PRE-PROPOSAL CONFERENCE Agenda 2-Rev 1.ppt

PPT presentation 476 KB Posted

Attached to
Operations and Maintenance of the Base Telecommunications System (BTS) at Dover AFB, DE
Solicitation number
FA8773-08-R-0136
Issued by

About this file

PreProposal Conference Agenda 2 - Rev 1

View the file

Other files

File Type Posted
Dover PWS Final 03 Jun 08.doc DOC document
Pricing Table Summary Page..xls XLS spreadsheet
Dover EIPS Final 14 Apr 08 v2.doc DOC document
Redacted Contract.doc DOC document
Amendment 0006.doc DOC document
Dover NAICS reversal.pdf PDF
Amendment 0005.doc DOC document
FA8773-08-R-0136-0004.doc DOC document
Dover Pricing Final 03 Jun 08.xls XLS spreadsheet
Amend 0003.doc DOC document
Dover Pricing Final 08 May 08.xls XLS spreadsheet
Dover PWS Final 03 Jun 08.doc DOC document
Site Attendee List.pdf PDF
Questions and Answers.doc DOC document
Amendment 0002.doc DOC document
Amend 0001.doc DOC document
Notice of Order.doc DOC document
Dover PWS Final 01 MAY 08 v2.doc DOC document
Dover RFP-FA8773-08-R-0136.doc DOC document
CVC_Training_Guide.pdf PDF
RFP - Cvr Letter.doc DOC document
Dover EIPS Final 14 Apr 08 v2.doc DOC document
Performance Plan 15 Apr 08.doc DOC document
Dover Pricing Final 08 May 08.xls XLS spreadsheet
Contract Attachments.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation

FA8773-08-R-0136

DATE: 20 MAY 08

TIME: 0900 -1600

LOCATION: DOVER AFB

MEETING: Informational

SPEAKER: Debra Harrison, Contracting Officer, (405) 734-9706

38 EIG/PKL
4079 Hilltop Rd
Tinker AFB OK 73145-2713
debra.harrison@tinker.af.mil
Part I: Introduction/Welcome
Part II: General Information
Part III: Solicitation Review
Part IV: Solicitation Attachments
Part V: Site Visit
Part VI: Conclusion/Dismissal

Two C-5 Galaxy aircraft from Dover Air Force Base, Del.

Submit Questions Electronically Only
Debra.harrison@tinker.af.mil &
By 1500 on 28 May 08

Conference Informational only, does not alter RFP

Obtain documents from fbo.gov, nothing mailed out

Mandatory CCR Registration, www.ccr.gov

Mandatory ORCA Certifications, http://orca.bpn.gov.

Must match NAICS for this acquisition, 517110

Contract for O&M of BTS (primarily Services), HOWEVER:

Possibility of construction, alteration, or repair > $2k; DBA applies for those work orders; mixed skill rate will be required

Offerors responsible for STUDYING THE ENTIRE RFP before proposal

Commercial acquisition, change from prior awards

SET ASIDE: 8a

No More Uniform Contract Format (UCF)

Change to SF 1449 from SF 1155

CLINs/SLINs (approx 50 or so pages) / Base Period “0xxx” & Options “1xxx, 2xxx, 3xxx, 4xxx

List of Inspection place and by whom

List of Period of Performance, by CLIN/SLIN
Note UIC column, aka
“ship to” code;
BPN
DODAAC
Inspect/Acceptor Code in WAWF

CLAUSES

Change in clauses due to Commercial Acquisition
Some are the Same
Same Text, Different Number
Some Deleted
Some New
Some Changed
Some By Reference (same forces as full text)/Some by Full Text
Find Clauses at http://farsite.hill.af.mil

CLAUSES, Not covering all clauses

Full Text Versions
Some require fill-in by either Government or Offeror
Some included due to age of clause

Certifications used to be in “Section K” now scattered, but in numerical order - fill in via ORCA, not manual

Other clauses may require fill-ins manually as they are not certifications, not in ORCA

52.212-1 (Instructions) Commercial version of Section L “52.215…”

Tailored by addendum (s), not within clause itself

Read both clause and addendum to get whole picture

Trouble spots:
Subcontracting/Partner Over 10% must submit separate entire Volumes I & 2 for Prime & each partner

Binders are important, different volumes go to different evaluation teams, possibly different buildings

Fluff eats page count for no purpose

52.212-1 (Instructions) Trouble spots (Cont’d):

Past Performance
Re-review PWS Appendix 5.2
Provide details on experience relative to O&M of that equipment
If possible, list DCO relevance. May save an EN to answer
Partnership experience counts but only as far as the 49%
Remember this is a Voice Switching System & Infrastructure
Explain relevance of “similar” systems/equipment
Contract/Pricing Volume (Vol 3)
Sign your proposal
Be Timely – 5 minutes late is still late
Fill in everything (except CLINs/SLINs in SF1449 Continuation Pgs
Don’t assume if possible, ask questions – If no other way, state within proposal

52.212-1 (Instructions) Trouble spots (Cont’d):

Most importantly, STUDY 52.212.2 (and addendums) also

Includes Evaluation Factors
Checklist of items to discuss
Everything visible

PRICING TABLE

No longer password protected

Careful with data input
Don’t change quantities, descriptions, or other “white cells”

Math Check verifies no tampering/changing

Use Latest Version

Latest version will be linked back to Offeror’s numbers for award

FILL IN EVERY DARK YELLOW CELL (award is all or none)

PERFORMANCE WORK STATEMENT (PWS)

Performance Based Acquisition IAW AFI 63-124

Defines Requirements in terms of “what,” not “how”

Appendices
5.1 Estimates
5.2 Equipment to be maintained (Inventory)
5.3 Glossary & Acronyms
5.4 Sustainment
5.5 Traffic Measurement Analysis
5.6 Applicable Documents

EQUIPMENT AND INSTALLATION PERFORMANCE SPECIFICATION (EIPS)

Replaces the old EPS and ISS

Generic Template Document for Most O&M

Can be Base Specific

Provides detail for Pricing Table and PWS

SCA & DBA Wage Determinations

Dept of Labor currently doing revisions

No longer incorporated by full text – just referenced

SCA WD’s revised annually to latest version

Adjustments must be requested timely

DBA WD’s also may be revised annually

DBA clause does not permit contract price adjustments, escalation possible through pricing table/options

PERFORMANCE PLAN

Not Binding

Informational/Cognizance Only—Not agreement

Signature required upon award, can be signed earlier

Living Document

How QAPs ensure compliance

QUESTIONS AND ANSWERS (Q&A)

Posted as soon as possible after receipt

May be posted without amendment, but final will be with amendment

Identity not included with question

May be incorporated into final contract

File details come from the government source that posted it. Updated .