CMC/WxR Production Integration for Modification Award (PIMA)- Kitting Effort. The attached Draft Contract Data Requirements List (CDRLs) represents the planned data deliverables for the scope of work for the production Kitting effort.

View the file

Other files

File Type Posted
Final_Email_Q&As_Post_to_FBO_27_Dec_17.pdf PDF
QAs_from_Model_Contract_Industry_Day_for_posting_17_Dec_FBO_Posting.docx DOCX document
Draft_Model_Contract.pdf PDF
Copy_of_Kit_Delivery_Dates.xlsx XLSX spreadsheet
Attachment___Initial_Spares_List.xlsx XLSX spreadsheet
Directed_Subs_Contact_List.docx DOCX document
Model_Contract_Section_K_Reps_and_Certs.pdf PDF
Attachment_L004-_Pricing_Matrix_FBO_POSTING.xlsx XLSX spreadsheet
SOW_Industry_Day_QA_(FBO_Posting).docx DOCX document
Directed_Subs_Contact_List.docx DOCX document
QAs_from_TDP_Industry_Day_FBO_Posting.docx DOCX document
Sections_L_and_M_Industry_Day_QAs_(FBO_Posting).docx DOCX document
Section_L__(FBO_Draft)_11.30.17.pdf PDF
Section_M_(FBO_Draft)__11.29.17.pdf PDF
Section_L__(FBO_Draft)_11.29.17(Read-Only).docx DOCX document
FBO_DRAFT_CMC_WXR_PIMA_SOW_15_Nov_17.pdf PDF
C-5M_Enterprise_Industry_Days_Q&A_Programs.docx DOCX document
Final_Registration.pdf PDF
RMCD_Program_-_Copy.pdf PDF
Core_Mission_Computer_Weather_Radar_Production_-_Copy.pdf PDF
C5__Industry_Day_2017_Small_Business_Briefing.pptx PPTX presentation
C5_Enterprise_Overview_-_Copy.pdf PDF
CNS_ATM_Production_-_Copy.pdf PDF
MUOS_Program_-_Copy.pdf PDF
LAIRCM_Block_30_Production_-_Copy.pdf PDF
C5M_Industry_Day_Registration_Form.pdf PDF
Core_Mission_Computer_Weather_Radar_Production_-_Copy.pdf PDF
C5__Industry_Day_2017_Small_Business_Briefing.pptx PPTX presentation
MUOS_Program_-_Copy.pdf PDF
RMCD_Program_-_Copy.pdf PDF
LAIRCM_Block_30_Production_-_Copy.pdf PDF
C5_Enterprise_Overview_-_Copy.pdf PDF
CNS_ATM_Production_-_Copy.pdf PDF
http://www.signupgenius.com/go/30E0F4BAAAD2CA2FF2-oneonone —
C5M_Industry_Day_Registration_Form_1.pdf PDF
AGENDA_Industry_Days.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT #: FA8625-18-R-6701

CONTRACTOR:

SET NAME: CMC/WxR INSTALL KITS SYSTEM ITEM:

PROGRAM: C-5

DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH

A001 AFLCMC/WLSP DI-ADMN-81249B/T SOW Para:

Conference Agenda

A002 AFLCMC/WLSP DI-ADMN-81250B/T SOW Para:

Conference Minutes

A003 AFLCMC/WLSE DI-ADMN-81401B SOW Para:

Contract Change Proposal (CCP)

A004 AFLCMC/WLSE DI-SESS-80639D/T SOW Para:

Engineering Change Proposal (ECP)

A005 AFLCMC/WLSE DI-SESS-80640D/T SOW Para.

Request for Variance (RFV)

A006 AFLCMC/WLSE DI-MGMT-81453B/T SOW Para:

Data Accession List (DAL)

A007 AFLCMC/WLSE DI-MGMT-81804A/T SOW Para:

Item Unique Identification (IUID) Marking Activity and Verification Report

A008 AFLCMC/WLSE DI-MISC-81832/T SOW Para.

Counterfeit Prevention Plan

A009 AFLCMC/WLSE DI-SAFT-80106C SOW Para.

Health Hazard Assessment Report (HHAR)

A010 AFLCMC/WLSE DI-SESS-80858C SOW Para:

Suppliers Configuration Management Plan

A011 AFLCMC/WLSL DI-SESS-81639A SOW Para.

