Section_L__(FBO_Draft)_11.29.17(Read-Only).docx

DOCX document 77 KB Posted

Attached to
C-5M RFP Follow Up Questions & Answers
Solicitation number
FA8625-18-R-6701
Issued by

About this file

Section L, Instructions, Conditions, and Notices To Offerors Or Respondents

View the file

Other files

File Type Posted
Final_Email_Q&As_Post_to_FBO_27_Dec_17.pdf PDF
QAs_from_Model_Contract_Industry_Day_for_posting_17_Dec_FBO_Posting.docx DOCX document
Draft_Model_Contract.pdf PDF
Copy_of_Kit_Delivery_Dates.xlsx XLSX spreadsheet
Attachment___Initial_Spares_List.xlsx XLSX spreadsheet
Directed_Subs_Contact_List.docx DOCX document
Model_Contract_Section_K_Reps_and_Certs.pdf PDF
Attachment_L004-_Pricing_Matrix_FBO_POSTING.xlsx XLSX spreadsheet
SOW_Industry_Day_QA_(FBO_Posting).docx DOCX document
Directed_Subs_Contact_List.docx DOCX document
QAs_from_TDP_Industry_Day_FBO_Posting.docx DOCX document
Sections_L_and_M_Industry_Day_QAs_(FBO_Posting).docx DOCX document
Section_L__(FBO_Draft)_11.30.17.pdf PDF
Section_M_(FBO_Draft)__11.29.17.pdf PDF
FBO_DRAFT_CMC_WXR_PIMA_SOW_15_Nov_17.pdf PDF
PIMA_CDRLs_-_Draft_-_15_Nov_2017.pdf PDF
C-5M_Enterprise_Industry_Days_Q&A_Programs.docx DOCX document
Final_Registration.pdf PDF
RMCD_Program_-_Copy.pdf PDF
Core_Mission_Computer_Weather_Radar_Production_-_Copy.pdf PDF
C5__Industry_Day_2017_Small_Business_Briefing.pptx PPTX presentation
C5_Enterprise_Overview_-_Copy.pdf PDF
CNS_ATM_Production_-_Copy.pdf PDF
MUOS_Program_-_Copy.pdf PDF
LAIRCM_Block_30_Production_-_Copy.pdf PDF
C5M_Industry_Day_Registration_Form.pdf PDF
Core_Mission_Computer_Weather_Radar_Production_-_Copy.pdf PDF
C5__Industry_Day_2017_Small_Business_Briefing.pptx PPTX presentation
MUOS_Program_-_Copy.pdf PDF
RMCD_Program_-_Copy.pdf PDF
LAIRCM_Block_30_Production_-_Copy.pdf PDF
C5_Enterprise_Overview_-_Copy.pdf PDF
CNS_ATM_Production_-_Copy.pdf PDF
http://www.signupgenius.com/go/30E0F4BAAAD2CA2FF2-oneonone —
C5M_Industry_Day_Registration_Form_1.pdf PDF
AGENDA_Industry_Days.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION L

Instructions, Conditions, and Notices to Offeror(s) or Respondents

L001 INFORMATION TO OFFEROR(S) (ITO) AND INSTRUCTIONS FOR PROPOSAL PREPARATION

1.0 PROGRAM STRUCTURE AND OBJECTIVES

The Government plans to award up to one (1) contract for the integration and kitting of the C-5M Core Mission Computer/Weather Radar (CMC/WxR). The CMC/WxR Program is designed to reduce the impact to the users’ Fleet Aircraft Availability (AA) by delivering CMC/WxR kits to the Depot for installation concurrent with Programmed Depot Maintenance (PDM) and Unscheduled Depot Level Maintenance (UDLM) efforts. These Depot actions are planned years in advance, creating a firm delivery requirement for kits that may not be changed. The timing for each Depot installation is also limited, ranging from less than 30 days to 55 days for the majority of CMC/WxR installations. Offeror(s) should consider these key schedule limitations in their proposals.

1.1 Budget/Funding Information

Notice to Offeror(s)/Suppliers(s): FY18-FY21 funds are included in the FY18 President’s Budget. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an Offeror for any costs. Comment by OHLSON, JENNIFER P GS-13 USAF AFMC AFLCMC/WLSP:

2.0 GENERAL INSTRUCTIONS

2.1 To assure timely and equitable evaluation of proposals, Offeror(s) must follow the instructions contained herein. Offeror(s) are required to meet all solicitation requirements including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors and subfactors. The response shall consist of five (5) separate volumes: Volume I – Technical Proposal, Volume II – Cost/Price Proposal, Volume III – Past Performance Information, Volume IV – Small Business Participation Verification and Volume V – Contract Documentation.

