Sect J Atch 9 - Option Matrix 24 Feb 10.xlsx
XLSX spreadsheet 81 KB Posted
- Attached to
- KC-X Tanker Modernization Program Federal contract opportunity
- Solicitation number
- FA8625-10-R-6600
About this file
Sect J Atch 9 - Option Matrix 24 Feb 10.xlsx
View the file
Other files for this federal contract opportunity
Show all 50
KC-X Tanker Modernization Program has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
All Options
ATTACHMENT 9 - OPTION MATRIX
| OPTION MATRIX- SUMMARY OF OPTIONS | |||
| In accordance with Special Contract Requirement (SCR) H013 | |||
| CLIN | Title | Contract Type | Quantity |
| LRIP- (FYXX Government Notional) Lot 1 | |||
| 0101 | Low Rate Initial Production (Lot 1) | FFP | 4-7 |
| 0102 | Warranty of LRIP Lot 1 | FFP | 4-7 |
| 0103 | Data for LRIP Lot 1 | NSP | 1 Lot |
| 0104 | Interim Contractor Support | FFP | 1 Lot |
| 0105 | Spare Engines for LRIP Lot 1 | FFP | 0-2 |
| 0106 | Wing Refueling Pod Kits for LRIP Lot 1 | FFP | 1-5 |
| 0107 | LRIP Studies and Analysis | FFP | N/A |
| LRIP- (FYXX Government Notional) Lot 2 | |||
| 0201 | Low Rate Initial Production (Lot 2) | FFP | 8-15 |
| 0202 | Warranty of LRIP Lot 2 | FFP | 8-15 |
| 0203 | Data for LRIP Lot 2 | NSP | 1 Lot |
| 0204 | Interim Contractor Support | FFP | 1 Lot |
| 0205 | Spare Engines for LRIP Lot 2 | FFP | 0-2 |
| 0206 | Wing Refueling Pod Kits for LRIP Lot 2 | FFP | 1-5 |
| 0207 | LRIP Studies and Analysis | FFP | N/A |
| FULL RATE PRODUCTION- (FYXX Government Notional) Lot 3 | |||
| 0301 | Full Rate Production (Lot 3) | NTE | 9-18 |
| 0302 | Warranty of FRP Lot 3 | NTE | 9-18 |
| 0303 | Data for FRP Lot 3 | NTE | 1 Lot |
| 0304 | Interim Contractor Support | FFP | 1 Lot |
| 0305 | Spare Engines for FRP Lot 3 | FFP | 0-2 |
| 0306 | Wing Refueling Pod Kits for FRP Lot 3 | FFP | 1-5 |
| 0307 | FRP Studies and Analysis | FFP | N/A |
| 0308 | Over and Above Repairs | FFP, LOE | N/A |
| FULL RATE PRODUCTION- (FYXX Government Notional) LOT 4 | |||
| 0401 | Full Rate Production (Lot 4) | NTE | 9-18 |
| 0402 | Warranty of FRP Lot 4 | NTE | 9-18 |
| 0403 | Data for FRP Lot 4 | NTE | 1 Lot |
| 0404 | Interim Contractor Support | FFP | 1 Lot |
| 0405 | Spare Engines for FRP Lot 4 | FFP | 0-2 |
| 0406 | Wing Refueling Pod Kits for FRP Lot 4 | FFP | 1-5 |
| 0407 | FRP Studies and Analysis | FFP | N/A |
| 0408 | Over and Above Repairs | FFP, LOE | N/A |
| FULL RATE PRODUCTION- (FYXX Government Notional) LOT 5 | |||
| 0501 | Full Rate Production (Lot 5) | NTE | 9-18 |
| 0502 | Warranty of FRP Lot 5 | NTE | 9-18 |
| 0503 | Data for FRP Lot 5 | NTE | 1 Lot |
| 0504 | Interim Contractor Support | FFP | 1 Lot |
| 0505 | Spare Engines for FRP Lot 5 | FFP | 0-2 |
| 0506 | Wing Refueling Pod Kits for FRP Lot 5 | FFP | 1-5 |
| 0507 | FRP Studies and Analysis | FFP | N/A |
| 0508 | Over and Above Repairs | FFP, LOE | N/A |
| FULL RATE PRODUCTION- (FYXX Government Notional) LOT 6 | |||
| 0601 | Full Rate Production (Lot 6) | NTE | 12-15 |
| 0602 | Warranty of FRP Lot 6 | NTE | 12-15 |
| 0603 | Data for FRP Option 6 | NTE | 1 Lot |
| FULL RATE PRODUCTION- (FYXX Government Notional) LOT 7 | |||
| 0701 | Full Rate Production (Lot 7) | NTE | 12-15 |
| 0702 | Warranty of FRP Lot 7 | NTE | 12-15 |
| 0703 | Data for FRP Option 7 | NTE | 1 Lot |
| FULL RATE PRODUCTION- (FYXX Government Notional) LOT 8 | |||
| 0801 | Full Rate Production (Lot 8) | NTE | 12-15 |
| 0802 | Warranty of FRP Lot 8 | NTE | 12-15 |
| 0803 | Data for FRP Option 8 | NTE | 1 Lot |
| FULL RATE PRODUCTION- (FYXX Government Notional) LOT 9 | |||
| 0901 | Full Rate Production (Lot 9) | NTE | 12-15 |
| 0902 | Warranty of FRP Lot 9 | NTE | 12-15 |
| 0903 | Data for FRP Option 9 | NTE | 1 Lot |
| FULL RATE PRODUCTION- (FYXX Government Notional) LOT 10 | |||
| 1001 | Full Rate Production (Lot 10) | NTE | 12-15 |
| 1002 | Warranty of FRP Lot 10 | NTE | 12-15 |
| 1003 | Data for FRP Option 10 | NTE | 1 Lot |
| FULL RATE PRODUCTION- (FYXX Government Notional) LOT 11 | |||
| 1101 | Full Rate Production (Lot 11) | NTE | 12-15 |
| 1102 | Warranty of FRP Lot 11 | NTE | 12-15 |
| 1103 | Data for FRP Option 11 | NTE | 1 Lot |
| FULL RATE PRODUCTION- (FYXX Government Notional) LOT 12 | |||
| 1201 | Full Rate Production (Lot 12) | NTE | 12-15 |
| 1202 | Warranty of FRP Lot 12 | NTE | 12-15 |
| 1203 | Data for FRP Option 12 | NTE | 1 Lot |
