Text version
C-5 Large Aircraft Infrared Countermeasures
(LAIRCM)
Block 30 Program
Program Manager: Ms. Susan Jo Donati
AFLCMC/WLSP 937-904-5923
Contracting Officer: Mr. Daniel Andrews
AFLCMC/WLSK 937-656-9540
AF Life Cycle Management Center
Rules of Engagement
The Government does not intend to award a contract on the basis of the information received at this event
This is for informational purposes only. The contents of any future Request for Proposal (RFP) take precedence over anything provided during this briefing and one-on-one sessions
Questions and answers will be posted to FBO and are considered public record
Costs incurred as a result of this meeting are considered bid and proposal costs and will not be reimbursed by the Government
Information Presented during Briefings is Subject to Change
58as of 21 Jul 17
C-5 LAIRCM Block Agenda
Overview Notional Prime Contractors Responsibilities Block 20 vs. Block 30 Notional Block 30 Requirements Notional Contract Type Notional Acquisition Schedule Questions
C-5 LAIRCM Block 30 Overview
LAIRCM is an automatic defensive system that combines a Missile Warning System (MWS) and infrared laser jammer countermeasure system to protect the aircraft from shoulder-fired, Man-Portable Air Defense Systems (MANPADS) Infrared (IR) seeking missiles Upgrade C-5 LAIRCM Program from Block 20 to Block 30 to provide improved performance, security, and operator-requested features
Notional C-5 LAIRCM Block 30 Prime Contractor Responsibilities
Integrate and deliver (50) Group A & B Kits for depot installation Integrate and test (2) pre-production C-5 LAIRCM Block 30 Perform Non-Recurring Engineering (NRE) to integrate LAIRCM
Block 30 Group A modification kits onto C-5 aircraft (sensor mounts, wiring, circuit breakers, relabeling circuit breakers) Provide product support planning Provide provisioning and tech order source data updates Provide Interim Contractor Support (ICS) Obtain/maintain a security clearance level (Secret)
Note: Group B Kit components will be provided as Government Furnished Equipment
C-5 LAIRCM
Block 20 to Block 30
Infrared Missile (IR) Warning System (MWS) Sensors (2) LH/RH Side
Infrared (IR) Missile Warning System (MWS) Sensors (3)
LH/RH Side & CL Down
Regulated Transformer Rectifier Unit (RTRU)
Control Indicator Unit Replacement
(CIUR) Pointer Tracker Assembly
(P/TA)
LAIRCM System Processor
Replacement
(LSPR)
Repeater (2)
Block 20
Block 30
Requirements
Create technical data package for the purpose of Replacing Line Replacement Units (LRUs) oCIU with CIUR oLSP with LSPR oUV-MWS with IR-MWS
Adding and possibly relabeling circuit breakers oRe-terminate MWS power wires from LSP to circuit breakers oUpdate electrical load analysis as necessary
Adding wiring between CIUR and LSPR May require redesign of MWS mount for thermal dissipation May require re-orientation of the MWS mount for proper field of view
Source data for aircraft Technical Orders (wiring diagrams, Illustrated Parts Breakdown (IPB), operator and maintenance manuals) will be required Engineering Change Orders (ECOs) for impacts to any existing drawings Update the source code for the trainer simulators (written in C)
Contract Type
Anticipate a predominantly Firm-Fixed Price (FFP) contract for Kits, Non-Recurring Engineering, and ICS Travel will be Cost Reimbursable, No Fee (CRNF) Over & Above (O&A) will be Cost-Plus-Fixed Fee (CPFF)
(Dollar Value to be provided by the Government)
Notional Acquisition Schedule C-5 LAIRCM Block 30
Draft RFP Release 1Q FY18 Final RFP Release 2Q FY18 Proposals Due 2Q FY18 Contract Award 4Q FY18 First Kits Required at Depot 4Q FY20 Period of Performance End 4Q FY25
| C-5 Large Aircraft Infrared Countermeasures (LAIRCM) �Block 30 Program� |
| Rules of Engagement |
| C-5 LAIRCM Block Agenda |
| C-5 LAIRCM Block 30 Overview |
| Notional C-5 LAIRCM Block 30�Prime Contractor Responsibilities |
| C-5 LAIRCM �Block 20 to Block 30 |
| Notional C-5 LAIRCM Block 30�Requirements |
| �Notional C-5 LAIRCM Block 30�Contract Type� |
| Notional Acquisition Schedule�C-5 LAIRCM Block 30 |