5._AF_3052_Bid_Form_MHMV140041.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Repair MUNS Haul Road Federal contract opportunity
- Solicitation number
- FA9401-14-R-0003
About this file
AF Form 3052
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Q A.pdf | ||
| FA9401-14-R-0003_MUNS_Road.pdf | ||
| 9._DD1354_Form.pdf | ||
| 3._Specifications.pdf | ||
| 10._Waste_Diversion_Report.doc | DOC document | |
| 1._Statement_of_Work_(SOW).pdf | ||
| 15._EASTMAP_KAFB.pdf | ||
| 12._WD_NM140047-_Highway_(3Jan14).txt | TXT text file | |
| 8._AF_Form_3000-_Material_Submittal_Form.pdf | ||
| 13._Past_Performance_Information_Form.docx | DOCX document | |
| 6._AF_3064_-_Progress_Schedule.xls | XLS spreadsheet | |
| 7._AF_3065_Progress_Report.pdf | ||
| 2._Drawings_-_Haul_Route_Exhibit.pdf | ||
| 14._WESTMAP.pdf | ||
| 11._Waste_Summary_-_01_74_19_Appendix_A.xls | XLS spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
INSTRUCTIONS FOR COMPLETING AF FORM 3052
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to |
| permit itemizing of all direct costs. |
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square |
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). |
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be |
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will |
| be issued. Otherwise, the contractor is responsible for determining quantity estimates. |
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. |
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. |
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. |
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract |
| and of significant dollar value. |
| Col 10 Line Total. Self-explanatory. |
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last |
| page as follows. |
FOR OFFICIAL USE ONLY
TOTAL MATERIAL & LABOR COSTS $ 0.00
GENERAL CONDITIONS % $ 0.00
OVERHEAD % $ 0.00
PROFIT % $ 0.00
| BOND | % | $ | 0.00 | |
| \ | ||||
| NMGRT | 6.0625 | % | $ | 0.00 |
TOTAL PRICE $ 0.00
DATE : FIRM NAME :
| TITLE : | BY : | |
| (Signature) |
INSTRUCTIONS TO OFFERORS
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and |
| estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from |
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data |
| (see ASPR 3-807.3(e) and 3-807.4) |
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this |
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and |
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of |
| a. The existing, verifiable data. |
| b. The judgmental factors applied in projecting from known data to the estimate, and |
| c. The contingencies used by the offeror in his proposed price. |
| In short, the offeror's estimating process itself needs to be disclosed. |
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), |
| and made available to the contracting officer or his authorized representative upon request. |
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the |
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate |
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection |
| with any negotiations prior to contract award. |
(Reverse of AF Form 3052., AUG 93)
BREAKDOWN
| CONSTRUCTION COST ESTIMATE BREAKDOWN - ENGINEER'S ESTIMATE | SHEET NO. | 1 | OF | 1 | ||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Kirtland Air Force Base -Repair MUNS Haul Road and Bridge Primary Route | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | ||||||||
| MHMV140041 | Kirtland Air Force Base | |||||||||
| UNIT OF | COMBINED MATERIAL & LABOR COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE | UNIT COSTS | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | Mobilization/Demobilization | LS | $0.00 | |||||||
| 2 | Excavate & Dispose of unsuitable material, compl. | CY | $0.00 | |||||||
| 3 | Sub grade Prep 12" at 95% compaction, cip. | SY | $0.00 | |||||||
| 4 | Aggregate base course, cushed, 6" at 95% comp., cip. SD 2408. | SY | $0.00 | |||||||
| 5 | Aggregate base course, at 95% comp., cip. SD 2408 | TON | $0.00 | |||||||
| 6 | Seal coat | SY | $0.00 | |||||||
| 7 | Surface prep., asphalt concrete pavement overlay, cip. | SY | $0.00 | |||||||
| 8 | Concrete Box Culvert Repairs | LS | $0.00 | |||||||
| 9 | Arterial pavement, existing, remove & replace | SY | $0.00 | |||||||
| 10 | Saw cut AC pavement, 6" thickness or less, compl. | LF | $0.00 | |||||||
| 11 | Reflectorized Painted marking cip. | LF | $0.00 | |||||||
| 12 | Blow and seal with hot poured asphalt carck sealant material 1/4" to 1 1/4" wide (over 1000 LF ) | LF | $0.00 | |||||||
| 13 | PCC Joint Cleaning & Resealing, ¾" to 1 ½" Wide (under 1000 LF) | LF | $0.00 | |||||||
| 14 | Traffic Control | Day(s) | $0.00 | |||||||
| 15 | ||||||||||
| 16 | ||||||||||
| 17 | ||||||||||
| 18 | ||||||||||
| 19 | ||||||||||
| 20 | ||||||||||
| 33 | TOTAL | $ - 0 | $0.00 | |||||||
| (AF Form 3052., AUG 93) |
File details come from the government source that posted it. Updated .