G-0-2471 TO2 LEMON CRABCAKES Exhibit A 14 May 2020.docx
DOCX document 53 KB Posted
- Attached to
- Unicorn Blue
- Solicitation number
- FA8750-20-R-1001
About this file
This document outlines a pre-solicitation notice for an indefinite-delivery, indefinite-quantity research and development contract. The Air Force Research Laboratory, Information Directorate, Rome NY requires research, development, enhancement, and integration of technologies to develop digital signal processing capabilities and collection, detection, exploitation and geo-location of emerging signals of interest for various collection platforms. Anticipated deliverables include technical documentation, reports, software, and hardware. The total ordering period is 60 months with a maximum value of approximately $49.9 million. The NAICS code is 541715 with a small business size standard of 1,000 employees. Offerors must have a Top Secret facility clearance at the prime level and any subcontractor level where work will be performed. Foreign participation will be excluded at the prime level. The draft RFP is expected in February 2020 with the formal solicitation in March 2020.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8750-20-R-1001 UNICORN BLUE QA 20200706.docx | DOCX document | |
| FA8750-20-R-1001 UNICORN BLUE QA 20200521.docx | DOCX document | |
| FA8750-20-R-1001 G-0-2370 SOW 14 May 2020.docx | DOCX document | |
| Section M_20200506.docx | DOCX document | |
| G-0-2471 TO2 LEMON CRABCAKES SOW 14 May 2020.doc | DOC document | |
| FA8750-20-R-1001 DD254_basic.pdf | ||
| Section L_20200506.docx | DOCX document | |
| G-0-2354 TO1 NOISE Exhibit A 20 May 2020.docx | DOCX document | |
| G-0-2354 TO1 NOISE SOW 20 May 2020.doc | DOC document | |
| FA8750-20-R-1001 UNICORN BLUE QA 20200313.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0002
B. EXHIBIT
A
C. CATEGORY
TDP TM- OTHER MISC
D. SYSTEM/ITEM
LEMON CRABCAKES
E. CONTRACT/PR NO.
FA8750-20-F-1004
F. CONTRACTOR
G-0-2471
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
RESEARCH AND DEVELOPMENT (R&D) PROJECT SUMMARY
3. SUBTITLE
AFRL PROGRAM MANAGEMENT REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81612B/T
5. CONTRACT REFERENCE
SOW PARAGRAPH 4.4.1
6. REQUIRING OFFICE
AFRL/RIGC
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
| a. | ADDRESSEE |
| Draft | |
| Final |
| Reg |
| Repro |
16. REMARKS
REFERENCE BLOCK 4, TAILORING DID DI-MISC-81612B, DELETE THE REQUIREMENTS FOR 1.1.3, 1.2 – 1.2.2.3, 1.2.2.5, 1.2.2.6, 3.1.4, 3.1.6-3.1.6.3 & 3.2.2 CONTRACTOR FORMAT ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MS OFFICE COMPATIBLE FORMAT, RTF OR PDF AS COORDINATED WITH THE COTR.
FOR DELIVERY VIA EMAIL, INCLUDE THE CONTRACT NUMBER IN THE SUBJECT LINE.
SUBMIT THE FIRST REPORT FORTY (40) DAYS AFTER CONTRACT AWARD AND MONTHLY THEREAFTER FOR THE PERIOD OF PERFORMANCE.
SUBMIT CLASSIFIED DATA (UP TO AND INCLUDING SECRET) VIA THE SIPRNET OR AS COORDINATED WITH THE REQUIRING OFFICE.
SUBMIT EXPORT CONTROLLED DATA AS COORDINATED WITH THE REQUIRING OFFICE.
PROVIDE ADDITIONAL DISTRIBUTION AS COORDINATED WITH THE REQUIRING OFFICE.
COTR
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
BLAKE A MANEELEY
H. DATE
14 MAY 2020
I. APPROVED BY
DANIEL S ROBBINS
J. DATE
14 MAY 2020
| DD Form 1423-1, SEP 97 (EG) (Computer Generated) | PREVIOUS EDITIONS ARE OBSOLETE | Page | 1 | of | 8 | Pages |
| CONTRACT DATA REQUIREMENTS LIST |
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
TDP TM- OTHER MGMT
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
FA8750-20-F-1004
F. CONTRACTOR
G-0-2471
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
CONTRACT FUNDS STATUS REPORT (CFSR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81468
5. CONTRACT REFERENCE
SOW PARAGRAPH 4.4.2
6. REQUIRING OFFICE
AFRL/RIGC
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
| a. | ADDRESSEE |
| Draft | |
| Final |
| Reg |
| Repro |
16. REMARKS
COMPLETE CONTRACT LINE ITEM OR APPROPRIATION REPORTING IN TOTAL SHALL BE ACCOMPLISHED ON A QUARTERLY CALENDAR BASIS, AND ALSO BY SEPARATE CONTRACT LINE ITEM WHEN AN INDIVIDUAL CONTRACT LINE ITEM IS VALUED OVER $1,600,000.
