Answered RFIs.pdf
PDF 69 KB Posted
- Attached to
- Spectrum Beacon Tower Federal contract opportunity
- Solicitation number
- FA930121R0003
About this file
This document contains a solicitation and related federal contract opportunity for the replacement of an outdated beacon tower at Edwards Air Force Base in California. The solicitation seeks proposals for a new self-supporting tower up to 180 feet in height to better manage radio frequency spectrum and support operations. The contractor will demolish the existing 108-foot tower constructed in 1959 and dispose of all materials. Additional requirements include providing a new on-site generator and performing a safe shutdown of current electrical systems. The contract type will be lowest price technically acceptable with a small business set-aside and a performance period of 180 days from notice to proceed. The magnitude of the project is estimated between $500,000 to $1 million. The solicitation number is FA930121R0003 and is issued by the Department of the Air Force Materiel Command Test Center. Responses are due through the System for Award Management website.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Beacon Tower SOW and Attachments Updated 24 June 2021.pdf | ||
| RFIs Received 17June-Answer to Generator Questions (1).docx | DOCX document | |
| Solicitation Amendment FA930121R00030003 SF 30.pdf | ||
| Solicitation Amendment FA930121R00030002 SF 30.pdf | ||
| Beacon Tower Pictures.docx | DOCX document | |
| SCE Approved Drawing.pdf | ||
| Solicitation Amendment FA930121R00030001 SF 30.pdf | ||
| Attachment 1 - Beacon Tower SOW and Attachments Updated_7 June 2021.pdf | ||
| Solicitation - FA930121R0003.pdf | ||
| Attachment 4 - EAL Template.xls | XLS spreadsheet | |
| Attachment 3 - Past Performance Questionnaire.docx | DOCX document | |
| Attachment 2- Wage Determination CA20210022.pdf | ||
| Attachment 1 - Beacon Tower SOW and Attachments_09 APR 2021.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: FA930121R0003
Project: AF Plant 42 Spectrum Beacon Tower Edwards, CA 93524
RFI:
1. Where will we be pulling power from?
Power will be pulled from the Grey Eagle site which is approx. 300-500 feet from the new tower location. See Attachment 11.
2. Will we use the existing generator?
AFP 42 will not use the current generator. See updated SOW for new generator requirements.
3. Will we demo the old tower?
Yes, see SOW para 1.4.1.10.
4. Will the awarded contractor need to perform a safe off on the existing electrical system?
Question is not clear. Please clarify. Are you speaking of the electrical on the existing tower or from the Grey Eagle site. Please provide additional information. Electrical drawings from the Grey Eagle site are provided.
5. Will the old slab be removed by the contractor who is awarded the contract?
No, the old slab can remain in place.
6. Will we need to enter the flight line?
No, all construction is on Site 5. No airfield access is required.
7. Can we set up shop on site?
Yes, you may set up a laydown yard adjacent to the site and ensure that it does not impede traffic.
8. Do we have any slab blueprints to see all structural hardware?
Question not clear, please clarify. What hardware?
9. Can we have the old slab radar penetrated as needed?
Yes
10. Do you have any parameters on the dimensions of the sides?
a. Looks like the existing tower is around 7’ across but this tower is taller?
No, the width of the tower legs is dependent on the height and the additional engineering support required to support two platforms and a rotating beacon.
11. Could you give me an idea of what you guys are thinking about the new tower?
The requirements for the new tower are contained in the SOW.
12. After viewing the SOW with our tower vendor, they are needing to know more information regarding antenna loading. Do you have any information available for current or any future antennas that would go onto the new tower?
We have some Antennas that will be transferred from another tower but we cannot anticipate future growth. The platform weight loads should give them an indication of required steel strength. I will check with our IT department and try to get a picture of the current antennas.