04._TLOSS_Exhibit_B_v1.0.pdf
PDF 435 KB Posted
- Attached to
- Tools, Applications, and Processing (TAP) Laboratory and Overhead Persistent Infrared (OPIR) Battlespace Awareness Center (OBAC) Support Services (TLOSS) Federal contract opportunity
- Solicitation number
- FA8810-19-R-0002
About this file
This document contains a draft request for proposal (RFP) for Tools, Applications, and Processing (TAP) Laboratory and Overhead Persistent Infrared (OPIR) Battlespace Awareness Center (OBAC) support services. The RFP seeks proposals for a predominately cost-plus-fixed-fee contract to provide performance-based support services for a government-controlled and managed data exploitation research, development, test, and evaluation capability called the TAP Lab located in Boulder, Colorado. The support would also include the OPIR Battlespace Awareness Center co-located with the Space Based Infrared System Mission Control Station at Buckley Air Force Base in Colorado. The Space and Missile Systems Center Remote Sensing Systems Directorate intends to release the RFP in the second quarter of fiscal year 2019 and award the contract by the end of fiscal year 2019. The RFP solicits feedback on the draft CLIN structure, performance work statement, technical evaluation factors, and identifies a small business set-aside under NAICS code 541715 with a size standard of 1,250 employees. Comments on the draft RFP are due by February 27, 2019.
TLOSS Draft Exhibit B
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 02._TLOSS_Solicitation_FA880219R0002.pdf | ||
| 14._Attachment_10_TAP_OBAC_CRM_comments_.xlsx | XLSX spreadsheet | |
| 12._Attachment__08_OCI_mitigation_checklist__(2017.08.23).pdf | ||
| 05._Attachment_1_PWS_TAP_and_OBAC_Support_Services_v9.1.pdf | ||
| 10._Attachment_6_TAP_Lab_-_OBAC_Support_Services_Section_M_v3.7.docx.pdf | ||
| 07._Attachment_3_Government_Work_Breakdown_Structurev2.pdf | ||
| 03._TLOSS_Exhibit_A_v1.4.pdf | ||
| 08._Attachment_4_Security_Classification_Specification_DD254.pdf | ||
| 06._Attachment_2_GFP_List_FIAR.pdf | ||
| 11._Attachment_7_Employee_Professional_Compensation_FA8810-18-R-0002_TLOSS.xlsx | XLSX spreadsheet | |
| Atch_9_Industry_Day_Site_Visit.pdf | ||
| 09._Attachment_5__TAP_Lab_-_OBAC_Support_Services_Section_L_v3.9_wPast_Perf_Q.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit B – CDRL List Contract No. FA8810-19-R-0002
FA8810-19-R-0002 Page 1 of 10
Exhibit B
CONTRACT DATA REQUIREMENTS LIST (CDRL)
For
TAP Lab and OBAC Support Services (TLOSS)
28 Sep 2018
Space and Missile Systems Center
Remote Sensing Systems Directorate (SMC/RS)
483 N Aviation Blvd.
El Segundo, CA 90245-2808
FA8810-19-R-0002 Page 2 of 10
CONTRACT DATA REQUIREMENTS LIST (CDRL) INSTRUCTIONS
This Contract Data Requirements List (CDRL) Exhibit reflects the required data submissions for Contract Line Item Number (CLIN)
1001.
1.0 EXPLANATION OF TERMS
This paragraph explains the data fields of the DD Form 1423-1, which is used to document contract data requirements as direct by
DoD 5010.12-M, Procedures for the Acquisition and Management of Technical Data.
Block 1: Data Item Number (DIN): Four characters are used: first character separates CDRL types, second through fourth characters are a sequence number (001-999).
Block 2: Title: Title as it appears on the Data Item Description (DID) DD Form 1664.
Block 3: Subtitle: Further identification of data item (optional entry).
Block 4: Authority (Data Acquisition Document No.): The DID number which prescribes the preparation instructions or requirements for the data.
Block 5: Contract Reference: The contract terms and conditions or Statement of Work task, which requires or generates subject data.
Block 6: Requiring Office: The Office of Primary Responsibility (OPR) and technical authority of the CDRL.
Block 7: DD Form 250: Designates source or destination of Government inspection and acceptance. LT indicates a Letter of
Transmittal (LT) only.
Block 8: Approval Code: “A” designates government approval is required. “N/A” indicates government approval is not required.
Block 9: Distribution Statement Required: If a distribution statement is required, the statements are defined as follows:
“DISTRIBUTION STATEMENT A. Approved for public release.”
“DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only (fill in reason) (date of determination). Other requests for this document shall be referred to (insert controlling DoD office).”
“DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (fill in reason) (date of determination). Other requests for this document shall be referred to (insert controlling DoD office).”
“DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (fill in reason) (date of determination). Other requests shall be referred to (insert controlling DoD office).”
“DISTRIBUTION STATEMENT E. Distribution authorized to DoD Components only (fill in reason) (date of determination). Other requests shall be referred to (insert controlling DoD office).”
EXPORT CONTROL WARNING. All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data shall be marked as shown in Figure 1. When it is technically infeasible to use the entire statement, an abbreviated marking may be used, and a copy of the full statement added to the “Notice To Accompany Release of Export-Controlled
Data” required by Reference (e).
Block 10: Frequency: Denotes fixed reporting intervals (monthly, one-time, as required, and one-time with revisions)
Block 11: As of Date: Denotes closing period for recurring reports (end of month, end of the quarter) or cutoff date for a one-time report, where applicable.
Block 12: Date of First Submission: Establishes due date for first report (i.e., DAC + 30 CDs or EOM + 20 CDs).
FA8810-19-R-0002 Page 3 of 10
Block 13: Date of Subsequent Submission: Due date for recurring reports, e.g., EOM + 20 CDs or ASREQ. Include explanation in
Block 16, e.g., “As required by Procuring Contracting Officer (PCO)”.
Blocks 14 & 15: See Data Delivery instructions in Section 2 below.
Block 16: Use for additional/clarifying information for Items 1 through 15.
2.0 GENERAL INSTRUCTIONS FOR DATA DELIVERY AND APPROVAL
Delivery Requirements:
Official submittals shall be submitted electronically to the TLOSS government program manager and other necessary stakeholders as indicated in Block 14 of each CDRL. Certain CDRLs also need to be submitted electronically in the DCARC system as indicated in
Block 14 of Form 1423-1. All official submittals shall be accompanied by a corresponding transmittal letter. Address transmittal letter to SMC/RSK, 483 N. Aviation Boulevard, Los Angeles AFB El Segundo, CA 90245-2808.
The letter of transmittal shall contain the following information:
1. Contract number
2. CDRL Number
3. Date
4. Exact Title
5. Revision number if applicable
6. Period covered by the report for periodic reports
7. Approval Required (Yes/No).
Approval Information:
Approval indicates agreement or concurrence with the contractor’s furnished data only and shall not be construed as changing any of the terms or conditions of the subject contract. Approval of CDRLs shall be provided through the Procurement Contracting Officer
(PCO), by the Requiring Office, unless otherwise indicated in Block 16. Where applicable and unless otherwise specified, Government shall have 30 calendar days after submittal to provide responses to the Contractor through the PCO, and Contractor shall have 30 calendar days to provide subsequent delivery incorporating responses. If either party is unable to comply within this timeframe, coordination between Government and Contractor will determine new dates.
Documents will be considered approved only after “Approval” or “Approval with Comments” notification is received by the
Contractor provided through the PCO from the Requiring Office.
Approved: No further action. The document (identified with effective date of approval) becomes part of the historical CDRL data that is resident in the Contractor database.
Approved with Comments. The Contractor shall revise the data in accordance with specific comments provided by the
Requiring Office. The revised data shall be incorporated into the final document. Unless otherwise notified, no additional delivery or subsequent review/approval cycle is required. The document is considered approved when the revisions are incorporated.
Documents will be considered disapproved only after “Disapproval” or “Disapproval with Comments” notification is received through the PCO from the Requiring Office.
Supplemental Requirements
All data shall be delivered/deposited no later than the end of the business day for a specified due date. The contractor is considered delinquent when a Letter of Transmittal is not received by the specified government stakeholders or an item is not posted before the dates specified in the block 12, 13, and/or 16 of the CDRL. If the due date falls on a weekend or Government holiday, the delivery date becomes the first Government business day following the weekend and/or holiday.
Non-response by the Government to a contractor’s request for approval of a data item does not constitute approval of that data item.
The contractor may at any time submit a request for data closeout when no further submittal of a specific data requirement is beneficial to the program.
Any correspondence related to requests for data delivery deviations or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO).
FA8810-19-R-0002 Page 4 of 10
3.0 CODES USED IN THE DD FORM 1423-1
The directions for submittal and approval of data are indicated in Blocks 7, 8, 9, 10, 11, 12, 13, and 16 of the DD Form 1423-1. The following codes used in the DD Form 1423-1 are either extracted from Department of Defense (DoD) 5010.12-M or are common usage within the Space and Missile Systems Center (SMC).
