17B0003_-_Attachment_1_Wage_Determination.pdf

PDF 132 KB Posted

Attached to
Alter Power Distribution, Stockbridge Federal contract opportunity
Solicitation number
FA8751-17-B-0003
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Attachment 1

View the file

Other files for this federal contract opportunity

Other files attached to Alter Power Distribution, Stockbridge, newest first.
File Type Posted
17B00030001.pdf PDF
3599_E9_Detail_Switchgear.pdf PDF
Pre_Bid_RFIs__2.docx DOCX document
15-0323_-_Alter_Power_Distribution,_Stockbridge_-_Corrected_Panelboard_Mounting_Detail_.pdf PDF
Pre_Bid_RFIs__1.docx DOCX document
17B0003_-_Attachment_4_-_ULDF_15-0323_Drawings_Final.pdf PDF
17B0003_-_Attachment_2_-_Site_Visit_Request.pdf PDF
FA875117B0003.pdf PDF
17B0003_-_Attachment_3_-_ULDF_15-0323_Specs_Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: NY170015 03/17/2017 NY15

Superseded General Decision Number: NY20160015

State: New York

Construction Types: Building, Heavy and Highway

County: Madison County in New York.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories), HEAVY AND

HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 02/17/2017 2 03/03/2017 3 03/17/2017

* BRNY0002-006 07/01/2016

UTICA CHAPTER

Rates Fringes

BRICKLAYER

MADISON COUNTY (Townships of Sullivan and Cazenovia)

MARBLE, TILE & TERRAZZO

FINISHERS..................$ 23.93 16.68

MARBLE, TILE & TERRAZZO

WORKERS....................$ 29.36 17.13

MADISON COUNTY, (excluding Townships of Sullivan and Cazenovia)

BRICKLAYERS, STONE

MASONS; CEMENT MASONS,

PLASTERERS, POINTER,

CLEANERS & CAULKERS........$ 33.10 17.82

MARBLE, TILE & TERRAZZO

FINISHERS..................$ 25.73 16.23

BRNY0002-011 07/01/2016

4/24/2017https://www.wdol.gov/wdol/scafiles/davisbacon/NY15.dvb?v=3

HEAVY & HIGHWAY CONSTRUCTION

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 35.09 18.75

FOOTNOTE

a. Paid Holidays: Memorial Day, July the 4th, Labor Day, and Thanksgiving Day (provided the employee is employed one day before and one day after the holiday).

CARP0277-005 07/01/2016

Rates Fringes

CARPENTER

BUILDING CONSTRUCTION

Carpenters, Millwrights....$ 25.56 17.40 Piledriver.................$ 25.56 17.40

HEAVY & HIGHWAY

CONSTRUCTION................$ 29.10 20.48

ELEC0043-001 06/01/2016

Rates Fringes

CABLE SPLICER....................$ 39.35 23.45

ELECTRICIAN......................$ 35.75 23.34

ELEC0043-002 06/01/2016

GROTON TOWNSHIP ONLY

Rates Fringes

Electricians:

CABLE SPLICING..............$ 39.35 23.45

ELECTRICIANS................$ 35.75 23.34

ELEC1249-003 05/02/2016

Rates Fringes

ELECTRICIAN (LINE

CONSTRUCTION: LIGHTING AND

TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 24.99 7.25%+21.75+a Groundman (Truck Driver)....$ 33.32 7.25%+21.75+a Groundman Truck Driver (tractor trailer unit)......$ 35.40 7.25%+21.75+a Lineman & Technician........$ 41.65 7.25%+21.75+a Mechanic....................$ 33.32 7.25%+21.75+a

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-004 05/02/2016

Rates Fringes

ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 30.28 7.25%+21.75+a Groundman digging machine operator...................$ 45.41 7.25%+21.75+a Groundman truck driver (tractor trailer unit).....$ 42.89 7.25%+21.75+a Groundman Truck driver.....$ 40.37 7.25%+21.75+a Lineman and Technician.....$ 50.46 7.25%+21.75+a Mechanic...................$ 40.37 7.25%+21.75+a Substation:

