CONTRACT DATA REQUIREMENTS LIST
(CDRL)
GENERAL INSTRUCTIONS
FOR THE
B-52 Training Systems Support
DATED: TBD (Contract Award Date)
CONTRACT NUMBER: RFP FA8621-15-R-6338
PREPARED BY:
AGILE COMBAT SUPPORT-AFLCMC/WNS
SIMULATOR DIVISION
WRIGHT-PATTERSON AIR FORCE BASE, OHIO 45433-7249
CDRL MODIFICATION MATRIX.
This matrix identifies the CDRL changes as implemented by contract modification.
PROPOSAL NO. CDRL REV NO. DATE CDRL/PAGES REVISED
Contract Award Basic xx-xx-xx All Rev 1 xx-xx-xx Identify CDRLs as appropriate
(Contract Award Date)
TABLE OF CONTENTS
(Contract Award Date)
1 APPLICABLE DOCUMENTS
2 REFERENCE DOCUMENTS
3 DATA DELIVERIES
3.1 DELIVERY DATES
3.2 TAILORED DATA ITEMS
3.3 APPROVAL OF DATA
3.4 RE-SUBMITTAL OF DATA
3.5 FINAL SUBMITTAL OF DATA
3.6 DD FORM 250 REQUIREMENTS
3.7 CLASSIFIED DATA
4 ELECTRONIC DATA TRANSMISSION
4.1 SUBMISSION
4.2 DELIVERY NON-COMPLIANCE
4.3 FINANCIAL INFORMATION FORMAT
5 LETTERS OF TRANSMITTAL (LOT)
6 MODIFICATION OF DATA REQUIREMENTS
7 COMMON ABBREVIATIONS
8 MARKING TECHNICAL DOCUMENTATION
8.1 DISTRIBUTION MARKING SYSTEM:
8.2 MARKING TECHNICAL DATA
8.3 DISTRIBUTION STATEMENTS
8.4 CONTROLLING OFFICE
8.5 EXPORT-CONTROLLED WARNING STATEMENT
8.6 DESTRUCTION NOTICE
9 MAILING LISTS
10 CDRL TABLE OF CONTENTS
APPLICABLE DOCUMENTS
Data Item Descriptions (DIDs)/DD Form 1664s, are identified in Block 4 of the individual Contract Data Requirements List (CDRL)/DD Form 1423. All DIDs are available to the contractor at the following website:
http://quicksearch.dla.mil/
REFERENCE DOCUMENTS
DoD 5220.22-M National Industrial Security Program
Operating Manual DoD 5200.1-R, Vol 1 to 4 Information Security Program Regulation DoDD 5230.24 Distribution Statements on Technical Documents DoDD 5230.25 Unclassified Technical Data Disclosure DoDI 5010.12-M DoD Technical Data Management Program
DATA DELIVERIES
The CDRL establishes the data to be delivered by the contractor. The CDRL also identifies the submittal, inspection, approval, acceptance, and distribution requirements of all the CDRL data items contained herein.
Delivery Dates In the event a CDRL delivery date falls on a Saturday or Sunday, the delivery will be made by Friday to be counted as an on-time delivery. Unless otherwise specified in Block 16 of the CDRL, all references to “days” will refer to calendar days.
Tailored Data Items Tailoring instructions are as described in Block 16 of each affected CDRL. If the data preparation instructions contained in Block 16 of the CDRL are different than the instructions contained in Block 10 of the DID, the CDRL (DD Form 1423) shall govern.
Approval of Data
a. An "A" designator in Block 8 of the CDRL indicates the Government will formally reply to each data submittal with an approval, approval with comments, or disapproval. The Government will respond by issuing a Contracting Officer (CO) letter or e-mail to the contractor within 45 calendar days, unless otherwise specified on the CDRL, Block 16.
This does not apply to Engineering Change Proposals (ECPs) and Contract Change Proposals (CCPs).
http://quicksearch.dla.mil/
b. For those CDRLs with an "N/A" in Block 8, Government approval of the content is not required; however, compliance with data item format and content requirements as specified in Block 10 of the DID, and as tailored in Block 16 of the CDRL, is mandatory. However, the government will not provide a formal response back to the contractor. The Government has the right to disapprove any data submittal(s) not in compliance with contract requirements.
Re-submittal of Data If re-submittal of a CDRL is required, it shall be resubmitted within 30 calendar days after CO notification, unless otherwise specified. Should the contractor disagree with the re-submittal requirements, they shall submit their comments to the CO within 30 calendar days of notification. Each page of a re-submittal shall have changes indicated by a vertical line down the outer right margin designating those areas that have been revised. The document revision shall be indicated on the title page of the data item, each page, and a summary of document changes section contained within the document.
Final Submittal of Data
a. For the final delivery of each data item in the contract/delivery order, the contractor shall clearly state in the Letter of Transmittal (LOT), as defined in paragraph 5.0, when it is the last submittal being made, and that all contractual requirements concerning that data item have been fulfilled.
b. When the final delivery on a CDRL has been made, Block 16 of the CDRL shall be modified to state this. The revised CDRLs will be incorporated into the contract via a modification.
DD Form 250 Requirements Block 7 of the CDRL directs the method of submittal - individual DD Form 250s are required only if indicated in Block 7. All other submittals shall be via a Letter of Transmittal (LOT).
Classified Data Classified data shall be submitted in accordance with the requirements established by the DD Form 254. The contractor shall contact the CO for the mailing addresses for classified data.
ELECTRONIC DATA TRANSMISSION
Submission The contractor shall submit all data deliverables in accordance with the specific submittal instructions indicated in Block 16 of each CDRL. The versions of the software used shall remain compatible with current program office software. Any submittals by other means shall require program office approval prior to delivery of data. Data to be submitted by electronic data transmission (EDT) shall be identified in “Block 14.b Reg” of the CDRL.
Electronic Delivery includes delivery/availability of data files via Government-approved website, web page, server or via attachment of electronic files, as mutually agreed to between the Government and the contractor. Electronic data delivery and access is subject to Government protection/security requirements.
Delivery Non-Compliance The contractor shall inform the program office if any of their data deliverables cannot comply with the required electronic formats. In such cases the contractor shall recommend, for program office approval, an alternative delivery format(s).
Financial Information Format Financial information provided in excel spreadsheets should be able to be manipulated.
LETTERS OF TRANSMITTAL (LOT)
a. All data deliveries shall include a LOT. The LOT may be in the form of a letter in .pdf format with appropriate contractor representative signature or e-mail from the designated contractor representative. As a minimum, the LOT shall contain:
Contractor’s POC Contractor’s address Date Contract number and program name Letter control number Document control number Document revision level Document date CDRL sequence number DID Number Data Title/Subtitle Reason/Frequency of submittal (monthly, draft, final, update, etc.)
List of Distribution addressees as identified in Block 14 of the CDRL
b. If submittal is made via e-mail, the list of addressees in the “TO” line shall include the complete list of addressees and shall be considered sufficient.
MODIFICATION OF DATA REQUIREMENTS.
During the performance of this contract, the CO may unilaterally increase or decrease the number of addressees and/or number of copies the technical office requires; or may make other administrative or clarification changes to the CDRL.
a. The amendment shall be at no change in contract price provided the increase for an individual line item of data is not greater than 150% nor a decrease of less than 50% in the total number of copies initially specified in the CDRL. In the event of an increase greater than 150% or of a decrease greater than 50%, the parties will negotiate any equitable adjustment in accordance with the procedures of the “Changes” clause.
b. The CO may unilaterally make other administrative and/or clarification changes to the CDRLs. The contract price will constitute full satisfaction of any entitlement of equitable adjustment under the “Changes” clause provided the Contractor agrees to accept such change at no change in contract price. Unilateral action shall be by the issuance of a CO's letter, which will reference this paragraph as its authority. The Contractor shall notify the CO of the estimated cost if the changes impact the contract price.
COMMON ABBREVIATIONS
Block 7: SS Source (ACO)
DD Destination (PCO) LOT Letter of Transmittal
Block 8: A Approval N/A Approval Not Required
Blocks 10, 12 & 13: ANNLY Annually ASREQ As Required BLK 16 See Block 16 MTHLY Monthly QRTLY Quarterly
MARKING TECHNICAL DOCUMENTATION
Distribution Marking System:
a. In accordance with Section 1.30 of Title 10, “United States Code” a DoD distribution marking system for technical data has been established by DoD Directive 5230.24, “Distribution Statements on Technical Documents,” 18 March 1987. The intent of the system is to stem the flow of military-related technical data to our adversaries, without inhibiting technological growth or blocking the exchange of technical data that is vital to progress and innovation. The contractor shall mark all distribution statements and export-control statements, supplemental to any security markings, on all technical data to denote the extent of its availability for secondary distribution, release, and disclosure without need for additional approvals and authorizations from the controlling DoD office.
b. Distribution statements have been annotated in Block 9 of each CDRL and defined in the following paragraph 8.2. If the contractor feels that a different statement is required, he must notify the CO with the recommended statement. The Government will review the request and determine which statement is the most appropriate and provide the contractor with an acceptance of the change or reason for not accepting the contractor’s request for change.
Marking Technical Data
a. The contractor shall mark all requested technical information, regardless of its medium, with a distribution statement. This includes technical reports, blueprints, drawings, technical orders, technical manuals, plans, instructions, computer software, viewgraphs, film, technical papers, photographs, etc. If the document contains export-controlled technical data, it also must be marked with an export control warning statement. Distribution statements can be applied to technical data that contain or reveal proprietary information used.
b. Technical data categorized as cryptographic/communications security, communications/electronic intelligence, and similar categories as may be designated by the Director, National Security Agency, whose distribution is limited through alternate methods, are exempt from these marking provisions.
c. Certain types of technical data preclude placing the entire notice on the document. To accommodate this problem, each distribution statement contains an authorized abbreviation form. Abbreviated distribution statements are to be used only when space precludes placing the entire notice on the document. The use and wording of these statements are described in the following paragraphs.
Distribution Statements
The following statement, also found in, (Block 9 of the CDRL), regarding distribution must appear on the cover and title page of each document submitted, including the first sheet of each drawing.
DISTRIBUTION STATEMENT D
"DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE (DOD) AND
U.S. DOD CONTRACTORS ONLY: (CRITICAL TECHNOLOGY); (13 Feb 15).
OTHER REQUESTS SHALL BE REFERRED TO THE (B-52 Training Systems Program Office (AFLCMC/WNS), 2300 D Street, WPAFB, OH 45433-7249).”
The abbreviated form is: “Statement D, DoD & DoD Contractors, (AFLCMC/WNSA).”
Controlling Office
The following address will be used on all documentation for the “controlling office” for this program:
AFLCMC/WNSA
Simulators Division 2300 D Street, Bldg. 32
WPAFB, OH 45433-7240
Export-Controlled Warning Statement Besides a distribution statement, the marking system also requires the use of a warning notice on all documents that contain export-controlled technical data. That notice may be used in conjunction with any of the six limited distribution statements (“B”, “C”, “D”, “E”, “F” and “X”.) Statement “A” , which denotes public release, cannot be used in conjunction with the export-control warning notice.