CONTRACTOR FORMAT IS ACCEPTABLE PROVIDING ALL THE ELEMENTS REQUIRED ARE INCLUDED AND ADDRESSED. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT, PDF OR RTF.
COMPILE AND SUBMIT BLOCK 12 INFORMATION OF DD FORM 1586, “OPEN COMMITMENTS” AND “ACCRUED EXPENDITURES” MONTHLY AS FOLLOWS: ACTUAL TO DATE (CURRENT MONTH), NEXT MONTH PROJECTION, THE FOLLOWING MONTH PROJECTION, THEN THE PROJECTION FOR EACH REMAINING FISCAL QUARTER. ALL OF THE ABOVE ARE CUMULATIVE FIGURES. ANY ADDITIONAL PROJECTIONS MAY BE ADDED BY THE CONTRACTOR SO LONG AS THE ELEMENTS ARE CLEARLY IDENTIFIED.
PROVIDE MONTHLY ACCRUED VALUE FOR THE CURRENT PERIOD AND PROJECTED ACCRUED EXPENDITURES FOR THE NEXT THREE (3) MONTHS THROUGH CONTRACT COMPLETION.
THIS DATA ITEM RELATES TO A001; DO NOT DUPLICATE REPORTING REQUIREMENTS ESTABLISHED THEREIN.
FOR DELIVERY VIA EMAIL, INCLUDE THE CONTRACT NUMBER IN THE SUBJECT LINE.
COTR
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 8 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
TDP TM- OTHER ADMN
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
FA8750-20-F-1004
F. CONTRACTOR
G-0-2471
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
PRESENTATION MATERIAL
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81373
5. CONTRACT REFERENCE
SOW PARAGRAPH 4.4.3
6. REQUIRING OFFICE
AFRL/RIGC
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
| a. | ADDRESSEE |
| Draft | |
| Final |
| Reg |
| Repro |
16. REMARKS
CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT, AS COORDINATED WITH THE COTR.
FOR DELIVERY VIA EMAIL, INCLUDE THE CONTRACT NUMBER IN THE SUBJECT LINE.
THE CONTRACTOR SHALL SUBMIT DRAFT PRESENTATION MATERIAL THREE (3) DAYS PRIOR TO EACH PRESENTATION.
COORDINATE THE NUMBER OF COPIES AND DELIVERY MEDIA REQUIRED FOR EACH PRESENTATION WITH THE REQUIRING OFFICE.
SUBMIT CLASSIFIED DATA (UP TO AND INCLUDING SECRET) VIA THE SIPRNET OR AS COORDINATED WITH THE REQUIRING OFFICE.
SUBMIT EXPORT CONTROLLED DATA AS COORDINATED WITH THE REQUIRING OFFICE.
| COTR |
| 1 |
| 1 |
| 1 |
SEE BLOCK 16
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 8 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
TDP TM- OTHER ADMN
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
FA8750-20-F-1004
F. CONTRACTOR
G-0-2471
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
CONFERENCE MINUTES
3. SUBTITLE
TECHNICAL INTERCHANGE MEETINGS
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250B
5. CONTRACT REFERENCE
SOW PARAGRAPH 4.4.3
6. REQUIRING OFFICE
AFRL/RIGC
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
| a. | ADDRESSEE |
| Draft | |
| Final |
| Reg |
| Repro |
16. REMARKS
CONTRACTOR FORMAT ACCEPTABLE. ELECTRONIC DELIVERY PREFERED IN MS OFFICE COMPATIBLE FORMAT, RTF OR PDF AS COORDINATED WITH THE COTR.
FOR DELIVERY VIA EMAIL, INCLUDE THE CONTRACT NUMBER IN THE SUBJECT LINE.
THE CONTRACTOR SHALL PROVIDE MINUTES AS DOCUMENTED IN THE CONTRACT SCHEDULE.
COTR
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 8 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
TDP TM- OTHER IPSC
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
FA8750-20-F-1004
F. CONTRACTOR
G-0-2471
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
SOFTWARE PRODUCT SPECIFICATION (SPS)
3. SUBTITLE
EXECUTABLE SOFTWARE, SOURCE FILES AND PACKAGING REQUIREMENTS
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81441A/T
5. CONTRACT REFERENCE
SOW PARAGRAPH 4.5.1
6. REQUIRING OFFICE
AFRL/RIGC
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
| a. | ADDRESSEE |
| Draft | |
| Final |
| Reg |
| Repro |
16. REMARKS
BLOCK 2 AND 4, REFERENCE DD FORM 1664 OR FACSIMILE. TAILORING: ONLY PARAGRAPHS 3.1, 3.2 AND 3.3 APPLY. IN THE EVENT THE SOFTWARE PRODUCED HEREIN IS NOT A COMPUTER SOFTWARE CONFIGURATION ITEM (CSCI), DISREGARD CSCI REQUIREMENTS.
CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY, AS COORDINATED WITH THE COTR.
THE CONTRACTOR SHALL SUBMIT EXECUTABLE SOFTWARE, COMMENTED SOURCE CODE FILES AND PACKAGING REQUIREMENTS AT THE COMPLETION OF CLIN 0001. COORDINATE THE DELIVERY MEDIA WITH THE REQUIRING OFFICE.
COTR
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 8 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
FA8750-20-F-1004
F. CONTRACTOR
G-0-2471
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
TECHNICAL INFORMATION REPORT
3. SUBTITLE
USERS MANUAL
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80652
5. CONTRACT REFERENCE
SOW PARAGRAPH 4.5.2
6. REQUIRING OFFICE
AFRL/RIGC
7. DD250 REQ
NO
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
| a. | ADDRESSEE |
| Draft | |
| Final |
| Reg |
| Repro |
16. REMARKS
CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT, PDF OR RTF, AS COORDINATED WITH THE COTR.
FOR DELIVERY VIA EMAIL, INCLUDE THE CONTRACT NUMBER IN THE SUBJECT LINE.
THE CONTRACTOR SHALL SUBMIT THIS DOCUMENT AS COORDINATED WITH THE COTR.
THE GOVERNMENT WILL RETURN COMMENTS NOT LATER THAN FIFTEEN (15) DAYS AFTER RECEIPT.
SUBMIT UPDATED DOCUMENT NOT LATER THAN FIFTEEN (15) DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
PROVIDE UPDATES AND SUPPLEMENTS TO THIS DOCUMENT, AS APPROPRIATE, DURING THE PERIOD OF PERFORMANCE. IDENTIFY CHANGES FROM PREVIOUS VERSIONS. PERMANENT CHANGE PAGES SHALL CONFORM TO THE REQUIREMENTS, QUALITY, STYLE AND FORMAT OF THE BASIC DOCUMENTATION.
SUBMIT CLASSIFIED DATA (UP TO AND INCLUDING SECRET) VIA THE SIPRNET OR AS COORDINATED WITH THE REQUIRING OFFICE.
SUBMIT EXPORT CONTROLLED DATA AS COORDINATED WITH THE REQUIRING OFFICE.
| COTR |
| 1 |
| 1 |
| 1 |
SEE BLOCK 16
| 15. TOTAL |
| 1 |
| 1 |
| 1 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 6 of 8 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
FA8750-20-F-1004
F. CONTRACTOR
G-0-2471
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
FINAL TECHNICAL REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A/T
5. CONTRACT REFERENCE
SOW PARAGRAPH 4.4.4
6. REQUIRING OFFICE
AFRL/RIGC
7. DD250 REQ
DD
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
| a. | ADDRESSEE |
| Draft | |
| Final |
| Reg |
| Repro |
16. REMARKS
BLOCK 4:REFERENCE DI-MISC-80711A/T AND
· ANSI/NISO Z39.18-2005 BASED AFRL FORMAT GUIDELINES
· STANDARD FORM 298
· FORMAT GUIDELINES CAN BE FOUND AT (https://www.wpafb.af.mil/afrl/ri/)
NOTE 1: FOR UNCLASSIFIED: MAIL TO AFRL/RIOSI(STINFO), 26 ELECTRONIC PARKWAY, ROME NY 13441-4514 AND AFRL/RIGC(COTR), 525 BROOKS RD, ROME NY 13441-4505 NOTE 2: FOR CLASSIFIED (UP TO AND INCLUDING SECRET): DELIVER APPROPRIATELY MARKED VIA AN APPROVED MAILING SERVICE FOR CLASSIFIED, TO AFRL/RIOSI, 26 ELECTRONIC PARKWAY, ROME NY 13441-4514 AND AFRL/RIGC(COTR), 525 BROOKS RD, ROME NY 13441-4505. ALL OTHER FTR CDRL CONDITIONS APPLY.
NOTE 3: FOR ALL CLASSIFICATION LEVELS (INCLUDING UNCLASSIFIED) WHEN DD 254 BLOCK 10.e.1 or 2 IS MARKED “YES” DELIVER APPROPRIATELY MARKED THROUGH PROPER CHANNELS TO AFRL/RIEE/SSO, 525 BROOKS RD, ROME, NEW YORK 13441-4505 PER INSTRUCTIONS IN THE DD254. ALL OTHER FTR CDRL CONDITIONS APPLY.
SUBMIT A NOTIFICATION OF SSO DELIVERY TO AFRL/RIOSI AND COTR VIA EMAIL .
CONTINUED ON NEXT PAGE
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 7 of 8 Pages
CLIN 0002 A FA8750-20-F-1004 G-0-2471 A007 CONT’D
BLOCK 16 CONTINUED
BLOCK 9: DISTRIBUTION STATEMENT F: FURTHER DISSEMINATION ONLY AS DIRECTED BY THE CONTROLLING DOD OFFICE.
NOTE: THE ABOVE DISTRIBUTION STATEMENT IS PRELIMINARY ONLY. FINAL DISTRIBUTION STATEMENT SHALL BE DETERMINED BY THE GOVERNMENT.
(IF APPLICABLE, INCLUDE) "WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, USC, SEC 2751 ET SEQ) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, USC, APP 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IAW THE PROVISIONS OF DOD DIRECTIVE 5230.25"
BLOCK 11: COMPLETION OF TECHNICAL EFFORT, SEE SECTION F.
BLOCK 12: NOT LATER THAN FIFTEEN (15) CALENDAR DAYS AFTER THE COMPLETION OF THE TECHNICAL EFFORT BLOCK 13: NOT LATER THAN FIFTEEN (15) CALENDAR DAYS AFTER RECIEPT OF GOVERNMENT COMMENTS BLOCK 14: DELIVER THE FINAL TECHNICAL REPORT, AS ONE EDITABLE TEXT FORMAT (MS WORD) FILE, WITH THE COMPLETED SF 298 EMBEDDED. FOR UNCLASSIFIED, DELIVER ELECTRONIC VERSION ONLY (CDR/DVD), ALL OTHER DELIVER ONE (1) HARDCOPY AND ONE (1) ELECTRONIC VERSION (CDR/DVD).
THE GOVERNMENT WILL REVIEW, EDIT AND RETURN FOR CORRECTIONS IF REQUIRED NOT LATER THAN THIRTY (30) CALENDAR DAYS AFTER RECEIPT.
UPON RECEIPT OF THE WRITTEN GOVERNMENT COMMENTS, AND IF APPLICABLE, ORCON REQUIREMENTS, THE CONTRACTOR SHALL INCORPORATE ALL REQUIRED CHANGES AND RESUBMIT THE REPORT, SF 298 AND ANNOTATED CHANGE PAGES TO THE CONTROLLING OFFICE, USING THE SAME DELIVERY METHOD AND DESTINATION AS INITIAL SUBMISSION.
REPRODUCTION AND DISTRIBUTION OF THIS DOCUMENT IS THE RESPONSIBILITY OF CONTROLLING DOD OFFICE. SUBMISSION OF THE FINAL UPDATED REPORT SATISFIES THE REQUIREMENT AT DFARS 252.235-7011.
DATA RIGHTS ASSERTIONS:
NOTE: THE CONTRACTOR SHALL NOT DELIVER ANY TECHNICAL DATA WITH RESTRICTIVE MARKINGS UNLESS THE TECHNICAL DATA ARE LISTED ON AN ATTACHMENT TO THIS CONTRACT ENTITLED “IDENTIFICATION AND ASSERTION OF RESTRICTIONS ON THE GOVERNMENT’S USE, RELEASE OR DISCLOSURE OF TECHNICAL DATA OR COMPUTER SOFTWARE.” UNLESS WAIVED BY THE AFRL TECHNICAL DIRECTOR, IF THE FINAL REPORT CONTAINS DATA THAT IS DELIVERED WITH LESS-THAN-UNLIMITED RIGHTS (e.g. LIMITED RIGHTS, GOVERNMENT PURPOSE RIGHTS, SPECIFICALLY NEGOTIATED LICENSE RIGHTS), THE DATA WITH LESS-THAN-UNLIMITED RIGHTS SHALL BE DELIVERED IN AN APPROPRIATELY MARKED (PER DFARS 252.227-7013) APPENDIX TO THE FINAL REPORT. THE FINAL REPORT WITHOUT THE APPENDIX SHALL BE CONSIDERED TO BE DELIVERED WITH UNLIMITED RIGHTS. THE REQUIREMENT FOR A SEPARATE APPENDIX IS MANDATORY AND CAN ONLY BE WAIVED WITH WRITTEN APPROPRIATE AFRL TECHNICAL DIRECTOR APPROVAL.
Page __8____ of ___8____ Pages
File details come from the government source that posted it. Updated .