Door Field Measurements FTEL.pdf

PDF 98 KB Posted

Attached to
412th Flight Test Engineering Lab (FTEL) Move at Edwards AFB CA
Solicitation number
FA930224Q0096
Issued by

About this file

This document is a Request for Quote (RFQ) for a contract to provide moving services for the 412th Test Engineering Group (412 TENG) Building 1400 at Edwards Air Force Base (AFB), CA to the new 412 TENG Flight Test Engineering Laboratory (FTEL) Building 2710 at Edwards AFB.

The solicitation is a 100% Small Business Set-Aside with a NAICS code of 484210 "Used Household and Office Goods Moving" and a size standard of $34,000,000. The planned move timeframe is between November 2024 and March 2025, with a proposed move date of November 12-19, 2024. A site visit for offerors is scheduled for September 16, 2024. Quotes are due by September 20, 2024 at 4:00 PM Pacific. The Government will issue one Purchase Order as a result of this solicitation. Pricing is required to be FOB Destination to Edwards AFB, CA. The contracting agency is the Department of the Air Force Materiel Command Test Center.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From: HUGGINS, ROBERT L CIV USAF AFMC 412 TENG/ENG To: HUGGINS, ROBERT L CIV USAF AFMC 412 TENG/ENG Subject: FW: door field measurements FTEL Date: Wednesday, September 18, 2024 5:14:27 PM

Non-secured side

Storefront to lobby doors are 72” w by 94 ½” h

Double doors from lobby to corridor 1100 and 1300 72”w by 83”h

Library doors are 72”w by 86”h

C/D first and second floor ceilings are 10’ in office spaces and corridors.

C/D corridors are 62”w by 10’h

All interior wooden doors are 34 ½”w by 83”h

Exterior metal doors are 34”w by 83”h

Exterior metal double door to corridor 1100 62”w by 94”h

Secured side

Mantrap doors 33 1/2”w by 82 ½”h

All interior metal doors are 35” by 83”h

All exterior egress doors are 35”w by 83”h

A/B corridors 72”w by 9’h

Ground stations are 42 ½”w by 95 ½” h (same for tempest rooms)

POD bay exterior double doors are 82”w by 94”h mailto:robert.huggins.2@us.af.mil mailto:robert.huggins.2@us.af.mil

File details come from the government source that posted it. Updated .