Solicitation Amendment - FA865625RB0010002.pdf

PDF 2 MB Posted

Attached to
EWAAC On Ramp IV Federal contract opportunity
Solicitation number
FA865625RB001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Eglin Air Force Base

About this file

This file is a solicitation amendment for the Enterprise-Wide Agile Acquisition Contract (EWAAC) On-Ramp IV, containing detailed terms, conditions and clauses for the IDIQ contract vehicle. The contract provides rapid acquisition capabilities for PEO Weapons requirements, focusing on air armament and Digital Trinity programs, through delivery orders (DOs) and task orders (TOs). The base ordering period is 2 years with one 3-year option period followed by one 5-year option period, for a potential total of 10 years.

The contract has a minimum guarantee of $1,000 and maximum ceiling of $46 billion. Proposals are due by 4:00pm CDT on November 25, 2024, with questions due by 4:00pm CDT on November 7, 2024. All submissions must be made through the EWAAC Portal at www.ewaacportal.com. The contract excludes Advisory and Assistance Services requirements. Multiple awards may be made to qualified offerors submitting responsive and unique proposals. The contract uses various pricing arrangements including firm-fixed-price and cost-reimbursement. The contracting activity is the Department of the Air Force Materiel Command Lifecycle Management Center at Eglin Air Force Base. Key customers include AFLCMC/EB divisions, SOCOM Det-1, Air Force Research Lab, and Air Force Nuclear Warfare Center.

View the file

Other files for this federal contract opportunity

Other files attached to EWAAC On Ramp IV, newest first.
File Type Posted
1_EWAAC_SOO_7.31.24_Rev 41.pdf PDF
Solicitation Amendment - FA865625RB0010001.pdf PDF
2_EWAAC Sec L__On Ramp IV_Final.pdf PDF
Q_A Attachment.pdf PDF
Summary of RFP Amendment Changes.pdf PDF
Solicitation - FA865625RB001.pdf PDF
2_EWAAC Sec L__On Ramp IV_Final.pdf PDF
4_OCI Mitigation Plan Checklist_Final.pdf PDF
1_EWAAC_SOO_7.31.24_Rev 41.pdf PDF
3_EWAAC Sec M__On Ramp IV_Final.pdf PDF
5_EWAAC Vendor On-Ramp Instructions.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

Section A - Solicitation/Contract Form

EWAAC On-Ramp IV

Product Service Code: 1395

FA865625RB0010002

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies / Services Quantity Unit Unit Price Amount

Requirement/End Item Delivery Orders shall be inclusive of all labor, material, ODC, and program management/oversight to execute in accordance with the SOO and the terms of the DO. Contract type may be determined at the TO/DO level.

Pricing Arrangement: Firm Fixed Price

Additional Descriptive Data:

NAICS Code - 332993 Ordering Period 1 (Award Date - 09/09/2026)

Pursuant to FAR 52.216-22(b), Indefinite Quantity, the IDIQ contract minimum quantity is $1000 and the contract maximum quantity is $46,000,000,000.

Travel Travel shall be reimbursed in accordance with the Joint Travel and Federal Acquisition Regulations.

Pricing Arrangement: Cost No Fee

Additional Descriptive Data:

NAICS Code - 332993 Ordering Period 1 (Award Date - 09/09/2026)

Data CLIN shall include the cost of data rights if applicable. Data shall be delivered in accordance with the Delivery Order requirement and appropriate DD Forms 1423 (CDRLS).

Pricing Arrangement: Firm Fixed Price

Additional Descriptive Data:

NAICS Code - 332993 Ordering Period 1 (Award Date - 09/09/2026)

Requirement/End Item

Option Line Item

Delivery Orders shall be inclusive of all labor, material, ODC, and program management/oversight to execute in accordance with the SOO and the terms of the DO. Contract type may be determined at the TO/DO level.

Pricing Arrangement: Firm Fixed Price

Additional Descriptive Data:

NAICS Code - 332993 Ordering Period 2 (09/10/2026-09/09/2031)

Pursuant to FAR 52.216-22(b), Indefinite Quantity, the IDIQ contract minimum quantity is $1000 and the contract maximum quantity is $46,000,000,000.

Option Line Item

Travel Travel shall be reimbursed in accordance with the Joint Travel and Federal Acquisition Regulations.

Pricing Arrangement: Cost No Fee

Additional Descriptive Data:

NAICS Code - 332993 Ordering Period 2 (09/10/2026-09/09/2031)

Option Line Item

Data CLIN shall include the cost of data rights if applicable. Data shall be delivered in accordance with the Delivery Order requirement and appropriate DD Forms 1423 (CDRLS).

Pricing Arrangement: Firm Fixed Price

Additional Descriptive Data:

NAICS Code - 332993 Ordering Period 2 (09/10/2026-09/09/2031)

Section C - Description/Specifications/Statement of Work

Requirements Fourth On-Ramp for Eglin Wide Agile Acquisition Contract (EWAAC) vehicle. The Armament Directorate (AFLCMC/EB) at Eglin AFB, FL is seeking the ability to: a) rapidly develop technologies of novel weapons capabilities, b) apply unique solutions and innovative ideas, and c) characterize new technologies and system concepts that provide evolutionary, revolutionary, and disruptive capabilities for the United States Air Force through weapons systems requirements development, studies and demonstrations. The primary objective is to provide rapid response applicable to all areas and lifecycle phases of weapons development to include weapons concepts, concept development, concept demonstrations, weapons system procurement, production, fielding, operations, and sustainment to quickly meet current and future weapons system requirements. Customers include, but are not limited to AFLCMC/EB divisions, SOCOM Det-1, Air Force Research Lab (AFRL), and the Air Force Nuclear Warfare Center (AFNWC).

Section D - Packaging and Marking

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-3 Inspection of Supplies-Cost-Reimbursement. May 2001 52.246-4 Inspection of Services-Fixed-Price. Aug 1996 52.246-5 Inspection of Services-Cost-Reimbursement. Apr 1984 52.246-6 Inspection-Time-and-Material and Labor-Hour. May 2001 52.246-7 Inspection of Research and Development-Fixed-Price. Aug 1996 52.246-8 Inspection of Research and Development-Cost-Reimbursement. May 2001 52.246-15 Certificate of Conformance. Apr 1984 52.246-16 Responsibility for Supplies. Apr 1984

FAR Clauses Incorporated by Full Text

52.246-11 Higher-Level Contract Quality Requirement. (Dec 2014)

As prescribed in 46.311 , insert the following clause:

Higher-Level Contract Quality Requirement (Dec 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

Determined at TO/DO Level[Contracting Officer insert the title, number (if any), date, and tailoring (if any) of the higher-level quality standards.]

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

Section F - Deliveries or Performance

Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes

FoB Details Contractor Destination

FoB Details Contractor Destination

FoB Details Contractor Destination

Option Line Item

FoB Details Contractor Destination

Option Line Item

FoB Details Contractor Destination

Option Line Item

FoB Details Contractor Destination

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.211-17 Delivery of Excess Quantities. Sep 1989 52.242-15 Stop-Work Order. Aug 1989 52.242-15 Stop-Work Order. (Alternate I) Aug 1989 Alternate I Apr 1984 52.242-17 Government Delay of Work. Apr 1984 52.247-29 F.o.b. Origin. Feb 2006 52.247-34 F.o.b. Destination. Nov 1991 52.247-39 F.o.b. Inland Point, Country of Importation. Apr 1984 52.247-48 F.o.b. Destination-Evidence of Shipment. Feb 1999 52.247-65 F.o.b. Origin, Prepaid Freight-Small Package Shipments. Jan 1991

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.223-7003 Change in Place of Performance--Ammunition and Explosives. Dec 1991

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.201-7000 Contracting Officer's Representative. Dec 1991 252.204-7002 Payment for Contract Line or Subline Items Not Separately Priced. Apr 2020 252.231-7000 Supplemental Cost Principles Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

As prescribed in 232.7004(b), use the following clause:

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause-

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Determined at TO/DO Level

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Determined at TO/DO Level

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Determined at TO/DO Level Issue By DoDAAC Determined at TO/DO Level Admin DoDAAC Determined at TO/DO Level Inspect By DoDAAC Determined at TO/DO Level Ship To Code Determined at TO/DO Level Ship From Code Determined at TO/DO Level Mark For Code Determined at TO/DO Level Service Approver (DoDAAC) Determined at TO/DO Level Service Acceptor (DoDAAC) Determined at TO/DO Level Accept at Other DoDAAC Determined at TO/DO Level LPO DoDAAC Determined at TO/DO Level DCAA Auditor DoDAAC Determined at TO/DO Level Other DoDAAC(s) Determined at TO/DO Level (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Determined at TO/DO Level

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

Eglin-H001 ORDERING PROCEDURES (October 2024)

The Enterprise-Wide Agile Acquisition Contract (EWAAC) ordering procedures shall be centrally located on the EWAAC portal at https://www.

ewaacportal.com. Offerors will be able to view the ordering procedures and shall abide by the most recent version available on the EWAAC portal.