Warranty Performance Report

A012 AFLCMC/WLSE DI-MGMT-81808 SOW Para:

Contractors Risk Management Plan

A013 AFLCMC/WLSE DI-MGMT-81889/T SOW Para:

Manufacturing Plan

A014 AFLCMC/WLSE DI-QCIC-80562/T SOW Para:

Assembly and Subassembly Manufacturing Quality Report

2of1Page

CDRL Table of Contents11/15/2017 4:00:31 PM CST

A015 AFLCMC/WLSP DI-MGMT-81642 SOW Para:

Small Business Subcontractor Report

A016 AFLCMC/WLSE DI-MGMT-81948 SOW Para:

Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan

A017 AFLCMC/WLSE DI-PSSS-81656B SOW Para:

Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

B001 AFLCMC/WLSE DI-SESS-81000E/T SOW Para:

Product Drawings/Models and Associated Lists

2of2Page

CDRL Table of Contents11/15/2017 4:00:31 PM CST

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Conference Agenda

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81249B/T

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSP

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) DI-ADMN-81249B is tailored as follows: Paragraph 3.j, The agenda shall provide copies of all briefing materials, slides, reports and other applicable documents to be reviewed as part of the event.

Block 8:

Blocks 11, 12, 13: The Contractor shall submit agenda for each applicable conference and/or meeting fifteen (15) calendar days prior to each event. The Contractor shall submit approved agenda NLT five

(5) calendar days prior to each event.

Block 14: In addition to Block 14 requirements, all Government Offices represented at each meeting shall receive notification and/or a copy of agenda.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSP 0 1 0

AFLCMC/WLSE 0 1 0

15. TOTAL 0 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

17. PRICE GROUP

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Conference Minutes

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250B/T

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSP

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) DI-ADMN-81250B is tailored as follows: Paragraph 3.e: A list of attendees by name, rank, activity represented, activity code (office symbol), e-mail and phone number as appropriate.

Block 8: Written Government comments/disposition/disapproval on the draft minutes will be within ten (10) business days after receipt of delivery.

Blocks 12, 13: The Contractor shall submit draft minutes for each applicable conference and/or meeting five (5) business days after each event. The Contractor shall make adjustments according to Government comments/disposition/disapproval and resubmit five (5) business days after notification.

Block 14: In addition, to Block 14 requirements, all Government Offices represented at each meeting shall receive notification and/or a copy of the final minutes.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSP 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Contract Change Proposal (CCP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81401B

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

Block 8: Disposition of the CCP will be via a Procuring Contracting Officer Letter (PCOL) for the technical portion; cost will be subject to negotiations.

Block 12: The Contractor shall submit a draft technical volume within thirty (30) calendar days of receipt of Request for Proposal (RFP), unless otherwise specified by the PCO. Government/Contractor review/page-turn will be scheduled within fifteen (15) calendar days of receipt of the draft CCP Technical Volume.

Block 13: Subsequent submittal with Cost Volume shall be provided thirty (30) calendar days after receipt of Government comments or as directed by PCO letter or other PCO accepted media for correction/revision as required.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSE 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Engineering Change Proposal (ECP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80639D/T

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

BLK16

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 4: Contractor format is acceptable. The ECP shall include a not-to-exceed price if a firm fixed price cannot be made available.

A Life Cycle Cost (LCC) impact analysis (identifying acquisition, supply and maintenance costs and fuel consumption rate estimated changes) shall be submitted as part of the ECP. ECPs shall address impact to OSS&E certifications.

All Class I ECPs shall contain a Safety Impact Assessment.

Block 8:

Block 9:

Blocks 12, 13: Receipt of PCO Letter requesting change is required prior to submittal of routine ECPs.

a: The Contractor shall submit ECPs upon written request from the Procuring Contracting officer. The Contractor's price shall be valid for 180 calendar days after Government receipt.

b: The Contractor shall submit ECPs in two volumes as shown as follows:

1. Technical Volume

2. Cost Volume c: The Contractor shall submit the cost volume in excel format with working formulas to arrive at all calculations leading up to total price by CLIN.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSE 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Request for Variance (RFV)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80640D/T

5. CONTRACT REFERENCE

SOW Para.

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 4: This DID is tailored as follows:

a. Include an Environmental Safety and Occupational Health Assessment Report and/or Impact Statement for each submittal.

b. Include an Airworthiness Determination Form, (AFLCMC/EN-EZ form dated xxxxxxxxx) with each submittal.

c. Include a Corrective Action plan for each Major RFV.

Block 8:

Blocks: 11, 12, 13: The Contractor shall submit the draft RFV NLT 30 days after identification. The Contractor shall submit the final RFV NLT 30 days after the Government response to the draft

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSE 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Data Accession List (DAL)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81453B/T

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

QTRLY

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 4: This DID is tailored as follows:

Paragraph 3. Content: Change to read: "The DAL shall specify existing data, internally generated data and computer software used by the Contractor to develop, test, and manage the program. The format and content of the data listed on the DAL shall be as prepared by the Contractor to document compliance with the SOW Task requirements. The DAL shall be a cumulative listing from the beginning of the Contract period."