Cable Splicer..............$ 52.75 7.25%+21.75+a Flagman....................$ 28.77 7.25%+21.75+a Ground man truck driver....$ 38.36 7.25%+21.75+a Groundman digging machine operator...................$ 43.16 7.25%+21.75+a Groundman truck driver (tractor trailer unit).....$ 40.76 7.25%+21.75+a Lineman & Technician.......$ 47.95 7.25%+21.75+a Mechanic...................$ 38.36 7.25%+21.75+a Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 54.20 7.25%+21.75+a Flagman....................$ 29.56 7.25%+21.75+a Groundman Digging Machine Operator...................$ 44.34 7.25%+21.75+a Groundman Truck Driver (tractor-trailer unit).....$ 41.88 7.25%+21.75+a Groundman Truck Driver.....$ 39.42 7.25%+21.75+a Lineman & Technician.......$ 49.27 7.25%+21.75+a Mechanic...................$ 39.42 7.25%+21.75+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-008 01/01/2014

Rates Fringes

ELECTRICIAN (Line Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 29.12 3%+4.43 Groundman..................$ 12.98 3%+4.43 Installer Repairman- Teledata Lineman/Technician- Equipment Operator.........$ 27.64 3%+4.43 Tree Trimmer................$ 22.41 8.30+3%+a

a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

ENGI0545-001 07/01/2016

BUILDING

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 35.32 23.55+a GROUP 2.....................$ 33.32 23.55+a GROUP 3.....................$ 29.34 23.55+a GROUP 4.....................$ 37.32 23.55+a

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING)

GROUP 1: Air plako, asphalt and blacktop roller, automated concrete spreader (CMI or equivalent), automated fine grade machine (CMI), backhoe, elt palcer, blacktop spreader (such as barber Green & Blaw Knox), blacktop plant (automated), blast or rotary drill (truck or cat mounted), boom truck, cableway, caisson auger, central mix plant (automated), cherry picker (15 tons), concrete pump, crane, crusher (rock), derrick, diesel power unit, dragline, dredge, dual drum paver, elevating grader (self-propelled), elevator hoist (2 cage), excavator (all purpose-hydraulically operated), fork lift (loed and lull and other rough terrain type), front end loader (4 c.y. and over), gradall, grader (power), head tower (Saurman or equal), host ( 2 or 3 drum), hydroblaster (laser pump), work boat operator (LCM), light plants (compressors and generators), locomotive,maintenance engineer, maintenance welder, mine hoist, mucking machine or mole, overhead crane -fixed permanent, pile driver, quarry master or equivalent, refrigeration equipment (for soil stabilization), scraper sea mule, shovel, side boom, slip form paver, straddle buggy (ross carrier, lumber carrier), tractor drawn belt type loader (Euclid loader), tranching machine (digging capacity of over 4 ft depth), truck crane (operator), truck of trailer mounted log chipper (self feeder), tug operator (manned, rented equipment excluded), tunnel shovel, vibro or sonic hammer controls (when not mounted in proximity to the rig operator

GROUP 2: "A" frame truck, blacktop plant (non automatic), All Back Dumps, Boring machine, bulldozer, cagehoist, central mix plant (non automated),cherry picker 15 tons and under), than 5), concrete paver (single drum over 16S), core boring machine, drill rigs (tractor mounted), elevator (as a material hoist), fork lift (all others), front end loader (under 4 c.y.), gunite machine, high pressure boiler 915 lbs & over), hoist (one drum), hydraulic breaking hammer (drop hammer), Kolman plant loader (screening gravel), maintenance grease man, mizer for stabilized base (self propelled Seaman mixer), monrail machine, parapet concrete or pavement grinder, parts man, post hole digger (truck or tractor mounted), power sweeper (wayne or similar), grout pump, pump- crete or sqeeze-crete, road widener (front end of grader or self prop.), roller, self contained hydraulic bench drill, shell winder (motorized), snorkel (overhead arms), snowblower control man, trenching machine (digging capacity of 4 ft or less), tugger hoist, vibrotamp, well drill, well point system, winch (motor driven), winch cat, winch truck