Eglin- H099 Organizational Conflicts of Interest (OCI) (October 2024)

a. Definitions:

"Organizational Conflict of Interest" means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the Government, or the person's objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage. "Person" as used herein includes Corporations, Partnerships, Joint Ventures, Teaming Arrangements, and other business enterprises. The term "contractor" as used in this clause, includes any person, firm or corporation which has a majority or controlling interest in the contractor or in any parent corporation thereof, any person, firm, or corporation in or as to which the contractor (or any parent or subsidiary corporation thereof) has a majority or controlling interest. The term also includes the corporate officers of the contractor, those of any corporation which has a majority or controlling interest in the contractor, and those of any corporation in which the contractor (or any parent or subsidiary corporation thereof) has a majority or controlling interest. All references to the "contractor" as contained in this clause shall apply with equal force to all of these included. "Contract" and "Delivery Order" shall be used as applicable to the level at which this clause is being invoked.

b. Impact on Future Agency Contracts and DOs:

1. The contractor shall be excluded from competition for, or award of any Government contracts as to which, in the course of performance of this contract, the contractor has received advance procurement information before such information has been made generally available to other persons or firms unless mitigation measures are put in place, to avoid, neutralize, or mitigate an OCI.

2. The contractor shall be excluded from competition for, or award of any Government contract for which the contractor actually assists in the development of the screening information request (SIR), specifications or statements of work unless mitigation measures are put in place to avoid, neutralize or mitigate an OCI.

3. The contractor shall be excluded from competition for or award of any Government contract which calls for the evaluation of system requirements, system definitions, or other products developed by the contractor under this contract or resulting DOs unless mitigation measures are put in place to avoid, neutralize or mitigate and OCI.

4. The contractor shall be excluded from competition for, or award of any Government contract which calls for the construction or fabrication of any system, equipment, hardware, and/or software for which the contractor participated in the development of requirements or definitions pursuant to this contract or resulting DO unless mitigation measures are put in place to avoid, neutralize or mitigate and OCI. This clause shall not exclude the contractor from performing work under any amendment or modification to this contract or from competing for award for any future contract for work that is the same or similar to work performed under this contract. This clause shall have effect throughout the period of performance of this contract (and any applicable Delivery Order performance period that exceeds the basic contract ordering period), any extensions thereto by change order or supplemental agreement, and for three (3) years thereafter. The agency may in its sole discretion, waive any provisions of this clause if deemed in the best interest of the Government. The exclusions contained in this clause shall apply for the duration of the applicable delivery order(s) and for three (3) years after completion and acceptance of all work performed hereunder. If any provision of this clause excludes the contractor from competition for, or award of any contract, the contractor shall not be permitted to serve as a subcontractor, at any tier, on such contract. This clause shall be incorporated into any subcontracts or consultant agreements awarded under this contract unless the Contracting Officer determines otherwise.

c. Affirmative Duties and Responsibilities for Government Contractors:

The contractor warrants that to the best of its knowledge and belief, and except as otherwise set forth in the contract, the contractor does not have any organizational conflict of interest(s) as defined in paragraph a. above. The contractor agrees that, if after award, it discovers an actual or potential organizational conflict of interest at the contract level it shall make immediate and full disclosure in writing to the Contracting Officer. Changes in the contractor's relationships due to mergers, consolidations or any unanticipated circumstances may create an unacceptable organizational conflict of interest which would necessitate such disclosure. The notification shall include a description of the actual or potential organizational conflict of interest, a description of the action that the contractor has taken or proposes to take to avoid, mitigate, or neutralize the conflict, and any other relevant information that would assist the Contracting Officer in making a determination on this matter. The contractor, upon identification of a potential conflict, shall submit requests to participate in the DO for written approval on a DO-by-DO basis, unless the contractor is aware of multiple DOs that may create the appearance of a conflict, or be an actual conflict. In the case of the later, the contractor shall notify the Contracting Officer as soon as the conflicts/apparent conflicts have been identified. This provision shall be in effect throughout the period of performance of this contract, any extensions thereto by change order or supplemental agreement, and for three years thereafter. The contractor shall permit a Government audit of internal OCI mitigation procedures for verification purposes. The Government reserves the right to reject a mitigation plan, if in the opinion of the Contracting Officer, such a plan is not in the best interests of the Government. The contractor shall hold the government harmless and will freely indemnify the Government as to any cost/loss resulting from the unauthorized use or disclosure of any third-party proprietary information by its employees, the employees of subcontractors, or by its agents. The Contracting Officer's decision as to the existence or nonexistence of an actual or potential organizational conflict of interest shall be final. The contractor shall include the same provisions as are expressed in this clause, including this paragraph, in all subcontracts awarded for performance of any portion of this requirement. This restriction is applicable throughout the period of performance of the subcontract, and any extensions thereof by change order or supplemental agreement, and for three years thereafter. When the provisions of this clause are included in a subcontract, the term "Contracting Officer" shall represent the head of the contracts office of the prime contract. Any deviations or less restrictive coverage deemed necessary or required by the prime contractor for a particular subcontract must first be submitted to the Contracting Officer for approval. Subcontract restrictions will be limited to the technical area(s) addressed in the specific statements of work in the subcontractor's given Delivery Orders.

