STATEMENT OF WORK

REQUEST FOR PROPOSAL

DATE OF DOCUMENT: 05/04/20

TITLE / BLDG: REPLACE FLOORING, B1450

**EQUIPMENT MOVE**

SITE SUPPORT

412 MXG/MXOL

AIR FORCE TEST CENTER

EDWARDS AIR FORCE BASE, CALIFORNIA 93523-8540

Attachment 1 412th Maintenance PMEL Equipment Move

Statement of Work (SOW)

FOUO

May 04, 2020

1.0 SCOPE AND OBJECTIVE:

1.1 Introduction

This Statement of Work (SOW) outlines the requirement for the contractor to provide labor, supervision, equipment, and materials necessary to support the 412th Maintenance Group located at Edwards AFB, CA for the disassembling and relocating furnishings/equipment removed from Building 1450 to be staged at Building 1407 and Building 1600 in support of new flooring project. The work to be accomplished includes but is not limited to general labor and heavy equipment operations of the following items below.

1.2 Scope of Work:

The contractor shall provide the following service:

a. A team of movers shall move the following items:

(82) Standard work benches to be relocated in B1407.

(18) Office desks to be relocated in B1407.

(4) Break room tables to be relocated to B1407.

(9) Lockers to be relocated to B1407.

(36) Four shelf cabinets to be relocated to B1407.

(6) 7 ft. Rotating tower cabinets to be relocated in B1407.

(2) Refrigerators to be relocated to B1407..

(8) LISTA cabinets ranging in weights from 150 lbs. – 300 lbs. to be relocated to B1407.

(20) Misc. pieces of Test Equipment to be relocated to B1407.

(10) Work benches to be relocated within B1450.

(4) Four shelf cabinets to be relocated within B1450.

(2) LISTA cabinets to be relocated within B1450.

(2) Misc. pieces of Test Equipment to be relocated within B1450.

(1) LISTA cabinet to be relocated to B1600 Avionics.

(3) Work benches to be relocated to B1600 Avionics.

(5) Four shelf cabinets to be relocated to B1600 Avionics.

(1) Attenuator/Switch Driver to be relocated to B1407.

(1) High power medium requenc to be relocated to B1407

(1) Phase noise test set to be relocated to B1407.

(1) Down Converter to be relocated to B1407.

(1) High power RF pulse signal to be relocated in B1407.

(3) Microwave Measurement Rec. to be relocated to B1407..

(1) 50 Ghz. Spectrum analyzer to be relocated to B1407.

(1) Power meter to be relocated in B1407.

(1) 26.5 Ghz. Spectrum analyzer to be relocated to B1407.

(1) Power meter to be relocated to B1407.

(1) Main frame to be relocated to B1407.

(1) Rubidium GPS Receiver to be relocated to B1407.

(1) Secondary Vibration Cal S to be relocated to B1407.

Attachment 1 412th Maintenance PMEL Equipment Move

Statement of Work (SOW)

FOUO

(1) Internal Accelerometer to be relocated to B1407.

(1) Signal conditioner to be relocated to B1407.

(1) Multifunction Daq to be relocated to B1407.

(1) Shaker to be relocated to B1407.

(1) Power Amplifier to be relocated to B1407.

(1) Granite angle block to be relocated to B1407.

(1) #100 Universal calibrator to be relocated to B1407.

(1) #2 Dead weight calibrator to be relocated to B1407.

(1) #5 Dead weight calibrator to be relocated to B1407.

(1) Force Scale Press to be relocated to B1407.

(1) Force calibration system to be relocated to B1407.

(1) 100k Compress load frame to be relocated to B1407.

This work is in support of the installation of new flooring at B1450 and a period of performance will be 14 working days but will be scheduled around the installation of the new flooring. New flooring may take up to 60 days from start to finish so contractor will need to schedule their equipment moves before and after the installation of the new flooring system. Reinstallation of all items relocated will be accomplished within 7 days upon completion of the flooring project. Scheduling of work will be coordinated with both the flooring and moving contractors. The work to be accomplished includes but is not limited to the following: General Labor and Heavy Equipment Operations.

Period of Performance: Phase 1 31 Aug 2020-04 Sep 2020 Phase 2 09 Nov 2020-13 Nov 2020

2.0 PURPOSE OF THE DOCUMENT:

This Statement of Work serves as a tool for recording customer requirements, ensuring that these requirements are met and evaluating the project design before the project begins. The overall objective is to establish a plan of action for defining and achieving desired results and goals.

3.0 REQUIREMENTS:

The contractor shall adhere to all applicable laws, regulations and standards that encompass this project. Requirements statements in this section are organized using CSI/CSC UniFormat for Building Construction. The contractor shall accomplish the following:

4.0 GENERAL REQUIREMENTS

4.1 Administrative

4.1.1 Contractor shall field verify all dimensions and equipment to be relocated within

B1450 and to be moved to Buildings 1407 and 1600.

4.1.2 Contractor shall keep the area clean at all times and remove all waste in a timely manner.

Attachment 1 412th Maintenance PMEL Equipment Move

Statement of Work (SOW)

FOUO

4.1.3 Contractor will replace or repair all items that are damaged due to the actions of the contractor’s employees and/or subcontractors, either willful or neglectful, while working on this project.

4.1.4 All contractor personnel shall comply with all measures in the Environmental

Requirements Checklist.

4.1.5 Contractor will accomplish these requirements within the normal operating hours of

Monday through Friday, no earlier than 0700 and no later than 1730, excluding holidays.

Special circumstances may dictate after hours work if the mission of Edwards AFB deems it necessary.

5.0 Procedural

5.1 All personnel shall wear the appropriate Personal Protection Equipment (PPE) while on the construction site. Failure to comply will result in removal from the construction site until the PPE is donned.

5.1.1 Contractor shall coordinate construction effort with facility and/or project manager to prevent any construction delays, interruptions of classified work within the facility and/or movement of personnel and/or equipment.

5.1.2 All workers driving on Edwards AFB Flightline will obtain a flightline driver’s license by attending and passing the appropriate training.

5.1.3 All workers for this project shall be cleared by the customers’ security and given a daily temporary workers badge before entering the customers’ controlled area.

5.1.4 Any waste or excess material resulting from any contract requirement shall be removed and disposed of at a proper disposal site off Edwards Air Force Base by the Contractor in strict accordance with applicable Federal, State, County and local laws.

6.0 Temporary Facilities and Temporary Controls

6.1 Contractor shall install temporary signage and/or barricades to redirect personnel from the construction area.

7.0 Execution and Closeout Requirements

7.1 Contractor shall safely transport all identified items from B1450 to buildings 1407 and 1600 or within B1450 itself.

7.1.1 Contractor will coordinate with the Site Support Personnel within B1600 to safely barricade and re-route pedestrian traffic during the mobilization and demobilization of the precision equipment.

Statement of Work (SOW)

FOUO

7.1.2 Contractor will safely return and reinstall precision equipment to B1450 and place it in its designated locations once the new flooring has been installed.

Statement of Work (SOW)

FOUO

Statement of Work (SOW)

FOUO