of the public. A person who is the subject of the information may challenge its accuracy or completeness under AS 44.99.310, by giving a written description of the challenged information, the changes needed to correct it, and a name and address where the person can be reached.

False statements made in an application for a benefit are punishable under AS 11.56.210. In submitting this form, the applicant agrees with the Department to use “electronic” means to conduct “transactions” (as those terms are used in the Uniform Electronic Transactions Act, AS 09.80.010 – AS 09.80.195) that relate to this form and that the Department need not retain the original paper form of this record: the department may retain this record as an electronic record and destroy the original. In submitting this form, the applicant certifies that he or she has not changed the original text of the form or any attached documents provided by the Division.

3/14/2023

Form 102-4018 (Rev 06/21) Page 5 of 5

8. ANNUAL RECLAMATION STATEMENT—REQUIRED IF YOU FILED A LETTER OF INTENT (CHECKED BOX C ON THE FIRST PAGE) FOR THIS OPERATION. DUE DATE: DECEMBER 31, ________. YOU MUST FILE EVEN IF THE MINING DESCRIBED

IN YOUR LETTER OF INTENT DID NOT TAKE PLACE.

This _______________ annual reclamation statement is for:

(year)

a. ____________________ Total acreage mined.

b. ____________________ Total volume mined or disturbed, including overburden.

c. ____________________ Total acreage reclaimed.

d. ____________________ Cumulative total of unreclaimed acreage.

e. Reclamation measures that were used (check appropriate measures from Section 4, DESCRIPTION OF THE RECLAMATION OPERATION, and attach list of additional or stricter measures if applicable).

The above annual reclamation statement and all attachments are correct and complete to the best of my knowledge.

Signature of Miner Date

AS 27.19.030 and AS 27.19.050 require a miner either to file a reclamation plan for approval or to file a letter of intent followed by an annual reclamation statement. AS 38.05.035(a) authorizes the director to decide what information is needed to process an application for the sale or use of state land and resources. This information is made a part of the state public land records and becomes public information under AS 40.25.110 and 40.25.120 (unless the information qualifies for confidentiality under AS 38.05.035(a)(8) and confidentiality is requested, AS 43.05.230, or AS 45.48).

Public information is open to inspection by you or any member of the public. A person who is the subject of the information may challenge its accuracy or completeness under AS 44.99.310, by giving a written description of the challenged information, the changes needed to correct it, and a name and address where the person can be reached.

False statements made in an application for a benefit are punishable under AS 11.56.210. In submitting this form, the applicant agrees with the Department to use “electronic” means to conduct “transactions” (as those terms are used in the Uniform Electronic Transactions Act, AS 09.80.010 – AS 09.80.195) that relate to this form and that the Department need not retain the original paper form of this record: the department may retain this record as an electronic record and destroy the original. In submitting this form, the applicant certifies that he or she has not changed the original text of the form or any attached documents provided by the Division.

Non-refundable filing fee for reclamation plan: See current Director's Fee Order for applicable fees.

For Department Use Only Application received date stamp

Receipt Type: 17

Mining and Reclamation Guidelines

MS 670-089-2

March 2023

State of Alaska Department of Transportation & Public Facilities

Material Site 670-089-2 Central, Alaska

These guidelines are subject to the Alaska Department of Natural Resources (DNR) Material Sale Contract, ADL 419036, and stipulations contained therein.

Legal Description Within the S½S½ of Section 26 and N½N½ of Section 35, T9N, R14E, FM.

General Information This material site is located east of the Central Airport runway at Mile 128 Steese Highway. There is an improved dirt road from the Steese Highway to the material site along the north side of the air strip on the airport property.

The material consists of alluvial sand and gravel with silt and cobbles. The site has provided borrow and high quality crushed aggregate for construction and maintenance projects on the Steese Highway since the 1970’s. Conventional excavation methods can be used.

DOT&PF conducted exploratory drilling in 1988. Vegetation consists of spruce, birch and cottonwood trees up to 20-inch diameter. Silt to silty sand overburden generally ranged from 1 to 5 feet thick. Groundwater was intercepted in some areas at depths of 6 to 9 feet. Permafrost was sporadic. Additional site information is available at the DOT&PF Materials office, 2301 Peger Road, Fairbanks, Alaska 99709.

Work Pad Access to the material site and a work pad will remain at the end of individual projects for future use for crushing, screening and stockpiling material. When possible, this work pad will be at least 5 acres. Once the entire material site is depleted, the work pad and access road will be reclaimed and the pit closed out.

Mining Guidelines To date, this site has been mined above the water table. There should be sufficient material above the water table to provide the quantities required for the next ten years.

Guidelines therefore apply to mining above the water table.

For each new use or project, the user or contractor shall submit a Project Mining and Reclamation Plan to DNR and DOT&PF for approval prior to any mining activities. The Plan will adhere to the following guidelines.

1. Locate and mark material site boundaries prior to breaking ground.

2. Maintain minimum 100-foot buffer along site boundaries. Mark on the ground.

3. Stockpile surface vegetation and organic soils along the perimeter of material site adjacent to buffers for future reclamation.

4. Stockpile overburden separately from vegetation/organics for future reclamation or use directly for reclamation of previously mined areas on the east edge of the site.

5. Do not place organics or overburden piles in future mining area or where it would need to be moved again.

6. Pit perimeter slopes (i.e. adjacent buffers) shall not exceed 3H:1V.

7. Keep pit floor at least 2 feet higher than the water table to keep it in a dry condition.

8. Grade pit floor level or slope gently to the southeast, blend with earlier depth limits.

9. After mining, remove all equipment and man-made debris from the site.

10. All mining and stockpiling activities shall be in accordance with applicable

Construction General Permits (CGP) and Storm Water Pollution Prevention Plans

(SWPPP)

Reclamation Objectives and Guidelines The reclamation plan has several objectives:

1. To not disturb previously reclaimed areas.

2. To blend with previous reclamation and surrounding topography.

3. To prevent erosion and sediment transport to surrounding, undisturbed areas.

4. To allow reestablishment of native vegetation and wildlife habitat.

5. To leave the site in a safe condition that does not endanger people or wildlife.

6. To not preclude future development of un-mined areas.

Reclamation activities will include:

1. Grading slopes just inside the perimeter buffers, or where future development is not anticipated at 3H: 1V or flatter.

2. Spread available overburden and then organic material on reclaimed slopes.

Contact agencies to determine site-specific seeding and fertilizer requirements.