d. Compliance:

Compliance with this OCI requirement is a material obligation of this contract. The rights and remedies described herein shall not be exclusive and are in addition to other rights and remedies provided by law, including those set forth at FAR Part 9.5, or elsewhere included in this contract. If the contractor takes any action prohibited by this requirement or fails to take action required by this requirement, the Government may terminate this contract for default. For breach of any of the restrictions contained herein, or for nondisclosure or misrepresentation of any relevant facts required to be disclosed concerning this contract, the government reserves the right to terminate this contract for default, disqualify the contractor for subsequent related contractual efforts, and to pursue such other remedies as may be available under law. If in compliance with this clause, the contractor discovers and promptly reports an organizational conflict of interest subsequent to contract award, the Contracting Officer may choose to terminate this contract for convenience of the Government, when such termination is deemed to be in the best interest of the Government AT THE DELIVERY

ORDER LEVEL

e. OCI / Advisory and Assistance Services Possibilities.

It is recognized by the parties hereto that some of the services identified in the SOW may include (1) incidental advisory and assistance services (2) technical evaluation of other contractor's products and services; (3) surveillance of other contractor's services and work products; and, (4) access to other contractors' proprietary information. Such activities create a significant potential for certain conflicts of interest, as set forth in FAR 9.505-1, FAR 9.505-2, FAR 9.505-3, and FAR 9.505-4. It is the intention of the parties that the contractor will not engage in any other contractual or other activities which could create an organizational conflict of interest with its position under this contract; which might impair its ability to render unbiased advice and recommendations; or, in which it may derive an unfair competitive advantage as a result of knowledge, information, and experience gained during the performance of this contract. Therefore, the contractor agrees that it will seek the prior written approval of the Contracting Officer before participating in any DO that may involve such a conflict. The contractor agrees that it shall not release, disclose, or use in any way that would permit or result in disclosure to any party outside the government any information provided to the contractor by the Government during or as a result of performance of this DO. Such information includes, but is not limited to, information submitted to the Government on a confidential basis by other persons. Further, the prohibition against release of GFI extends to cover such information whether or not in its original form, where the information has been included in contractor generated work, or where it is discernible from materials incorporating or based upon such information. This prohibition shall not expire after a given period of time. Whenever performance of this contract requires access to another contractor's proprietary information, the contractor shall (1) enter into a written agreement with the other entities involved, as appropriate, in order to protect such proprietary information from unauthorized use or disclosure for as long as it remains proprietary; and (2) refrain from using such proprietary information other than as agreed to, for example; to provide assistance during technical evaluation of other contractors' offers or products under this contract. An executed copy of all proprietary information agreements by individual personnel or on a corporate basis shall be furnished to the DO Contracting Officer within fifteen (15) calendar days of execution. The contractor shall promptly notify the Contracting Officer, in writing, if it has been tasked to evaluate or advise the Government concerning its own products or activities or those of a competitor in order to ensure that proper safeguards exist to guarantee objectivity and to protect the Government's interest. In the event that a DO is issued to the contractor that would require activity that would create a potential conflict of interest, the contractor shall:

1. Notify the Contracting Officer of a potential conflict

2. Recommend to the Government an alternate tasking approach which would avoid the potential conflict, or,

3. Present for approval a conflict of interest mitigation plan that will:

4. Describe in detail the DO requirement that creates the potential conflict of interest; and,

5. Outline in detail the actions to be taken by the contractor or the Government in the performance of the task to mitigate the conflict, division of subcontractor effort, and limited access to information, or other acceptable means.

