These construction documents detail a renovation project for a Technical Services (TS) Vault at Kirtland Air Force Base in Albuquerque, New Mexico, prepared by ORCOM (a division of Ortega Companies, Inc.) and Wilson Electric Services Corp. The comprehensive set of drawings covers general construction, mechanical, electrical, and HVAC systems for Room 103, Rooms 002 and 003, with detailed floor plans, demolition and new work plans, power and lighting layouts, panel schedules, and one-line electrical diagrams.
Key technical specifications include HVAC system modifications, electrical panel reconfigurations, lighting fixture replacements, and structural adjustments such as ceiling repairs, installing raised computer floors, and relocating grilles, registers, and diffusers. The documents are marked as 100% Construction Documents, digitally signed by Eric D. Conklin, and dated March 2021. The project involves multiple technical disciplines, with detailed drawings showing precise equipment placement, electrical load calculations, and systematic renovation approaches for the specified rooms within the facility.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEQUENCE NO. 01 OF 13
%100
SEQUENCE NO. 02 OF 13
TS VAULT
12.11.2020
EWR
Digitally signed by Eric D. Conklin Date: 2021.03.16 13:41:58-06'00'
Date: 2021.03.19 09:46:30-06'00'
Date: 2021.03.16 13:42:49-06'00'
09:47:57-06'00'
09:48:21-06'00'