About this file

This is a Questions and Responses document for the Aircrew Facility Network Install solicitation FA9401-25-Q-0021 dated August 6, 2025. The document contains three contractor questions and government responses addressing technical specifications for network infrastructure installation at Kirtland Air Force Base.

The Q&A addresses specific technical requirements including requests for pictures of Manhole C-0006 and Vault 1004 SD-A (with reference pictures provided in attached tabs), specifications for a new handhole requiring a concrete, preformed 4'x4'x4' configuration, and conduit requirements specifying 4" schedule 40 PVC conduit per Kirtland AFB Communication Division Standards. The document includes reference materials such as handhole specification data sheets and both outside plant (OSP) and inside plant (ISP) conduit sizing standards. This document serves as a technical clarification supplement to the main solicitation for contractors bidding on the aircrew facility network installation project at Kirtland Air Force Base.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

REQUIREMENT:Aircrew Facility Network Install
Solicitation #:FA9401-25-Q-0021
Date:6-Aug-25
NumberQuestionGovernment Response
1Please provide pictures on MH C-0006 and Vault 1004 SD-A.Picture can be found in the tab "#1 Manhole Picture".
2What kind of handhole is required for the "New HH"?“New HH” will need to be a concrete, preformed 4’x4’x4’ handhole. In tab "#2 Hand-Hole Specs" is a data sheet example of a handhole as reference.
3What is your preferred 1 or 2 4" Conduits ran?4” schedule 40 PVC conduit is required per the Kirtland AFB Comm Division Standards for outside plant conduit. Attached is a copy for reference if necessary for both outside plant (OSP) conduit and inside plant (ISP) conduit sizing.