6. The contractor shall not commence work on a DO related to a potential conflict of interest until specifically notified by the Contracting Officer to proceed

7. If the Contracting Officer determines that it is in the best interest of the Government to issue a DO, notwithstanding a conflict of interest, a request for waiver shall be submitted in accordance with FAR 9.503

8. Conflicts Of Interest Compliance Plan: In the event that a waiver is requested, the Contractor shall submit with the waiver request a Conflicts of Interest (COI) Compliance Plan to the Contracting Officer for approval. The COI Compliance Plan shall address the Contractor's approach for adhering to the Section H. Organizational Conflicts of Interest (OCI) and describe its procedures for aggressively identifying and resolving both organizational and employee conflicts of interest. The overall purpose of the COI Compliance Plan is to demonstrate how the Contractor will assure that its operations meet the highest standards of ethical conduct, and how its assistance and advice are impartial and objective.

The COI Compliance Plan shall specifically address:

I. How the Contractor will protect confidential, proprietary, or sensitive information;

II. Preventing the existence of conflicting roles that might bias a contractor's judgment; and, III. Preventing an unfair competitive advantage. Contractors are invited to review FAR 9.5 "Organizational and Consultant Conflicts of Interest (OCI)." Particular attention is directed to from FAR 9.505-1 thru FAR 9.505-4.

f. Avoidance of OCI.

The policy of the government is to avoid contracting with contractors who have unacceptable organizational conflicts of interest. It is not the intent of the government to foreclose a vendor from a competitive acquisition due to a perceived OCI. The Contracting Officers are fully empowered to evaluate each potential OCI scenario based upon the applicable facts and circumstances. The final determination of such action may be negotiated between the impaired vendor and the Contracting Officer. The Contracting Officer's business judgment and sound discretion in identifying, negotiating, and eliminating OCI scenarios should not adversely affect the government's policy for competition. The government is committed to working with potential vendors to eliminate or mitigate actual and perceived OCI situations, without detriment to the integrity of the competitive process, the mission of the government, or the legitimate business interests of the vendor community.

Eglin-H100On Ramp IV (October 2024)

The Government intends to establish an awardee group under the EWAAC effort. The Government will initially establish the awardee pool by competitively awarding multiple-award IDIQ contracts. Initial awardees of the EWAAC effort will be awarded contract with a base ordering period of two (2) years. After the base period the Government reserves the right to award an option of three (3) years followed by an option of five (5) years.

The Government reserves the right to/not to re-open competition at any time during the term of the contract to add additional contractors to the original group of awardees. The addition of other contractors; however, will not extend the overall ordering period beyond the original and both option periods for a total of ten (10) years. Any awardee already in the awardee pool will not re-compete for an awardee group position.

Once a new awardee is selected, that awardee will be included in the awardee group and will compete for future orders. The ordering period for new contractors being added to the awardee group will coincide with the initial awardees ordering period but shall not extend the overall term of the ordering period nor shall it re-establish the basic contract ordering period.

Eglin-H101 On Ramp IV, Use of Non-Government Advisors (October 2024)

Offerors are advised that technical, cost/price data, and source selection sensitive information submitted to the Government in response to this solicitation may be released to non-Government advisors for proposal review and analysis. All non-Government advisors have signed non-disclosure statements. The non-Government advisor support will be provided by the EWAAC Project Manager, Timothy Voruz, (timothy.voruz.1.ctr@us.af.

mil), E-pass Contractor. Offerors shall complete paragraph (2) below or provide a written objection to disclosure as indicated in paragraph (1) below.

If the Offeror objects to disclosure of a portion of the proposal, the consent in (2) should be provided for the remainder of the proposal.

Include either paragraph (1) or (2) below, completed as applicable, within the proposal cover letter (Volume I).

(1) Any objection to disclosure:

(i) Shall be provided in writing to the PCO within five (5) calendar days of Solicitation issuance; and

(ii) Shall include a detailed statement of the basis for the objection. The detailed statement shall identify the specific portions of the proposal the Offeror objects to disclosure to non-Government advisors.

(2) I understand technical, cost/price data, and source selection information submitted to the Government in response to this Solicitation may be released to non-Government advisors.

By submitting a response to the RFP for which this clause is included, I consent to release of any (unless objection is provided in (1) above) proprietary, confidential, or privileged commercial or financial data provided by the firm(s) responding to RFPFA865625RB001.

Section I - Contract Clauses

252.204-7024 Notice on the Use of the Supplier Performance Risk System.

As prescribed in 204.7604, use the following provision .