GROUP 3: Compressor (up to 500 C.F.), concrete pave ror mixer (under 16S), concrete pavement spreaders and finishers (not automated), conveyor (over 12 ft), electric submersible pump (4" and over), farm tractor with or without accessories, fine grade machine (not automated), fireman, form tamper, generator (2,500 Watts and over), hydraulic pump, mechanical heaters (more than 2 whosw combined output exceeds 640,000 BTU per hour

(manufacturer's rating) plus one self contained heating unit (sundog, air heat type, new Holland hay dryer type excluded), power heaterman (hay dryer), pumps (water and trash), revinus widener (road widener), single light plant, steam cleaner or jenny, tractor with or without towed accessories

GROUP 4: Master mechanic

PREMIUMS:

Hazmat Work 2.50 Quad 9 Bulldozer or Multibowl Scraper .50

CRANE PREMIUMS (add to Group 1 Rate):

All Lattice Boom Cranes (65 ton (capacity) and over Group 1 Rate Plus 1.75 All Hydraulic Cranes (100 ton capacity) and over Group 1 Rate Plus 1.75 All Hydraulic Cranes (80 ton capacity to 99 ton capacity) Group 1 Rate Plus 1.25 All Hydraulic Cranes (65 ton capacity to 79 ton capacity) Group 1 Rate Plus 1.10

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day provided the employee has worked five consecutive working days before and the working day after the holiday.

ENGI0545-002 07/01/2016

HEAVY & HIGHWAY

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 38.97 24.90+a GROUP 2.....................$ 38.09 24.90+a GROUP 3.....................$ 34.81 24.90+a GROUP 4.....................$ 42.97 24.90+a GROUP 5.....................$ 41.97 24.90+a GROUP 6.....................$ 40.97 24.90+a GROUP 7.....................$ 40.32 24.90+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual

Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Fork Lift, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump (jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro-Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self-propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee has worked the working day before and the working day after the holiday.

IRON0060-008 05/01/2016

TOWNSHIPS OF CAZENOVIA, DERUYTER, FENNER, GEORGETOWN, LENOX,

LINCOLN, NELSON, SMITHFIELD AND SULLIVAN

Rates Fringes

Ironworkers:

Structural, Ornamental, Reinforcing, Pre-cast Concrete Erector, Machinery Mover & Rigger, Fence Erector, Stone Derrickman Welder, Sheeter, Sheeter Bucker-up..$ 29.00 24.15

IRON0440-006 05/02/2016

TOWNSHIPS OF BROOKFIELD, EATON, HAMILTON, LEBANON, MADISON,

ONEIDA, AND STOCKBRIDGE

Rates Fringes

Ironworkers:

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone Derrickman..................$ 26.60 24.84

LABO0035-003 07/01/2016

BUILDING CONSTRUCTION

Rates Fringes

Laborers:

Asbestos Removal............$ 24.00 18.94 Blasters, Form Setters, Motor-Buggy Operator (Ryder Type)................$ 23.00 18.94 Hazardous Waste Removal

(Hazardous waste removal includes, wetting, stripping, removal, scrapping, vaccuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)........$ 24.00 18.94 Laborers....................$ 22.50 18.94 Pipelayers, Motor Mixers, Motor Buggy Operator (Walk Behind), Power Lift (Walk Behind) Wagon Drill Operator....................$ 22.65 18.94 Wagon Drill Operator........$ 22.90 18.94

LABO0035-006 07/01/2016

HEAVY AND HIGHWAY

Rates Fringes

LABORER

GROUP 1.....................$ 28.05 21.89+a GROUP 2.....................$ 28.25 21.89+a GROUP 3.....................$ 28.45 21.89+a GROUP 4.....................$ 28.65 21.89+a

FOOTNOTE:

PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day Labor Day, Thanksgiving Day, and Christmas Day.

GROUP 1: Laborer, Flagmen, Outboard and Hand Boats

GROUP 2: Bull Float, Chain Saw, Concrete Aggregate Bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jack Hammer, Mason Tender, Mortar Mixer, Pavement Breaker, Handlers of all Steel Mesh, Small Generators for Laborers Tools, Installation of Bridge Drainage Pipe layers, Vibrator Type Rollers, Tamper, Drill Doctor, Tail or Screw Operator on Asphalt Paver, Water Pump Operator (l-1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding and sand blasting), Laborers on Chain Link Fence Erection, Rock Splitter and Power Unit, Pusher Type Concret Saw and all other gas, electic, Oil, and Air Tool Operators, Wrecking Laborers.

