Train Carts Removal Site Visit - Questions and Answers Final.pdf

PDF 338 KB Posted

Attached to
Removal of 3 Train Carts Federal contract opportunity
Solicitation number
FA930123Q0013
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This document contains questions and answers from a site visit regarding Solicitation Number FA930123Q0013 for the Removal of 3 Train Carts from the Department of the Air Force Materiel Command Test Center. The solicitation requires the removal of three train carts located on base, including the rails, HVAC units, stairways, and handrails attached to the carts. The carts must be dismantled and disposed of according to DOT and environmental regulations due to asbestos and lead present inside and outside the carts. No information is provided on the individual weights of the carts. Offerors are responsible for providing their own water and safely blocking access during removal. Photos of the carts have been added to the solicitation to assist offerors.

View the file

Other files for this federal contract opportunity

Other files attached to Removal of 3 Train Carts, newest first.
File Type Posted
Combined Synopsis Solicitation - Train Carts Removal- Amendment 01.docx DOCX document
Combined Synopsis Solicitation - Train Carts Removal- Amendment 02.docx DOCX document
Combined Synopsis Solicitation - Train Carts Removal- Amendment 03.docx DOCX document
6004.pdf PDF
L91885 6004 Train Cars 2022.pdf PDF
261093 PLM.pdf PDF
L87750.pdf PDF
L87750 coc lab.pdf PDF
277199 PLM_train exterior all 3 2022.pdf PDF
274631 acm sample map corrected.pdf PDF
L91882 Lead 6004 Caboose 2022.pdf PDF
261093 PLM 6004 Interior Exterior 2021.pdf PDF
269949 coc lab.pdf PDF
Train Carts Photos.pdf PDF
274625 coc lab.pdf PDF
274631 6004 Bulk Sample Form 14 June 2022.pdf PDF
269949 PLM 6004 window blind.pdf PDF
277200 coc lab.pdf PDF
277199 coc lab.pdf PDF
261093 coc lab.pdf PDF
274625 PLM 6004 Caboose 2022.pdf PDF
L87750 6004 2021.pdf PDF
L91885 coc lab.pdf PDF
277200 PLM train interior 2022.pdf PDF
274631 coc lab.pdf PDF
L91882 coc Caboose.pdf PDF
274631 6004 Bulk Sample Form 14 June 2022.xlsx XLSX spreadsheet
274631 PLM 6004 Train Cars 2022.pdf PDF
List of Train Carts Asbestos and Lead Reports (24 documents).PNG PNG image
SAM_Kern County_Wage Determination_122722.pdf PDF
Remove 3 Trains SOW.pdf PDF
Solicitation Model Contract - FA930123Q0013.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Train Cart Removal Site Visit Question & Answers

Solicitation #FA9301-23-Q-0013 Page 1 of 4

# Questions Answers 1 What is being removed? Just the three carts, and if not what else?

Only what is attached to the Train Carts, to include the rails and wooden rail-ties on the ground under the carts, the HVAC on the North Side and the one in-between the two passenger carts, the wooden stairways on the North/West side, the concrete/brick stairs on the South Side, the aluminum hand rails/ramps on the South side, etc. For more details, photos have been added to this solicitation via Amendment #2.

2 Can the train be dismantled on site? Yes, so long as in the process the site is contained and they are dismantled via DOT transportation laws, as well as proper asbestos/lead containment practices.

3 Can a Range Finder be used? Yes, so long as it is facing North (i.e., away from the flightline and runway), and if an aircraft is not flying in the same line of sight as the range finder is being aimed/used.

4 Will the electricity/water/utilities be shut off?

Yes, all water and electricity will be turned off.

5 Will the grease trap piping stay or is it to be removed too? i.e., the three manholes to the North/West side on the ground that are marked “Interceptors”?

The pipping is not connected to the Train Carts.

The removal of these items is NOT required, they will remain.

6 Will the HVAC units need to be disposed of as well?

Yes, the HVAC units are included and will need to be properly disposed of. There is one on the North side and one in-between the passenger carts.

Solicitation #FA9301-23-Q-0013 Page 2 of 4

7 Was asbestos/lead “hot” inside and out?

Yes. The asbestos/lead reports have been added to the solicitation for your reference via Amendment #2. For all intents and purposes, consider the inside and outside of the carts to be “hot.”

8 What do the different train carts weigh?

The Government is not certain of the weight of each train cart. However, in our research it was noted that any 6-axil cart is considered “very heavy.” Note that there are two 6-axil carts and one caboose.

9 Is the Government directing that the carts be disposed of at a certain site?

No, so long as the winning contractor disposes of the carts at an approved site for items containing asbestos/lead, as directed in the Statement of Work posted on the original Combined Synopsis/Solicitation.

10 Can the Government confirm that there are or are not any under-ground water/sewer/etc. lines in the parking lot to the South of the carts?

This is vital for our planning and positioning of equipment in the removal process.

See below (after the last question and answer) for drawing of location of utility line.

11 Is the winning contractor for this effort permitted to “keep” the caboose as opposed to disposing of it?

No, all carts must be disposed of IAW local, state and federal regulations. The winning offeror is not permitted to keep the caboose.

12 Please provide us with the weight of each individual train cart, so the contractor knows what type of Crane to utilize for removal.

No information available. See Question/Answer #8 above.

13 Please provide As-Builts? No As-builts

Solicitation #FA9301-23-Q-0013 Page 3 of 4

14 Will you require a temporary fence or permit fencing during this project?

All that is required is blocking all entry, i.e.

parking lot entry and sidewalks, with caution signs, or closed.

15 Who will provide water onsite? Winning contractor will be required to provide their own water.

16 What is the thickness of the carts? No info available

17 Where is the lead and asbestos coming from?

See reports attached

18 Is there material in the tanks? If so, what is the material(s)?

Underground tanks are not part of this scope.

19 Please provide any MSDS information if you have it.

No SDS available

20 Has any analytical been done to test how much lead and/or asbestos is in the tank?

See reports attached

21 Need pics of the bottom of the train and a few of the side to see where to pickup from.

Photos have been added to this solicitation via Amendment #2.

Solicitation #FA9301-23-Q-0013 Page 4 of 4