RFP_Section_J_Atch_8_-_Section_M_Evaluation_Factors_for_Award.pdf

PDF 124 KB Posted

Attached to
Joint Directed Energy Transition Office (DE-JTO) Professional Technical Support Services
Solicitation number
FA9451-18-R-0002
Issued by

About this file

This document provides the evaluation criteria for a solicitation seeking proposals for professional technical support services to support the Joint Directed Energy Transition Office. Key details include:

  • Proposals are due by July 27, 2018 to support the Department of the Air Force Materiel Command Research Laboratory. The solicitation will utilize tradeoff source selection procedures and evaluate proposals based on four factors: Technical, Past Performance, Cost/Price, and Small Business Participation. Technical and Past Performance factors are significantly more important than Cost/Price.

  • Under the Technical factor, proposals will be evaluated on two subfactors: Human Resource Management and Technical and Management Approach. The Past Performance factor will assess recent and relevant contracts based on recency, relevancy and quality of performance. Cost/Price will be evaluated for unbalanced pricing, reasonableness, realism and a Total Evaluated Price calculated inclusive of option periods. Small Business Participation must receive an "Acceptable" rating to be eligible for award.

Section J Attachment 8 - Evaluation Criteria

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA9451-18-R-0002

Section J, Attachment 8, Evaluation Criteria

07 June 2018

SECTION M

Evaluation Factors for Award

1. GENERAL GUIDANCE

1.1 This acquisition will utilize Tradeoff Source Selection procedures, with technical proposals, to make an integrated assessment for a best value award decision. The source selection will be conducted in accordance with (IAW) Federal Acquisition Regulation (FAR) part 15, Contracting by Negotiation, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS), DoD Source Selection Procedures (01 April 2016) and Air Force Mandatory Procedures 5315.3 (03 October 2017). These regulations are available electronically at the Air Force (AF) FARSite, http://farsite.hill.af.mil.

1.2 Award will be made to the offeror who is deemed responsible IAW with FAR part 9, as supplemented, whose proposal conforms to the solicitation’s requirements (to include all terms and conditions, representations and certifications, technical requirements, and all other information required by Section L of this solicitation including facility clearance requirements) and is judged, based on the evaluation factors and subfactors, to represent the best value to the Government. This may result in an award to a higher rated, higher priced offeror, where the decision is consistent with the evaluation factors and the Source Selection Authority (SSA) reasonably determines that the technical and/or overall business approach and/or past performance of the higher priced offeror outweighs the cost difference.

1.3 As the selected offeror must ultimately meet all performance requirements, the Government must be assured that the offeror has the ability to perform and will perform the requirements of the Performance Work Statement. By submission of its offer, the offeror agrees to all solicitation requirements.

1.4 Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and PWS requirements, in addition to those identified as factors and subfactors. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.

1.5 In the case that a discrepancy exists between Section L - Instructions to Offerors (ITO) and Section M - Evaluation Factors for Award, the evaluation criteria in Section M- Evaluation Factors for Award will take precedence.

http://farsite.hill.af.mil/vffara.htm

2. SOURCE SELECTION PROCESS

2.1 SSA Decision: The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation (described herein.) While the Government source selection evaluation team and the SSA will strive for maximum objectivity, the source selection process, by its nature, is subjective; therefore, professional judgment is implicit throughout the entire process.

2.2 Number of Contracts to be Awarded: The Government intends to select one contractor for this acquisition; however, the Government reserves the right not to award a contract at all, depending on the quality of the proposals, prices submitted, and the availability of funds.

2.3 Rejections of Offers: The Government may reject any evaluated proposal that fails to adequately address a significant portion of the requirement or contract terms and conditions.

This may include rejection of a proposal that does not demonstrate an adequate understanding of the contract/program requirements and/or displays a fundamental lack of competence or failure to comprehend the complexity and risk of the program. All aspects/volumes of the proposals may be reviewed to ensure adequate resources to perform the proposed technical approach.

2.4 Evaluation Methodology/Factors: Award will be made to the offeror proposing the combination of factors deemed most advantageous to the Government based upon an integrated assessment of the evaluation factors described below:

Factor 1: Technical Subfactor 1: Human Resource Management Subfactor 2: Technical and Management Approach Factor 2: Past Performance Factor 3: Cost/Price Factor 4: Small Business Participation

Offerors are cautioned to submit sufficient information and in the format specified in Section L.