GROUP 3: All Rock or Drilling Machine Operators (except quarry master and similar type) Acetylene Torch Operators, Asphalt Paver, Powderman.

GROUP 4: Blasters, Form Setters, Stone or Granite Curb Setters.

PAIN0004-020 05/01/2016

Rates Fringes

Painters:

BUILDING CONSTRUCTION

Brush & Roll, Drywall Taping/Finishing...........$ 23.00 20.04 Spray, Sandblasting, Structural Steel...........$ 23.50 20.04

HEAVY & HIGHWAY

CONSTRUCTION

Bridges....................$ 38.00 25.25

PLUM0112-011 05/01/2016

Rates Fringes

PLUMBER (Including Steamfitting)

NORTHERN ZONE

Townships of Brookfield, Eaton, Fenner, Hamilton, Lebanon, Lenox, Lincoln, Madison, Nelson, Oneida, Smithfield, Stockbridge.....$ 34.50 25.00

SOUTHERN ZONE

Township of Georgetown......$ 33.48 24.54

PLUM0267-007 05/01/2016

THE TOWNSHIPS WHICH ADJOIN THE EASTERN BORDERS OF ONONDAGA

COUNTY

Rates Fringes

Plumber, Pipefitter, Steamfitter (Including HVAC Work)............................$ 33.16 23.17

ROOF0195-001 06/01/2016

Rates Fringes

ROOFER...........................$ 26.23 19.90

SFNY0669-001 04/01/2016

Rates Fringes

SPRINKLER FITTER.................$ 32.66 21.42

SHEE0058-001 05/01/2012

Rates Fringes

Sheet Metal Worker Projects 10 million or less.$ 26.94 17.19 Projects over $10 million...$ 27.94 17.19

TEAM0317-002 06/01/2016

BUILDING CONSTRUCTION

Rates Fringes

Truck drivers:

Jobs where total project cost is $5 million or less..$ 20.43 22.29 Jobs where total project cost is over $5 million

GROUP 1....................$ 20.43 22.94

GROUP 2....................$ 20.43 22.94

GROUP 3....................$ 20.58 22.94

GROUP 4....................$ 20.43 22.94

GROUP 5....................$ 20.43 22.94

TRUCK DRIVERS BUILDING CLASSIFICATIONS

GROUP 1: Parts chasers.

GROUP 2: Truck Driver GROUP 3: Tractor Trailer drivers, farm tractor and fuel truck drivers.

GROUP 4: Material check and reciver.

GROUP 5: Euclid driver.

TEAM0317-003 07/01/2016

HEAVY/HIGHWAY CONSTRUCTION

Rates Fringes

TRUCK DRIVER

GROUP 1.....................$ 23.94 22.87+a GROUP 2.....................$ 24.14 22.87+a

FOOTNOTES:

PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Christmas Day provided employee has worked the working day before and the working day after the holiday.

Work on Hazardous Waste Sites Receive additional $1.50/hr.

TRUCK DRIVERS HEAVY & HIGHWAY CLASSIFICATIONS

GROUP 1: Pickups, panel trucks, flatboy material trucks (straight jobs), single-axle dump trucks, dupsters, receivers, greasers, truck tiremen, tandems and batch trucks, semi-trailers, low-boy trucks, asphalt distributor trucks, & agitator, mixer trucks & dumpcrete type vehicles, fuel trucks

GROUP 2: Specialized earth moving equipment-euclid type, or similar off-highway equipment, where not self loaded,straddle (ross) carrier, and self-contained concrete mobile unit, off-highway tandem back-dump, twin engine euipment and double-hitched equipment where not self loaded.

SUNY1992-001 09/21/1992

Rates Fringes

GLAZIER..........................$ 15.76 2.80

LABORER..........................$ 13.37 3.67

PAINTER..........................$ 16.84 2.86

Power equipment operator -backhoe..........................$ 19.08 7.50+a

FOOTNOTE:

a. New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works five consective working days before and the working day after the holiday.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION