This document is a Vendor Questions and Answers document from the Federal Aviation Administration (FAA) related to a market survey for VOR (VHF Omnidirectional Range) system replacements. Key details include: the FAA plans to replace more than 600 VORs, with replacement percentages dependent on vendor manufacturing capabilities and FAA resources. The FAA will retain authority over acquisition methods, installation, and maintenance services. The procurement will be subject to the Buy American Act, specifically the FAA Buy American Preference clause found at AMS 3.6.4-5, though the specific methodology for auditing Buy American requirements is still being determined. The document clarifies that when vendors are asked about operational system deployments, this only applies to the specific model being presented to the government.

View the file

Other files

File Type Posted
Commercially Available VOR Systems Market Survey_Final_A1.pdf PDF
TACAN Specification FAA-E-7870 - Approved 2025-06-24.pdf PDF
DME Specification FAA-E-37016 - Approved 2025-06-24.pdf PDF
D-5288-2 Rev E - VOR-VORTAC Facility Plastic Antenna Shelter-16 Cone.pdf PDF
D-5288-3 Rev E - VOR-VORTAC Facility Plastic Antenna Shelter-16 Cone.pdf PDF
D-5288-1 Rev D - VOR-VORTAC Facility Plastic Antenna Shelter 16 Cone.pdf PDF
D-5701.pdf PDF
B-50402 Rev C - VOR Antenna Support Plate itw.pdf PDF
DE-A-3481A.pdf PDF
DE-D-2744-1 Rev G - Doppler VOR Carrier Antenna Assembly.pdf PDF
D-50737 Rev B - Doppler VOR Antenna Details.pdf PDF
DE-B-2611-1 Rev J - VHF Loop Antenna Assembly Insulator.pdf PDF
B-50400 Rev C - VOR Antenna Pedestal.pdf PDF
DE-A-3060C.PDF PDF
D-50399 Rev H - VOR Loop Antenna Assembly.pdf PDF
Draft DVT SIR Comment Form.docx DOCX document
D-50399 Rev H - VOR Loop Antenna Assembly itw.pdf PDF
B-50401 Rev D - VOR Polarizer Pedestal itw.pdf PDF
D-51007-2 Rev D - Doppler VOR SB Antenna Details.pdf PDF
DE-B-2611-3 Rev I - VHF Loop Antenna Assembly Insulator.pdf PDF
DE-A-2744-4 Rev C - Doppler VOR Carrier Antenna Nameplate.pdf PDF
DW-B-21547 Rev E - VOR Polarizer.pdf PDF
DE-B-2132 Rev B - VOR Antenna MTG Plate Locking Wedge.pdf PDF
B-50400 Rev C - VOR Antenna Pedestal (1).pdf PDF
DE-B-2132 Rev B - VOR Antenna MTG Plate Locking Wedge itw.pdf PDF
D-50435 Rev D - Antenna Pedestal Mounting Support itw.pdf PDF
DW-B-21547 Rev E - VOR Polarizer itw.pdf PDF
D-5615 Rev 6 - Doppler VOR Antenna Pedastal Bracing Kit.pdf PDF
DE-D-2744-2 Rev E - Doppler VOR Carrier Antenna Mechanical Details.pdf PDF
DE-D-2744-5 Rev B - Doppler VOR Carrier Antenna Mechanical Details.pdf PDF
DE-B-3196 Rev A VOR Pedestal Cover.pdf PDF
DE-B-3428 Rev D BALUN.PDF PDF
DE-D-2744-3 Rev D - Doppler VOR Carrier Antenna Mechanical Details.pdf PDF
B-50403 Rev A - VOR Antenna Pedastal Mounting Support Bonding Segment (1).PDF PDF
D-51007-1 Rev B - Doppler VOR SB Antenna Details.PDF PDF
DVT SIR - DRAFT Section C - Statement of Work - Clean.pdf PDF
DVT SIR - DRAFT Section F - Deliveries or Performance - Clean.pdf PDF
DVT SIR - DRAFT Task Order 2 - Engineering Design and Development - Clean.pdf PDF
DVT SIR - DRAFT Section D - Packaging and Marking - Clean.pdf PDF
DVT SIR - DRAFT Section H - Special Contract Requirements - Clean.pdf PDF
DVT SIR - DRAFT Section K-Reps Certs -Clean.pdf PDF
DVT SIR - DRAFT Task Order 1 - Program Mgmt - Clean.pdf PDF
FAA-E-37012 Comment Form.docx DOCX document
QA_DVT_Industry_Engagement_Event_Final.pdf PDF
Tactical Air Navigation (TACAN) Antenna System Functional Fault Hazard Analysis (FFHA).pdf PDF
Draft DME Specification FAA-E-37016_v0.2.pdf PDF
Draft TACAN_Transponder_Specification_v0.8.pdf PDF
80 Percent Draft TACAN_Transponder_Specification_v0.7.pdf PDF
Draft TACAN Transponder Performance Specification FAA-E-37011 Comment Form.docx DOCX document
DVT Status Brief to Industry 072020.pptx PPTX presentation
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor Questions and FAA Responses

Q: In Section 8.f asks “the number of operational systems that are currently deployed. As applicable, please provide quantities each for USA deployments and foreign deployments.” Can the Government confirm this applies only to the model being presented to the Government?

A: Correct.

Q: Does the FAA anticipate the system integrator being the ultimate decision authority on the acquisition method, installer and maintainer of the systems?

A: The anticipation is that the FAA will be the authority on the acquisition method, installation, and maintenance services.

Q: Please provide the aggregated figures of VOR installed based in the NAS and an estimate (range) of the percentage of VOR to be replaced per year. Please comment on potential consolidation of figures as part of VOR rationalization.

A: More than 600 VORs will need replacement; the percentage will depend upon several factors, e.g., the Vendor’s manufacturing capability, and FAA resources.

Q: We understand this procurement will be subject to Buy America. Please confirm or provide reasons why it will not be.

A: Any future procurement that comes out of this Market Survey will be subject to the Buy American Act, specifically the FAA Buy American Preference clause found at AMS 3.6.4-5.

Q: Please confirm and provide the methodology the FAA plans to audit the Buy America throughout the program.

A: How the FAA plans to audit Buy American requirements throughout the program is still being determined.

File details come from the government source that posted it. Updated .