Blast Booth QA.pdf

PDF 52 KB Posted

Attached to
Blast Booth Removal Federal contract opportunity
Solicitation number
FA910124QB034
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This document appears to be a Question and Answer (Q&A) sheet related to a federal solicitation for the removal of a blast booth. The key details are:

The solicitation number is FA910124QB034 for "Blast Booth Removal" from the Department of the Air Force Materiel Command Test Center. The scope includes disconnecting utilities, removing the blast room sitting on top of concrete, and performing the work over a 4-day period on a Monday through Thursday schedule. There are no hazardous materials present. No submittals are required prior to mobilization and no bond will be necessary. The government plans to award immediately after the due date. Small business set-asides such as SDVOSB and HubZone will not be considered, as the award must be made in accordance with the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Blast Booth Removal, newest first.
File Type Posted
Blast Booth QA.pdf PDF
Wage Determination 2015-5455.pdf PDF
Blast Booth QA.pdf PDF
FA9101-24-Q-B034 - Combined Synopsis Solicitation.docx DOCX document
Atch 1 Blast Booth Removal Specifications.pdf PDF
Atch 3 Blast Booth Pictures.pdf PDF
Atch 2 Provision and clauses..pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Answer

Are all utilities: air, electric, gas and water disconnected from unit or will they be prior to our arrival? YES

2 Is the blast room base embedded in the concrete or sitting on top of the concrete? Sitting on top of the concrete

If embedded, are we required to remove from the concrete and pour concrete back?

Or can we cut flush with concrete? N/A

Are we allowed to use torches in this location as long as proper fire watch protocols are followed? YES

What site personnel are we required to have and can we act in a dual role? We see this as a two-man demo for approx. 4 days with no need for increased cost due to added personnel roles.

What ever personnel you need to perform the operation.

6 What are the work hours and can we work over the weekend?

We are here from 0600 Monday thru Thursday and 0630 to 1600 every other Friday.

It appears that there is a roll-up door alongside the dust collector, what are the dimensions of this door, H’xW’?

The door next to the dust collector is 16’ wide by 16’ tall. The roll-up door near the blast room is 20’ wide X 16’ high. The dust collector is outside the building, the blast room is inside the building.

How quickly are you looking to award after due date? Immediately

How quickly will we be able to mobilize after award and what submittals will be required prior to mobilization?

No submittals required, and able to mobilize after notice of award

We have our SDVOSB & HubZone certifications, will these be considered for the contract?

No, we must award in accordance with the solicitation

11 Will a bond be required? No

Is there any lead, asbestos or other hazmat materials that will have to be remediated before dismantling begins? Or will just standard safe work practices be sufficient?

There is no lead, asbestos or any other hazardous materials that we know of in that blast room

The large rusty pressure tank shown in picture next to outside hopper is NOT to be removed, correct?

The large tank is an air receiver that belongs to the facility that will not be removed.

FA9101-24-Q-B034 Blast Booth Removal Questions and Answers

Sheet1

File details come from the government source that posted it. Updated .