2.1.1 The Offeror's proposal must include all data and information requested by this ITO and must be submitted in accordance with these instructions. The proposal shall be compliant with the requirements as stated in the Statement of Work (SOW), Contract Data Requirements Lists (CDRLs), and Model Contract. Non-conformance with the instructions provided in this ITO may result in an unfavorable proposal evaluation.

2.1.2 The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements but rather shall provide convincing rationale to address how the Offeror intends to meet these requirements. Offeror(s) shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the Offeror's proposal. Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.

2.1.3 The proposal acceptance period is specified in the Federal Business Opportunities (FedBizOpps) website at http://www.fedbizopps.gov. The Offeror shall make a clear statement in the proposal documentation volume that the proposal is valid through this date.

2.1.4 In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the Offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals within 60 days of contract award.

2.1.5 The proposal must be received by the Government prior to the deadline as specified in the Federal Business Opportunities (FedBizOpps) website at http://www.fedbizopps.gov. Proposals received after the deadline will be handled in accordance with FAR 15.208.

2.2 General Information

2.2.1 Point of Contact

The Contracting Officer (CO) and buyer are the sole points of contact for this acquisition. Address any questions or concerns you may have to the CO, Ms. Michelle Pickel at (937) 656-9540 or the buyer, Ms. Sarah Zwiesler at (937) 656-9653, or via email at AFLCMC.WLSK.C5CMCWxR@us.af.mil. Written requests for clarification may be sent to the CO:

AFLCMC/AZA

ATTN: Ms. Michelle Pickel

1755 ELEVENTH STREET

WPAFB OH 45424-7404

Email: AFLCMC.WLSK.C5CMCWxR@us.af.mil Phone: (937) 656-9540

2.2.2 Debriefings: The CO will promptly notify Offeror(s) of any decision to exclude them from the competitive range; whereupon, they may request and receive a debriefing in accordance with FAR 15.505. Offeror(s) excluded from the competitive range may request a pre-award debriefing or they may choose to wait until after the source selection decision to request a post-award debriefing. However, Offeror(s) excluded from the competitive range are entitled to no more than one debriefing for each proposal. The CO will notify unsuccessful Offeror(s) in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsuccessful Offeror(s) may request and receive a debriefing. Offeror(s) desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.

2.2.3 Discrepancies: If an Offeror believes that the requirements in these instructions contains an error, omission, or are otherwise unsound, the Offeror shall immediately notify the CO in writing with supporting rationale as well as the remedies the Offeror is asking the CO to consider as related to the omission or error. Offeror(s) are reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion. This reservation includes matters of additional or substitute pages of the initial proposal.

2.2.4 Electronic Reference Documents: All referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) website at http://www.fedbizopps.gov. Potential Offeror(s) are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.

2.2.5 Communications: Exchanges of Source Selection Information between the Government and Offeror(s) will be controlled by the CO. E-mail may be used to transmit information to Offeror(s) only if it does not contain Source Selection Sensitive Information (FAR 2.101 & 3.104). Exchanges of Source Selection Sensitive Information must be accomplished using AMRDEC Safe Access File Exchange (https://safe.amrdec.army.mil/SAFE/) or encrypted e-mails. In order to facilitate the sending and receiving of encrypted e-mails, Offeror(s) must use Microsoft Outlook e-mail configured to support encryption or a different e-mail product that is S/MIME compatible and configured to support encryption. If you intend to submit Source Selection Information via encrypted e-mail, you must contact the Contracting Officer and Buyer, indicated on the face page of the solicitation, prior to the first submittal in order to exchange Public PKI key credentials. See Attachment L007 to this Section L for instructions to exchange encrypted and signed e-mail. To ensure the process is working correctly, send a test encrypted message first (without including any source selection information).

2.2.6 Use of Non-Government Advisors: Offeror(s) are advised that technical and cost/price data submitted to the Government in response to this solicitation may be released to non-government advisors for review and analysis. The non-government advisor support will be provided by:

Position/Title
Company Name
Company Address
Scheduling Support Specialist & Program Management Advisor
KBR Wyle
2601 Mission Point Blvd, Suite 300

Dayton, OH 45431

Offeror(s) shall provide written objection to disclosure as indicated in paragraph 2.2.6.1 below if the Offeror objects to disclosure of a portion of the proposal, the consent in written objection letter should be provided for the remainder of the proposal.

