Fabric Awning Repacement.pdf

PDF 3 MB Posted

Attached to
St. Pete Headquarters' Awnings Replacement
Solicitation number
ITB-15637
Issued by
Leon County, Florida

About this file

This is a project specification and technical drawing file for the Florida Fish and Wildlife Conservation Commission's fabric awning replacement project at the St. Pete Headquarters Campus located at 100 Eighth Avenue SE, St. Petersburg, Florida. The project involves removal of damaged fabric covers from existing awning frames and fabrication and installation of new all-weather exterior woven acrylic or polyester fiber-reinforced vinyl fabric covers at four locations: RMI Ground Floor Entrance (base bid), JU 4th Floor West Terrace (Alternate Bid #1), JU East Terrace (Alternate Bid #1), and RMI Rooftop (Alternate Bid #2). All new fabric covers must include a minimum 10-year warranty with seams and edges heat welded and double stitched using UV and marine environment-resistant thread with lifetime warranty. Attachment methods vary by location, utilizing either rope and grommet lacing at the RMI Entrance and Rooftop locations or staple stitch method at the JU terrace locations. The mandatory pre-bid conference and site visit occurred on April 23, 2026, at 11:00 AM ET; written questions were due April 30, 2026, at 5:00 PM ET with responses posted by May 6, 2026; sealed bid submission was due May 14, 2026, at 3:00 PM ET with public opening at the same date and time; and the anticipated award date was May 19, 2026. The contract term is one year from Purchase Order issuance with project completion required by August 31, 2026.

Contractors are responsible for obtaining accurate field dimensions onsite, as all dimensions shown in client drawings are approximate, and must provide a one-year warranty on labor, materials, and equipment from final completion. The estimated project budget is $60,000, with liquidated damages of $250 per calendar day applicable for delays beyond the specified completion date, except for circumstances beyond the contractor's control. Bidders must submit a minimum of three references for similar projects completed and be registered in both MyFloridaMarketPlace (MFMP) and the SunBiz system prior to bid opening. The procurement is subject to standard Florida state purchasing terms and conditions, including compliance with E-Verify employment verification requirements and non-discrimination provisions. No incumbent vendors or current contractors are identified, and no specific set-aside designations for disadvantaged enterprises are noted in the available documentation. Evaluation will focus on identifying the lowest responsive and responsible bidder meeting all technical and qualification requirements.

View the file

Other files

File Type Posted
Fabric Awning Repacement.pdf PDF
FWC 25.26.100 Questions & Answers Addendum.pdf PDF
FWC.25.26.100 ITB Final.pdf PDF
FWC.25.26.100 ITB Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PA

G

E O

F

DA

TE

RE

VI

SI

O

N

SC

AL

E

DR

AW

N

CH

EC

KE

D

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

N

A

JB

B

E

I G

H T

H

V

E N

U E

S

T.

P

T E

R S

B U

R G

F

L O

R I

D A

FA

C

IL

IT

IE

S

SE

R

VI

C

ES

FI

SH

A

N D

W

IL

D

LI

FE

R

ES

EA

R C

H

IN

ST

IT

U

TE

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

F A

B R

I C

W N

I

R

P L

A C

E M

E N

T S

T

E R

S B

E

M

P

J.

R

. M . I a n d

F.

B U

I L

D I

N G

S

COVER

SHEET

JB

B

1 0 0 E I G H T H A V E N U E S E S T. P E T E R S B U R G , F L O R I D A

3 3 7 0 1 - 5 0 0 0

F A B R I C A W N I N G RE P L A C E M E N T

S T. P E T E R S B U R G C A M P U S - J. U. A N D R. M. I. B U I L D I N G S

FISH AND WILDLIFE RESEARCH INSTITUTE

Florida Fish and Wildlife Conservation Commission

KEY PLAN

SHEET LIST TABLE

SHEET TITLESHEET #

COVER

ALT

BID

#1

BASE

BID

ALT

BID

#2BASE BID - 'RMI' ENTRANCE

ALT. BID #1 - 'JU' E. TERRACE

ALT. BID #2 - 'RMI' ROOF TOP

ALT. BID #1 - 'JU' W. TERRACE

SECTION DETAILS

· New covers to be constructed using all weather exterior woven acrylic or polyester fiber reinforced vinyl fabric. Fabric is to be covered by a minimum 10 Year Warranty.

