Attachment_7_-__Base_Support_Letter.pdf
PDF 240 KB Posted
- Solicitation number
- FA8903-13-R-0115
About this file
ATTACHMENT 7 - BASE SUPPORT LETTER
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_9_-_Past_Performance.doc | DOC document | |
| Attachment_2_-__Evaluation_Criteria_and_Instruction_to_offerors_TURBINE.doc | DOC document | |
| Attachment_4-_Offeror_Information.xlsx | XLSX spreadsheet | |
| Attahcment_8_-_GFP_Available_0115.xlsx | XLSX spreadsheet | |
| Attachment_1_-__PWS_31_May_2013.doc | DOC document | |
| Attachment_5_-_Blade_Inspection_Report.DOC | DOC document | |
| FA8903-13-R-0115_SYNOPSIS_ _SOLICITATION.docx | DOCX document | |
| Attachment_3_-__CDRLs_31_May_2013.doc | DOC document | |
| Attachment_6_-_Transformer_inspection_report.pdf | ||
| Attachment_2_-__Evaluation_Criteria_and_Instruction_to_offerors_TURBINE.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT
LACKLAND AIR FORCE BASE TEXAS
21 May 2013
MEMORANDUM FOR 772 ESS/PKJ
Attn: Ms. Neosenys Carpio
FROM: AFCEC/CZRE/MMR
322 E. Inner Rd
Otis ANG Base MA 02542
SUBJECT: Base Support Letter for Service and Maintenance of Wind Turbine I and Blade and
Transformer Inspections at Wind Turbine I and Wind Turbine II, FA8903-13-R-0115 at the
Massachusetts Military Reservation (MMR), MA
1. AFCEC is providing technical and contractual services to the MMR Installation Restoration Program
Office in support of the above referenced project. As part of these activities, the Base will provide the following:
a. Access to engineering plans, drawings, diagrams, maps, technical reports, analytical data, files, etc, will be provided by the Base, if available.
b. Access to “Controlled” or “Secured” areas as needed to support the requirements of the project. Therefore, it shall be mandatory for all Contractor employees working on this project to obtain both Base and Controlled access passes. The acquisition of these passes will be coordinated between the Contractor, IRP office, and Base
Security Police.
2. If you have any questions concerning this letter, please contact the COR, Ms. Rose Forbes
(508-968-4670 x5613) or the undersigned (508-968-4670 x4952).
Jonathan S. Davis, PE, GS-14, DAF
Remediation Program Manager