2.2.6.1 Any objection to disclosure:

2.2.6.1.1 Shall be provided in writing to the CO within 10 calendar days of RFP issuance; and

2.2.6.1.2 Shall include a detailed statement of the basis for the objection. The detailed statement shall identify the specific portions of the proposal the Offeror objects to disclosure to non-government advisors.

2.2.6.2 Offeror(s) shall submit the following if they accept the non-government advisor disclosure:

I understand technical and cost/price data submitted to the government in response to this solicitation may be released to non-government advisors. I consent to release of any (unless objection is provided above) proprietary, confidential, or privileged commercial or financial data provided by the firm(s) named below in response to this solicitation, to non-government advisors for review and analysis:

Firm:
Name (individual authorized to commit firm):
Title:
Date of Execution:

2.3 Organization/Number of Copies/Page Limits

The Offeror shall prepare the proposal as set forth in the Proposal Organization Table (Table 2.3 below). The titles and contents of the volumes shall be as defined in this table, all of which shall be within the required page limits and with the number of copies as specified in Table 2.3. The contents of each proposal volume are described in the ITO paragraph as noted in the table below in Table 2.3:

Table 2.3 - Proposal Organization

VOLUME
ITO Paragraph

Number

VOLUME TITLE
HARD COPIES
ELECTRONIC COPIES
PAGE LIMIT
I
3.0
Technical
2
1
Total 35 pages of which 15 pages are assigned to Subfactor 1 and 20 pages to Subfactor 2
I
3.1
Executive Summary
2
1
2 pages (not counted as part of Technical Volume total)
I
3.2
Subfactor 1: Quality Management Plan
2
1
15 pages
I
3.3
Subfactor 2: Program Management Plan
2
1
20 pages (IMS Printout not included in page count limitation)
II
4.0
Cost/Price
2
1
Unlimited
III
5.0
Past Performance
2
1
30
IV
6.0
Small Business Participation Verification
2
1
10
V
7.0
Contract Documentation
2
1
Unlimited

2.3.1 Page Limitations: Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal and excess paper copies will be returned to the Offeror as soon as practical. Page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the Offeror(s). Each page shall be counted except the following: Cover Page, Table of Contents, Glossary, Acronyms and Index.

2.3.2 Page Size and Format: A page is defined as each face of a sheet of paper containing information. When both sides of a sheet display printed material, it shall be counted as two pages. Page size shall be 8.5 x 11 inches, not including foldouts, single spaced except for the reproduced sections of the solicitation document, and the text size shall be no less than 12 point Times New Roman font. Tracking, kerning, and leading values shall not be changed from the default values of the word processing or page layout software. Use at least 1 inch margins on the top and bottom and ¾-inch side margins. Pages shall be numbered sequentially by volume. Page size and format restrictions shall apply to responses to ENs. These limitations shall apply to both electronic and hard copy proposals.

2.3.3 Tables, Charts, Graphs and Figures: Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible, and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, and may only be used for large tables, charts, graphs, diagrams and schematics, not for pages of text. For tables, charts, graphs and figures, the text shall be no smaller than 8 point Times New Roman font. Transmittal letters will not be considered in overall page count nor will they be evaluated. These limitations shall apply to both electronic and hard copy proposals.

2.3.4 Cost or Pricing Related Data: All cost or pricing data shall be addressed ONLY in the Cost/Price Proposal and Contract Documentation Volumes. Cost tradeoff information, work hour estimates, and material kinds and quantities may be used in other volumes only as appropriate for presenting rationale for alternatives or tradeoff decisions.

2.3.5 Cross-Referencing: To the greatest extent possible, each volume shall be written on a standalone basis so that its contents may be evaluated with a minimum of cross-referencing to other volumes of the proposal. Information required for proposal evaluation which is not found in its designated volume will be assumed to have been omitted from the proposal. Cross-referencing within a proposal volume is permitted where its use would conserve space without impairing clarity.

2.3.5.1 Solicitation Cross Reference Matrix (CRM)

The Offeror shall provide a CRM indicating by ITO and SOW the corresponding proposal paragraph in that section which addresses the referenced item. The CRM is a management tool for both the Offeror and Government to ensure that no requirement is overlooked and therefore is not for evaluation purposes. Data in the matrix will not be evaluated in accordance with Section M. Deliver the CRM in tabular and Microsoft Excel 2007-2013 format or later. The Cross Reference Matrix is provided as Attachment L001 for you to complete and submit with your proposal.

2.3.6 Table of Contents / Indexing: Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections. Table of contents do not count against the page limitations for their respective volumes.

2.3.7 Glossary of Abbreviations and Acronyms: Each volume shall contain a glossary of all abbreviations and acronyms used, and with an explanation for each. Glossaries do not count against the page limitations for their respective volumes.

2.3.8 Binding and Labeling: Each volume of the proposal shall be separately bound in a three-ring, loose leaf binder permitting the volume to lie flat when open. Staples shall not be used. A cover sheet shall be bound in each book, clearly marked as to volume number, title, copy number, solicitation identification, and the Offeror's name. The same identifying data shall be placed on the spine of each binder. All unclassified document binders shall have a color other than red or other applicable security designation colors. Be sure to apply all appropriate markings including those prescribed in accordance with FAR 52.215-1(e), Restriction on Disclosure and Use of Data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information.

2.3.9 Electronic Proposals: The Offeror shall submit one (1) electronic copy, the content and page size of the electronic copy must be identical to the hard copies. For electronic copies, indicate on each CD the volume number and title. Use separate files to permit rapid location of all portions, including subfactors, exhibits, annexes, and attachments, if any. The Offeror shall submit volumes in electronic format, using recordable CDs. Each volume shall be in a different directory on a CD. Files shall not be compressed. The electronic copies of the proposal shall be submitted in Microsoft (MS) Office, Word, Excel, Project, or PowerPoint, versions 2007-2013, or Adobe Acrobat (.pdf). If there are any discrepancies between the hard copies and the electronic copies of the proposal, the hard copies will be used for evaluation.

2.3.10 Distribution: The "original" proposal shall be identified. Proposals shall be addressed to the CO and mailed or hand carried to the address stated in paragraph 2.2.1.

3.0 Volume I – Evaluation Factor 1 – Technical

The Technical Volume should be specific and complete. Legibility, clarity, and coherence are critically important for a timely selection process. Your responses will be evaluated against the Technical Subfactors defined in Section M, Evaluation Factors for Award. Using the instructions provided below, provide as specifically as possible the actual methodology you would use for accomplishing/satisfying these subfactors. All the requirements specified in the solicitation are mandatory. By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation. It is not necessary or desirable for you to tell us so in your proposal. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation.

3.1 Executive Summary

Provide a Technical Volume Executive Summary to summarize the proposal. The Executive Summary will not be evaluated; it is merely a means of familiarizing the evaluators with your approach.

3.2 Subfactor 1: Quality Systems Approach

The Offeror(s) shall describe in their Quality Systems Approach and how their system assures product quality; achieves stable, capable processes; prevents defects; and employs effective methods for conducting root cause analyses and implementation of corrective actions. Offeror(s) Quality Systems Approach shall include strategies for their Manufacturing Plan, Quality System, and Supplier Management. The Offeror’s plan shall address how the Quality Systems Approach will achieve the requirements of the SOW and on-time, high quality kit deliveries. Offeror(s) are encouraged to identify any best practices/innovations that may be applicable to this effort. As a minimum, the proposed approach shall address the following essential components.

3.2.1 Manufacturing Plan. The offeror shall describe:

3.2.1.1 How their manufacturing management system meets the requirements of AS6500.

3.2.1.2 The major assembly sequence chart and anticipated manufacturing process flow.

3.2.1.3 Facility requirements and layouts.

3.2.2 Quality Systems. The offeror shall describe how their quality system assures product quality; achieves stable, capable processes; prevents defects; and employs effective methods for conducting root cause analyses and implementation of corrective actions.

3.2.3 Supplier Management. The offeror shall describe their:

3.2.3.1 Approach to selecting and managing key suppliers.

3.2.3.2 Processes for integration of key supplier activities into the overall program plan to assure that supplier activities support the overall program performance.

3.2.3.3 Specific supplier risks to the program and plans for mitigating those risks.

3.2.3.4 Plan for preventing the intrusion of counterfeit parts in factory equipment and delivered products.

3.3 Subfactor 2: Program Management Plan

The Offeror(s) shall submit a Program Management Plan (PMP) that details the Offeror(s) strategy for successfully completing the requirements of the SOW and kit deliveries. The PMP shall present a fully integrated set of documents consisting of the following sub-plans: Human Resource Management Plan (HRMP), Risk Management Plan (RMP), and Integrated Master Schedule (IMS). The PMP, with all sub-plans, shall present a detailed approach that proactively manages schedule, performance and risks as applicable to the SOW and kit deliveries. Offeror(s) may include an executive summary to help orient the evaluators to the Offeror’s specific approach, however, the executive summary will not be evaluated.

