Atch 1 Blast Booth Removal Specifications.pdf
PDF 134 KB Posted
- Attached to
- Blast Booth Removal Federal contract opportunity
- Solicitation number
- FA910124QB034
About this file
This document appears to be a Requirements Document for the removal and disposal of a blast booth, dust collection silo, and associated ductwork located in Building 1185 at the Holloman High Speed Test Track (HHSTT) facility operated by the 846th Test Squadron.
The Contractor shall dismantle, remove, and dispose of one Clemco blast booth, one outside dust collection silo, and all associated ductwork both inside and outside Building 1185. The period of performance is 21 days from the date of award. Inspection of the worksite by 846 TS personnel will be conducted prior to contract completion, and any delays must be immediately communicated to the customer. The vendor shall coordinate all actions with William Reynolds at (575) 572-8989.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Blast Booth QA.pdf | ||
| Wage Determination 2015-5455.pdf | ||
| Blast Booth QA.pdf | ||
| Blast Booth QA.pdf | ||
| FA9101-24-Q-B034 - Combined Synopsis Solicitation.docx | DOCX document | |
| Atch 2 Provision and clauses..pdf | ||
| Atch 3 Blast Booth Pictures.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 1185 BLAST BOOTH REMOVAL
Requirements Document
For
704th Test Group/846th Test Squadron
19 April 2024
1.0 PURPOSE
The 846 TS’s primary test capability is the Holloman High Speed Test Track (HHSTT) where rocket powered sled trains are utilized to simulate flight-like environments and scenarios with the control and recovery of a ground-based system. As part of its manufacturing processes, the 846 TS operates a 5000sf Heat Treating facility (building 1185) to process materials to produce complex rocket sleds, test track hardware and test articles for “Research & Development customers in direct support of the “National Defense Strategy” and the US “War Fighter”.
In May of 2022, there was an accidental fire that destroyed this vital asset. Recently, 49CONs has contracted building 1185 to be cleaned and restored. However, one damaged equipment item remains in the facility that has halted the project, a large shot blasting booth. This blast booth is too large to remove by 846TS personnel. They do not have the labor or specialized equipment needed to safely remove and dispose of the blast booth.
2.0 SCOPE
The Contractor shall:
2.1 Dismantle, remove, and dispose of one (1) Clemco blast booth, model 1431-r, manufactured in 1977. The extents of the blast room inside bldg. 1185 are: 22’ long X 20’ wide X 12’ high.
2.2 Remove and dispose of one (1) outside dust collection silo - no manufacturer listed, located on the south side of building 1185. The extents of the dust collection system outside the bldg. are: 15’ wide X 9’ deep X 14’ high. The dimensions of the dust collector include the motor.
2.3 Remove and dispose of all associated duct work connecting the blast booth and dust collector both inside and outside building 1185, and clean work site.
3.0 MILESTONES
3.1 The Contractor’s period of performance will be 21 days from the date of award of the basic contract. Inspection of worksite will be conducted by 846 TS personnel prior to contract completion. Any delays must be immediately communicated to the customer.
4.0 DELIVERABLES
4.1 The vendor shall coordinate all action with William Reynolds at (575) 572-8989.
| 2.0 SCOPE |
| The Contractor shall: |
| 2.1 Dismantle, remove, and dispose of one (1) Clemco blast booth, model 1431-r, manufactured in 1977. The extents of the blast room inside bldg. 1185 are: 22’ long X 20’ wide X 12’ high. |
| 2.2 Remove and dispose of one (1) outside dust collection silo - no manufacturer listed, located on the south side of building 1185. The extents of the dust collection system outside the bldg. are: 15’ wide X 9’ deep X 14’ high. The dimensions of the... |
| 2.3 Remove and dispose of all associated duct work connecting the blast booth and dust collector both inside and outside building 1185, and clean work site. |
| 3.0 MILESTONES |
| 3.1 The Contractor’s period of performance will be 21 days from the date of award of the basic contract. Inspection of worksite will be conducted by 846 TS personnel prior to contract completion. Any delays must be immediately communicated to the cus... |
| 4.0 DELIVERABLES |
| 4.1 The vendor shall coordinate all action with William Reynolds at (575) 572-8989. |