Block 8:

Block 9: See General Instructions for detailed requirements.

Blocks 11, 12, 13: The Contractor shall submit the first DAL NLT 30 days after contract award. The Contractor shall submit updates quarterly for the length of the contract. The Contractor shall submit Government requested data within 10 working days.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSE 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Item Unique Identification (IUID) Marking Activity and Verification Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81804A/T

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ANNLY

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 2: The full title of this data item is: Item Unique Identification (IUID) Marking Activity and Validation and Verification Report.

Block 4: Data Item Description (DID) DI-MGMT-81804A is tailored as follows: The following paragraphs are not required: 4.9 National Stock Number (NSN), 4.14 Other Event/Activity Date* (Optional) and

4.15 Other Event/Activity (optional).

Block 8:

Blocks 11, 12, 13: Draft IUID report shall be submitted ninety (90) calendar days prior to First Group A Component Audit and Kit Audit.

Written Government comments and/or disposition will be forty five

(45) calendar days after data submittal. The Contractor shall resubmit thirty (30) calendar days after receipt of Government comments. A final summary report shall be submitted no later than thirty (30) calendar days prior to the end of the program. If no changes have occurred, the Contractor shall submit a letter stating there are no changes annually.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSE 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY

russell-krach.teri.lee.1057035710

H. DATE

2017/11/15

I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81832/T

5. CONTRACT REFERENCE

SOW Para.

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ANNLY

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 4: The DID is tailored as follows:

a. Use Society of Automotive Engineers (SAE) AS5553A, “Fraudulent/Counterfeit Electronic Parts; Avoidance, Detection, Mitigation, and Disposition,” as guidance.

b. Paragraph l.a: Change "it" to "its".

c. Paragraph l.c.: Reword to say: "Monitoring procedures to include the delivery system of components. Deliver all test results and analysis from routine integrity checks of supply chains to identify possible corruption throughout the supply chain from the OEM."

d. Paragraph j.(1): Delete sentence "However, consultation with the OEM is authorized."

e. Paragraph j.(2): Reword to say: "Step 2: Contractors that identify suspect items shall immediately notify their customer that is the next link toward the prime contractor. Notification shall be passed up the customer chain until reaching the prime contractor. The prime contractor shall notify the cognizant Contracting Officer and the Program Protection Lead within 24 hours of identifying any suspected items."

f. Paragraph j.(3)e.: Reword to say: "List of all affected DoD systems."

g. Paragraph j.(5): Reword to say: "Step 5: If the parts are found to be counterfeit, they shall be isolated and controlled pending direction from the C-5M Program Office."

Block 9: See General Instructions for detailed requirements.

Blocks: 11, 12, 13: The Contractor shall submit the preliminary draft 30 days prior to program PDR. The Contractor shall submit the updated draft 30 days prior to program First Group A Component Audit and Kit Audit. The Contractor shall submit the final 90 days after Government approval. The Contractor shall update as changes occur.

If no changes have occurred, the Contractor shall submit a letter stating there are no changes annually.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSE 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER SAFT

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

Health Hazard Assessment Report (HHAR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80106C

5. CONTRACT REFERENCE

SOW Para.

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

Block 8: Written Government comments/disposition on the data shall be within 45 days after receipt of data. When comments are provided, the Contractor shall provide an updated submittal IAW the timeline provided with Government comments/change requests.

Blocks: 11, 12, 13: First submittal is due NLT 30 days prior to Critical Design Review (CDR). Revisions, as applicable.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSE 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A010

2. TITLE OF DATA ITEM

Suppliers Configuration Management Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80858C

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

Block 8:

BLOCKS: 11, 12, 13: The Contractor shall submit a draft CMP not later than 30 calendar days after contract award. The Contractor shall submit a final NLT 30 calendar days after receipt of Government comments. The Contractor shall submit updates as internal procedures change.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSE 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A011

2. TITLE OF DATA ITEM

Warranty Performance Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81639A

5. CONTRACT REFERENCE

SOW Para.

6. REQUIRING OFFICE

AFLCMC/WLSL

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ANNLY

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

Block 8: Written Government comments/disposition/disapproval shall be in accordance with the Government approved schedule. When comments are provided, the Contractor shall provide an updated submittal in accordance with the Government approved timeline.

Blocks: 11, 12, 13: Draft report due 75 days after contract award.