| FULL RATE PRODUCTION- (FYXX Government Notional) LOT 13 | |||
| 1301 | Full Rate Production (Lot 13) | NTE | 6-15 |
| 1302 | Warranty of FRP Lot 13 | NTE | 6-15 |
| 1303 | Data for FRP Option 13 | NTE | 1 Lot |
FA8625-10-R-6600
Section J, Attachment 9 Page &P of 20 24 February 2010
LRIP FYXX Lot 1
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | ||||
| LRIP- (FYXX Government Notional) Lot 1 | ||||
| CLIN | Title | Delivery Schedule | Price | |
| 0101 | Low Rate Initial Production (Lot 1) | |||
| (4) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (5) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (6) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (7) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| 0102 | Warranty of LRIP Lot 1 | |||
| (4) each KC-X Aircraft | NLT TBP | TBP | ||
| (5) each KC-X Aircraft | NLT TBP | TBP | ||
| (6) each KC-X Aircraft | NLT TBP | TBP | ||
| (7) each KC-X Aircraft | NLT TBP | TBP | ||
| 0103 | Data for LRIP Lot 1 | Per DD Forms 1423 | Price within line item 0101 | |
| 0104 | Interim Contractor Support | See separate ICS Year 1 Table | ||
| 0105 | Spare Engines for LRIP Lot 1 | |||
| (1) each Spare Engine | NLT TBP | TBP | ||
| (2) each Spare Engine | NLT TBP | TBP | ||
| 0106 | Wing Refueling Pod Kits for LRIP Lot 1 | |||
| (1) each Pod Kit | NLT TBP | TBP | ||
| (2) each Pod Kit | NLT TBP | TBP | ||
| (3) each Pod Kit | NLT TBP | TBP | ||
| (4) each Pod Kit | NLT TBP | TBP | ||
| (5) each Pod Kit | NLT TBP | TBP | ||
| 0107 | LRIP Studies and Analysis | NLT TBP | TBP | $ Per Hour |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
LRIP FYXX Lot 2
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | ||||
| LRIP- (FYXX Government Notional) Lot 2 | ||||
| CLIN | Title | Delivery Schedule | Price | |
| 0201 | Low Rate Initial Production (Lot 2) | |||
| (8) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (9) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (10) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (11) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (12) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (14) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (15) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| 0202 | Warranty of LRIP Lot 2 | |||
| (8) each KC-X Aircraft | NLT TBP | TBP | ||
| (9) each KC-X Aircraft | NLT TBP | TBP | ||
| (10) each KC-X Aircraft | NLT TBP | TBP | ||
| (11) each KC-X Aircraft | NLT TBP | TBP | ||
| (12) each KC-X Aircraft | NLT TBP | TBP | ||
| (13) each KC-X Aircraft | NLT TBP | TBP | ||
| (14) each KC-X Aircraft | NLT TBP | TBP | ||
| (15) each KC-X Aircraft | NLT TBP | TBP | ||
| 0203 | Data for LRIP Lot 2 | Per DD Forms 1423 | Price within line item 0201 | |
| 0204 | Interim Contractor Support | See separate ICS Year 2 Table | ||
| 0205 | Spare Engines for LRIP Lot 2 | |||
| (1) each Spare Engine | NLT TBP | TBP | ||
| (2) each Spare Engine | NLT TBP | TBP | ||
| 0206 | Wing Refueling Pod Kits for LRIP lot 2 | |||
| (1) each Pod Kit | NLT TBP | TBP | ||
| (2) each Pod Kit | NLT TBP | TBP | ||
| (3) each Pod Kit | NLT TBP | TBP | ||
| (4) each Pod Kit | NLT TBP | TBP | ||
| (5) each Pod Kit | NLT TBP | TBP | ||
| 0207 | LRIP Studies and Analysis | NLT TBP | TBP | $ Per Hour |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
PROD FYXX Lot 3
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | ||||
| FULL RATE PRODUCTION- (FYXX Government Notional) Lot 3 | ||||
| CLIN | Title | Delivery Schedule | Price | |
| 0301 | Full Rate Production (Lot 3) | |||
| (9) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (10) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (11) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (12) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (14) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (15) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (16) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (17) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (18) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| 0302 | Warranty of FRP Lot 3 | |||