Destruction Notice All unclassified technical data marked with distribution statements “B”, “C”, “D”, “E”, “F” or “X” shall be handled and destroyed as “For Official Use Only” (FOUO) documents, in accordance with DoD 5400.7-R. Classified data and classified limited technical data shall be handled and destroyed in accordance with the procedures in Chapter IX of DoD 5200.1-R “Information Security Program Regulation” or follow the procedures in DoD 5220.22-M “Industrial Security Manual”.
"WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE
EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT
(TITLE 22, U.S.C., SEC 2751 ET SEQ.) OR THE EXPORT
ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C.. APP.
2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT
TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE
WITH THE PROVISIONS OF DOD 5230.25.
MAILING LISTS
The Government will provide the following information for each recipient identified in Block 14: Office symbol, mailing address, point of contact, e-mail and phone number.
OFFICE SYMBOL MAILING ADDRESS
AFLCMC/WNSA AFLCMC/WNSA
2300 D Street, Bldg 32 Wright-Patterson AFB OH 45433-7249 mailto:Phillip.Hangen@us.af.mil
AFLCMC/WNSE AFLCMC/WNSA
2300 D Street, Bldg 32
Wright-Patterson AFB OH 45433-7249 mailto:Pamela.bernard.ctr@us.af.mil mailto:Ashley.Robinson.19@us.af.mil
AFLCMC/WNSK AFLCMC/WNSK
2300 D Street, Bldg 32 Wright-Patterson AFB OH 45433-7249 mailto:David.Moorehead@us.af.mil mailto:Tonya.Hylton@us.af.mil
AFLCMC/WNSL AFLCMC/WNSL
2300 D Street, Bldg 32 Wright-Patterson AFB OH 45433-7249 mailto:Larry.Brown@us.af.mil mailto:Aaron.Yeager.2@us.af.mil
ACO DCMA Dayton -ACAD Bldg 30, Area A 1725 Van Patton Drive Wright-Patterson AFB OH 45433-5302 mailto:David.Schlatter@dcma.mil
DET3 Det 3, 29 TSS/PO 45 Kenney Ave, STE 217
Barksdale AFB LA 71110 mailto:donald.schlaht@us.af.mil
5 OSS 5 OSS/OST
476 Trainer Trail Minot AFB ND 58705 James.Hogan.4@us.af.mil mailto:Phillip.Hangen@us.af.mil mailto:Pamela.bernard.ctr@us.af.mil mailto:Ashley.Robinson.19@us.af.mil mailto:David.Moorehead@us.af.mil mailto:Tonya.Hylton@us.af.mil mailto:gerardo.beltran.2@us.af.mil mailto:Aaron.Yeager.2@us.af.mil mailto:David.Schlatter@dcma.mil mailto:donald.schlaht@us.af.mil mailto:James.Hogan.4@us.af.mil
2 OSS 2 OSS/OSO
415 Davis Ave East Barksdale AFB LA 71110 mailto:grady.woosley@us.af.mil
AFLCMC/WWVM AFLCMC/WWVM
3001 Staff Drive, STE 2AF196A Tinker AFB, OK 73145 mailto:J.Nauman@tinker.af.mil
AFGSC/A3TO HQ AFGSC/A3TO
245 Davis Ave East Barksdale AFB LA 71110
Ivan.Ware.2@us.af.mil
AFGSC/A5B HQ AFGSC/A5B
841 Fairchild Ave, Bldg 5541 STE 109 Barksdale AFB, LA 71110 Daniel.Willson.5@us.af.mil
AFLCMC/EZAS AFLCMC/WNSK
2300 D Street, Bldg 32 Wright-Patterson AFB OH 45433-7249
Frances.Vucic.2.ctr@us.af.mil craig.siefert@us.af.mil
OSD CAPE Http://dcarc.pae.osd.mil mailto:grady.woosley@us.af.mil mailto:J.Nauman@us.af.mil mailto:Ivan.Ware.2@us.af.mil mailto:Daniel.Willson.5@us.af.mil mailto:Frances.Vucic.2.ctr@us.af.mil mailto:craig.siefert@us.af.mil
SET NAME: B-52 TRAINING SYSTEMS SUPPORT SYSTEM
ITEM:
B-52 TS
PROGRAM: Simulators
DATA ITEM REQUIRING
OFFICE
AUTHORITY/TITLE/SUBTITLE PWS PARAGRAPH
A001 AFLCMC/WNSE DI-ADMN-80925 PWS Para: 2.2.2, 2.2.3, 2.2.5.1, 2.2.5.2.1, 2.2.7.4.4, 4.3.7
REVISIONS TO EXISTING GOVERNMENT
DOCUMENTS
A002 AFLCMC/WNSA DI-ADMN-81249A
CONFERENCE AGENDA
PWS Para: 2.1.6, 2.1.6.1, 2.1.6.2, 2.2.5.3, 2.2.5.3.1, 2.2.5.3.2, 2.2.5.3.3, 2.2.5.3.4, 2.2.8.4.1, 2.2.8.4.3, 2.2.8.4.4, 2.2.8.7.3, 4.2.2
A003 AFLCMC/WNSA DI-ADMN-81250A
CONFERENCE MINUTES