Offerors may be asked to clarify certain aspects of their proposal (for example, the relevance of past performance information) or respond to adverse past performance information to which the offeror has not previously had an opportunity to respond. Communication conducted to resolve minor or clerical errors will not constitute discussions. The offeror is reminded that, in accordance with Section L Paragraph 3.1, the Government intends to award based on the initial proposals, as received, without discussions.

2.5 Relative Importance of Factors and Subfactors: Among Factors 1, 2, and 3 considered in the tradeoff decision, Factor 1 (Technical) is the most important, followed by Factor 2 (Past Performance), and then Factor 3 (Cost/Price). Subfactors listed under Factor 1 (Technical) are listed in descending order of importance. In accordance with FAR 15.304(e), Factor 1 (Technical) and Factor 2 (Past Performance), when combined, are significantly more important than cost or price; however, Cost/Price will contribute substantially to the selection decision.

2.6 Small Business Participation Factor: In order to be considered awardable, offerors must receive an “acceptable” rating for Factor 4 – Small Business Participation. See Table

6.1.2 for rating information.

2.7 Competitive Range Determination: During the evaluation process, multiple competitive range determinations may be made that eliminate offerors from the competition IAW FAR 15.503. A competitive range determination may eliminate offerors based on their initial proposal evaluation results, after discussions (if necessary) or prior to issuance of the Final Proposal Revision (FPR) request. If offerors are excluded from the competitive range they may request a debriefing IAW FAR 15.505.

3. TECHNICAL EVALUATION

3.1 COMBINED TECHNICAL / RISK RATING

3.1.1 This Government technical evaluation team will evaluate the proposals utilizing a combined technical/risk rating. The combined technical/risk rating includes consideration of risk in conjunction with the strengths, weaknesses, significant weaknesses, uncertainties, and deficiencies in determining technical ratings. The technical rating evaluates the quality of the offeror’s technical solution for meeting the Government’s requirement. Technical risk, which is manifested by the identification of weaknesses, assesses the degree to which an offeror’s proposed approach for the requirements of the solicitation may cause disruption of schedule, increased costs, degraded performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance. The evaluation shall address the Source Selection Team’s identification of any weakness, as well as the offeror’s identified risks and proposed mitigation (if applicable) and document why the approach is or is not manageable.

Each Technical subfactor identified above will receive one of the color ratings described in the DoD Source Selection Procedures, excerpted below, which focuses on the strengths, weaknesses, significant weaknesses, uncertainties, and deficiencies of the offeror's proposal.

The color rating depicts how well the offeror’s proposal meets the Technical subfactor requirements. Subfactor ratings shall not be rolled up into an overall color rating for the Technical factor.

Table 3.1.1. Combined Technical/Risk Rating Color Rating Adjectival Rating Description

Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and the risk of unsuccessful performance is no worse than moderate.

Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

3.2 TECHNICAL EVALUATION METHODOLOGY

3.2.1 Each offeror’s written technical proposal shall be evaluated, based on the subfactors below, to determine if the offeror provides a sound, compliant approach that meets the requirements of the PWS, and demonstrates a thorough knowledge and understanding of those requirements and their associated risks. The technical proposal shall address each of the following subfactors in sufficient detail. For each subfactor, the offeror shall identify risks, if any, associated with the proposed approach and actions the offeror will take to mitigate the identified risks. If no risks/mitigations are identified in the offeror’s proposal, it indicates the offeror does not consider there to be any risk associated with their proposed approach.

The Government will assign strengths for aspects of an offeror’s proposal that have merit or exceed specified performance or capability requirements in a way that will be advantageous to the Government during contract performance. NOTE: At the Government’s discretion, aspects of the proposal identified as strengths will be incorporated into the resulting contract.

SUBFACTOR 1: HUMAN RESOURCE MANAGEMENT

Description: The Government will evaluate the offeror’s proposed approach to staff and retain appropriate qualified personnel and consulting agreements required to meet the Government’s Performance Work Statement (PWS).

Measure of Merit: The subfactor is met when the offeror provides a staffing plan and evidence which clearly demonstrate all of the following measures of merit:

1. Personnel, including resumes, that individually meet both the education and experience qualifications specified in PWS paragraph 2.6.

2. Agreements with consultants experienced in the Directed Energy (DE) and High Energy Laser (HEL) community and the ability to maintain consulting agreements throughout the contract period of performance.

3. A comprehensive plan to ensure the personnel proposed will be available to support the DE-JTO by completion of the phase-in transition period including signed letters of

SUBFACTOR 1: HUMAN RESOURCE MANAGEMENT

intent from both the Key Personnel and consultants noted in the PWS contingent upon award of the PTSS contract.

