FA8625-10-R-6600 Amend 0003.pdf
PDF 48 KB Posted
- Attached to
- KC-X Tanker Modernization Program Federal contract opportunity
- Solicitation number
- FA8625-10-R-6600
About this file
FA8625-10-R-6600 Amend 0003.pdf
View the file
Other files for this federal contract opportunity
Show all 50
KC-X Tanker Modernization Program has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
See Block #2
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
18 MAY 2010
4. REQUISITION/PURCHASE REQ.NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY 836 AESG/SYK CODE FA8625 7. ADMINISTERED BY (If other than Item 6) CODE
USAF/AFMC
AERONAUTICAL SYSTEMS CENTER (ASC)
2590 LOOP ROAD W, BLDG 558, RM 210
WRIGHT-PATTERSON AFB OH 45433-7142
ROBERT M. NOLIN 937-656-9343
robert.nolin@wpafb.af.mil
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
FA8625-10-R-6600
X
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X )
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM
10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: KC-X RFP Amendment 0003, Clarification of procurement and delivery of the KC-X LAIRCM system.
CONTRACTING OFFICER: Barbara G. Gehrs, (937) 255-0408; Joseph C. Leising, (937) 255-8964
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print).
16A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
(Signature of person authorized to sign)
BY________________________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.12.0 FAR (48 CFR) 53.243 Created 17 May 2010 4:23 PM
SCHEDULE OF CHANGES
FA8625-10-R-6600 0003
Solicitation FA8625-10-R-6600 is hereby amended as follows:
1. SECTION J - LIST OF ATTACHMENTS
The following attachment/exhibit(s) are modified in Section J:
Attachment 2 STATEMENT OF OBJECTIVES/WORK FOR KC-X PROGRAM - ENGINEERING AND
MANUFACTURING DEVELOPMENT (EMD)
Attachment 2 is replaced in its entirety by the separate file dated 4 May 2010 uploaded to FedBizOpps.
The updated SOO clarifies the procurement and development of test plans and procedures for the LAIRCM System in paragraphs 1; 3.5.7 and the subparagraphs thereto; and 5.9.
Attachment 3 STATEMENT OF OBJECTIVES/WORK FOR KC-X PROGRAM - PRODUCTION
(INCLUDING LOW-RATE INITIAL; FULL-RATE PRODUCTION; AND INTERIM CONTRACTOR
SUPPORT)
Attachment 3 is replaced in its entirety by the separate file dated 4 May 2010 uploaded to FedBizOpps.
The updated SOO clarifies the procurement and delivery for the LAIRCM System in Production KC-X aircraft in paragraphs 1.1 and the subparagraphs thereto; 3.5.5.3; and Annex B - Acronym List.
2. SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
The following clauses are changed in Section L:
L047/836 AESG L-III INFORMATION TO OFFERORS (ITO) AND INSTRUCTIONS FOR PROPOSAL
PREPARATION (May 2010) Clause information is contained in separate file uploaded to FedBizOpps with this Amendment 0003.
The solicitation's clause L047/836 AESG posted to FedBizOpps with Amendment 0002 dated 22 Apr 2010 is hereby replaced in its entirety with a revised posted version dated 4 May 2010. The revised clause L047/836 AESG posted to FedBizOpps has "tracked changes" enabled to permit offerors to quickly find changes to the 22 Apr 2010 version. The changes are summarized as follows. This summary is for informational purposes only and offerors are cautioned that the actual text of the revised L047/836 AESG file are the solicitation's formal instructions.
a. The subparagraphs established with Amendment 0002 under paragraph 2.16 are deleted and a revised/simplified statement of the procurement of the LAIRCM System is established in revised subparagraph 2.16.1.
b. Paragraph 4.2.1.2, under the section entitled "Performance", is revised to clarify Air Vehicle Description Data that must include the LAIRCM GLTAs.
c. Paragraph 5.2.5 is revised by the addition of language clarifying that installed LAIRCM components (including the GLTAs) and uninstalled LAIRCM components (TTAs and GLTA cover plates) shall be included when completing the Total Proposed Price worksheets.
d. Paragraph 5.3.2.2 is revised to clarify offeror required input data for the IFARA (Section L, Attachment 7) describing their proposed aircraft configuration to include installed GLTAs.
e. Paragraph 7. List of Attachments:
Attachment 1 entitled "Correlation Matrix" dated 22 Apr 2010 is hereby replaced in its entirety with the revised version dated 4 May 2010 uploaded to FedBizOpps with this Amendment 0003.
The Attachment is specifically revised on pages 1 and 18 [of 48] to reflect the changes to the SOO paragraphs accomplished with this Amendment 0003.
SCHEDULE OF CHANGES
3. All RFP Sections not identified within this Amendment 0003 remain in effect as posted to FedBizOpps on 24 Feb 2010, Amendment 0001 posted on 11 Mar 2010, and Amendment 0002 posted on 29 Apr 2010.
LIST OF ATTACHMENTS
DOCUMENT PGS DATE TITLE
ATTACHMENT 2 43 04 MAY 2010 STATEMENT OF OBJECTIVES/WORK FOR KC-X
PROGRAM - ENGINEERING AND
MANUFACTURING DEVELOPMENT (EMD)
ATTACHMENT 3 27 04 MAY 2010 STATEMENT OF OBJECTIVES/WORK FOR KC-X
PROGRAM - PRODUCTION (INCLUDING LOW-
RATE INITIAL; FULL-RATE PRODUCTION; AND
INTERIM CONTRACTOR SUPPORT)