Communications, Navigation, Surveillance / Air Traffic Management (CNS/ATM) Production Briefing - C-5M Enterprise Industry Days
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Communications, Navigation, Surveillance/Air Traffic
Management (CNS/ATM) Program
Program Manager: Ms. Monika Mapley
AFLCMC/WLSP 937-656-7552
Contracting Officer: Mr. Daniel Andrews
AFLCMC/WLSK 937-255-1054
AFLCMC.WLSP.CNSATM_Production@us.af.mil
AF Life Cycle Management Center
Rules of Engagement
The Government does not intend to award a contract on the basis of the information received at this event
This is for informational purposes only. The contents of any future Request for Proposal (RFP) take precedence over anything provided during this briefing and one-on-one sessions
Questions and answers will be posted to FBO and are considered public record
Costs incurred as a result of this meeting are considered bid and proposal costs and will not be reimbursed by the Government
Information Presented during Briefings is Subject to Change
45as of 21 Jul 17
CNS/ATM Production Program Agenda
Program Overview Program Phases Anticipated Schedule Technical Considerations Considerations for Options Contracting Strategy Next Major Events
Overview
CNS/ATM Program implements several technical upgrades driven by multiple civil and military mandates, including:
Replacement of the exiting AERO-I SATCOM communication system with an AERO-H+/Swift broadband capability
Replacement of the ARC-210 Gen 3 radio with Gen 5 radio
Implementation of Automatic Dependent Surveillance-Broadcast (ADS-B) Out functionality; and Identification Friend or Foe (IFF) Mode 5 functionality
SATCOM
Antenna
MCS-7120
Satellite Data
Unit
ARC-210 Receiver- Transmitters
KY-58
Crypto
KYV-5
Crypto
SATCOM
D/LNA
TSV – Tactical Secure Voice D/LNA – Diplexer/Low Noise Amplifier
CNS/ATM Production Program Overview
SATCOM
Replacement
Secured Voice ARC-210 Gen 5
KY-
58M KYV-
5M
APX-119 Transponder ADS-B Out & IFF Mode 5
Phases
EMD Program Ongoing contract with Lockheed Martin Aero, Marietta, GA oRequires delivery of Technical Data Package (TDP) Production Phase 1 Accelerated ADS-B Out with IFF Mode 5 oEffort being accomplished under sole source contract with APX-119 OEM Production Phase 2 SATCOM and Secured Voice Upgrade oBased on EMD design/test – configuration changes will not be accepted Installations performed by WR Air Logistics Complex (ALC) Some components will/may be Government Furnished Property (GFP) and may be shipped directly to WR ALC oARC-210 will be GFP oCrypto Equipment will be GFP
Phases
Production Phase 2 - Competitive Portion Will include Group A production, kit assembly, storage, transportation, peculiar support equipment (SE), and Group A spares May include Interim Contractor Support (ICS) oExcluding ARC-210 radios and Crypto May include Kits for Trainers May include procurement of SATCOM AERO H+ system from
Honeywell (directed part numbers as tested under EMD)
Notional Schedule
Program Milestones
EMD
Equipment Procurement
Kit Production
Sustainment
CDR
Development
DT&E OT&E
Production
RFP
SRR PDR
MS B
May
FCA/PCA
Production
ASP
ESIS
OND17 JFM AMJ JAS
80%TDP
OND18 OND19
Final TDP
JFM AMJ JAS JFM AMJ JAS JFM AMJ JASOND20OND15 JFM AMJ JAS OND16 JFM AMJ JAS OND21 JFM AMJ JAS OND22 JFM AMJ JAS
MS C
5 5 4 5 4 7 6 4 4 1 3 1 1Kit Need Dates at WR ALC
Q1
FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
SRAR
A/C 1 Mod A/C 2 Mod
Kitting
Interim Contractor Support
OND17 JFM AMJ JAS OND18 OND19JFM AMJ JAS JFM AMJ JAS JFM AMJ JASOND20OND15 JFM AMJ JAS OND16 JFM AMJ JAS OND21 JFM AMJ JAS OND22 JFM AMJ JAS
ARC 210 deliveries
SATCOM deliveries
EMD Contract Award
Production Contract
ARC-210
Order
ARC-210
Deliveries
SATCOM
Order
SATCOM
Deliveries
Draft Schedule, Pre-Decisional, subject to change
Kit Deliveries
Technical Considerations
Anticipated Clearance Level: SECRET Technical Documentation Anticipate providing 80% complete technical data package
(TDP) at the time of competitive production Request for Proposal (RFP)
Final TDP will be available after production contract award (est. Q4 FY19)
Contractor shall plan for validation/verification of kits with USG involvement Contractor shall have capability to promptly incorporate changes to the kit content as required, resulting from potential engineering changes
Considerations for Options
Strategy for handling cryptographic equipment and ARC-210 radios is still in development These items are designated as Cryptographic
Controlled Items (CCI) and require special transportation and storage requirements as defined in CNSSI-4001 o Contractor may be required to handle CCIs
Strategy for procurement of SATCOM Aero H+ equipment is still in development Contractor may be required to procure specific
SATCOM AeroH+ system from a directed source (Honeywell)
Contracting Strategy
Contracting strategy is in development Anticipate predominantly Firm Fixed Price (FFP) contract for kit production efforts May consider schedule incentives May consider cost-reimbursement contract line items portions for over and above work
Notional Acquisition Schedule
Market Research Q4 FY17 RFP Release: Q3 FY18 Contract(s) award: Q3 FY19 First Kits delivered to Depot: Q3 FY20
| Communications, Navigation, Surveillance/Air Traffic Management (CNS/ATM) �Program� |
| Rules of Engagement |
| CNS/ATM Production Program �Agenda |
| CNS/ATM Production Program �Overview |
| CNS/ATM Production Program�Overview |
| CNS/ATM Production Program�Phases |
| CNS/ATM Production Program�Phases |
| CNS/ATM Production Program Notional Schedule |
| CNS/ATM Production Program Technical Considerations |
| CNS/ATM Production Program Considerations for Options |
| CNS/ATM Production Program Contracting Strategy |
| CNS/ATM Production Program�Notional Acquisition Schedule |
File details come from the government source that posted it. Updated .