| (9) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (10) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (11) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (12) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (13) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (14) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (15) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (16) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (17) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (18) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| 0303 | Data for FRP Lot 3 | Per DD Forms 1423 | Price within line item 0301 | |
| 0304 | Interim Contractor Support | See separate ICS Year 3 Table | ||
| 0305 | Spare Engines for FRP Lot 3 | |||
| (1) each Spare Engine | NLT TBP | TBP | ||
| (2) each Spare Engine | NLT TBP | TBP | ||
| 0306 | Wing Refueling Pod Kits for FRP Lot 3 | |||
| (1) each Pod Kit | NLT TBP | TBP | ||
| (2) each Pod Kit | NLT TBP | TBP | ||
| (3) each Pod Kit | NLT TBP | TBP | ||
| (4) each Pod Kit | NLT TBP | TBP | ||
| (5) each Pod Kit | NLT TBP | TBP | ||
| 0307 | FRP Studies and Analysis | NLT TBP | TBP | $ Per Hour |
| 0308 | Over and Above Repairs | NLT TBP | TBP | $ Per Hour |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
PROD FYXX Lot 4
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | ||||
| FULL RATE PRODUCTION- (FYXX Government Notional) Lot 4 | ||||
| CLIN | Title | Delivery Schedule | Price | |
| 0401 | Full Rate Production (Lot 4) | |||
| (9) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (10) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (11) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (12) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (14) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (15) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (16) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (17) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (18) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| 0402 | Warranty of FRP Lot 4 | |||
| (9) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (10) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (11) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (12) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (13) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (14) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (15) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (16) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (17) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (18) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| 0403 | Data for FRP Lot 4 | Per DD Forms 1423 | Price within line item 0401 | |
| 0404 | Interim Contractor Support | See separate ICS Year 4 Table | ||
| 0405 | Spare Engines for FRP Lot 4 | |||
| (1) each Spare Engine | NLT TBP | TBP | ||
| (2) each Spare Engine | NLT TBP | TBP | ||
| 0406 | Wing Refueling Pod Kits for FRP Lot 4 | |||
| (1) each Pod Kit | NLT TBP | TBP | ||
| (2) each Pod Kit | NLT TBP | TBP | ||
| (3) each Pod Kit | NLT TBP | TBP | ||
| (4) each Pod Kit | NLT TBP | TBP | ||
| (5) each Pod Kit | NLT TBP | TBP | ||
| 0407 | FRP Studies and Analysis | NLT TBP | TBP | $ Per Hour |
| 0408 | Over and Above Repairs | NLT TBP | TBP | $ Per Hour |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
PROD FYXX Lot 5
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | ||||
| FULL RATE PRODUCTION- (FYXX Government Notional) Lot 5 | ||||
| CLIN | Title | Delivery Schedule | Price | |
| 0501 | Full Rate Production (Lot 5) | |||
| (9) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (10) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (11) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (12) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (14) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (15) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (16) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (17) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| (18) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | ||
| 0502 | Warranty of FRP Lot 5 | |||
| (9) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (10) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (11) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (12) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (13) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (14) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (15) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (16) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (17) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| (18) each KC-X Aircraft | NLT TBP | TBP NTE | ||
