This document outlines a task order under the Technical Operations VI indefinite-delivery/indefinite-quantity contract. The task order objectives include developing, modeling, designing, and characterizing 2D materials, resistive switching systems, dielectric magnetic materials, and ultra-wide bandgap semiconductors with desirable electrical, magnetic, thermal, mechanical, and switching properties for applications in RF, sensing, communications, information processing, power conversion, and extreme conditions. The contractor will pursue materials design and development, perform characterization and modeling, and demonstrate device concepts over a period of five years. Total funding is $4.375 million distributed annually from FY22 through FY27. The deliverables include mandatory and elective CDRLs, with review, inspection, and acceptance at the destination stated. The estimated level of effort is 40 person-years.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 22S5003_Amend_02.pdf | ||
| 22S5003_Atch 4_TO 0003 SOO_30 Dec 2021.pdf | ||
| 22S5003_Atch 2_TO 0001 SOO_30 Dec 2021.pdf | ||
| 22S5003_BAA_Amend -01.pdf | ||
| 22S5003_Atch 1_Model.pdf | ||
| 22S5003_Atch 4_TO 0003 SOO.pdf | ||
| 22S5003_Atch 2_TO 0001 SOO.pdf | ||
| 22S5003_BAA_TOPS VI.pdf | ||
| 22S5003_Atch 3_TO 0002 SOO.pdf | ||
| NOCA-TOPS VI_V1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20 September 2021
Technical Operations VI (TOPS VI)
Task Order Description/Work Statement
TOPS Effort #:
Date: 20 Sep 2021
Requestor: Ajit Roy, RXAN
TO Title: Integrated Magnetic and Electronic Systems
TO Objectives: The objectives of this Integrated Magnetic and Electronic Systems Task Order are: (a) the development, modeling, design, and characterization of 2D materials with electrical, magnetic, thermal, and mechanical properties to meet air force application needs in the areas associated with RF, sensing, communications, and information processing, (b) the development, modeling, design, and characterization of resistive switching systems for information processing and RF applications, (c) the development, modeling and characterization of dielectric magnetic materials for RF, communications and information processing and (d) ) the development, modeling and characterization of ultra-wide bandgap semiconductor materials with optimized electrical switching properties to meet air force application needs in the areas associated with RF, power conversion and information processing in extreme conditions.
Description of Work:
The contractor shall pursue materials design, develop materials, perform materials characterization and modeling to with desirable materials properties to test and demonstrate novel nanomaterial device concepts.
The work includes materials deposition and simple device fabrication development studies with supported material and basic device characterization studies. These studies shall be matched to appropriate modeling efforts when appropriate, leading to innovative materials and device design. The emphasis of the studies shall be given on alternative materials and characterization as opposed to more conventionally researched materials and characterization processes in these areas. Contractor shall work in a dynamic environment of civilian, military, contractual on-site scientists and engineers, as well as academic, commercial, and DoD collaborators in order to rapidly mature technology.
SECURITY REQUIREMENTS
OPERATIONS SECURITY (OPSEC)
The contractor shall participate in all activities associated with the disciplines of the organization’s Industrial
Security, Information Security, Personnel Security, Operations Security (OPSEC), and Antiterrorism programs, following appropriate measures in each program as required for this particular contract. Security measures are required to reduce program vulnerability from successful adversary collection, exploitation of critical information, and violations of export control requirements. The prime contractor shall ensure all subcontractors, if applicable, conform to these requirements as required by the prime contractor.
PROGRAM PROTECTION PLAN (PPP) REQUIREMENTS
Any potential critical program information (CPI) generated as part of this effort will be reviewed to determine the need for a PPP or to be included as part of an existing PPP.
Start Date: Mail Date
End Date: 60 months after mail date (including 3 months for the final report).
20 September 2021
Funding Profile:
FY22 FY23 FY24 FY25 FY26 FY27 Total
$475K $875K $875K $875K $875K $400K $4.375M
Deliverables: Mandatory CDRLs: A001, A002, and A004 (all TBD)
Elective CDRLs: A005, A006, A013 (all TBD)
Place of Review, Inspection, and Acceptance: Destination (F4FBFP)
Estimated Level of Effort: 40 person-years
TO Requestor:
Signature Date
Team Lead or Supervisor:
TOPS VI Manager: