Answered RFIs.pdf

PDF 69 KB Posted

Attached to
Spectrum Beacon Tower Federal contract opportunity
Solicitation number
FA930121R0003
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This document contains a solicitation and related federal contract opportunity for the replacement of an outdated beacon tower at Edwards Air Force Base in California. The solicitation seeks proposals for a new self-supporting tower up to 180 feet in height to better manage radio frequency spectrum and support operations. The contractor will demolish the existing 108-foot tower constructed in 1959 and dispose of all materials. Additional requirements include providing a new on-site generator and performing a safe shutdown of current electrical systems. The contract type will be lowest price technically acceptable with a small business set-aside and a performance period of 180 days from notice to proceed. The magnitude of the project is estimated between $500,000 to $1 million. The solicitation number is FA930121R0003 and is issued by the Department of the Air Force Materiel Command Test Center. Responses are due through the System for Award Management website.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: FA930121R0003

Project: AF Plant 42 Spectrum Beacon Tower Edwards, CA 93524

RFI:

1. Where will we be pulling power from?

Power will be pulled from the Grey Eagle site which is approx. 300-500 feet from the new tower location. See Attachment 11.

2. Will we use the existing generator?

AFP 42 will not use the current generator. See updated SOW for new generator requirements.

3. Will we demo the old tower?

Yes, see SOW para 1.4.1.10.

4. Will the awarded contractor need to perform a safe off on the existing electrical system?

Question is not clear. Please clarify. Are you speaking of the electrical on the existing tower or from the Grey Eagle site. Please provide additional information. Electrical drawings from the Grey Eagle site are provided.

5. Will the old slab be removed by the contractor who is awarded the contract?

No, the old slab can remain in place.

6. Will we need to enter the flight line?

No, all construction is on Site 5. No airfield access is required.

7. Can we set up shop on site?

Yes, you may set up a laydown yard adjacent to the site and ensure that it does not impede traffic.

8. Do we have any slab blueprints to see all structural hardware?

Question not clear, please clarify. What hardware?

9. Can we have the old slab radar penetrated as needed?

Yes

10. Do you have any parameters on the dimensions of the sides?

a. Looks like the existing tower is around 7’ across but this tower is taller?

No, the width of the tower legs is dependent on the height and the additional engineering support required to support two platforms and a rotating beacon.

11. Could you give me an idea of what you guys are thinking about the new tower?

The requirements for the new tower are contained in the SOW.

12. After viewing the SOW with our tower vendor, they are needing to know more information regarding antenna loading. Do you have any information available for current or any future antennas that would go onto the new tower?

We have some Antennas that will be transferred from another tower but we cannot anticipate future growth. The platform weight loads should give them an indication of required steel strength. I will check with our IT department and try to get a picture of the current antennas.