| 0503 | Data for FRP Lot 5 | Per DD Forms 1423 | Price within line item 0501 | |
| 0504 | Interim Contractor Support | See separate ICS Year 5 Table | ||
| 0505 | Spare Engines for FRP Lot 5 | |||
| (1) each Spare Engine | NLT TBP | TBP | ||
| (2) each Spare Engine | NLT TBP | TBP | ||
| 0506 | Wing Refueling Pod Kits for FRP Lot 5 | |||
| (1) each Pod Kit | NLT TBP | TBP | ||
| (2) each Pod Kit | NLT TBP | TBP | ||
| (3) each Pod Kit | NLT TBP | TBP | ||
| (4) each Pod Kit | NLT TBP | TBP | ||
| (5) each Pod Kit | NLT TBP | TBP | ||
| 0507 | FRP Studies and Analysis | N/A | TBP | $ Per Hour |
| 0508 | Over and Above Repairs | N/A | TBP | $ Per Hour |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
PROD FYXX Lot 6
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| FULL RATE PRODUCTION- (FYXX Government Notional) Lot 6 | |||
| CLIN | Title | Delivery Schedule | Price |
| 0601 | Full Rate Production (Lot 6) | ||
| (12) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (14) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (15) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| 0602 | Warranty of FRP Lot 6 | ||
| (12) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (13) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (14) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (15) each KC-X Aircraft | NLT TBP | TBP NTE | |
| 0603 | Data for FRP Option 6 | Per DD Forms 1423 | Price within line item 0601 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
PROD FYXX Lot 7
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| FULL RATE PRODUCTION- (FYXX Government Notional) Lot 7 | |||
| CLIN | Title | Delivery Schedule | Price |
| 0701 | Full Rate Production (Lot 7) | ||
| (12) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (14) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (15) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| 0702 | Warranty of FRP Lot 7 | ||
| (12) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (13) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (14) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (15) each KC-X Aircraft | NLT TBP | TBP NTE | |
| 0703 | Data for FRP Option 7 | Per DD Forms 1423 | Price within line item 0701 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
PROD FYXX Lot 8
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| FULL RATE PRODUCTION- (FYXX Government Notional) Lot 8 | |||
| CLIN | Title | Delivery Schedule | Price |
| 0801 | Full Rate Production (Lot 8) | ||
| (12) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (14) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (15) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| 0802 | Warranty of FRP Lot 8 | ||
| (12) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (13) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (14) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (15) each KC-X Aircraft | NLT TBP | TBP NTE | |
| 0803 | Data for FRP Option 8 | Per DD Forms 1423 | Price within line item 0801 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
PROD FYXX Lot 9
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| FULL RATE PRODUCTION- (FYXX Government Notional) Lot 9 | |||
| CLIN | Title | Delivery Schedule | Price |
| 0901 | Full Rate Production (Lot 9) | ||
| (12) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (15) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| 0902 | Warranty of FRP Lot 9 | ||
| (12) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (13) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (14) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (15) each KC-X Aircraft | NLT TBP | TBP NTE | |
| 0903 | Data for FRP Option 9 | Per DD Forms 1423 | Price within line item 0901 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
PROD FYXX Lot 10
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| FULL RATE PRODUCTION- (FYXX Government Notional) Lot 10 | |||
| CLIN | Title | Delivery Schedule | Price |
| 1001 | Full Rate Production (Lot 10) | ||
| (12) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (14) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (15) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| 1002 | Warranty of FRP Lot 10 | ||