4. A comprehensive plan to retain qualified personnel, identify and hire new personnel, and ensure staffing is sufficient to perform surge requirements and fill vacancies within 30 days.

SUBFACTOR 2: TECHNICAL AND MANAGEMENT APPROACH

Description: The Government will evaluate the offeror's proposed approach to provide technical and management support to the DE-JTO program office.

Measure of Merit: The subfactor is met when the offeror provides a technical and management plan which clearly demonstrate all of the following measures of merit:

1. Knowledge of the past and current Laser Weapon and Directed Energy (DE) environment and how this knowledge will allow the offeror to conduct assessments on topic areas such as Laser Sources; Beam Control; Atmospheric Propagation; Lethality; Modeling and Simulation and Advanced HEL Concepts.

2. A comprehensive plan to conduct the Sample Task Order, Joint Laser Deconfliction Safety System (JLDSS) Phase II Program Support, including the ability to develop technical reports, presentations, and recommendations that are clear, concise, and contain analytically defendable results and conclusions.

3. A comprehensive understanding and plan to conduct a variety of assessments such as proposal reviews, developmental tests, operational tests, capability demonstrations, technology demonstrations, risk management assessments, independent test reviews, and special studies.

4. PAST PERFORMANCE EVALUATION

4.1 PAST PERFORMANCE GENERAL INFORMATION

4.1.1 The Past Performance evaluation assesses the degree of confidence the Government has in an offeror’s ability to supply the services that meet users’ needs, including cost and schedule, based on a demonstrated record of performance. A critical subcontractor is defined as a business entity that performs equal to or higher than 33% of the total proposed value. The recency and relevancy of the information, the source of the information, context of the data and general trends in the contractor’s performance will be considered.

4.1.2 For purposes of this evaluation, recency is defined as active or completed efforts performed within the past three (3) years from the issuance date of this solicitation with a minimum of six months performance. The Government will take into account past performance information regarding predecessor companies, affiliates, other divisions, or corporate management if such was provided for evaluation and if the offeror’s past performance volume demonstrates the company, affiliate, or division will provide the offeror with resources for the instant proposed effort, such as workforce, management, facilities, or other capabilities demonstrating direct and meaningful involvement in the performance of the proposed instant effort.

4.2 PERFORMANCE EVALUATION RATINGS

4.2.1 As a result of the recency, relevancy, and quality assessments of the contracts evaluated, one of the ratings as described in the DoD Source Selection Procedures will be assigned to the Past Performance factor. The performance confidence assessment ratings are excerpted below.

Table 4.2.1 Performance Confidence Assessment Ratings

Adjectival Rating Description

Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

4.3 PAST PERFORMANCE EVALUATION PROCESS

4.3.1 Past Performance Consideration: The past performance evaluation considers the offeror’s demonstrated record of performance in providing products and services that meet users’ needs. Performance confidence is assessed at the overall past performance factor level after evaluating aspects of the offeror’s recent past performance, focusing on performance that is relevant to Factor 1, Technical, and Factor 3, Cost/Price. More relevant performance may have a greater impact on the performance confidence assessment than less relevant effort.

More recent performance may have a greater impact on the performance confidence assessment than less recent performance. The Government may consider past performance in the aggregate, in addition to, on an individual contract basis. In conducting the past performance evaluation, the Government reserves the right to use both the information provided in the offeror’s past performance proposal volume and information obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems, Defense Contract Management Agency (DCMA), and commercial sources. The Government reserves the right to use all information available to fully assess the offeror’s past performance.

4.3.2 Recency Assessment: An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must have been performed during the past three (3) years from the date of issuance of this solicitation with a minimum of six months of performance. If any part of the performance falls within the above timeframe, the contract in its entirety may be evaluated for past performance. Past performance information that fails this condition will not be evaluated.

4.3.3 Relevancy Assessment: The Government will conduct an evaluation of all recent performance information obtained to determine how closely the services performed under those contracts relate to the Technical Factor and Price assessment. Consideration will be given to things such as similar service, similar complexity of the effort, breadth and depth of skills, similar contract scope and type, contract magnitude, and schedule. A relevancy determination of the offeror’s (including joint venture partner(s) and major and critical subcontractor(s)) past performance will be made based upon the aforementioned considerations. In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror, teaming partner, or subcontractor whose contract is being reviewed and evaluated. The Government will consider the portion of the effort accomplished on previous/current contracts compared to the portion to be performed on the proposed effort. The past performance information forms contained in Section L and information obtained from other sources will be used to establish the degree of relevancy of past performance. The Government will use the following degrees of relevancy described in the DoD Source Selection Procedures, when assessing recent, relevant contracts.