NOTICE ON THE USE OF THE SUPPLIER PERFORMANCE RISK SYSTEM (MAR 2023)

(a) As used in this provision-- Definitions.

"Item risk" means the probability that a product, based on intended use, will introduce performance risk resulting in safety issues, mission degradation, or monetary loss.

"Price risk" means a measure of whether a proposed price for a product or service is consistent with historical prices paid for that item or service.

"Supplier risk" means the probability that an award may subject the procurement to the risk of unsuccessful performance or to supply chain risk (see Defense Federal Acquisition Regulation Supplement ). 239.7301

(b) The Supplier Performance Risk System (SPRS), available at , will be used in the evaluation of the Quoter or Offeror's https://piee.eb.mil/ performance. SPRS retrieves item, price, quality, delivery, and contractor information on contracts from Government reporting systems in order to develop risk assessments.

(c) The Contracting Officer will consider SPRS risk assessments during the evaluation of quotations or offers received in response to this solicitation as follows:

(1) Item risk will be considered to determine whether the procurement represents a high performance risk to the Government.

(2) Price risk will be considered in determining if a proposed price is consistent with historical prices paid for a product or a service or otherwise creates a risk to the Government.

(3) Supplier risk, including but not limited to quality and delivery, will be considered to assess the risk of unsuccessful performance and supply chain risk.

(d) SPRS risk assessments are generated daily. Quoters or Offerors are able to access their risk assessments by following the access instructions in the SPRS user's guide available at . Quoters and Offerors are granted access to SPRS for their own risk https://www.sprs.csd.disa.mil/reference.htm assessment classifications only. SPRS reporting procedures and risk assessment methodology are detailed in the SPRS user's guide. The method to challenge a rating generated by SPRS is also provided in the user's guide. SPRS evaluation criteria are available at https://www.sprs.csd.disa.mil/pdf

./SPRS_DataEvaluationCriteria.pdf

(e) The Contracting Officer may consider any other available and relevant information when evaluating a quotation or an offer.

(End of provision)

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-5 Covenant Against Contingent Fees. May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government. Jun 2020 52.203-7 Anti-Kickback Procedures. Jun 2020

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity.

May 2014

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. May 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.203-13 Contractor Code of Business Ethics and Conduct. Nov 2021

52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009.

Jun 2010

52.203-17 Contractor Employee Whistleblower Rights. Nov 2023

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

Jan 2017

FA865625RB0010002

https://www.acquisition.gov/dfars/part-239-acquisition-information-technology#DFARS_239.7301 https://piee.eb.mil/ https://www.sprs.csd.disa.mil/reference.htm https://www.sprs.csd.disa.mil/pdf/SPRS_DataEvaluationCriteria.pdf https://www.sprs.csd.disa.mil/pdf/SPRS_DataEvaluationCriteria.pdf

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. May 2011 52.204-9 Personal Identity Verification of Contractor Personnel. Jan 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Jun 2020 52.204-12 Unique Entity Identifier Maintenance. Oct 2016 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.204-21 Basic Safeguarding of Covered Contractor Information Systems. Nov 2021

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities.

Dec 2023

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

Nov 2021

52.204-27 Prohibition on a ByteDance Covered Application. Jun 2023 52.204-30 Federal Acquisition Supply Chain Security Act Orders-Prohibition. Dec 2023

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.

Nov 2021

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. Oct 2018 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.210-1 Market Research. Nov 2021 52.211-5 Material Requirements. Aug 2000 52.211-15 Defense Priority and Allocation Requirements. Apr 2008 52.214-26 Audit and Records-Sealed Bidding. (Alternate I) Jun 2020 Alternate I Mar 2009 52.214-26 Audit and Records-Sealed Bidding. Jun 2020 52.215-2 Audit and Records-Negotiation. (Alternate I) Jun 2020 Alternate I Mar 2009 52.215-2 Audit and Records-Negotiation. Jun 2020 52.215-8 Order of Precedence-Uniform Contract Format. Oct 1997 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data. Aug 2011

52.215-11 Price Reduction for Defective Certified Cost or Pricing Data -- Modifications

(DEVIATION 2022-O0001)

Jun 2020 Deviation 2022-O0001 Oct 2021

52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-Modifications. Jun 2020 52.215-12 Subcontractor Certified Cost or Pricing Data. Jun 2020 52.215-14 Integrity of Unit Prices. Nov 2021 52.215-15 Pension Adjustments and Asset Reversions. Oct 2010

52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other Than Pensions.

