FA9451-22-R-1000-A00001_22June22.pdf
PDF 623 KB Posted
- Attached to
- FA9451-22-R-1000 - Advanced Space Technology Research and Optimization (ASTRO) - Request for Proposal (RFP) Federal contract opportunity
- Solicitation number
- FA9451-22-R-1000
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA9451-22-R-1000-A00004_11July22.pdf | ||
| FA9451-22-R-1000-A00003_7July22.pdf | ||
| FA9451-22-R-1000-A00002_30June22.pdf | ||
| Final RFP_ASTRO_Questions_ROUND 2_16Jun22.xlsx | XLSX spreadsheet | |
| RFP FA945122-R-1000_REV2_16June22.pdf | ||
| QandA Round 1_31May22.xlsx | XLSX spreadsheet | |
| RFP FA945122-R-1000_REV1_31May22.pdf | ||
| QandA Round 1_31May22.pdf | ||
| TASK ORDER 0001_REV1_31MAY22.pdf | ||
| TASK ORDER 0003_REV1_31MAY22.pdf | ||
| TASK ORDER 0001_20APR22.pdf | ||
| RFP FA9451-22-R-1000_20APR22.pdf | ||
| TASK ORDER 0002_20APR22.pdf | ||
| TASK ORDER 0003_20APR22.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A00001
FA9451
Cori Duford, Contracting Officer
Refer to the continuation page for full details.
AF Research Laboratory (DET 8) 3550 Aberdeen Ave SE Kirtland AFB NM 87117-5776
FA9451-22-R-1000
1 2
06/22/2022
04/21/2022
FA9451-22-R-1000-A00001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification):
The purpose of this amendment is as follows:
1. Capture changes as published to FBO (SAM.gov) to the RFP. Key highlights include (though are not all encompassing): CO POC/name; a summary of the most current documents in effect; restatement of key dates/times. Refer to the referenced documents for full information/details.
2. As of this Amendment the current version of documents is as follows:
RFP Revision 2 dated 16 June 2022 (applicable updates noted in paragraph 5 below) TO 1 Revision 1 dated 31 May 2022 TO 2 (original) dated 21 April 2022 TO 3 Revision 1 dated 31 May 2022
Questions/Answers (QA) Round 1 published 31 May 2022 Questions/Answers (QA) Round 2 published 16 June 2022
A timeline of events/document and information posting is at the bottom, for reference purposes.
3. The Government may decide to incorporate an additional CDRL (anticipated topic: AMOS users handbook and update on an annual basis). If the Government decides to do so, an Amendment will be issued with the additional CDRL. Likewise, the proposal due date will be re-assessed if it needs to be extended.
4. This Amendment updates the following. A full RFP revision will NOT be issued, rather the information below is incorporated via this Amendment:
a. Proposal due date is changed from 14 July 2022 (4:00 pm Mountain Daylight Time) to 19 July 2022 (4:00 pm Mountain Daylight Time)
b. RFP Rev 2 Section L Para 2.1.1 Point of Contact “……Address any questions you may have about this solicitation to the CO. Written requests for clarification shall be submitted to the CO by 4:00pm Mountain Daylight Time on Wed 29 June 2022…...”
[RFP Rev 2 stated 31 May 2022, this Amendment changes it]
c. RFP Rev 2 Section L Para 2.1.3 Discrepancies, Errors and Omissions “If an Offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the Offeror shall notify the CO by 4:00pm Mountain Daylight Time on Wed 29 June 2022 ….”
[RFP Rev 2 stated 31 May 2022, this Amendment changes it]
FA9451-22-R-1000-A00001
d. RFP Rev 2 Section L Para 2.1.4 Electronic Reference Documents “……All Bidder’s Library DVD must be returned to the address below upon the closing of this solicitation. DVD must be received no later than by 4:00p.m. Mountain Daylight Time two (2) weeks after proposal due date…..”
[RFP Rev 2 stated 29 July 2022, this Amendment changes it]
e. Restatement of RFP Rev 2 Section L Para 2.3 Electronic Offerors: All offerors are reminded to review Para 2.3 in its entirety, to include Offeror emailing to contracting personnel proof of DOD SAFE drop off reflecting date/time of submission and number of documents/files; and ensuring to including the Contracting Officer and both Contract Specialists identified on the correspondence and DOD SAFE submission. Ensure RFP Rev 2 Para 2.3 is read and adhered to in its entirety.
5. Timeline the following information/documents was published/posted to FBO/SAM.gov:
a. 21 April 2022 RFP (original) Task Order (TO) 1 (original) TO 2 (original) TO 3 (original) Original proposal due date 6 June 2022
b. 31 May 2022 the following was published/posted:
Round 1 Question/Answer (QA) published as a pdf Request for Proposal (RFP) Revision 1 TO 1 Revision 1 TO 3 Revision Per RFP Revision 1 due date changed from 6 June 2022 to 20 June 2022.
c. 7 June 2022 the following was published/posted:
Round 1 Question/Answer (QA) published as a spreadsheet Proposal due date changed from 20 June 2022 to 12 July 2022
d. 16 June 2022 the following was published/posted:
Round 2 Question/Answer (QA) published as a spreadsheet RFP Revision 2 RFP Revision 2 restates due date of 12 July 2022.
All Contracting Officer POC information (in the RFP, TOs and FBO/SAM.gov posting) changed from Kimerie Smith to Cori Duford
6. All other terms, conditions and provisions remain unchanged and in effect.
| a- |
| b- |
File details come from the government source that posted it. Updated .