2._Drawings_-_Haul_Route_Exhibit.pdf
PDF 16 MB Posted
- Attached to
- Repair MUNS Haul Road Federal contract opportunity
- Solicitation number
- FA9401-14-R-0003
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Q A.pdf | ||
| FA9401-14-R-0003_MUNS_Road.pdf | ||
| 9._DD1354_Form.pdf | ||
| 3._Specifications.pdf | ||
| 10._Waste_Diversion_Report.doc | DOC document | |
| 1._Statement_of_Work_(SOW).pdf | ||
| 15._EASTMAP_KAFB.pdf | ||
| 5._AF_3052_Bid_Form_MHMV140041.xlsx | XLSX spreadsheet | |
| 12._WD_NM140047-_Highway_(3Jan14).txt | TXT text file | |
| 8._AF_Form_3000-_Material_Submittal_Form.pdf | ||
| 13._Past_Performance_Information_Form.docx | DOCX document | |
| 6._AF_3064_-_Progress_Schedule.xls | XLS spreadsheet | |
| 7._AF_3065_Progress_Report.pdf | ||
| 14._WESTMAP.pdf | ||
| 11._Waste_Summary_-_01_74_19_Appendix_A.xls | XLS spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES:
A. ANY WORK DETAILED ON THESE PLANS TO BE PERFORMED UNDER CONTRACT SHALL BE
CONSTRUCTED IN ACCORDANCE WITH CITY OF ALBUQUERQUE SPECIFICATIONS AND
ASSOCIATED DETAILS, LATEST EDITION FOR PUBLIC WORKS CONSTRUCTION.
B. ANY UTILITIES ENCOUNTERED AND DISTURBED DURING CONSTRUCTION, INCLUDING
IRRIGATION, WATER, SEWER, STORM, COMM., ELECTRIC, LIGHTNING PROTECTION, ETC.,
SHALL BE RESTORED TO PRE-CONSTRUCTION CONDITION AT NO ADDITIONAL COST.
C. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSION/LOCATIONS AND ANY
DISCREPANCIES SHALL BE COORDINATED/RESOLVED BETWEEN THE CONTRACTOR AND
THE CONTRACTING OFFICER.
D. SHOULD A CONFLICT EXIST BETWEEN THESE PLANS AND ACTUAL FIELD CONDITIONS,
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING SO THAT THE
CONFLICT CAN BE RESOLVED IN A TIMELY MANNER.
E. CONTRACTOR SHALL MAINTAIN ACCESS TO ADJACENT AREAS AND ROADWAYS DURING
CONSTRUCTION. IN SO DOING, CONTRACTOR SHALL NOT STAGE EQUIPMENT AND/OR
MATERIALS IN A MANNER THAT IMPEDES PATROL ROUTES, ACCESS ROUTES OR EGRESS.
CONTRACTOR SHALL MAINTAIN ACCESSIBLE ROUTES AT ALL TIMES.
F. CONTRACTOR SHALL PROVIDE PORTABLE RESTROOM FACILITIES AT A LOCATION TO BE
COORDINATED WITH INSPECTOR. CONTRACTOR WILL NOT BE ALLOWED TO UTILIZE
RESTROOM FACILITIES INSIDE BUILDINGS.
G. CONTRACTOR SHALL OBTAIN ALL APPLICABLE PERMITS REQUIRED BY AIR FORCE,
COUNTY, CITY AND STATE i.e. DIGGING PERMIT, BURN PERMIT (IF REQUIRED) ETC.
H. ALL EQUIPMENT SHALL BE PARKED AT THE CONTRACTOR'S LAYDOWN YARD WHICH
WILL BE COORDINATED AT PRE-CONSTRUCTION MEETING.
I. THE CONTRACTOR SHALL BE REQUIRED TO IMMEDIATELY AND COMPLETELY VACATE
THE ENTIRE SITE WHEN AN UNSCHEDULED ACTIVITY OCCURS NEAR THE PROJECT SITE.
FOR SCHEDULED ACTIVITIES THE CONTRACTOR WILL BE GIVEN AS MUCH NOTICE AS
PERMISSIBLE. ANTICIPATED FREQUENCY OF SCHEDULED ACTIVITIES WILL BE DISCUSSED
AT PRE-BID.
J. PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR MUST SUBMIT A LIST OF ALL
PERSONNEL WHO WILL BE REQUIRED TO WORK ON THE PROJECT, INCLUDING
CONTRACTORS. INFORMATION FOR EACH PERSON SHALL INCLUDE: FULL NAME, SOCIAL
SECURITY NUMBER, DATE OF BIRTH, PLACE OF BIRTH. ALL PERSONNEL MUST CARRY A
FORM OF PICTURE ID AT ALL TIMES.
PROJECT NOTES:
1. The intent of this project is to repair asphalt concrete along the MUNS Haul Route between Pad 5 and the KUMMSC Topside Facility.
2. Repairs shall include:
2.1. Sealing all minor cracks with joint sealant.
2.2. Cracks more significant shall be routed and cleaned and then sealed.
2.3. Application of a seal-coat to all asphalt surfaces.
2.4. Re-striping of both shoulders with high reflectivity paint.
2.5. Minor asphalt concrete repairs along roadway shoulders.
2.6. Minor PCC concrete repairs to concrete box culvert and concrete approach slabs
3. Contractor shall prepare an execution plan accounting for anticipated scheduling.