PWS Para: 2.1.3.4, 2.1.6, 2.1.6.1, 2.1.6.2, 2.2.5.3, 2.2.5.3.1, 2.2.5.3.2, 2.2.5.3.3, 2.2.5.3.4, 2.2.8.4.1, 2.2.8.4.3, 2.2.8.4.4, 2.2.8.7.3, 4.2.2, A004 AFLCMC/WNSE DI-ADMN-81401B/T PWS Para: 2.1.16, 2.2.7.2, 6.3.4, 6.4
CONTRACT CHANGE PROPOSAL (CCP)
A005 AFLCMC/WNSE DI-ALSS-81535 PWS Para: 2.2.7.7
DEFICIENCY REPORT (DR)
A006 AFLCMC/WNSE DI-CMAN-80639C/T PWS Para: 2.2.7.2, 4.0, 4.2, 4.2.1, 6.3.4, 6.4
ENGINEERING CHANGE PROPOSAL (ECP)
A007 AFLCMC/WNSE DI-CMAN-80640C PWS Para: 2.2.5.2.1, 2.2.7.2
REQUEST FOR DEVIATION (RFD)
A008 AFLCMC/WNSE DI-CMAN-80858B PWS Para: 2.2.7, 2.2.7.4
CONTRACTOR'S CONFIGURATION MANAGEMENT
PLAN
A009 AFLCMC/WNSE-CM DI-CMAN-81253A PWS Para: 2.2.7.3
CONFIGURATION STATUS ACCOUNTING
INFORMATION
A010 AFLCMC/WNSF DI-FNCL-81831/T PWS Para: 2.1.3.3
CONTRACTOR SUSTAINMENT REPORT
A011 AFLCMC/WNSE DI-ILSS-80134A
PROPOSED SPARE PARTS LIST
PWS Para: 4.0
A012 AFLCMC/WNSA DI-ILSS-80191D/T PWS Para: 3.1.2, 3.12.1
CONTRACTOR DEVICE PERFORMANCE REPORT
A013 AFLCMC/WNSE DI-IPSC-81435A PWS Para: 2.2.5.1
SOFTWARE DESIGN DESCRIPTION
A014 AFLCMC/WNSL TM-86-01 See attachment PWS Para: 2.2.5.2.1, 4.3.6, 4.3.7
TECHNICAL MANUALS/TIME COMPLIANT
TECHNICAL ORDERS
TECHNICAL ORDER (TM/TCTO)
A015 AFLCMC/WNSE DI-IPSC-81443A PWS Para: 2.2.5.1
SOFTWARE USERS MANUAL (SUM)
A016 AFLCMC/WNSE DI-IPSC-81446A PWS Para: 2.2.5.1
COMPUTER OPERATION MANUAL (COM)
A017 AFLCMC/WNSE DI-IPSC-81447A PWS Para: 2.2.5.1
COMPUTER PROGRAMMING MANUAL (CPM)
A018 AFLCMC/WNSE DI-IPSC-81448B PWS Para: 2.2.5.1
FIRMWARE SUPPORT MANUAL (FSM)
A019 AFLCMC/WNSA DI-MGMT-80004A PWS Para: 2.1.1, 2.1.24
MANAGEMENT PLAN (MP)
A020 AFLCMC/WNSE DI-MGMT-80061A PWS Para: 4.3.3
ENGINEERING AND TECHNICAL SERVICES
ACCOMPLISHMENT REPORT
A021 AFLCMC/WNSA DI-MGMT-80227/T PWS Para: 2..1.3.6, 2.2.8.3, 4.3.4
CONTRACTORS PROGRESS, STATUS AND
MANAGEMENT REPORT
A022 AFLCMC/WNSL DI-MGMT-80269 PWS Para: 3.9
STATUS OF GFE REPORT
A023 AFLCMC/WNSA DI-MGMT-81334D PWS Para: 2.1.3.2, 4.2.1
CONTRACT WORK BREAKDOWN STRUCTURE
A024 AFLCMC/WNSE DI-MGMT-81453A/T PWS Para: 2.1.2, 2.1.7, 2.1.17, 2.1.20, 2.2.3, 2.2.5.1, 2.2.5.2.1, 2.2.7.4.3, 2.2.7.7, 2.2.10, 2.210.1, 2.2.10.5, 6.1.1, 6.1.2
A025 AFLCMC/WNSF DI-MGMT-81468/T PWS Para: 2.1.3.1
CONTRACT FUNDS STATUS REPORT
A026 AFLCMC/WNSL DI-MGMT-81749A/T PWS Para: 2.1.3.7
50/50 REQUIREMENT REPORT
A027 AFLCMC/WNSL DI-MGMT-81804A PWS Para: 2.1.7.6
ITEM UNIQUE IDENTIFICATION (IUID) MARKING
ACTIVITY VALID AND VERIF REPORT
A028 AFLCMC/EZAS DI-MGMT-81844/T PWS Para: 2.1.10.9
INFORMATION ASSURANCE TEST PLAN
A029 AFLCMC/EZAS DI-MGMT-81845/T PWS Para: 2.1.10.4, 2.1.10.7, 2.1.10.8, 4.0
INFORMATION ASSURANCE (IA) DESIGN REVIEW
INFORMATION PACKAGE
A030 AFLCMC/WNSF DI-MGMT-81861/T PWS Para: 2.1.2, 2.1.3.2
INTEGRATED PROGRAM MANAGEMENT RPT
A031 AFLCMC/WNSL DI-MGMT-81941/T PWS Para: 2.2.6
OBSOLESCENCE ALERT NOTICE
A032 AFLCMC/EZAS PWS Para: 2.1.10.8, 4.0
A033 AFLCMC/WNSE PWS Para: 4.3.6
DI-MISC 80841
SECURITY VULNERABILITY ANALYSIS
DI-MISC-80393A
MASTER DOCUMENTS LIST (MDL)
A034 AFLCMC/EZAS
AFLCMC/WNSA
DI-MISC-80508B PWS Para: 2.1.10, 2.1.16, 2.1.16.1, 2.1.16.2, 2.1.16.3, 2.1.16.4, 4.3.9, 4.4, 6.2.1, 6.3.1
TECHNICAL REPORT-STUDY/SERVICES
A035 AFLCMC/EZAS DI-MISC-80711A PWS Para: 2.1.10.6
SCIENTIFIC AND TECHNICAL REPORTS
A036 AFLCMC/WNSE DI-MISC-80748/T PWS Para: 4.0, 4.3.8, 4.3.10
ENGINEERING SERVICES MEMORANDUM (ESM)
DATA ACCESSION LIST
A037 AFLCMC/EZAS DI-MISC-81832 PWS Para: 2.1.10.6
COUNTERFEIT PREVENTION PLAN
A038 AFLCMC/WNSE DI-NDTI-80603A PWS Para: 2.2.2, 2.2.8.2, 2.2.8.4.2
TEST PROCEDURES
A039 AFLCMC/WNSE DI-NDTI-80809B PWS Para: 2.1.10.9, 2.2.8.9
TEST/INSPECTION REPORT