Abbreviation Definition
A Approval required
Actg Accounting
ASREQ* As required
CA Contract Award
CD Calendar Days
CDR Critical Design Review
CDRL Contractor Data Requirement Lists
DAC Days after Contract award
DID Data Item Description
DIN Data Item Number
EOM End of Month
FY Fiscal Year
IAW In Accordance With
KTR Contractor
LT Letter of Transmittal
MTHLY Monthly
N/A Not Applicable/Not Required
ONE/D One-time draft
ONE/R One submittal, and revisions
OPR Office of Primary Responsibility
OTIME One time
PCO Procuring Contracting Officer
PDR Preliminary Design Review
QRTLY Quarterly
SV Space Vehicle
SW Software
TBR Technical Baseline Review
TRR Test Readiness Review
TWO/R Two submittals and revisions
UQT Unit Qualification Test
WD Working Days
4.0 DATA ACCESSION LIST (DAL)
Requests from the PCO for data ordered from the DAL shall be provided at no increase in contract price. Requests for quantities greater than two each per document shall be honored upon receipt of PCO direction and with Contractor concurrence that such requests can be filled at no increase in contract price.
5.0 ORDER OF PRECEDENCE
For all compliance documentation reference herein, Attachment 3, Compliance Document List (CDL) takes precedence and contains a complete list of approved alternates and substitutes.
FA8810-19-R-0002 Page 5 of 10
CDRL SUMMARY LIST
CDRL # CDRL Name Gov’t Approval
B001 Travel A
B002 Other Direct Costs (ODC) A
FA8810-19-R-0002 Page 6 of 10
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLINs 0003-6003
B. EXHIBIT
B
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM
TAP Lab/OBAC Support Services
E. CONTRACT/PR NO.
FA8810-19-R-0002
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
Travel Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-8I 765B/T
5. CONTRACT REFERENCE
PWS Paragraph 4.1.1.4
6. REQUIRING OFFICE
SMC/RSX
7. DD 250 REQ
No
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
See Blk 16
12. DATE OF FIRST
SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16
DRAFT Final
Req Repro
16. REMARKS Page 1 of 2 Travel Report
Blk 4: Contractor format acceptable. The report shall include:
a. Travel Dates
b. Name(s) of contractor and PK personnel participating
C. Purpose of travel
d. Travel costs identified in these categories:
I. Transportation (airfare, train fare)
2. Car Rental
3. Lodging
4. Meals & incidentals
5. Total Trip Cost
6. Receipts
e. Summary of travel accomplishments
Blks 10, 11, 12 & 13: Report shall be provided 5 business days after returning from each trip
Blk I4b: Minimum required: one electronic copy and one hard copy each to the Contracting
Officer Representative (COR), and the PCO (SMC/PKE).
PCO 1
COR 1
TAP Lab
Director
OBAC Director 1
15. TOTAL 4
G. PREPARED BY
Capt John Thurman
H. DATE
I. APPROVED BY
Doreen Grosvirt-Dramen
J. DATE
FA8810-19-R-0002 Page 7 of 10
(1 Data Item)
A. CONTRACT LINE ITEM NO.
CLINs 0003-6003
B. EXHIBIT
B
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM
TAP Lab/OBAC Support Services
E. CONTRACT/PR NO.
16. REMARKS Page 2 of 2 (continued) Travel Report
FA8810-19-R-0002 Page 8 of 10
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLINs 0003-6003
B. EXHIBIT
B
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM
TAP Lab/OBAC Support Services
E. CONTRACT/PR NO.
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM
Other Direct Costs
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-8I 765B/T
5. CONTRACT REFERENCE
PWS Paragraph 4.1.7.1
6. REQUIRING OFFICE
SMC/RSX
7. DD 250 REQ
No
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
As required
12. DATE OF FIRST
SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
8. APP CODE
N/A
11. AS OF DATE
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
As required
DRAFT Final
Req Repro
16. REMARKS Page 1 of 2 Travel Report
Blk 4: Contractor format acceptable. The report shall include:
i. Purpose of purchase
ii. Total Amount
e. Summary of travel accomplishments
Blks 11, 12: Report shall be provided 5 business days after each purchase
PCO 1
COR 1
TAP Lab
Director
OBAC Director 1
15. TOTAL 4
FA8810-19-R-0002 Page 9 of 10
(1 Data Item)
A. CONTRACT LINE ITEM NO.
CLINs 0003-6003
B. EXHIBIT
B
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM
TAP Lab/OBAC Support Services
E. CONTRACT/PR NO.
16. REMARKS Page 2 of 2 (continued) Other Direct Costs
FA8810-19-R-0002 Page 10 of 10
File details come from the government source that posted it. Updated .