3.3.1 Human Resource Management Plan (HRMP): As a minimum, the Offeror(s) shall provide a HRMP which details:

3.3.1.1 The current state of the Offeror’s program team and available, skilled personnel capable of achieving the requirements of the SOW and on-time, high-quality Kit Deliveries;

3.3.1.2 The planned (end) state of the Offeror(s) program team and required skilled personnel capable of achieving the requirements of the SOW and on-time, high-quality Kit Deliveries;

3.3.1.3 The Offeror(s) strategy to hire, train, and equip the necessary skilled personnel to deliver the requirements of the SOW and delivery on-time, high-quality Kits. ***If the Offeror(s) strategy is to subcontract with another company to provide skilled personnel to complete the requirements of the SOW and deliver high-quality kits, the Offeror shall include the subcontractors’ past performance data in the Past Performance Section of this Offeror(s) proposal.

3.3.2 Risk Management Plan (RMP): As a minimum, the Offeror(s) shall describe the process for implementing proactive risk management by submitting an RMP which includes:

3.3.2.1 A description for identifying, assessing, and handling risk mitigation, avoidance, transfer, assumption, and tracking program risks;

3.3.2.2 An outline of the Offeror(s) process for conducting on-going risk management planning, risk identification analysis, risk monitoring and risk control on the program;

3.3.2.3 A process for implementing risk response plans, tracking identified risks, monitoring residual risks, and evaluating the risk process throughout the program life cycle;

3.3.2.4 A discussion of any tools or methodologies the Offeror uses throughout the risk management process and for risk assessments

3.3.2.5 The Offeror(s) shall identify the top three (3) highest rated risks (risks with the highest probability of occurrence with the highest consequence) inherent in the Offeror(s) specific approach. Offeror(s) shall assess these risks in terms of probability of occurrence and level of impact and provide rationale for these ratings. Offeror(s) shall identify their proposed risk handling/mitigation strategy for each and provide a post-mitigation rating;

3.3.2.6 Subsequent RMP updates shall be delivered after contract award in accordance with CDRL AXXX.

3.3.3 Integrated Master Schedule (IMS): Offeror(s) shall generate an IMS using the template provided in Attachment L003 which captures the core activities and processes necessary to successfully execute the program from contract award through the delivery of the first lot of kits. The intent of this section is to obtain a functionally integrated understanding of the proposal with clear tracks between technical, schedule, management, etc., in a way that provides the Government confidence that the program is structured to be executable for the resources indicated. Offeror(s) shall use Microsoft Project (2007-2010) file format (.mpp)—no other format is acceptable. Offeror(s) shall use a contract award start date of 15 Oct 2018. The IMS shall address:

Comment by OHLSON, JENNIFER P GS-13 USAF AFMC AFLCMC/WLSP: Comment by OHLSON, JENNIFER P GS-13 USAF AFMC AFLCMC/WLSP: Comment by OHLSON, JENNIFER P GS-13 USAF AFMC AFLCMC/WLSP:

3.3.3.1 Plans to provide the needed manpower, facilities, and equipment necessary to meet delivery schedule;

3.3.3.2 Subcontract/Vendor Milestones;

3.3.3.3 Manufacturing milestones, including key supplier deliveries, fabrication, and assembly deliveries;

3.3.3.4 Proposed Kit Audit dates as required in SOW para XXX.XXX;

3.3.3.5 Use Attachment L002, IMS Guidance, to build a mechanically sound schedule. As a minimum, the IMS shall be constructed accordingly:

3.3.3.5.1 Link all tasks in the IMS logically;

3.3.3.5.2 Show predecessor/successor relationships

3.3.3.5.3 Link all tasks to form a valid critical path;

3.3.3.5.4 Trace the IMS to the Contractor’s Work Breakdown Structure, as applicable, using the available column in Microsoft Project.

4.0 Volume II – Evaluation Factor 2 – Cost/Price

4.1 General Instructions

4.1.1 Adequate Price Competition: The CO has initially determined that adequate price competition is anticipated for this Source Selection. Certified cost or pricing data is not currently required. If it is determined that certified cost or pricing data is necessary, Offeror(s) will be asked to provide such data within 30 calendar days of the request.

4.1.2 Cost/Price Reasonableness: This section is to assist Offeror(s) in submitting data other than certified cost or pricing data that is required to evaluate the reasonableness of your proposed cost/price. Compliance with these requirements is mandatory and failure to comply may result in rejection of their proposal. Information submitted in the Cost/Price Proposal must be consistent with data submitted in other volumes of the proposal. Any cost information not submitted in the Cost/Price Proposal shall not be evaluated. The data provided in the Cost/Price Proposal will be evaluated based on the criteria in Section M of the RFP.

4.1.3 Government Fiscal Year (GFY): Proposals shall be based on the Government Fiscal Year (GFY), which begins on 1 October and ends on 30 September.

4.1.4 Cost/Price Data: Data beyond that required by this instruction shall not be submitted, unless you consider it essential to document or support your cost/price position. All data relating to the proposed price, including all required supporting documentation, must be included in the section of the proposal designated as the Cost/Price Proposal. Under no circumstances shall this data and documentation be included elsewhere in the proposal.

4.2 Volume Organization

4.2.1 Section 1—Pricing Assumptions: Offeror(s) shall summarize all significant pricing assumptions, scope limitations and/or qualifications of the Price Proposal.

4.2.2 Section 2—CMC/WxR Pricing Matrix: CMC/WxR Total Evaluated Price(TEP) Matrix, provided in Attachment L004, is for Offeror(s) to submit Cost/Price related information. All information provided must relate to the Offeror(s) Cost/Price. Cost/Price information submitted outside of the Cost/Price Proposal, the model contract, or the Price Matrix will not be evaluated. All inputs shall be in Then-Year (TY) United States Dollars. TY Dollars are dollars that have been escalated into the time period for the performance of the contract. They are sometimes referred to as “escalated dollars” or “inflated dollars.” All dollars shall be displayed in whole dollar units.

4.2.3 CMC/WxR Pricing Matrix Content and Submission: Offeror(s) (prime only) shall complete the CMC/WxR TEP Matrix of this RFP found in Attachment L004 using Microsoft Excel format and submit electronically encoded. The CMC/WxR TEP Matrix submitted must duplicate the logic and mathematical formulas reflected in the paper copy of your proposal. All dollar amounts provided shall be rounded to the nearest dollar. The CMC/WxR Pricing Matrix submitted must comply with the following format requirements:

4.2.3.1 Data file should be submitted on a CD in .xlsx file format.

4.2.3.2 Offeror(s) shall input the amounts in each field that is highlighted in yellow of the matrix. Travel and Over and Above will be included in the TEP at Government estimated amounts. The Offeror shall propose a fixed fee for the Over and Above calculation.

4.2.3.3 The amounts from the highlighted fields will then automatically calculate the Offeror’s overall TEP. Fields not highlighted in yellow are locked for editing and shall not be changed. Totals will be calculated automatically.

4.2.3.4 Subsets of the CMC/WxR PIMA TEP Matrix provided by the winning Offeror will be incorporated under Section J of the awarded contract as Attachments. These Section J attachments will be utilized during contract execution to establish the FFP, CPFF, or CRNF amounts for each of the option CLINs prior to the exercise of each option.

4.2.3.5 Offeror(s) shall complete and return the price matrix and ensure all formulas and calculations are correct. Proposed Then Year Dollar prices shall be consistent with proposed prices in Section B of the model contract.

5.0 Volume III– Evaluation Factor 3 – Past Performance

Each Offeror shall submit a past performance volume with its proposal, containing past performance information in accordance with the format contained in Attachment L005 – Past Performance Information Instructions. This information is required of the Offeror and all subcontractors, teaming partners, and/or joint venture partners who are to perform 25 percent or more of the effort based on the total proposed price or perform aspects of the effort the Offeror considers critical to overall successful performance. Offeror(s) are cautioned that the Government will use data provided by each Offeror in this volume and data obtained from other sources in the evaluation of past performance.

5.1 Consent/Authorization Letters

Along with the information required in this section, the Offeror shall submit a consent letter executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the Offeror so the Offeror can respond to such information. For each identified effort for a commercial customer, the Offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the Offeror's performance.

5.2 Early Proposal Information

Each Offeror is requested to submit the information shown in Attachment L005 for each relevant contract 15 days prior to the date set for receipt of proposals. Failure to submit early proposal information will not result in Offeror disqualification.