| (12) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (13) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (14) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (15) each KC-X Aircraft | NLT TBP | TBP NTE | |
| 1003 | Data for FRP Option 10 | Per DD Forms 1423 | Price within line item 1001 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
PROD FYXX Lot 11
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| FULL RATE PRODUCTION- (FYXX Government Notional) Lot 11 | |||
| CLIN | Title | Delivery Schedule | Price |
| 1101 | Full Rate Production (Lot 11) | ||
| (12) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (14) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (15) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| 1102 | Warranty of FRP Lot 11 | ||
| (12) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (13) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (14) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (15) each KC-X Aircraft | NLT TBP | TBP NTE | |
| 1103 | Data for FRP Option 11 | Per DD Forms 1423 | Price within line item 1101 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
PROD FYXX Lot 12
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| FULL RATE PRODUCTION- (FYXX Government Notional) Lot 12 | |||
| CLIN | Title | Delivery Schedule | Price |
| 1201 | Full Rate Production (Lot 12) | ||
| (12) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (14) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (15) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| 1202 | Warranty of FRP Lot 12 | ||
| (12) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (13) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (14) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (15) each KC-X Aircraft | NLT TBP | TBP NTE | |
| 1203 | Data for FRP Option 12 | Per DD Forms 1423 | Price within line item 1201 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
PROD FYXX Lot 13
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| FULL RATE PRODUCTION- (FYXX Government Notional) Lot 13 | |||
| CLIN | Title | Delivery Schedule | Price |
| 1301 | Full Rate Production (Lot 13) | ||
| (6) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (7) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (8) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (9) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (10) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (11) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (12) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (13) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (14) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| (15) each KC-X Aircraft | NLT TBP | Pricing identified in Attach 7 | |
| 1302 | Warranty of FRP Lot 13 | ||
| (6) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (7) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (8) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (9) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (10) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (11) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (12) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (13) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (14) each KC-X Aircraft | NLT TBP | TBP NTE | |
| (15) each KC-X Aircraft | NLT TBP | TBP NTE | |
| 1303 | Data for FRP Option 13 | Per DD Forms 1423 | Price within line item 1301 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the production lot options in accordance with the dates shown below: |
| LOT 1, NLT 30 days after Milestone C approval (LRIP) |
| LOT 2, NLT 14 months after Milestone C approval (LRIP) |
| LOT 3, NLT 30 days after Full Rate Production approval |
| LOT 4, NLT 14 months after Full Rate Production approval |
| LOT 5, NLT 26 months after Full Rate Production approval |
| LOT 6, NLT 38 months after Full Rate Production approval |
| LOT 7, NLT 50 months after Full Rate Production approval |
| LOT 8, NLT 62 months after Full Rate Production approval |
| LOT 9, NLT 74 months after Full Rate Production approval |
| LOT 10, NLT 86 months after Full Rate Production approval |
| LOT 11, NLT 98 months after Full Rate Production approval |
| LOT 12, NLT 110 months after Full Rate Production approval |
