Questions and Answers from FTEL Move Site Visit on 16 Sep 2024.pdf

PDF 150 KB Posted

Attached to
412th Flight Test Engineering Lab (FTEL) Move at Edwards AFB CA
Solicitation number
FA930224Q0096
Issued by

About this file

This document contains questions and answers from a site visit for a federal contract opportunity related to the 412th Flight Test Engineering Lab (FTEL) move at Edwards AFB, CA. The key details are:

The solicitation is a combined synopsis/request for quote (RFQ) for commercial moving services under Simplified Acquisition Procedures. The North American Industry Classification System (NAICS) code is 484210 "Used Household and Office Goods Moving" with a $34,000,000 size standard. The contract is a 100% Small Business Set-Aside with a period of performance between November 2024 and March 2025. A site visit is scheduled for September 16, 2024 from 1:00-4:00 PM PST. The due date for responses is September 20, 2024 at 4:00 PM PST. The contract will be awarded as a Purchase Order. The solicitation provides details on the move requirements, including coordination for classified items, disassembly/reassembly, floor protection, and elevator/stair usage. A list of questions and answers from the site visit is included, covering topics such as move phasing, item labeling, staging, and access to the SCIF area.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FTEL Site Walk Through Questions and Answers/Actions:

Questions in Bldg 1400:

1. Question: Do we have to coordinate the move in certain phases?

Answer: No coordination except for when it comes to the classified items and items moving to the SCIF.

2. Question: Do we have to dissemble the items fixed to the walls?

Answer: No, Large wall mounted TVs are not included in the move.

3. Question: Do we have to assemble the monitors?

Answer: Monitors will be moved, but you don’t have to assemble the wires

4. Question: Will all the chairs be moved to the staging area?

Answer: Yes, they will be in a central location.

5. Question: How will we know what to move?

Answer: Everything moved will be marked and labeled.

6. Question: Can we stage our trucks near the warehouse

Answer: Yes, there is a rolling door for use.

7. Question: Are all the safes similar?

Answer: No, some safes are large, and several are small. All safes were seen on the site visit.

8. Question: How do we move items in the secure area?

Answer: Movers will be escorted and ensure no electronics are brought in the area.

9. Question: Any special processes for moving the safes (Rm 314)?

Answer: The safes that are empty do not need an escort.

10. Question: What’s the room count?

Answer: Approximate room number count: Bldg. 2710: 189 Bldg. 1400: 104

11. Question: Do we have to stick to moving during the 0700-1630 timeframe only?

Answer: No, we are flexible on working hours. Working hours shall be coordinated after award.

12. Question: Can they use lodging on base?

Answer: No

13. Question: Can vendors leave the trucks overnight?

Answer: Yes, trucks can be left overnight but must be left in a parking lot.

14. Question: Can vendors and their workers get 30-day passes to get on base during the move?

Answer: Yes, Passes can be obtained for up to 30 days. All personnel obtaining a pass will need to be pre-registered at the visitor control center at West Gate no less than 3 days prior to move start date.

15. Question: Is our inventory accurate?

Answer: Not exactly, some quantities have been overestimated to account for unknowns. The “moving to Rm.” And cube numbers are tentative. A list with finalized move to room/cube will be provided prior to move start date

Questions in Bldg 2710:

16. Question: What is the weight capacity and dimensions of the elevator?

Answer: The elevator weight capacity is 6000 Lbs. Elevator dimensions are attached.

17. Question: Are the doors 36 inches?

Answer: No, most of the doors are 30 inches. But there are a couple of roll up doors, but they also lead to 30 inch doors going out. Door dimensions for Bldg.2710 are attached.

18. Question: Will a Move POC be identified to coordinate with?

Answer: Yes. This is written in the SOW. Shouldn’t need an escort all the time. But the SCIF area will need to be coordinated and have an escort.

Action: Will verify SCIF escort procedures.

19. Question: Will we have to protect the floors?

Answer: Yes, that is in the SOW.

20. Question: Can we use the elevator vs the stairs?

Answer: Yes, as long as the items are protected. But it’s not a freight elevator.

21. Question: Can vendors get a digital layout of the building?

Answer: Yes, drawings are attached.

22. Question: Will vendors have to disassemble items?

Answer: Yes, Minor disassembly and reassembly for items that require it to fit in and out of doors and buildings is required.