Government comments will be incorporated with next annually delivery unless otherwise specified. Reports are due annually until the end of the contract.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSL 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A012

2. TITLE OF DATA ITEM

Contractors Risk Management Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81808

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

Block 8:

Blocks 11, 12, 13:

a. Preliminary draft shall be submitted 30 days after contract award.

b. Final shall be submitted 60 days after receipt of Government comments.

c. If any revision to the approved plan are made the Contractor shall submit for Government review.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSE 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A013

2. TITLE OF DATA ITEM

Manufacturing Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81889/T

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

Block 4: Data Item Description DI-MGMT-81889 is tailored as follows:

The manufacturing plan shall meet the requirements of AS6500.

Block 8: Written Government comments/disposition/disapproval will be provided 14 calendar days after receipt of document.

Block 11, 12, 13: The first submittal is due 30 calendar days after contract award. The Contractor shall incorporate Government comments and resubmit updated Plan. The Contractor will provide an updated Plan if there are any changes to manufacturing processes, facilities, sources of supply, or any change(s) that impact the manufacturing approach.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSE 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER QCIC

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A014

2. TITLE OF DATA ITEM

Assembly and Subassembly Manufacturing Quality Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-80562/T

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

QTRLY

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

Block 4: Contractor format is acceptable. The report shall present schedule and quality metrics only. Cost metrics are not required.

Block 8:

Block 9; See General Instructions for detailed requirements.

Blocks 11, 12, 13: The Contractor shall submit the draft at the start of the first full quarter after contract award. The Contractor shall submit the final NLT 30 days following incorporation of Government approved changes. The Contractor shall submit quarterly updates. In the event there are no changes to the report, the Contractor shall submit a CO letter stating there are no changes. The report shall be presented at all technical and program reviews.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSE 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A015

2. TITLE OF DATA ITEM

Small Business Subcontractor Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81642

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSP

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ANNLY

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 8:

Block 9: See General Instructions for detailed requirements.

Block 12, 13: The Contractor shall submit annual reports not later than thirty (30) calendar days after the close of each reporting period. The Contractor shall submit a final report within thirty (30) calendar days of completion of the contract.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSP 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A016

2. TITLE OF DATA ITEM

Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81948

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 2: The complete title for this Data Item Description is as follows: Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan.

Block 8:

Blocks 11, 12, 13: The Contractor shall submit a draft NLT 90 calendar days after contract award. The Contractor shall resubmit NLT 30 calendar days after receipt of Government comments. In the event there are no changes to the DMSMS Management Plan, the Contractor shall submit a letter stating there are no changes.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSL 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER PSSS

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

A017

2. TITLE OF DATA ITEM

Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-PSSS-81656B

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

MTHLY

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

Block 2: Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

BLK 8: Written Government comments/disapproval shall be within 45 days after receipt of data. When comments are provided, the Contractor shall provide an updated submittal NLT 20 days after receipt of the comments/change request(s).

BLKS 11, 12, 13: First submittal due 90 days after contract award.

Subsequent submittals due monthly contingent on DMSMS Forecast Analysis Report changes. If the DMSMS Forecast Analysis Report has no changes, submit a transmittal letter stating such, in lieu of a DMSMS Forecast Analysis Report.

Submittals IAW the CDRL requirements and electronically via MEARS.

AFLCMC/WLSE WP 0 1 1

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

B

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM/ITEM

CMC/WxR INSTALL KITS

E. CONTRACT/PR NO.

FA8625-18-R-6701

F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Product Drawings/Models and Associated Lists

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81000E/T

5. CONTRACT REFERENCE

SOW Para:

6. REQUIRING OFFICE

AFLCMC/WLSE

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

QRTLY

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. Air Force drawings 9579776, Rev L and 9579777, Rev A (CAGE 98752) are a part of this CDRL. A copy of the drawings may be requested through the Procurement Contracting Officer (PCO).

2. METADATA shall be in accordance with 9579776, paragraph 10, Option one.

SEE CONTINUATION SHEETS

Vendor Item Control Drawings shall be used to specify the requirements for purchased items when such items have been approved for use in the design and are used without alteration, selection or source qualification (testing of an item prior to procurement action to ensure that it satisfies the specified requirements).

This CDRL takes precedence over any Single Process Initiative (SPI) relating to the preparation, content and delivery of engineering data provided to the Government, as a result of this contract, and which is developed after this CDRL is dated and signed. Should a current Contractor SPI in use be discovered to be at odds with a requirement on this CDRL, the Government shall immediately use a vetting process to quickly resolve any issue(s).

Blocks 11, 12 and 13: See Continuation sheet

AFLCMC/WLSE 1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

TOTAL PRICE