| LOT 13, NLT 122 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
ICS Year 1
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| ICS YEAR 1 - (FYXX Government Notional) | |||
| CLIN | Title | Period of Performance | Price |
| 0104 | ICS YEAR 1 | ||
| TBP (12 mos.) | Pricing identified in Attach 7 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the ICS options in accordance with the dates shown below: |
| ICS Year 1, NLT 30 days after Milestone C approval (LRIP) |
| ICS Year 2, NLT 14 months after Milestone C approval (LRIP) |
| ICS Year 3, NLT 30 days after Full Rate Production approval |
| ICS Year 4, NLT 14 months after Full Rate Production approval |
| ICS Year 5, NLT 26 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
ICS Year 2
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| ICS YEAR 2 - (FYXX Government Notional) | |||
| CLIN | Title | Period of Performance | Price |
| 0204 | ICS YEAR 2 | ||
| 4- 7 Fielded Aircraft supported | TBP (12 mos.) | Pricing identified in Attach 7 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the ICS options in accordance with the dates shown below: |
| ICS Year 1, NLT 30 days after Milestone C approval (LRIP) |
| ICS Year 2, NLT 14 months after Milestone C approval (LRIP) |
| ICS Year 3, NLT 30 days after Full Rate Production approval |
| ICS Year 4, NLT 14 months after Full Rate Production approval |
| ICS Year 5, NLT 26 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
ICS Year 3
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| ICS YEAR 3 - (FYXX Government Notional) | |||
| CLIN | Title | Period of Performance | Price |
| 0304 | ICS YEAR 3 | ||
| 12 - 14 Fielded Aircraft supported | TBP (12 mos.) | Pricing identified in Attach 7 | |
| 15 - 18 Fielded Aircraft supported | TBP (12 mos.) | Pricing identified in Attach 7 | |
| 19 - 22 Fielded Aircraft supported | TBP (12 mos.) | Pricing identified in Attach 7 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the ICS options in accordance with the dates shown below: |
| ICS Year 1, NLT 30 days after Milestone C approval (LRIP) |
| ICS Year 2, NLT 14 months after Milestone C approval (LRIP) |
| ICS Year 3, NLT 30 days after Full Rate Production approval |
| ICS Year 4, NLT 14 months after Full Rate Production approval |
| ICS Year 5, NLT 26 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
ICS Year 4
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| ICS YEAR 4 - (FYXX Government Notional) | |||
| CLIN | Title | Period of Performance | Price |
| 0404 | ICS YEAR 4 | ||
| 25 - 30 Fielded Aircraft supported | TBP (12 mos.) | Pricing identified in Attach 7 | |
| 31 - 37 Fielded Aircraft supported | TBP (12 mos.) | Pricing identified in Attach 7 | |
| 38 - 44 Fielded Aircraft supported | TBP (12 mos.) | Pricing identified in Attach 7 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the ICS options in accordance with the dates shown below: |
| ICS Year 1, NLT 30 days after Milestone C approval (LRIP) |
| ICS Year 2, NLT 14 months after Milestone C approval (LRIP) |
| ICS Year 3, NLT 30 days after Full Rate Production approval |
| ICS Year 4, NLT 14 months after Full Rate Production approval |
| ICS Year 5, NLT 26 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9
ICS Year 5
| Offeror shall propose prices and delivery dates based on the option exercise milestone dates set forth below. | |||
| ICS YEAR 5 - (FYXX Government Notional) | |||
| CLIN | Title | Period of Performance | Price |
| 0504 | ICS YEAR 5 | ||
| 34 - 42 Fielded Aircraft supported | TBP (12 mos.) | Pricing identified in Attach 7 | |
| 43 - 52 Fielded Aircraft supported | TBP (12 mos.) | Pricing identified in Attach 7 | |
| 53 - 62 Fielded Aircraft supported | TBP (12 mos.) | Pricing identified in Attach 7 |
| The Government will notify the Contractor of their intent to exercise an option no later than 60 days prior to the option exercise date. |
| The Government may exercise the ICS options in accordance with the dates shown below: |
| ICS Year 1, NLT 30 days after Milestone C approval (LRIP) |
| ICS Year 2, NLT 14 months after Milestone C approval (LRIP) |
| ICS Year 3, NLT 30 days after Full Rate Production approval |
| ICS Year 4, NLT 14 months after Full Rate Production approval |
| ICS Year 5, NLT 26 months after Full Rate Production approval |
FA8625-10-R-6600
Section J, Attachment 9