· All fabric seams and edges shall be heat welded and double stitched.

· Sewing thread shall be U.V. Sunlight and Marine Environment resistant with a lifetime warranty.

· New covers at 'RMI' Entrance (Base Bid), and 'RMI' Rooftop (Alt. Bid #2) to be attached to frame using industry standard "rope & grommet" (laced) method.

· New covers at 'JU' West Terrace and 'JU' East Terrace (Alt. Bid #1) to be attached to frame using industry standard "staple stitch" method.

· All dimensions shown in Client submitted drawings are approximate.

Contractor shall be responsible for obtaining all field dimensions onsite.

· The Contractor shall warranty labor, materials, and equipment for a period of one (1) year from Final Completion. Contractor shall make good any defects,and shall include all necessary adjustments to and replacement of defective items without expense to the Owner.

Remove all remaining damaged fabric covers from existing awning frames.

Fabricate new awning covers and attach to existing frames, as specified.

SCOPE OF WORK

N O

R

E O

F

DA

TE

RE

VI

SI

O

N

SC

AL

E

DR

AW

N

CH

EC

KE

D

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

3/

JB

B

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

FA

C

IL

IT

IE

S

SE

R

VI

C

ES

FI

SH

A

N D

W

IL

D

LI

FE

R

ES

EA

R C

H

IN

ST

IT

U

TE

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

F A

B R

N

I

P L

A C

E M

E N

T S

T

E R

S B

E

M

P

R

. M . I a

U

I L

D I

N G

S

'RMI'

ENTRANCE

BASE BID

JB

B

31' - 1"+/-

7' - 10"+/-

2' - 2"+/-

5' - 2"+/-

7' - 10"+/-

FABRIC

FABRIC

ELEVATION - 'RMI' ENTRANCE

PLAN VIEW - 'RMI' ENTRANCE

ELEVATION - 'RMI' ENTRANCE ELEVATION - 'RMI' ENTRANCE

1' - 2"+/-NOTE: AWNING FRAMEWORK

SHOWN WITHOUT FABRIC

FOR CLARITY

8"

3'-5"+/-

31' - 1"+/- 7' - 10"+/-

8"

3'-5"+/-

10' - 0"+/- 1' - 2"+/-

8"

3'-5"+/-

11'-2"+/-

E O

F

DA

TE

RE

VI

SI

O

N

SC

AL

E

DR

AW

N

CH

EC

KE

D

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

JB

B

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

F A

B R

N

I

P L

A C

E M

E N

T S

T

E R

S B

E

M

P

R

. M . I a

U

I L

D I

N G

S

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

FA

C

IL

IT

IE

S

SE

R

VI

C

ES

FI

SH

A

N D

W

IL

D

LI

FE

R

ES

EA

R C

H

IN

ST

IT

U

TE

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

'JU' WEST

TERRACE

ALTERNATE

BID #1

3/

JB

B

A

SECTION - 'JU-1' AWNING FRAMEWORK

ELEVATION - 'JU-1' AWNING FRAMEWORK

41' - 2"+/-

7"

4' - 1"+/-

25' - 3"+/-

25' - 3"+/-

41' - 2"+/-

9' - 8"+/-

18' - 0"+/-

3' - 4"+/-

A

PLAN VIEW - 'JU-1' AWNING FRAMEWORK

3' - 4"+/-

26' - 3"+/-

18' - 5'+/-

NOTE: AWNING FRAMEWORK

SHOWN WITHOUT

FABRIC FOR CLARITY

EXISTING

STRUCTURE

18' - 5"+/-

4' - 1"+/-

2' - 2"+/-

FABRIC

FABRIC

FABRIC

2' - 2"+/-

7"

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

FA

C

IL

IT

IE

S

SE

R

VI

C

ES

FI

SH

A

N D

W

IL

D

LI

FE

R

ES

EA

R C

H

IN

ST

IT

U

TE

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

F A

B R

N

I

P L

A C

E M

E N

T S

T

E R

S B

E

M

P

R

. M . I a

U

I L

D I

N G

S

PA

G

E O

F

DA

TE

RE

VI

SI

O

N

SC

AL

E

DR

AW

N

CH

EC

KE

D

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

JB

B

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

'JU' EAST

TERRACE

ALTERNATE

BID #1

3/

JB

B

A

SECTION - 'JU-2' AWNING FRAMEWORK

ELEVATION - 'JU-2' AWNING FRAMEWORK

2' - 6"+/-2' - 5"+/-

27' - 7"+/- 3' - 9"+/-

EXISTING

STRUCTURE

A

31' - 11"+/-

3' - 11"+/- 7"

