Questions and Answers Set 4 McLaughlin B017.docx
DOCX document 23 KB Posted
- Solicitation number
- FA860424RB017
About this file
This document is a set of questions and answers regarding a federal contract opportunity for a Materials Handling System at McLaughlin Air National Guard Base in West Virginia.
The key details are:
- The contract opportunity is solicitation number FA8604-24-R-B017, set aside for small businesses with a NAICS code of 333922.
- The contract requirements include the performance, design, fabrication, installation, and testing of a Materials Handling System.
- The contract completion is required within 300 days from the date of award.
- Evaluation will be based on Lowest Price Technically Acceptable (LPTA).
- Proposals are due by 4:00 PM EDT on 16 August 2024.
- The government will only accept questions on the RFP until 9 August 2024 by 2:00 PM EDT.
- The contracting agency is the Department of the Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8604-22-R-B017
McLaughlin ANGB Question Set #4 6 August 2024 Question/Answer Response:
Please advise on the following:
Bin Shelving on 2nd Floor of Mezzanine:
Q: Does the wire cage that encloses the existing bin shelving remain or is it to be removed and replaced?
A: The wire cages around the perimeter of the 2nd floor mezzanine will remain.
Q: There are currently lights located in the aisles for the existing bin shelving located at 97”H above the floor. New bin shelving is at 99”. Are new lights required or will the existing lights be reused.
A: Existing lights may be reused.
Rack Supported Mezzanine Q: Existing lights are currently powered from an existing power box located on the North wall of the warehouse. Can power be run from the existing power panel or is a new box required.
A: Power can be run from the existing power panel Q: There are currently two LED light fixtures mounted above the existing Mezzanine. One at each end of the area. Are lights required for the upper level of the new mezzanine?
A: Existing LED lights fixtures should be reused for upper level lights.
Q: 3.2.6.4 Fire Suppression Design Analysis: If the analysis provided with the shop drawing determines that fire suppression is required for the rack supported mezzanine, is the Contractor responsible for implementing the fire suppression retrofit or will the Government Cover the cost of implementation and execution.
A: Current mezzanine does not have a fire suppression system and it is expected that the new one will not require one either. If a licensed professional Fire Protection Engineer says otherwise, then the base or government will review, and, if needed, look into options to cover the additional cost.