Table 4.3.3 Past Performance Relevancy Ratings

Adjectival Rating Description

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this acquisition requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

4.3.4 Performance Quality Assessment: The Government will consider the performance quality of recent, relevant efforts (how well the contractor performed on the contracts). For each recent past performance citation reviewed, the performance quality of the work performed will be assessed for the technical subfactors and price factor (however, all aspects of performance that relate to this acquisition may be considered.) The quality assessment consists of an evaluation of all past performance information available, regardless of its source.

Pursuant to FAR 15.305(a)(2)(v), the assessment will consider the extent to which the offeror’s evaluated past performance demonstrates compliance with subcontracting plan goals for small disadvantaged business (SDB) concerns. Pursuant to DFARS 215.305(a)(2), the assessment will also consider the extent to which the offeror’s evaluated past performance demonstrates compliance with FAR 52.219-8, Utilization of Small Business Concerns and FAR 52.219-9, Small Business Subcontracting Plan, when one or both of these clauses were contained in the submitted contracts.

The quality assessment may result in positive or adverse findings. Adverse is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comment received from sources without a formal rating system.

For adverse information identified, the evaluation will consider the number and severity of the problem(s), mitigating circumstances, and the effectiveness of corrective actions that have resulted in sustained improvements. Process changes will only be considered when objectively measurable improvements in performance have been demonstrated. A separate quality assessment rating will not be assessed; rather, the past performance confidence assessment rating presented in Table 4.2.1 is based on the offeror’s overall record of recency, relevancy and quality of performance.

5. COST/PRICE EVALUATION

5.1 COST/PRICE EVALUATION FACTOR

5.1.1 The cost/price for Task Order 0001 and the Sample Task Order will be evaluated, using one or more of the techniques defined in FAR 15.404, for (1) unbalanced pricing, (2) reasonableness, (3) realism, and (4) Total Evaluated Price (TEP), calculated as stated in paragraph 5.1.7 below.

5.1.2 Unbalanced Pricing: The Government may determine a proposal to be un-awardable should the proposed prices be materially unbalanced IAW FAR 15.404-1(g). A proposal may be rejected if it is determined that the lack of balance poses an unacceptable risk to the Government.

5.1.3 Reasonableness: For a price to be reasonable, it shall represent a price to the Government that a prudent person would pay when consideration is given to prices in the market. Normally, price reasonableness is established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 15.404. For further information, see FAR 31.201-3. If there is no finding that the price of the otherwise successful offeror is unreasonable and adequate price competition exists IAW FAR 15.403- 1(c)(1), reasonableness will be documented for the otherwise successful offeror. Offerors whose price is determined to be unreasonable will not be considered for award.

5.1.4 Realism: The offeror’s proposed cost for the Cost Plus Fixed Fee (CPFF) Sample Task Order will be evaluated by the Most Probable Cost (MPC) computed by the Government for the Sample Task Order. The offeror’s proposed estimated costs shall not be controlling for selection purposes. MPC will be measured as follows: Government anticipated performance costs and proposed fee. This evaluation will be a determination of the extent to which proposed costs are sufficient for the work to be performed, reflective of a clear understanding of the requirements, and consistent with the unique methods of performance and materials described in the offeror’s technical solution (FAR 15.404-1(d)(1)).

5.1.5 Professional Employee Compensation Plan: Consistent with FAR Subpart 52.222- 46 -- Evaluation of Compensation for Professional Employees (Feb 1993) (included in this solicitation), the Government will evaluate the employee compensation plan to ensure that it reflects a sound management approach, an understanding of the contract requirements, and to determine if the salary and fringe benefits proposed are realistic. The Government may use government civilian rates, similar contract labor rates, www.salary.com, other similar or relevant websites, or anything else it deems appropriate or beneficial in its evaluation of realism. Failure to comply with the requirements in FAR Provision 52.222-46 may constitute sufficient cause to justify rejection of the proposal.

5.1.6 Option to Extend Services: The contract will include FAR clause 52.217-8, Option to

Extend Services with the potential to extend the contract an additional 6 months beyond the awarded contract performance period. The pricing for the 6-month extension will be evaluated at time of award and is included in the TEP calculation. In the event the Government requires continued performance, the Government’s evaluation of proposed prices will be considered fair and reasonable as applied to an extension of services.

5.1.7 Total Evaluated Price (TEP): The TEP will be the sum of the FFP Labor and Operations Task Order line items, sum of the Six Month Option to Extend Services and the MPC for the CPFF Sample Task Order, inclusive of all option periods. The offeror shall populate Section J, Attachment 9 with proposed pricing and provide all elements requested in Section L as part of the Cost Volume. Travel will be excluded from the TEP and will be incorporated at award as a non-fee bearing cost reimbursement CLIN. Evaluation of options shall not obligate the Government to exercise such options.

6. SMALL BUSINESS PARTICIPATION VOLUME

6.1 SMALL BUSINESS PARTICIPATION EVALUATION

6.1.1 The Government evaluation team will evaluate the extent of proposed participation and commitment to use small business concerns in the performance of this acquisition. All offerors are required to provide a Small Business Participation proposal volume identifying the level of participation and commitment of small business in the performance of this acquisition.

6.1.2 The Government evaluation team will evaluate Small Business Participation utilizing an unacceptable/acceptable rating. In order to be considered awardable, offerors must receive an “acceptable” rating for Small Business Participation (Factor 4). The team shall evaluate the offeror’s proposal against the below requirements to determine whether the proposal is acceptable or unacceptable, using the ratings and descriptions in the ratings excerpted below.

Table 6.1.2. Small Business Rating Method Color Rating Adjectival Rating Description

Green Acceptable Proposal indicates an adequate approach and understanding of small business objectives.

Red Unacceptable Proposal does not meet small business objectives.

6.1.3 This factor applies to all offerors, regardless of size-status (both other than small businesses and small businesses). NOTE: The Small Business Subcontracting Plans will not be assessed as part of this factor.

FACTOR 4: SMALL BUSINESS PARTICIPATION

Description: The Government will evaluate the offeror’s proposed approach to achieve the small business participation objective.

FACTOR 4: SMALL BUSINESS PARTICIPATION

Measure of Merit: The factor is met when the offeror provides a comprehensive plan to demonstrate the following objective:

1. Commit identified work (to be performed under this contract) to one or more identified companies that are categorized as small business concerns, veteran owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and/or woman owned small business concerns, whether as a joint venture, teaming arrangement, or (critical or non-critical) subcontractor. A prime offeror that is a small business may identify in its Small Business Participation Volume work that the prime offeror itself is committed to perform.

7. ADDITIONAL INFORMATION

7.1 Clarification: Offerors may be asked to clarify certain aspects of their proposal.

Communication conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision.

7.2 Discussions: It is the Government’s intent to award without discussions. Therefore, each initial offer should contain the offeror’s best terms. If, during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs) and the FPR, will be used in making the source selection decision. Exchanges with offerors conducted to resolve minor or clerical errors will not constitute discussions. The SSA reserves the right to award a contract without discussion as well as without the opportunity for proposal revision.

7.3 Pre-Award Survey: The Government may conduct a Pre-award Survey (PAS) as part of this source selection. Results of the PAS (if conducted) will be evaluated to determine each offeror's capability to meet the requirements of the solicitation.

7.4 Solicitation Requirements, Terms and Conditions: By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Offerors are cautioned that failure to meet solicitation requirements may result in an offer being determined ineligible for award. The Government may reject without discussions any proposal that includes exceptions to the solicitation requirements or does not fully comply with the terms and conditions.

7.5 Potential for Correction of Proposal: Should the Government elect to conduct discussions, the Government will consider the “potential for correction” of any proposal when establishing the competitive ranges. The judgment of such "potential for correction" is within the sole discretion of the Government CO. If an aspect of an offeror's proposal does not meet the Government’s requirements and is not considered to have “potential for correction,” the offeror may be eliminated from the competitive range.

SECTION M
1. GENERAL GUIDANCE
2. SOURCE SELECTION PROCESS
3. TECHNICAL EVALUATION
3.1 COMBINED TECHNICAL / RISK RATING
3.2 TECHNICAL EVALUATION METHODOLOGY
4. PAST PERFORMANCE EVALUATION
4.1 PAST PERFORMANCE GENERAL INFORMATION
4.2 PERFORMANCE EVALUATION RATINGS
4.3 PAST PERFORMANCE EVALUATION PROCESS
5. COST/PRICE EVALUATION
5.1 COST/PRICE EVALUATION FACTOR
6. SMALL BUSINESS PARTICIPATION VOLUME
7. ADDITIONAL INFORMATION

File details come from the government source that posted it. Updated .