18' - 5"+/- 17' - 2"+/-

30' - 2"+/-

7"

31' - 11"+/-

27' - 7"+/-

3' - 9"+/-

PLAN VIEW - 'JU-2' AWNING FRAMEWORK

FABRIC

NOTE: AWNING FRAMEWORK

SHOWN WITHOUT

FABRIC FOR CLARITY

FABRIC

FABRIC

3'-113 4"

20'-101 4"

E O

F

DA

TE

RE

VI

SI

O

N

SC

AL

E

DR

AW

N

CH

EC

KE

D

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

JB

B

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

FA

C

IL

IT

IE

S

SE

R

VI

C

ES

FI

SH

A

N D

W

IL

D

LI

FE

R

ES

EA

R C

H

IN

ST

IT

U

TE

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

F A

B R

N

I

P L

A C

E M

E N

T S

T

E R

S B

E

M

P

R

. M . I a

U

I L

D I

N G

S

'RMI'

ROOFTOP

ALTERNATE

BID #2

3/

JB

B

28' - 4"+/-

18' - 4"+/-

18' - 4"+/-

A

SECTION - 'RMI' ROOFTOP - ALT. BID #2

ELEVATION - 'RMI' ROOFTOP - ALT. BID #2PLAN VIEW - 'RMI' ROOFTOP - ALT. BID #2

8"

28' - 4"+/-

NOTE: AWNING FRAMEWORK

SHOWN WITHOUT

FABRIC FOR CLARITY

EXISTING

STRUCTURE

A

8"

FABRIC

FABRIC

FABRIC

EXISTING

STRUCTURE

E O

F

DA

TE

RE

VI

SI

O

N

SC

AL

E

DR

AW

N

CH

EC

KE

D

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

RE

VI

SI

O

N

DA

TE

DR

AW

N

6"

JB

B

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

FA

C

IL

IT

IE

S

SE

R

VI

C

ES

FI

SH

A

N D

W

IL

D

LI

FE

R

ES

EA

R C

H

IN

ST

IT

U

TE

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

CH

EC

KE

D

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

F A

B R

N

I

P L

A C

E M

E N

T S

T

E R

S B

E

M

P

R

. M . I a

U

I L

D I

N G

S

'RMI'

DETAILS

JB

B

7"

2"

1/2" Ø CONTINUOUS ALUM. ROD

WELDED AT INSIDE PERIMETER

OF FRAMEWORK ASSEMBLY USED

TO SECURE AWNING LACING LINES

4"

1" x 1" ALUMINUM

TUBING (TYP.)

1" x 2" ALUM.

TUBING

A SECTION - 'RMI' ENTRANCE

1" x 1" GALVANIZED

STEEL TUBING (TYP.)

3/4" Ø CONTINUOUS GALVANIZED

STEEL TUBING WELDED AT INSIDE

PERIMETER OF FRAMEWORK ASSEMBLY

USED TO SECURE AWNING LACING LINES

1" x 1" GALVANIZED

STEEL TUBING (TYP.)

1" x 1" GALVANIZED

STEEL TUBING (TYP.)

1" x 2" GALVANIZED

STEEL TUBING (TYP.)

8"

4"

3"

B SECTION - 'RMI' ROOFTOP

ST. PETE_Awnings - FINAL-AWNING REPLACEMENT-cover_rev.3.pdf
ST. PETE_Awnings - FINAL-'RMI' ENTRANCE_rev.3.pdf
ST. PETE_Awnings - FINAL-'JU' W. TERRACE_rev.3.pdf
ST. PETE_Awnings - FINAL-'JU' E. TERRACE_rev.3.pdf
ST. PETE_Awnings - FINAL-'RMI' ROOF TOP_rev.3.pdf
ST. PETE_Awnings - FINAL-DETAILS_rev.3.pdf

File details come from the government source that posted it. Updated .