5.3 Recent and Relevant Contracts

Offeror(s) are required to explain what aspects of their contracts are deemed relevant to the proposed effort and to what aspects of the proposed effort they relate. Consideration will be given to contract scope and type, uses of similar technology, and complexity of effort. Submit completed copies of Attachment L005, Past Performance Information Sheet on three recent contracts that you consider most relevant in demonstrating your ability to perform the proposed effort. Also include information on three recent contracts performed by each of your teaming partners and significant subcontractors that you consider most relevant in demonstrating their ability to perform the proposed effort. Include rationale supporting your assertion of relevance.

5.3.1 Specific Content: Offeror(s) are required to explain what aspects of the contracts are deemed relevant to the proposed effort and to what aspects of the proposed effort they relate. This may include a discussion of efforts accomplished by the Offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a no confidence rating, since the problems encountered may have been on a more complex program, or an Offeror may have subsequently demonstrated the ability to overcome the problems encountered. The Offeror is required to clearly demonstrate management actions employed in overcoming problems and the effects of those actions in terms of improvements achieved or problems rectified. This may allow the Offeror to be considered more favorably than without evidence of problem resolution. For example, submittal of quality performance indicators or other management indicators that clearly support that an Offeror has overcome past problems is required. Categorize the relevant information into the specific Technical subfactors and Cost/Price factor used to evaluate the proposal.

5.3.2 Organizational Structure Change History: Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. A pamphlet or other commercial document describing such reorganizations may suffice. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider past performance information provided by other sources as well as that provided by the Offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.

6.0 Volume IV—Evaluation Factor 4—Small Business Participation Verification The Offeror (prime only) shall complete the CMC/WxR Small Business Participation Verification Worksheet of this RFP found in Attachment L006 using Microsoft Excel format and submit electronically. The CMC/WxR Small Business Participation Verification Worksheet submitted must include all information in each column, for all suppliers. Offeror(s) must comply with the Non-Manufacturers Rule for Kit assemblers as set out in 13CFR §121.406, (c)(1)(2), which states:

(1) Where the manufactured item being acquired is a kit of supplies or other goods provided by an offeror for a special purpose, the offeror cannot exceed 500 employees, and 50 percent of the total value of the components of the kit must be manufactured by business concerns in the United States which are small under the size standards for the NAICS codes of the components being assembled. The offeror need not itself be the manufacturer of any of the items assembled.

(2) Where the Government has specified an item for the kit which is not produced by U.S. small business concerns, such item shall be excluded from the calculation of total value in paragraph (c)(1) of this section.

Offeror(s) shall include the value of the Government directed components supplied from FTG Aerospace, Ballard, and Mega Industries to account for 100% of the kit value in Attachment L006; however, in accordance with the rule as stated above, the Government will exclude these items from the final calculation for the purposes of determining the Small Business Participation Verification.

7.0 Volume V Contract Documentation

7.1 Model Contract/Representations and Certifications

The purpose of this volume is to provide information to the Government for preparing the contract document and supporting file. The Offeror's proposal shall include a signed copy of the Model Contract, and Sections A through K. This includes:

7.1.1 Section A – Solicitation/Contract Form: Completion of blocks 12 thru 16 and signature and date for blocks 17 and 18 of the SF33. Signature by the Offeror on Block 17 constitutes an offer, which the Government may accept. The "original" copy should be clearly marked under separate cover and should be provided without any punched holes.

7.1.2 Section B – Supplies or Services and Costs/Prices: Offeror(s) shall provide pricing in Section B of the RFP following the established CLIN/SubCLIN structure:

Base Year CLINs/SubCLINs: 0001 through 0004; Option Year 1 CLINs/SubCLINs: 1001 through 1004; Option Year 2 CLINs/SubCLINs: 2001 through 2004; and, Option Year 3 CLINs/SubCLINs: 3001 through 3004. This pricing shall match the prices proposed in Attachment L004. If these Section B prices do not match the Attachment L004 prices, the Attachment L004 prices shall take precedence. The Data/CDRL CLINs are Not Separately Priced (NSP) and Offeror(s) shall not provide a price in Section B for these CLINs.

7.1.3 Section C – Description/Specifications/Work Statement: Offeror(s) are not required to provide a response to Section C of the Model Contract.

7.1.4 Section D – Packaging and Marking: Offeror(s) shall identify any items that require special packaging/marking. Attach product pages as necessary/desired to the model contract/RFP included in Volume II of its proposal, formatted in Microsoft Word.