A040 AFLCMC/WNSE DI-QCIC-80553A/T PWS Para: 2.2.2, 2.2.8.1, 2.2.8.4.2
ACCEPTANCE TEST PLAN
A041 AFLCMC/WNSE DI-SESS-81000E PWS Para: 2.2.5.2.1, 2.2.7.4.4
PRODUCT DRAWINGS MODELS AND ASSOCIATED
LISTS
A042 AFLCMC/WNSE DI-SESS-81785 PWS Para: 2.1.9, 2.2.1, 2.2.2, 2.2.8
SYSTEM ENGINEERING MANAGEMENT PLAN
A043 AFLCMC/WNSL DI-PACK-80120C PWS Para: 2.1.14.1
PRESERVATION AND PACKAGING DATA
A044 AFLCMC/WNSL DI-PACK-80877A/T PWS Para: 2.1.14.2
TRANSPORTATION DATA REPORT
A045 AFLCMC/WNSL PWS Para: 2.1.25, 2.2.5.2.1, 3.12, 3.14, 6.2.3, 6.3.2
DI-MISC-81107
INNVENTORY/UTILIZATION DATA REPORT
A046 AFLCMC/WNSE DI-IPSC-81437A PWS Para: 2.2.7.5
DATABASE DESIGN DESCRIPTION
A047 AFLCMC/WNSL DI-MGMT-81803
ITEM UNIQUE IDENTIFICATION (IUID)
MARKING PLAN
PWS Para: 2.2.7.6
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
B-52 TS
E. CONTRACT/PR NO.
FA8621-15-R-6338
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-80925
5. CONTRACT REFERENCE
SEE BLK 16
6. REQUIRING OFFICE
AFLCMC/WNSE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
Block 4: This data item shall be used to update and maintain the listing of B-52 legacy documentation
Block 5: PWS paragraph references as follow: 2.2.2, 2.2.3, 2.2.5.1, 2.2.5.2.1, 2.2.7.4.4, 4.3.7 Block 8: Approval will be via eMail notification from PCO
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (CRITICAL TECHNOLOGY) (13 Feb 15). Other requests shall be referred to the B-52 Training Systems Program Office, (AFLCMC/WNS), 2300 D Street, Bldg 32, Wright Patterson AFB, Ohio 45433-7249
Blocks 10 & 12:
a. For PWS Para 2.2.2: The final delivery shall be no later than 30 days after receipt of Government System Verification Review/Physical Configuration Audit (SVR/PCA) completion
b. Revisions as required to maintain the training system and Training Systems Support Center
(TSSC) data in a current status for each training device configuration and location
Block 14: Electronic media shall be the only method of CDRL delivery. The contractor will notify all government CDRL recipients when the CDRL is available for delivery. CDRLs shall be formatted in Microsoft Office 2010 (or later) unless specifically noted on the CDRL specific DD Form 1423-1
AFLCMC/WNSA 0 1 0
AFLCMC/WNSE 0 1 0
AFLCMC/WNSK 0 1 0
DET 3 0 1 0
15. TOTAL 0 4 0
G. PREPARED BY
Teresa Zack WNSE/Lead Configuration Manager
H. DATE I. APPROVED BY
Philip C. Hangen B-52 Program Manager
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
B-52 TS
E. CONTRACT/PR NO.
FA8621-15-R-6338
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
CONFERENCE AGENDA
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81249A
5. CONTRACT REFERENCE
SEE BLK 16
6. REQUIRING OFFICE
AFLCMC/WNSA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor format for content is acceptable
Block 5: PWS paragraph references as follow: 2.1.6, 2.1.6.1, 2.1.6.2, 2.2.5.3, 2.2.5.3.1, 2.2.5.3.2, 2.2.5.3.3, 2.2.5.3.4, 2.2.8.4.1, 2.2.8.4.3, 2.2.8.4.4, 2.2.8.7.3, 4.2.2
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (CRITICAL TECHNOLOGY) (13 Feb 15). Other requests shall be referred to the B-52 Training Systems Program Office, (AFLCMC/WNS), 2300 D Street, Bldg 32, Wright Patterson AFB, Ohio 45433-7249
Block 12. Final Conference Agenda shall be submitted at least 10 working days prior to the conference or meeting
Block 14: Electronic media shall be the only method of CDRL delivery. The contractor will notify all government CDRL recipients when the CDRL is available for delivery. CDRLs shall be formatted in Microsoft Office 2010 (or later) unless specifically noted on the CDRL specific DD Form 1423-1