Jul 2005

52.215-19 Notification of Ownership Changes. Oct 1997

52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications.

Nov 2021

52.215-23 Limitations on Pass-Through Charges. Jun 2020 52.216-8 Fixed Fee. Jun 2011 52.216-11 Cost Contract-No Fee. Apr 1984 52.219-8 Utilization of Small Business Concerns (DEVIATION 2024-O0002) Sep 2023 Deviation 2024-O0002 Jan 2024 52.219-8 Utilization of Small Business Concerns. Feb 2024 52.219-9 Small Business Subcontracting Plan. Sep 2023

52.219-9 Small Business Subcontracting Plan Alternate IV (DEVIATION 2019-O0005) Sep 2023 Alternate IV Deviation 2019-O0005

Jan 2019 Jan 2019

52.219-9 Small Business Subcontracting Plan. (Alternate IV) Sep 2023 Alternate IV Sep 2023 52.219-16 Liquidated Damages-Subcontracting Plan. Sep 2021

52.219-27 Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran- Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program.

Feb 2024

52.222-1 Notice to the Government of Labor Disputes. Feb 1997 52.222-3 Convict Labor. Jun 2003 52.222-19 Child Labor-Cooperation with Authorities and Remedies. Feb 2024 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment. Jun 2020 52.222-21 Prohibition of Segregated Facilities. Apr 2015 52.222-26 Equal Opportunity. Sep 2016 52.222-35 Equal Opportunity for Veterans. Jun 2020 52.222-36 Equal Opportunity for Workers with Disabilities. Jun 2020 52.222-37 Employment Reports on Veterans. Jun 2020 52.222-50 Combating Trafficking in Persons. Nov 2021 52.222-54 Employment Eligibility Verification. May 2022 52.222-62 Paid Sick Leave Under Executive Order 13706. Jan 2022 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts. May 2024 52.223-5 Pollution Prevention and Right-to-Know Information. (Alternate I) May 2011 Alternate I May 2011 52.223-5 Pollution Prevention and Right-to-Know Information. May 2024 52.223-6 Drug-Free Workplace. May 2001 52.223-10 Waste Reduction Program. May 2024 52.223-15 Energy Efficiency in Energy-Consuming Products. May 2020 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. Jun 2020 52.223-19 Compliance with Environmental Management Systems. May 2011 52.223-21 Foams. May 2024

52.223-23 Sustainable Products and Services. May 2024 52.224-1 Privacy Act Notification. Apr 1984 52.224-2 Privacy Act. Apr 1984 52.224-3 Privacy Training. Jan 2017 52.224-3 Privacy Training. (Alternate I) Jan 2017 Alternate I Jan 2017 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021

52.225-23 Required Use of American Iron, Steel, and Manufactured Goods-Buy American Statute-Construction Materials under Trade Agreements. (Alternate I)

Nov 2023 Alternate I Nov 2023

52.226-7 Drug-Free Workplace. May 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.227-1 Authorization and Consent. Jun 2020 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. Jun 2020 52.227-10 Filing of Patent Applications-Classified Subject Matter. Dec 2007 52.228-5 Insurance-Work on a Government Installation. Jan 1997 52.228-7 Insurance-Liability to Third Persons. Mar 1996 52.229-3 Federal, State, and Local Taxes. Feb 2013 52.229-4 Federal, State, and Local Taxes (State and Local Adjustments). Feb 2013 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.230-2 Cost Accounting Standards. Jun 2020 52.230-5 Cost Accounting Standards-Educational Institution. Jun 2020 52.230-6 Administration of Cost Accounting Standards. Jun 2010 52.232-17 Interest. May 2014 52.232-20 Limitation of Cost. Apr 1984 52.232-22 Limitation of Funds. Apr 1984 52.232-23 Assignment of Claims. May 2014 52.232-23 Assignment of Claims. (Alternate I) May 2014 Alternate I Apr 1984 52.232-25 Prompt Payment. (Alternate I) Jan 2017 Alternate I Feb 2002

52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services.