7.1.5 Section E – Inspection and Acceptance: Offeror(s) are not required to provide a response to Section E of the Model Contract.

7.1.6 Section F – Deliveries or Performance: Offeror shall provide a statement in the proposal confirming they will meet the Government-provided delivery schedule.

7.1.7 Section G – Contract Administrative Data: Offeror(s) are not required to provide a response to Section G of the Model Contract.

7.1.8 Section H – Special Contract Requirements: Offeror(s) are not required to provide a response to Section H of the Model Contract.

7.1.9 Section I – Contract Clauses: Offeror(s) are required to review and provide a response as needed to Section I of the Model Contract.

7.1.10 Section J – List of Attachments: Offeror(s) shall provide Attachments to the Model Contract. Attachments include CDRL Exhibit A and Exhibit B, and Section J Attachments 1 through 15.

7.1.11 Section K – Representations, Certifications, and other Statements of Offeror(s): Offeror(s) shall provide completed representations, certifications, acknowledgments, and statements requiring explanation or instruction. The original signed copy should be provided under separate cover directly to the CO.

7.2 Exceptions to Solicitation Requirements

Offeror(s) are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Offeror(s) must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. This information shall be provided in the format and content of Table 7.2.

Table 7.2 - Solicitation Exceptions

Solicitation Document Page/ Paragraph Requirement/ Portion Rationale

SOO, SOW, SPEC, Model Contract, ITO, etc.
Applicable

Page and Paragraph Numbers

Identify the requirement or portion to which exception is taken
Describe

why the requirement can/will not be met

7.3 Other Information Required

7.3.1 Authorized Offeror Personnel: Provide the name, title, and telephone number of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.

7.3.2 Government Offices: Provide the mailing address, telephone and fax numbers and facility codes for the cognizant Contract Administration Office, DCAA, and Government Paying Office. Also, provide the name and telephone and fax number for the ACO.

7.3.3 Company/Division Address, Identifying Codes, and Applicable Designations Provide company/division's street address, county and facility code; CAGE code; DUNS code; TIN; size of business (large or small); and labor surplus area designation. This same information must be provided if the work for this contract will be performed at any other location(s). List all locations where work is to be performed and indicate whether such facility is a division, affiliate, or subcontractor, and the percentage of work to be performed at each location.

7.3.4 Attachments to the Model Contract: The Offeror shall provide the following as attachments to the model contract:

7.3.4.1 Associate Contractor Agreements: Include Associate Contractor Agreements in accordance with AFFARS SUBPART 5317.9000/(Informational Guidance-IG5317.9000) where applicable.

7.3.4.2 Required Attachments

7.3.4.2.1 Contract Work Breakdown Structure (CWBS) and CWBS Dictionary The reference document for developing the WBS and dictionary is MIL-HDBK-881. The Offeror shall develop a Contract Work Breakdown Structure (CWBS) and dictionary, which reflects their view of the contract effort. The CWBS shall serve as the framework for organizing the CMC/WxR Program to include in-house, inter-divisional, subcontractor, and associate contractor activities. The CWBS shall be developed to a Level 3 to include critical subcontractor information and breadth sufficient to accurately describe the Offeror's understanding of the effort required for the CMC/WxR Program as reflected in the SOW. The Offeror's proposed CWBS and corresponding dictionary shall be provided as part of the model contract. The mapping of CLINs to WBS elements shall be completely consistent with that shown in Section B of the Model Contract.

7.3.4.2.2 Applicable Documents

A List of Applicable Documents has been provided to the Offeror(s) as an attachment to the SOW (J001A) in the solicitation, which includes a minimum list of Government Compliance Documents. The Offeror shall provide a list of any Offeror, industry, commercial, and tailored Government standards, specifications, processes, and/or practices selected as compliance documents. The Offeror shall also provide a list of all Government compliance documents intended to be used as compliance documents during the course of this contract. The Offeror shall submit a list of these documents, including any tailoring instructions, as an annex to the proposed SOW. The Offeror shall submit the completed Proposed Compliance Documents as a separately bound document.

8.0 List of Attachments: Section L attachments listed below are provided as separate files.

Attachment L001: Cross Reference Matrix Attachment L002: IMS Guidance Attachment L003: IMS Template Attachment L004: Cost/Price TEP Matrix Attachment L005: Past Performance Information Attachment L006: Small Business Participation Verification Worksheet Attachment L007: PKI Instructions

File details come from the government source that posted it.