AFLCMC/WNSA 0 1 0
AFLCMC/WNSK 0 1 0
AFLCMC/WWVM 0 1 0
DET 3 0 1 0
AFGSC/A3TO 0 1 0
AFGSC/AB5 0 1 0
2 OSS 0 1 0
5 OSS 0 1 0
15. TOTAL 0 8 0
G. PREPARED BY
Teresa Zack WNSE/Lead Configuration Manager
H. DATE I. APPROVED BY
Phillip C. Hangen B-52 Program Manager
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
B-52 TS
E. CONTRACT/PR NO.
FA8621-15-R-6338
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
CONFERENCE MINUTES
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250A
5. CONTRACT REFERENCE
SEE BLK 16
6. REQUIRING OFFICE
AFLCMC/WNSA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor format for content is acceptable
Block 5: PWS paragraph references as follow: 2.1.3.4, 2.1.6, 2.1.6.1, 2.1.6.2, 2.2.5.3, 2.2.5.3.1, 2.2.5.3.2, 2.2.5.3.3, 2.2.5.3.4, 2.2.8.4.1, 2.2.8.4.3, 2.2.8.4.4, 2.2.8.7.3, 4.2.2, Block 8: Approval will be via eMail notification from PCO
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (CRITICAL TECHNOLOGY) (13 Feb 15). Other requests shall be referred to the B-52 Training Systems Program Office, (AFLCMC/WNS), 2300 D Street, Bldg 32, Wright Patterson AFB, Ohio 45433-7249
Blocks 10 & 12:
a. Conference and meeting minutes shall be submitted for all meetings that involve Government personnel. Minutes shall be submitted no later than 7 working days after the meeting or conference
Block 14: Electronic media shall be the only method of CDRL delivery. The contractor will notify all government CDRL recipients when the CDRL is available for delivery. CDRLs shall be formatted in Microsoft Office 2010 (or later) unless specifically noted on the CDRL specific DD Form 1423-1
AFLCMC/WNSA 0 1 0
AFLCMC/WNSK 0 1 0
AFLCMC/WWVM 0 1 0
DET 3 0 1 0
AFGSC/A3TO 0 1 0
AFGSC/A5B 0 1 0
2 OSS 0 1 0
5 OSS 0 1 0
15. TOTAL 0 8 0
G. PREPARED BY
Teresa Zack WNSE/Lead Configuration Manager
H. DATE I. APPROVED BY
Phillip C. Hangen B-52 Program Manager
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
B-52 TS
E. CONTRACT/PR NO.
FA8621-15-R-6338
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
CONTRACT CHANGE PROPOSAL (CCP)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81401B/T
5. CONTRACT REFERENCE
SEE BLK 16
6. REQUIRING OFFICE
AFLCMC/WNSE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
BLK16
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor format for content is acceptable. This data item shall be tailored as follows:
a. All CCPs submitted shall include a statement addressing compliance with all applicable clauses of the contract including, but not limited to DFARS 252.227-7028 TECHNICAL DATA
OR COMPUTER SOFTWARE PREVIOUSLY DELIVERED TO THE GOVERNMENT
b. All CCPs submitted shall include an assertion statement in accordance with DFARS
252.227-7017 IDENTIFICATION AND ASSERTION OF USE, RELEASE, OR DISCLOSURE
RESTRICTIONS that, at a minimum, itemizes each individual hardware, software, firmware, technical documentation and/or other deliverable
c. All CCPs submitted shall be firm/fixed price (FFP) or cost per current CLIN structure
1) For proposals less than $10,000,000, the price shall be valid for not less than 180 calendar days
2) For proposals greater than or equivalent to $10,000,000, the price shall be valid for not less than 270 calendar days
d. The contractor shall flow down requirements to all subcontractors as required
e. The CCP shall consist of the following two sections:
1) Technical Section:
a) Changes to any contractual document (i.e. Management Plan, SEMP, CDRL(s), etc.). All changes shall be shown with tracked changes
b) Program execution schedule (as required)
2) Cost Section:
a) Information previously found on Standard Form (SF) 1411
(b) Cost/Price Summary:
AFLCMC/WNSA 0 1 0
AFLCMC/WNSE 0 1 0
AFLCMC/WNSK 0 1 0
AFLCMC/WWVM 0 1 0
DET 3 0 1 0
15. TOTAL 0 5 0
G. PREPARED BY
Teresa Zack WNSE/Lead Configuration Manager
H. DATE I. APPROVED BY
Phillip C. Hangen B-52 Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
B-52 TS
E. CONTRACT/PR NO.
FA8621-15-R-6338
F. CONTRACTOR
TBD
16. REMARKS (Continued)
1) The cost volume shall contain Basis of Estimates (BOEs) for each CLIN that provide rationale with technical depth of information. Travel back-up data shall be traceable to the associated BOE. The entire proposal shall be traceable to the pricing runs. The following pricing runs are necessary for the government to provide visibility and allow for accurate pricing: a summary run of the entire proposal(all CLINs) with all Calendar Years (CYs) of effort combined, a summary run for each CLIN with all CYs of effort combined and a run for each CLIN for each CY of effort shown separately. Subcontract, material, and other direct cost back-up shall be traceable to back-up data, BOEs, and the pricing runs. Any effort already completed shall be clearly identified and supported
2) Pricing rates/factors and cost spreadsheets shall be in MS Excel compatible format with the ability to copy and paste the data. The electronic copy must include working models of the cost proposal that is based on the contractor's estimating methodologies used in the proposal. For example, if input parameters change, the Excel model should automatically recalculate the new pricing.
Explanation of the formulas/calculations for cells and association with the information in the spreadsheet is required. Provide traceability for all cost dollars and supporting information
3) Proposed rates shall be based upon the current Forward Pricing Rate Agreement (FPRA) with the Defense Contract Management
Agency (DCMA) where applicable. If contractor includes unapproved rates, supplemental data substantiating these rates shall be provided
Block 5: PWS paragraph references as follow: 2.1.16, 2.2.7.2, 6.3.4, 6.4
Block 8: Approval shall be via CCP award
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (CRITICAL TECHNOLOGY) (13 Feb 15). Other requests shall be referred to the B-52 Training Systems Program Office, (AFLCMC/WNS), 2300 D Street, Bldg 32, Wright Patterson AFB, Ohio 45433-7249
Block 12: Submittal shall be NLT (45) calendar days after government request unless mutually agreed and/or otherwise specified in a PCO letter
Block 14: Electronic media shall be the only method of CDRL delivery. The contractor will notify all government CDRL recipients when the CDRL is available for delivery. CDRLs shall be formatted in Microsoft Office 2010 (or later) unless specifically noted on the CDRL specific DD Form 1423-1
DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER ALSS
D. SYSTEM/ITEM
B-52 TS
E. CONTRACT/PR NO.
FA8621-15-R-6338
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
DEFICIENCY REPORT (DR)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-ALSS-81535
5. CONTRACT REFERENCE
PWS Para: 2.2.7.7
6. REQUIRING OFFICE
AFLCMC/WNSE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft Final
Reg Repro
16. REMARKS
Block 4. Contractor format for content is acceptable
Block 8: Approval will be via eMail notification from PCO
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (CRITICAL TECHNOLOGY) (13 Feb 15). Other requests shall be referred to the B-52 Training Systems Program Office, (AFLCMC/WNS), 2300 D Street, Bldg 32, Wright Patterson AFB, Ohio 45433-7249
Blocks 12: The contractor shall report the results of final investigations NLT 14 calendar days after completion of the analysis
Block 14: Electronic media shall be the only method of CDRL delivery. The contractor will notify all government CDRL recipients when the CDRL is available for delivery. CDRLs shall be formatted in Microsoft Office 2010 (or later) unless specifically noted on the CDRL specific DD Form 1423-1
AFLCMC/WNSA 0 1 0
AFLCMC/WNSE 0 1 0
AFLCMC/WNSK 0 1 0
AFLCMC/WWVM 0 1 0
DET 3 0 1 0
AFGSC/A3TO 0 1 0
AFGSC/A5B 0 1 0
2 OSS 0 1 0
5 OSS 0 1 0
15. TOTAL 0 9 0
G. PREPARED BY
Teresa Zack WNSE/Lead Configuration Manager
H. DATE I. APPROVED BY
Phillip C. Hangen B-52 Program Manager
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER CMAN
D. SYSTEM/ITEM
B-52 TS
E. CONTRACT/PR NO.
FA8621-15-R-6338
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
ENGINEERING CHANGE PROPOSAL (ECP)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80639C/T
5. CONTRACT REFERENCE
SEE BLK16
6. REQUIRING OFFICE
AFLCMC/WNSE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
BLK16
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft Final
Reg Repro
16. REMARKS
Block 4: Contractor format for content is acceptable. This data item shall be tailored as follows:
a. All ECPs submitted shall include a statement addressing compliance with all applicable clauses of the contract including, but not limited to DFARS 252.227-7028 TECHNICAL DATA
OR COMPUTER SOFTWARE PREVIOUSLY DELIVERED TO THE GOVERNMENT
b. All ECPs submitted shall include an assertion statement in accordance with DFARS
252.227-7017 IDENTIFICATION AND ASSERTION OF USE, RELEASE, OR DISCLOSURE
RESTRICTIONS that, at a minimum, itemizes each individual hardware, software, firmware, technical documentation and/or other deliverable
c. All ECPs submitted shall be Firm Fixed Price (FFP), or Fixed Price Incentive Firm (FPIF) or cost per current CLIN structure
1) For proposals less than $10,000,000, the price shall be valid for not less than 180 calendar days
2) For proposals greater than or equivalent to $10,000,000, the price shall be valid for not less than 270 calendar days
d. The contractor shall flow down requirements to all subcontractors as required
e. The ECP shall consist of the following two sections:
1) Technical Section:
a) Changes to any contractual document (i.e. Management Plan, CDRL(s), etc.). All changes shall be shown with tracked changes
b) Program execution schedule as required
2) Cost Section:
a) Information previously found on Standard Form (SF) 1411
b) Cost/Price Summary:
AFLCMC/WNSA 0 1 0
AFLCMC/WNSE 0 1 0
AFLCMC/WNSK 0 1 0
AFLCMC/WWVM 0 1 0
DET 3 0 1 0
15. TOTAL 0 5 0
G. PREPARED BY
Teresa Zack WNSE/Lead Configuration Manager
H. DATE I. APPROVED BY
Phillip C. Hangen B-52 Program Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER CMAN
