This is a Questions and Answers document for a federal conference room technology upgrade project at Kirtland Air Force Base.

The Government seeks to upgrade a conference room with audiovisual and presentation capabilities to support multisource briefings. The project involves installing equipment from Exhibit 2 (or equivalent) into existing storage equipment, including four Vaddio ceiling microphone interface boxes with microphones, four Soundtube CM-EZ-II speakers, additional speakers with mounts, and an Ace Vision VS-U760i Performance Desktop computer. The system requires two DTP transmitters, two DTP receivers, and presentation switchers located at both the conference table and control desk. Two technical sources (TS) and one computer with standard keyboard and mouse provide inputs to the system. The conference room accommodates nine people around a conference table with additional seating in rows facing multiple televisions provided by the Government; updated mounting may be required. The contractor must remove self-installed equipment and meet NIPR security measures. Installation is limited to one week/40 hours on site unless extended by Government approval, with contractor access to the base granted through Government sponsorship. The room is not in a controlled area and does not require escort. This is classified as a supplies requirement; wage determination is not applicable. The Exhibit 2 equipment list represents recommendations from conference room technical experts, but offerors may propose alternative configurations that meet the Statement of Need and room objectives. The contractor may contact the Government representative regarding any additional equipment or extended timelines required.

View the file

Other files

File Type Posted
Statement of Need - Redacted.pdf PDF
Solicitation - FA940126Q0047 - Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Exhibit 2 is titled "Example of Equipment Below," and Statement of Need paragraph

6.0 permits "the equipment in Exhibit 2 or best equivalent items." Is Exhibit 2 the complete equipment list for technical acceptability, or does the Government expect offerors to furnish any additional equipment required to meet Objective 1? If additional equipment is needed, inform Government Representative and appropriate steps will be followed to accommodate the changes needed.

2. Paragraph 6.0 states the Exhibit 2 equipment will be added to equipment currently in storage. Please identify the stored equipment the contractor is expected to install, including display quantity and size, loudspeakers for the 70-volt amplifier, microphones, computers, and mounts. 4 x vaddio ceiling MIC interface box with 4x mics, 4 x Soundtube CM-EZ-II, 4 x additional Speakers with mounts (unsure of make), Ace Vision VS-U760i - Custom AAAQ43220(Performance Desktop

(PDT))

3. Exhibit 2 lists no microphones. The Vaddio ConferenceSHOT AV accepts up to two Vaddio MicPODs. Are room microphones required, and if so, are they Government-furnished or contractor-furnished? Mics are required; we currently have 4 x vaddio ceilingMIC interface box with 4x mics.

4. Exhibit 2 includes two DTP transmitters and two DTP receivers with no presentation switcher. Is the intent that each wall input feeds one display, or is a switcher Government-furnished or expected? The intent is for the presentation switcher to be in two locations (one on the table and one at the desk where the computer will be).

5. Which computer will the camera and USB extender connect to, and which network will the system connect to? Please advise of any information assurance or TEMPEST requirements for the room. We have an ACE Desktop marker for use in the room.

Ace Vision VS-U760i - Custom AAAQ43220(Performance Desktop (PDT))

6. Is the conference room a controlled area requiring escort, and will the Government sponsor base and building access for contractor personnel traveling to Kirtland

AFB? Conference room is not in a controlled area. The contractor will need to be able to access base with aid of gov sponsor.

7. Clause 52.222-41 is incorporated, but no wage determination is attached. Please identify the applicable wage determination and revision. This requirement is for supplies. Wage determination is not anticipated to be applicable

8. Are there any more specifics on the room itself? Tables, walls, ceilings? Four walls and one building wall this is where the TVs live, with one temp wall that can’t hold weight. Then a wall of windows and an external wall with external windows. There is a conference table that fits 9. 4 on each side and the head.

There are also rows of chairs on each side facing the TVs. Then there is a desk to act as the control point.

9. How many inputs/outputs? 2 TS’s and 1 computer with standard keyboard and mouse.

10. What security measures (if any) are needing to be met? Need to meet NIPR security measures.

11. Is conferencing needed. If so, what sources will be hosting conferencing calls?

Team will be the form of conferencing needed

12. The equipment table is identified as an example. Should offerors price the listed equipment and quantities as the required baseline, or may they propose an alternative equipment configuration that meets the Statement of Need's performance objectives? They may as long is it meets the statement on need and purpose for the room.

13. Is the Exhibit 2 list the new equipment that the government requires and/or prefers?

The “Example” in the heading makes it a bit unclear. It is what has been recommended by current conference room technical experts.

14. Can any diagrams, floor plans, or pictures be released of the room? Yes, please see below.

15. Is any removal of existing equipment required? Yes, there was some self-installed equipment that will need to be removed.

16. Is the government limiting the installation to one week/40 hours on site only? If more time is required, please contact government rep.

17. Please define more specifically "multisource briefing capabilities." Multiple TVs with ability from head of table, and control desk.

18. No TV displays are needed? TV are also provided by Gov. Updated mounting may be required.