Nov 2021

52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-36 Payment by Third Party. May 2014 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.233-3 Protest after Award. (Alternate I) Aug 1996 Alternate I Jun 1985 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.234-1 Industrial Resources Developed Under Title III, Defense Production Act. Sep 2016 52.237-2 Protection of Government Buildings, Equipment, and Vegetation. Apr 1984 52.242-1 Notice of Intent to Disallow Costs. Apr 1984 52.242-2 Production Progress Reports. Apr 1991 52.242-3 Penalties for Unallowable Costs. Dec 2022 52.242-5 Payments to Small Business Subcontractors. Jan 2017 52.242-13 Bankruptcy. Jul 1995 52.243-1 Changes-Fixed-Price. Aug 1987 52.243-1 Changes-Fixed-Price. (Alternate II) Aug 1987 Alternate II Apr 1984 52.243-1 Changes-Fixed-Price. (Alternate I) Aug 1987 Alternate I Apr 1984 52.243-1 Changes-Fixed-Price. (Alternate V) Aug 1987 Alternate V Apr 1984 52.243-1 Changes-Fixed-Price. (Alternate III) Aug 1987 Alternate III Apr 1984 52.243-1 Changes-Fixed-Price. (Alternate IV) Aug 1987 Alternate IV Apr 1984 52.243-2 Changes-Cost-Reimbursement. Aug 1987 52.243-2 Changes-Cost-Reimbursement. (Alternate II) Aug 1987 Alternate II Apr 1984 52.244-2 Subcontracts. (Alternate I) Jun 2020 Alternate I Jun 2020 52.244-5 Competition in Subcontracting. Aug 2024 52.244-6 Subcontracts for Commercial Products and Commercial Services. Feb 2024 52.245-1 Government Property. Sep 2021 52.245-1 Government Property. (Alternate I) Sep 2021 Alternate I Apr 2012 52.245-9 Use and Charges. Apr 2012 52.246-23 Limitation of Liability. Feb 1997 52.246-25 Limitation of Liability-Services. Feb 1997 52.246-26 Reporting Nonconforming Items. Aug 2024 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). Apr 1984 52.249-2 Termination for Convenience of the Government (Fixed-Price). Apr 2012 52.249-2 Termination for Convenience of the Government (Fixed-Price). (Alternate I) Apr 2012 Alternate I Sep 1996 52.249-6 Termination (Cost-Reimbursement). May 2004 52.249-6 Termination (Cost-Reimbursement). (Alternate I) May 2004 Alternate I Sep 1996 52.249-8 Default (Fixed-Price Supply and Service). Apr 1984 52.249-8 Default (Fixed-Price Supply and Service). (Alternate I) Apr 1984 Alternate I Apr 1984 52.249-14 Excusable Delays. Apr 1984 52.253-1 Computer Generated Forms. Jan 1991

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011

252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract-Related Felonies.

Jan 2023

252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.203-7003 Agency Office of the Inspector General. Aug 2019 252.203-7004 Display of Hotline Posters. Jan 2023 252.204-7000 Disclosure of Information. Oct 2016 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. Jan 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024

252.204-7014 Limitations on the Use or Disclosure of Information by Litigation Support Contractors.

Jan 2023

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

Jan 2023

252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Nov 2023 252.205-7000 Provision of Information to Cooperative Agreement Holders. Jun 2023

252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.

May 2019

252.211-7008 Use of Government-Assigned Serial Numbers. Sep 2010 252.215-7002 Cost Estimating System Requirements. Dec 2012 252.215-7015 Program Should-Cost Review. Nov 2019

252.216-7003 Economic Price Adjustment--Wage Rates or Material Prices Controlled by a Foreign Government.

Mar 2012

252.216-7009 Allowability of Legal Costs Incurred in Connection with a Whistleblower Proceeding.

Dec 2022

252.216-7010 Postaward Debriefings for Task Orders and Delivery Orders. Dec 2022 252.219-7003 Small Business Subcontracting Plan (DoD Contracts). Dec 2019 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. Jan 2023 252.223-7002 Safety Precautions for Ammunition and Explosives. Nov 2023 252.223-7004 Drug-Free Work Force. Sep 1988

252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials.

Sep 2014

252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. (Alternate I)

Sep 2014 Alternate I Sep 2014

252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7001 Buy American and Balance of Payments Program. Jan 2023 252.225-7001 Buy American and Balance of Payments Program. (Alternate I) Feb 2024 Alternate I Feb 2024 252.225-7002 Qualifying Country Sources as Subcontractors. Mar 2022

252.225-7004 Report of Intended Performance Outside the United States and Canada - Submission after Award.

Jul 2024

252.225-7008 Restriction on Acquisition of Specialty Metals. Mar 2013 252.225-7012 Preference for Certain Domestic Commodities. Apr 2022 252.225-7021 Trade Agreements. Feb 2024 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023

252.225-7058 Postaward Disclosure of Employment of Individuals Who Work in the People's Republic of China.

Jan 2023

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .