This document is an Air Force Base Civil Engineering Work Clearance Request form. It is used to coordinate work activities that may disrupt aircraft/vehicle traffic, utility services, fire/security systems, or routine base operations. The form requires details on the type of work involved, such as excavation, utility disturbance, or traffic impacts. It also documents the required clearance date, contact information, and signatures from various base functions (e.g. electrical, fire protection, communications) to approve the work. The form includes instructions on its purpose and processing requirements. It does not contain any details on a specific federal contract opportunity.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
DATE PREPARED
BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST
(See Instructions on Reverse)
1. Clearance is requested to proceed with work at on Work Order No.
, Contract No.
, involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.
2. TYPE OF FACILITY/WORK INVOLVED
G. AIRCRAFT OR VEHICULAR TRAFFIC FLOW
A. PAVEMENTS
D. FIRE DETECTION & PROTECTION SYSTEMS
H. SECURITY
B. DRAINAGE SYSTEMS
E. UTILITY
OVERHEAD
UNDERGROUND
I. OTHER
C. RAILROAD TRACKS
F. COMM
OVERHEAD
UNDERGROUND
4. DATE OF CLEARANCE
3. DATE CLEARANCE REQUIRED
5. SIGNATURE OF REQUESTING OFFICIAL
6. TELEPHONE NO.
7. ORGANIZATION
REMARKS
(Use Reverse for additional comments)
REVIEWER'S NAME AND INITIALS
ORGANIZATION
8.
A. ELECTRICAL DISTRIBUTION
B A S
B. STEAM DISTRIBUTION
E
C. WATER DISTRIBUTION
C I
D. POL DISTRIBUTION
V I L
E. SEWER DISTRIBUTION
E N
F. ENVIRONMENTAL
G I
G. PAVEMENTS/ GROUNDS
N E E
H. FIRE PROTECTION
R I
I. ZONE
N G J. OTHER (Specify)
9. SECURITY POLICE
10. SAFETY
11. COMMUNICATIONS
12. BASE OPERATIONS
13. CABLE TV
14. COMMERCIAL UTILITY COMPANY
TELEPHONE
GAS
ELECTRIC
15. OTHER (Specify)
APPROVED
DISAPPROVED
16. REQUESTED CLEARANCE
17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED
PREVIOUS EDITIONS ARE OBSOLETE.
AF IMT 103, 19940801, V3
Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign
INSTRUCTIONS
The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.
18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)
AF IMT 103, 19940801, V3
(REVERSE)
8.2.1.3158.1.475346.466429 involving excavation or utility disturbance per attached sketch. This area. Check box HAS Check box has not been staked or clearly marked.
Check box APPRVD
16. REQUESTED CLEARANCE., Check box disapproved.
Entery date as YYYYMMDD.
Ay F FORM 103, 19940801 I M T V 1. BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST. The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed. Enter date as Y Y Y Y M MD D.
1. Clearance is requested to proceed with work at on Work Order Number Contract Number
2. TYPE OF FACILITY WORK INVOLVED. Check box A. PAVEMENTS Check box B. DRAINAGE SYSTEMS Check box C. RAILROAD TRACKS Check box D. FIRE DETECTION and PROTECTION SYSTEMS Check box E. UTILITY Check box F. COMMUNICATIONS Check box OVERHEAD Check box OVERHEAD Check box UNDERGROUND Check box UNDERGROUND Check box G. AIRCRAFT OR VEHICULAR TRAFFIC FLOW Check box H. SECURITY Check box I. OTHER Field Other Enter date as YYYYMMDD.
3. DATE CLEARANCE REQUIRED Enter date as Y Y Y Y M M D D.
6. TELEPHONE Number. Number will be formatted automatically.
7. ORGANIZATION
ORGANIZATION. 8. Base civil engineering. A. Electrical distribution. REMARKS. Use Reverse for additional comments.
B. STEAM DISTRIBUTION. remarks C. WATER DISTRIBUTION. Remarks D. P O L DISTRIBUTION. Remarks E. SEWER DISTRIBUTION. Remarks F. ENVIRONMENTAL. Remarks G. PAVEMENTS or GROUNDS H. FIRE PROTECTION. Remarks I. Zone. Organization.
I. Zone. Organization. Remarks.
J. Other. Specify.
Other remarks.
9. SECURITY POLICE. Remarks
10. SAFETY. Remarks
11. COMMUNICATIONS. Remarks
12. BASE OPERATIONS. Remarks
13. CABLE TV. Remarks Other. Specify.
14. COMMERCIAL UTILITY COMPANY. Remarks
14. COMMERCIAL UTILITY COMPANY. Check box telephone
14. COMMERCIAL UTILITY COMPANY Check box Gas
14. COMMERCIAL UTILITY COMPANY Check box electric
18. Remarks. This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.
| HAS: 0 |
| HASNOT: 2 |
| APPRVD: 0 |
| DAPPRVD: 0 |
| Entery date as YYYYMMDD.: |
| LOCA: |
| WONO: |
| CTRNO: |
| ABC: 0 |
| ABC_2: 0 |
| ABC_3: 0 |
| D: 0 |
| E: 0 |
| F: 0 |
| OVHA: 0 |
| OVHB: 0 |
| UNDGA: 0 |
| UNDGB: 0 |
| GHI: 0 |
| GHI_2: 0 |
| GHI_3: 0 |
| OTH: |
| Enter date as YYYYMMDD.: 2024-03-27 |
| ReqOffclSig: |
| TELE: |
| ORGN: |
| REMKA: |
| SIGNATURE1: |
| REMKA_2: |
| SIGNATURE2: |
| REMKA_3: |
| SIGNATURE3: |
| REMKA_4: |
| SIGNATURE4: |
| REMKA_5: |
| SIGNATURE5: |
| REMKA_6: |
| SIGNATURE6: |
| REMKA_7: |
| SIGNATURE7: |
| REMKA_8: |
| SIGNATURE8: |
| ZONE: |
| REMKB: |
| SIGNATURE9: |
| OTHB: |
| REMKC: |
| SIGNATURE10: |
| REMKD: |
| SIGNATURE11: |
| REMKD_2: |
| SIGNATURE12: |
| REMKD_3: |
| SIGNATURE13: |
| REMKD_4: |
| SIGNATURE14: |
| REMKD_5: |
| OTHC: |
| REMKE: |
| COMUTIL: 0 |
| COMUTIL_2: 0 |
| COMUTIL_3: 0 |
| AppOffcrSig: |
| SIGNATURE16: |
| SIGNATUREfor13: |
| EF_1: |
| EF_2: |
| REMKSF: |
| SignatureStyle1: |
| SignatureStyle2: |
File details come from the government source that posted it. Updated .