D. SYSTEM/ITEM
B-52 TS
E. CONTRACT/PR NO.
FA8621-15-R-6338
F. CONTRACTOR
TBD
16. REMARKS (Continued)
1) The cost volume shall contain Basis of Estimates (BOEs) for each CLIN that provide rationale with technical depth of information. Travel back-up data shall be traceable to the associated BOE. The entire proposal shall be traceable to the pricing runs. The following pricing runs are necessary for the government to provide visibility and allow for accurate pricing: a summary run of the entire proposal (all CLINs) with all Calendar Years (CYs) of effort combined, a summary run for each CLIN with all CYs of effort combined and a run for each CLIN for each CY of effort shown separately. Subcontract, material, and other direct cost back-up shall be traceable to back-up data, BOEs, and the pricing runs. Any effort already completed shall be clearly identified and supported
2) Pricing rates/factors and cost spreadsheets shall be in MS Excel compatible format with the ability to copy and paste the Data. The electronic copy must include working models of the cost proposal that is based on the contractor's estimating methodologies used in the proposal. For example, if input parameters change, the Excel model should automatically recalculate the new pricing. Explanation of the of the formulas/calculations for cells and association with the information in the spreadsheet is required. Provide traceability for all cost dollars and supporting information
3) Proposed rates shall be based upon the current Forward Pricing Rate Agreement (FPRA) with the Defense Contract Management Agency
(DCMA) where applicable. If contractor includes unapproved rates, supplemental data substantiating these rates shall be provided
Block 5: PWS paragraph references as follow: 2.2.7.2, 4.0, 4.2, 4.2.1, 6.3.4, 6.4
Block 8: Approval shall be via contract ECP award
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (CRITICAL TECHNOLOGY) (13 Feb 15). Other requests shall be referred to the B-52 Training Systems Program Office, (AFLCMC/WNS), 2300 D Street, Bldg 32, Wright Patterson AFB, Ohio 45433-7249
Block 12: Submittal shall be NLT fourty-five (45) calendar days after government request unless mutually agreed and/or otherwise specified in the PCO letter
Block 14: Electronic media shall be the only method of CDRL delivery. The contractor will notify all government CDRL recipients when the CDRL is available for delivery. CDRLs shall be formatted in Microsoft Office 2010 (or later) unless specifically noted on the CDRL specific DD Form 1423-1
DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER CMAN
D. SYSTEM/ITEM
B-52 TS
E. CONTRACT/PR NO.
FA8621-15-R-6338
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
REQUEST FOR DEVIATION (RFD)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80640C
5. CONTRACT REFERENCE
SEE BLOCK 16
6. REQUIRING OFFICE
AFLCMC/WNSE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor format for content is acceptable. Use MIL-HDBK-61A as a guide
Block 5: PWS paragraph references as follow: 2.2.5.2.1, 2.2.7.2
Block 8. Approval will be via Government Configuration Control Board (CCB) decision and contract modification
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (CRITICAL TECHNOLOGY) (13 Feb 15). Other requests shall be referred to the B-52 Training Systems Program Office, (AFLCMC/WNS), 2300 D Street, Bldg 32, Wright Patterson AFB, Ohio 45433-7249
Block 14: Electronic media shall be the only method of CDRL delivery. The contractor will notify all government CDRL recipients when the CDRL is available for delivery. CDRLs shall be formatted in Microsoft Office 2010 (or later) unless specifically noted on the CDRL specific DD Form 1423-1
AFLCMC/WNSA 0 1 0
AFLCMC/WNSE 0 1 0
AFLCMC/WNSK 0 1 0
AFLCMC/WWVM 0 1 0
DET 3 0 1 0
15. TOTAL 0 5 0
G. PREPARED BY
Teresa Zack WNSE/Lead Configuration Manager
H. DATE I. APPROVED BY
Phillip C. Hangen B-52 Program Manager
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER CMAN
D. SYSTEM/ITEM
B-52 TS
E. CONTRACT/PR NO.
FA8621-15-R-6338
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
CONTRACTOR'S CONFIGURATION MANAGEMENT PLAN
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80858B
5. CONTRACT REFERENCE
PWS Para: 2.2.7, 2.2.7.4
6. REQUIRING OFFICE
AFLCMC/WNSE
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor format for content is acceptable
Block 8: Approval will be via eMail notification from PCO
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (CRITICAL TECHNOLOGY) (13 Feb 15). Other requests shall be referred to the B-52 Training Systems Program Office, (AFLCMC/WNS), 2300 D Street, Bldg 32, Wright Patterson AFB, Ohio 45433-7249
Blocks: 10, 12&13: Initial plan shall be submitted within 90 calandar days after base period award. Subsequent submissions as required
Block 14: Electronic media shall be the only method of CDRL delivery. The contractor will notify all government CDRL recipients when the CDRL is available for delivery. CDRLs shall be formatted in Microsoft Office 2010 (or later) unless specifically noted on the CDRL specific DD Form 1423-1
AFLCMC/WNSA 0 1 0
AFLCMC/WNSE 0 1 0
AFLCMC/WNSK 0 1 0
DET 3 0 1 0
15. TOTAL 0 4 0
G. PREPARED BY
Teresa Zack WNSE/Lead Configuration Manager
H. DATE I. APPROVED BY
Phillip C. Hangen B-52 Program Manager
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
B-52 TS
E. CONTRACT/PR NO.
FA8621-15-R-6338
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
CONFIGURATION STATUS ACCOUNTING INFORMATION
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-81253A
5. CONTRACT REFERENCE
PWS Para: 2.2.7.3
6. REQUIRING OFFICE
AFLCMC/WNSE-CM
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
QRTLY
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor format for content is acceptable
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (CRITICAL TECHNOLOGY) (13 Feb 15). Other requests shall be referred to the B-52 Training Systems Program Office, (AFLCMC/WNS), 2300 D Street, Bldg 32, Wright Patterson AFB, Ohio 45433-7249
Blocks 10, 11, 12&13: The first submission shall occur 45 calendar days after the base period award. Subsequent submittals shall be quarterly thereafter.